NVPILAR 2008
COST ESTIMATES
(D0 57 S.2002)

DIRECT COST INDIRECT COST

A. OVERHEAD EXPENSES – (6-7% CEILING)


A. COST OF MATERIALS DIRECT COST.
1. COST AT SOURCE, INCL. PROCESSING 1. ENGINEERING & ADMINISTRATIVE
ROYALTIES, LOCAL TAXES & ETC. SUPERVISION
2. EXPENSES FOR HAULING TO PROJ. SITE 2. TRANSPORTATION ALLOWANCES
3. HANDLING EXPENSES 3. OFFICE EXPENSES (EQPT & SUPPLIES)
4. STORAGE 4. CONTRACTORS ALL RISK INSURANCE
5. ALLOWANCE FOR WASTE/OR LOSSES 5. FINANCING COST INCL.
-PREMIUM ON BID SECURITY
-PREMIUM ON PERFORMANCE SECURITY
B. COST OF LABOR -PREMIUM/CHARGES ON CREDIT LINES
1. SALARIES & WAGES AS AUTHORIZED -COST OF MONEY TO FINANCE THE PROJ.
BY DOLE
2. FRINGE BENEFITS SUCH AS VACATION
& SICK LEAVES, GSIS & SSS CONTR. B. CONTINGENCY – 3-5% OF DC.
ALLOWANCES, BONUSES AND ETC.
C. MISCELLANEOUS – 1% OF DC.
INCLUDES LABORATORY TEST.
C. EQUIPMENT EXPENSES
1. RENTAL RATE SHALL BE BASED ON D. CONTRACTORS PROFIT
ACEL RATE AS APPRVD BY DPWH .
EST. DIRECT COST OCM PROFIT MOB/DEMOB MAX. TOTAL
OPERATED RENTAL RATE ARE
PREFERRED OVER BARE RENTAL RATE UP TO P1M. 13 15 1 29
2. MOB./DEMOB OF EQUIPMENT SHALL BE ABOVE P1M-5M 12 14 1 27
ON CASE TO CASE BASIS BUT IN NO ABOVE P5M-10M 12 13 1 26
CASE EXCEED 1% OF TOTAL CIVIL ABOVE P10M-20M 11 12 1 24
WORK ITEMS.
ABOVE P20M-50M 11 11 1 23
ABOVE P50M 10 10 1 21

VAT 3-5% PM Fee


NVPILAR 2008
“ THOSE WHO PREPARED/REVIEWED/CHECKED THE
ESTIMATES SHALL SEE TO IT THAT IN CASE THEY ARE
CALLED UPON TO MAKE GOOD THEIR ESTIMATES, THEY
CAN PERFORM THE JOB THEMSELVES AT THE COST THEY
HAVE GENERATED.”

NVPILAR 2008
PURPOSE
THIS DEPARTMENT ORDER SETS THE GUIDELINES, RULES AND PROCEDURES, TO
BE FOLLOWED BY ALL CONCERNED IN THE IMPLEMENTATION OF DEPARTMENT OF
LABOR AND EMPLOYMENT D.O. No. 13(DOLE D.O. No.13), SERIES OF 1998
OTHERWISE KNOWN AS THE “GUIDELINES GOVERNING OCCUPATIONAL SAFETY AND
HEALTH IN THE CONSTRUCTION INDUSTRY”, WITH EMPHASIS GIVEN ON THE
METHODOLOGY TO BE USED IN ESTIMATING THE COST OF CONSTRUCTION SAFETY
AND HEALTH PROGRAM AS REQUIRED IN SECTION 17.

