LOS ANGELES COMMUNITY COLLEGE DISTRICT

DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT


SUSTAINABLE BIUILDING PROGRAM

LEED™ POINT SUMMARY

Support from
Responsible
Consultant
Credit No.

Section
Credit/Prerequisite Description Submittals Required
(S)
Sustainable Sites

SPR1 Erosion and Sedimentation Control


Credits
S1 Site Selection
Do not build on land falling under
any of 5 criteria
S2 Urban Redevelopment
Minimum density 60,000 sf/acre
S3 Brownfield Redevelopment
S4 Alternative transportation
4.1 1/2 mile to rail station or within 1/4
mile 2 bus lines
4.2 Bicycle facilities and showers for 5%
occupants
4.3 Alternative fueling station for 3%
vehicles
4.4 Minimum parking by zoning, or no
new parking
S5 Reduced Site Disturbance
5.1 Limit site disturbance of natural
areas
5.2 Exceed local open space
requirements by 25%
S6 Stormwater Management

Form CC-0090 Page 1 of 11 Rev.1.23.2010


LOS ANGELES COMMUNITY COLLEGE DISTRICT
DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

LEED™ POINT SUMMARY

Support from
Responsible
Consultant
Credit No.

Section
Credit/Prerequisite Description Submittals Required
6.1 No net increase of water runoff from
existing or if >50% imperviousness,
decrease 25% stormwater runoff
6.2 Treatment system 80% tss, 40% tp
S7 Landscape and Design to reduce Heat Islands
7.1 Non-roof surfaces - Shade or low- Cut sheet showing reflectance value of sidewalk
albedo pavement
02751
OR

cut sheets for the pervious paving system,


02700 demonstrating that it is at least 50% pervious
7.2 Energy-Star compliant roof Cut sheet for roofing material, highlighting the
emissivity, the initial reflectance and the reflectance
07313, after 3 years.
07511,
07620
OR
cut sheets highlighting the green vegetated roof system

S8 Light Pollution Reduction


Do not exceed IESNA footcandle
levels and zero direct-beam
illumination leaves site
(W)
Water Efficiency
Credits
W1 Water Efficient Landscaping

Form CC-0090 Page 2 of 11 Rev.1.23.2010


LOS ANGELES COMMUNITY COLLEGE DISTRICT
DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

LEED™ POINT SUMMARY

Support from
Responsible
Consultant
Credit No.

Section
Credit/Prerequisite Description Submittals Required
high efficiency irrigation technology, Cut sheets for high-efficiency irrigation equipment
OR, use captured rain or recycled
site water for 50% reduction
1.1 02810
Use only captured rain or recycled
site water for an additional 50%
reduction (100% total reduction) of
potable water for site irrigation
needs, OR, do not install permanent
1.2 landscape irrigation systems.
W2 Innovative Wastewater Technologies
Reduce the use of municipally
provided potable water for building
sewage conveyance by a minimum
of 50%, OR, treat 100% of
wastewater on site to tertiary
standards.
W3 Water Use Reduction
Employ strategies that in aggregate Cut sheets for all water consuming fixtures necessary
use 20% less water than the water for the occupancy use of the building, with water
use baseline calculated for the conservation specifications highlighted to show that the
building (not including irrigation) fixtures meet or exceed fixture performance
after meeting Energy Policy Act of requirements of the Energy Policy Act of 1992 - for
1992 fixture performance baseline, refer to table 1 in 01101.1.03
requirements.

3.1 15050

Form CC-0090 Page 3 of 11 Rev.1.23.2010


LOS ANGELES COMMUNITY COLLEGE DISTRICT
DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

LEED™ POINT SUMMARY

Support from
Responsible
Consultant
Credit No.

