Você está na página 1de 1

Project No.

07322

We have examined this drawing but we do NOT accept


responsibility for dimensions, quantities, calculations or
methods of manufacture, nor do we imply that all relevant
information is necessarily shown.
The endorsement of this drawing does NOT in any way
constitute an instruction under the Contract nor does it
affect the responsibility of the Contractor under the
Contract.

This drawing is returned to the Contractor for the following


action:

A Carry out final check before proceeding with the works

B Attend to comments and resubmit

Rejected - Work not to proceed until this drawing is


C revised and resubmitted
Name: Date:
Sign:

for and on behalf of Aedas Pte Ltd

G F E D C B A
Date Received :
Date Returned :
Reviewed by :

A Approved

NCO B
C

H PARSONS BRINCKERHOFF PTE LTD

Date Received :
Date Returned :
Reviewed by :

A Approved

B
C

Arup Singapore Pte.Ltd

P01
300

ENLARGED PLAN @ ZONE 1 OUTSIDE OF D-WALL


SCALE 1:100

CPY CPY
CPY CPY E F
E F CPY CPY
E F

BMT BMT BMT BMT


C D BMT BMT C D B ISSUE FOR APPROVAL 10 OCT 14 JW NAM
C D A ISSUE FOR APPROVAL 02 APRIL 14 JW NAM

Issue Status: Issue For Approval


Sub-Contractor

Mechanical & Electrical Consultant

SECTION B SECTION C
SECTION A
Civil & Structural Consultant

Arup Singapore Pte Ltd


10 Hoe Chiang Road #26-01 Keppel Towers
Singapore 089315
Tel +65 6411 2500 Fax +65 6411 2501
CPY CPY www.arup.com
CPY CPY Hong Kong Singapore
CPY CPY E F E F
E F Main Contractor

BMT BMT
BMT
C
BMT
D
BMT
C
BMT
D
HYUNDAI
C D

Architect

10 Hoe Chiang Road,


#11-01 Keppel Towers, Singapore 089315
T +65 6734 4733 F +65 6734 6233
E singapore@aedas.com aedas.com
Design Consultant

Riverside, 22 Hester Road


London SW11 4AN
SECTION D SECTION E T +44 (0)20 7738 0455
SECTION F F +44 (0)20 7738 1107
Developer / Owner

South Beach Consortium Pte Ltd


38 Beach Road
Singapore 189767

CPY CPY Project


E F PROPOSED CONSERVATION & ADDITIONS AND
CPY CPY CPY CPY CPY CPY CPY CPY CPY CPY CPY CPY CPY ALTERATIONS TO EXISTING BLOCK 1, 9, 14 AND NCO
02 03 04 05 06 07 08 09 10 11 12 13 14 CLUB, AND NEW ERECTION OF 2 TOWER BLOCKS OF
BMT BMT 34 & 45 STOREY, 4 PODIUM BLOCKS AND 3 BASEMENT
C D LEVELS, COMPRISING OF HOTELS, OFFICES, RETAIL
BMT BMT BMT BMT BMT BMT BMT BMT BMT UNITS AND RESIDENTIAL DWELLING UNITS (TOTAL
01 02 03 04 05 06 07 08 09 190 UNITS) ON LOT 858K TS11 AT BEACH ROAD
(DOWNTOWN CORE PLANNING AREA)
Drawing Title

PODIUM WIDE
STRUCTURAL PLAN
1ST STOREY LEVEL OUT D-WALL ZONE 1-1

Project No: 07322 Scale: 1:200 @ A0 Drawn: Lee


Drawing No: Rev.#
HECSGSO_SD_TC_PDW_0454_01_STR