GENERAL GUIDELINES
IN COMPLIANCE WITH SECTION 17 OF DOLE D.O. No. 13, THE IMPLENTATION OF
CONSTRUCTION SAFETY SHALL BE CONSIDERED IN ALL STAGES OF PROJECT
PROCUREMENT ( DESIGN, ESTIMATE, AND CONSTRUCTION ) AND ITS COST SHALL
BE INTEGRATED TO THE OVERALL PROJECT COST UNDER PAY ITEM “SPL-
CONSTRUCTION SAFETY AND HEALTH” AS A LUMPSUM AMOUNT, TO BE
QUANTIFIED IN THE DETAILED ESTIMATE. LIKEWISE, ALL REQUIREMENTS,
PROVISIONS, AND INSTRUCTIONS PERTAINING TO THE IMPLEMENTATION OF
CONSTRUCTION SAFETY AND HEALTH IN EVERY PROJECT SHALL BE INCLUDED IN
THE PROJECT BIDDING DOCUMENTS SPECIFICALLY UNDER THE INSTRUCTION TO
BIDDERS.

NVPILAR 2008
CONCTRUCTION PROJECT
(D.O. No. 56 S. 2005)

CONSTRUCTION SAFETY AND HEALTH PROGRAM ( CSHP )


THE REQUIRED CSHP FOR SPECIFIC PROJECT SHALL INCLUDE BUT NOT LIMITED TO THE FF :
1. COMPOSITION OF SAFETY & HEALTH PERSONNEL RESPONSIBLE FOR THE IMPLENTATION OF CSHP;
2. SPECIFIC SAFETY POLICIES W/C SHALL BE UNDERTAKEN IN THE CONSTRUCTION SITE INCLUDING
FREQUENCY OF & PERSONS RESPONSIBLE FOR CONDUCTING TOOL BOX AND GANG MEETING;
3. PENALTIES AND SANCTIONS FOR VIOLATIONS OF THE CSHP;
4. FREQUENCY, CONTENT AND PERSONS RESPONSIBLE FOR ORIENTING, INSTRUCTING AND TRAINING
ALL WORKERS AT THE SITE WITH REGARD TO THE CSHP WHICH THEY OPERATE; &
5. THE MANNER OF DISPOSING WASTE ARISING FROM THE CONSTRUCTION.

MANPOWER EQUIPMENT/FACILITIES

1. SAFETY ENGINEER / OFFICER


2. SAFETY MAN / OFFICER 1. PERSONAL PROTECTIVE EQUPMENT (PPE)
-AS RECOMMENDED BY DOLE, FOR EVERY -FOR GENERAL CONST. THE REQUIRED BASIC
CONST. PROJ. W 100 & ABOVE WORKERS, AN PPE FOR ALL WORKERS SHALL BE SAFETY
ACCREDTED SAFETY OFFICER BY DOLE-BWC HELMET, SAFETY GLOVES AND SAFETY SHOES.
SHALL BE EMPLOYED. ONLY THE COST FOR THE SPECIALTY PPE SHALL BE PROVIDED IN ADDITION
CONST. SAFETY & HEALTH OFICER , WHETHER ON TO OR IN LIEU OF THE CORRESPONDING PPE AS
FULL OR PART TIME BASIS ASSIGNED ON SITE THE WORK ACTIVITY REQUIRES.
SHALL BE INCLUDED IN THE ESTIMATE. 2. SIGNAGES AND BARRICADES
3. HEALTH PERSONNEL -SHALL BE PROVIDED AS A PRECAUTION TO
-ONLY THE MEDICAL AND DENTAL ADVICE THE WORKERS & THE GENERAL PUBLIC OF
PRACTITIONERS ACTUALLY ASSIGNED IN THE THE HAZARDS EXISTING AT THE WORKSITE.
PROJECT SHALL BE INCLUDED IN THE COST OF 3. FACILITIES
SAFETY. - W ADEQUTE SAFE DRINKING WATER; SANITARY
& WASHING FACILITIES: LIVING ACCOMODATIONS
FOR WORKERS.