Section
Credit/Prerequisite Description Submittals Required
Exceed the potable water use
reduction by an additional 10% (30%
3.2 total efficiency increase).
(E)
Energy and Atmosphere
Prerequisites
EPR1 Fundamental Building Systems Commissioning 01810 refer to the commissioning spec
EPR2 Minimum Energy Performance
Meet ASHRAE 90.1-1999 or local
code, whichever is more stringent.
EPR3 CFC Reduction in HVAC & R
Equipment
Use no CFC refrigerants in new Cut sheets from all HVAC&R equipment, highlighting
construction. Phase out in reused refrigerant data
systems.
15050
Credits
E1 Energy Efficiency
Exceed ASHRAE 90.1-1999 by 20%
new, 10% old
1.1
1.2 by 30% new, 20% old
1.3 by 40% new, 30% old
1.4 by 50% new, 40% old
1.5 by 60% new, 50% old
E2 Renewable Energy
5% total building energy load
Provide cut sheets for on-site renewable energy
2.1 16200 systems

Form CC-0090 Page 4 of 11 Rev.1.23.2010


LOS ANGELES COMMUNITY COLLEGE DISTRICT
DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

LEED™ POINT SUMMARY

Support from
Responsible
Consultant
Credit No.

Section
Credit/Prerequisite Description Submittals Required
10% total building energy load
Provide cut sheets for on-site renewable energy
2.2 16200 systems
20% total building energy load
Provide cut sheets for on-site renewable energy
2.3 16200 systems
E3 Additional Commission 01810 refer to the commissioning spec
E4 Elimination of HCFC's and Halons
cut sheets for all HVAC&R equipment, highlighting
15050 refrigerant data
E5 Measurement and Verification
See USDOE IPMVP Standards.

cut sheets of sensors and the data collection system


used to provide continuous metering per IPMVP
15050 standards
E6 Green Power
2 year contract with green-e labeled
power
(M) Conserving Materials and Resources

Prerequisites
MPR1 Storage & Collection of Recyclables
Credits
M1 Existing building rehabilitation
Maintain 75% of original structural
1.1 shell
Maintain 100% of original structural
1.2 shell

Form CC-0090 Page 5 of 11 Rev.1.23.2010


LOS ANGELES COMMUNITY COLLEGE DISTRICT
DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

LEED™ POINT SUMMARY

Support from
Responsible
Consultant
Credit No.

Section
Credit/Prerequisite Description Submittals Required
Maintain 100% of original structural
shell
1.3 AND 50% non-shell
M2 Construction waste management
Waste plan plus recycle or salvage Sellen construction waste management plan, refer to
at least 50% (by weight) of section 01505
construction, demolition, and land all
2.1 clearing waste. divisions
Recycle or salvage an additional Sellen construction waste management plan, refer to
25% (by weight) of construction, section 01505
demolition, and land clearing waste. all
2.2 divisions
M3 Resource reuse
Specify 5% salvaged or refurbished
materials

Divs 2- Cut sheets or submittals shall clearly indicate whether


3.1 12 the material is a salvaged or reused material
Specify additional 5% salvaged or
refurbished materials
3.2 GC to provide LEED Calculator spreadsheet
M4 Recycled content
Specify a minimum of 25% of
building materials that contain in
aggregate, a minimum of 20%
postconsumer recycled content Cut sheets shall clearly indicate whether the material
material, OR, a minimum 40% post- Divs 2- contains post-consumer or post-industrial recycled
4.1 industrial recycled content material. 12 materials or both.

GC to provide LEED Calculator spreadsheet

Form CC-0090 Page 6 of 11 Rev.1.23.2010


LOS ANGELES COMMUNITY COLLEGE DISTRICT
DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

LEED™ POINT SUMMARY

Support from
Responsible
Consultant
Credit No.

Section
Credit/Prerequisite Description Submittals Required
Specify an additional 25% (50%
total) of building materials that
contain in aggregate, a minimum of
20% post-consumer recycled
content material, OR, a minimum Cut sheets shall clearly indicate whether the material
40% post-industrial recycled content Divs 2- contains post-consumer or post-industrial recycled
4.2 material. 12 materials or both.
M5 Local / Regional Materials
20% materials manufactured within
5.1 500 miles
50% of the above 20% that are
extracted, harvested, or recovered
within 500 miles.
Cut sheets shall clearly indicate location of
Divs 2- manufacture, highlighting those materials manufactured
5.2 12 within a 500-mile radius.
M6 Rapidly Renewable Materials
Specify rapidly renewable building
materials for 5% of total building
materials. Divs 2- Cut sheets shall clearly indicate rapidly renewable
12 materials contained in the product
M7 Certified Wood

Form CC-0090 Page 7 of 11 Rev.1.23.2010


LOS ANGELES COMMUNITY COLLEGE DISTRICT
DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

LEED™ POINT SUMMARY

Support from
Responsible
Consultant
Credit No.