COSTING
PAY ITEM “SPL – CONSTRUCTION SAFETY AND HEALTH” AS
A LUMP SUM AMOUNT, TO BE QUANTIFIED IN THE DETAILED
ESTIMATE.
NVPILAR 2008
SAFE CONDITION MANDATORY ACTION STOP OR
PROHIBITION

CAUTION OR RISK TRAFFIC AND ALERT RADIATION


HOUSEKEEPING

NOTE : DERIVED FROM CPES MANUAL NVPILAR 2008


REFERENCE :

SPECIFICATIONS

DPWH STD.SPECS., VOL. I, 1988, ED.


DPWH STD.SPECS.,VOL.II, 2004 ED.
DPWH STD.SPECS.,VOL.III, 1995 ED.

BOOKS
1. ESTIMATING BILL OF MATERIALS BY VICENTE TAGAYUN

2. SIMPLIFIED CONSTRUCTION ESTIMATE BY MAX B. FAJARDO JR.


3. HANDBOOK OF CONSTRUCTION ESTIMATE BY RHENO A. VELASCO
4. PLUMBING DESIGN & ESTIMATE BY MAX B. FAJARDO JR.
5. ELECTRICAL LAYOUT & ESTIMATE BY MAX B. FAJARDO JR.

NVPILAR 2008
OTHER CODES AND SPECIFICATIONS:
P.D.1096 – NATIONAL BUILDING CODE
R.A. 7160 – LOCAL GOVT. CODE OF 1991
DOLE D.O. 13 SERIES 1998 – CONSTRUCTION SAFETY
DPWH D.O. 56 SERIES 2005 – CONSTRUCTION SAFETY
B.P. 344 – ACCESSIBILITY LAW
NATIONAL STRUCTURAL CODE OF THE PHILIPPINES
AMERICAN CONCRETE INSTITUTE ( ACI )
AMERICAN SOCIETY OF TESTING MATERIALS ( ASTM )
ELECTRICAL CODE OF THE PHILIPPINES
PLUMBING CODE OF THE PHILIPPINES
PHILIPPINE MECHANICAL ENGINEERING CODE
ALL MATERIALS QUALITY TESTING CODE

NVPILAR 2008
NATIONAL BUILDING CODE
( P.D. 1096 )
5 MAJOR DIVISIONS IN BUILDING PLANS SUBJECT TO ESTIMATE

ARCHITECTURAL
ARCHITECTURAL AESTHETIC
AESTHETIC ARCHITECT
ARCHITECT

STRUCTURAL
STRUCTURAL STRENGTH
STRENGTH CIVIL
CIVILENGR
ENGR

ELECTRICAL/
ELECTRICAL/ POWER,
POWER,LIGHTING
LIGHTING ELECTL
ELECTLENGR/
ENGR/
ELECTRONIC
ELECTRONIC & COMMUNICATION
& COMMUNICATION ELECTRONIC
ELECTRONICENGR
ENGR

SANITARY/
SANITARY/ HEALTH
HEALTHAND
AND SANITARY
SANITARYENGR/
ENGR/
PLUMBING
PLUMBING SANITATION
SANITATION MASTER
MASTERPLUMBER
PLUMBER

MECHANICAL
MECHANICAL NECESSITIES
NECESSITIES MECHANICAL
MECHANICALENGR
ENGR

NVPILAR 2008
CLASSIFICATION OF BUILDING STRUCTURES

RESIDENTIAL – SINGLE DETACHED DWELLINGS AND DUPLEXES FOR USE OF


OWNER, “ON CAMPUS” DORMITORIES, RECTORIES, CONVENTS
AND MONASTERIES, RESIDENTIAL CONDOMINIUMS OWNED BY
OCCUPANTS, ARMY BARRACKS, ETC.

COMMERCIAL – SINGLE DETACHED DWELLINGS AND DUPLEXES FOR LEASE,


BOARDING HOUSES, APARTMENTS, ACCESORIAS, HOTELS AND
INNS, “OFF CAMPUS” DORMITORIES, TRANSPORTATION
TERMINALS AND STATIONS, NIGHT CLUBS AND DANCE HALLS,
RESTAURANTS, MARKETS AND SHOPPING CENTERS, THEATERS,
SPORTS STADIA, GRANDSTANDS, GASOLINE SERVICE STATIONS,
PARKING GARAGES, FUNERAL PARLORS, ETC.

INDUSTRIAL – FACTORIES, PLANTS, MILLS, ARSENALS, BREWERIES, PROCESSING


PLANTS, GAS GENERATING PLANTS, SHIPYARDS, AIRCRAFT
HANGARS, SLIPWAYS, DRYDOCKS AND PIERS, LUMBER MILLS,
WAREHOUSE, STORAGE TANKS, GRAIN AND CEMENT SILOS,
ETC.

NVPILAR 2008
INSTITUTIONAL – EDUCATIONAL INSTITUTIONS, LIBRARIES, MUSEUMS,
CLUBHOUSES, HOSPITALS, SANITARIA, ASYLUMS, HOMES
FOR THE AGED, JAILS, POLICE AND FIRE STATIONS, PLACES
OF WORSHIP, ETC.

RECREATIONAL – CINEMAS, BILLIARD HALLS, DISCO PADS, AMUSEMENT


HOUSES, ETC.

AGRICULTURAL – BARNS, POULTRY HOUSES, HATCHERIES, PIGGERIES,


STABLES, GREENHOUSES, GRANARIES, ETC.

ANCILLARY – GARAGES, CARPORTS, TANKS, TOWERS, SMOKESTACKS AND


CHIMNEYS, VAULTS, SWIMMING POOLS, PELOTA COURTS,
AVIARIES, AQUARIUMS, ZOO STRUCTURES, FIERE WALLS AND
FENCES OVER 1.8O METERS IN HEIGHT, ETC.
TEMPORARY – FIELD OFFICES, LABORERS’ QUARTERS, CANOPIES AND
RAILINGS, PROTECTIVE FENCINGS, ETC.
OTHERS – CEMETERY STRUCTURES AND MOUSOLEUMS, TOMBS, MULTI-LEVEL
NICHES, ETC.

NVPILAR 2008
TYPES OF CONSTRUCTION
( P.D. 1096, CHAPTER 4, SECTION 401 )
TYPE I - TYPE I BUILDING SHALL BE OF WOOD CONSTRUCTION. THE STRUCTURAL
ELEMENTS MAY BE ANY OF THE MATERIALS PERMITTED BY THIS CODE.

TYPE II - TYPE II BUILDING SHALL BE OF WOOD CONSTRUCTION WITH PROTECTIVE


FIRE RESISTANT MATERIALS AND ONE-HOUR FIRE RESISTIVE
THROUGHOUT: EXCEPT, THAT PERMANENT NON-BEARING PARTITIONS
MAY USE FIRE-RETARDANT TREATED WOOD WITHIN THE FRAMING
ASSEMBLY.

TYPE III – TYPE III BUILDING SHALL BE OF MASONRY AND WOOD CONSTRUCTION,
STRUCTURAL ELEMENTS MAY BE ANY OF THE MATERIALS PERMITTED
BY THIS CODE: PROVIDED, THAT THE BUILDING SHALL BE ONE-HOUR
FIRE – RESISTIVE THROUGHOUT. EXTERIOR WALLS SHALL BE
INCOMBUSTIBLE FIRE-RESISTIVE CONSTRUCTION

TYPE IV – TYPE IV BUILDING SHALL BE OF STEEL, IRON, CONCRETE OR MASONRY


CONSTRUCTION. WALLS, CEILING AND PERMANENT PARTITIONS SHALL
BE OF INCOMBUSTIBLE FIRE RESISTIVE CONSTRUCTION: EXCEPT, THAT
PERMANENT NON-BEARING PARTITIONS OF ONE-HOUR FIRE RESISTIVE
CONSTRUCTION MAY USE FIRE RETARTANT TREATED WOOD WITHIN THE
FRAMING ASSEMBLY.