Section
Credit/Prerequisite Description Submittals Required
50% certified materials per FSC Cut sheets highlighting certified wood-based materials
installed. Provide wood certification documentation
from manufacturer declaring conformance with FSC
guidelines for certified wood building components.

06105,
06150,
06402,
08211,
09640,
(Q)
Indoor Environmental Quality
Prerequisites
QPR1 Minimum IAQ Performance
minimum requirements of voluntary
consensus standard ASHRAE 62-
1999.
QPR2 Environmental Tobacco Smoke (ETS) Control
Credits
Q1 Carbon Dioxide (CO2) Monitoring
15050 Cut sheets for CO2 sensors and monitoring system
Q2 Increase Ventilation Effectiveness
Provide for the effective delivery and
mixing of fresh air to building
occupants to support their health,
safety, and comfort.
Q3 Construction IAQ management plan

Form CC-0090 Page 8 of 11 Rev.1.23.2010


LOS ANGELES COMMUNITY COLLEGE DISTRICT
DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

LEED™ POINT SUMMARY

Support from
Responsible
Consultant
Credit No.

Section
Credit/Prerequisite Description Submittals Required
Prevent indoor air quality problems
resulting from the
construction/renovation process, to
sustain long term tradesman and
occupant health and comfort.
Cut sheets for all filtration media used during
construction, highlighting MERV values of at least 13.
Provide photographs of construction IAQ management
measures such as protection of ducts and on-site stored
3.1 1 & 15 or installed absorptive materials
Advanced Plan - reduce construction
contaminants specify flush out
3.2
Q4 Low-Emitting Materials
Meet VOC limits for adhesives,
sealants

all Cut sheet and MSDS for each adhesive and each
4.1 sections sealant used in the building, highlighting the VOC limits.
Meet VOC limits for paints and
coatings - green seal
Cut sheet and MSDS for each coating used, highlighting
4.2 09900 VOC and Chemical component limits.
Meet CRI's green label for carpet
systems
Cut sheets for each carpet system element installed,
4.3 09681 highlighting VOC limits.
No added urea-formaldehyde in
glues for composite wood products

Cut sheets for each composite wood or agrifiber product


4.4 06402 used, highlighting urea-formaldehyde resin limits

Form CC-0090 Page 9 of 11 Rev.1.23.2010


LOS ANGELES COMMUNITY COLLEGE DISTRICT
DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

LEED™ POINT SUMMARY

Support from
Responsible
Consultant
Credit No.

Section
Credit/Prerequisite Description Submittals Required
Q5 Indoor Chemical and Pollutant Source Control
Design to minimize cross-
contamination of general occupancy
areas by chemical pollutants.
12484 Cut sheet for the doorway walk off mats
Q6 Controllability of Systems
Provide a minimum of one operable Cut sheets for operable windows and lighting controls
window and one lighting control
zone per 200 s.f. for all occupied 08520,
areas within 15 feet of the perimeter 08800,
6.1 wall. 13800
Provide controls for each individual
for airflow, temperature, and lighting
for 50% of the non perimeter, 13800,
6.2 regularly occupied areas. 15050 cut sheets for airflow, temperature, and lighting controls
Q7 Thermal Comfort
Comply with ASHRAE Standard 55-
1992, Addenda 1995 for thermal
7.1 comfort
Install a permanent temperature and
humidity monitoring system
configured to provide operators
control over thermal comfort
performance and effectiveness of
humidification and/or
dehumidification systems in the cut sheets for the elements of the permanent
7.2 building. 15050 temperature and humidity monitoring system
Q8 Daylight and Views

Form CC-0090 Page 10 of 11 Rev.1.23.2010


LOS ANGELES COMMUNITY COLLEGE DISTRICT
DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

LEED™ POINT SUMMARY

Support from
Responsible
Consultant
Credit No.

Section
Credit/Prerequisite Description Submittals Required
Diffuse sunlight to reach 75% of all
regularly occupied spaces
8.1
Direct line of sight to vision glazing
while seated from 90% of all
8.2 regularly occupied spaces
TOTAL CORE CREDIT POINTS

(D)
D1 Innovation
D2 Innovation
D3 Innovation
D4 Innovation
D5 LEED Certified Designer

Form CC-0090 Page 11 of 11 Rev.1.23.2010