TYPE V - TYPE V BUILDING SHALL BE FIRE-RESISTIVE. THE STRUCTURAL


ELEMENTS SHALL BE OF STEEL, IRON, CONCRETE, OR MASONRY
CONSTRUCTION. WALLS, CEILING AND PERMANENT PARTITIONS SHALL
BE OF INCOMBUSTIBLE FIRE-RESISTIVE CONSTRUCTION.
NVPILAR 2008
BURJ DUBAI ( DUBAI TOWER )
THE BURJ DUBAI IS A SUPERTALL SKYSCRAPER CURRENTLY UNDER CONSTRUCTION IN DUBAI, UNITED ARAB
EMIRATES. IT IS CURRENTLY THE TALLEST FREE STANDING STRUCTURES IN THE WORLD HAVING AN EXPECTED
HEIGHT OF 818 METERS BUT COULD REACH UP TO 940 METERS UPON THE SCHEDULED COMPLETION IN
SEPTEMBER 2009. THE BUILDING IS BEING BUILT BY A JOINT VENTURE OF THE SOUTH KOREAN COMPANY
SAMSUNG, THE BELGIAN COMPANY BESIX AND THE UAE COMPANY ARABTEC. IT WAS DESIGN BY ADRIAN SMITH
OF SKIDMORE, OWING AND MERRIL CONSULTANCY. THE TOTAL BUDGET FOR THE BURJ DUBAI PROJECT IS
ABOUT 4.1 BILLION DOLLARS.

*PICTURE & INFO FROM INTERNET NVPILAR 2008


SCOPE OF WORKS IN BUILDING CONSTRUCTION
PART - A- MOBILIZATION
PART - B- EARTHWORKS
PART - C- TERMITE CONTROL & WOOD PRESERVATIONS
PART - D- FOUNDATION WORKS
PART - E- DAMP PROOFING / MOISTURE CONTROL
PART - F- CONCRETE WORKS
PART - G- MASONRY WORKS
PART - H- CARPENTRY WORKS
PART - I - FABRICATED MATERIALS AND HARDWARE
PART - J- ROOF FRAMING WORKS
PART - K- ROOFING WORKS
PART - L- FINISHES
PART - M - PAINTING / VARNISHING
PART - N- WATER PROOFING
PART - O- SANITARY WORKS
PART - P- ELECTRICAL WORKS
PART - Q- MECHANICAL WORKS
PART - R- CONSTRUCTION SAFETY AND HEALTH (DO. 56)
NVPILAR 2008
PROJECT: ONE(1) STOREY (7X7 MODIFIED) CLASSROOM SCHOOL BUILDING

ARCHITECTURAL PLAN

1 2 3 3 2 1 A B C

GA 26 CORR. G I. GA 26 CORR. G I.
ROOFING ROOFING

D-1 D-1 D-1 W-2


W-1 W-1 W-2 W-2 CLASSROOM

FRONT ELEVATION REAR ELEVATION CROSS SECTION

1 2 3 2 1 2 3
1 3
SCH. OF DOORS & WINDOWS

C C C
W-2 W-2

EXPOSED SLOPE
B STEEL ‘C’ B
CLASSROOM B PURLINS AND
SLOPE
RAFTERS D-1 W-1 & W-2
W-1 FLUSH TYPE GLASS JALOUSIE
D-1 W-1 D-1 HOLLOW CORE WINDOWS ON
A A A DOOR W MARINE ALUMINUM HOUSIG
CORRIDOR PLYWOOD FACING
ON WOOD FRAME
FLOOR PLAN REFLECTED CEILING ROOF PLAN

*PLANS BY BOD NVPILAR 2008


STRUCTURAL PLAN
C-PURLINS
RAFTER C
A B
ANGULAR
BRACE
CORR. GI
SHEETS

C1-F1 C1-F1 C1-F1

WF-1 WF-1

WF-1

WF-1
LB LB
BASE PLATE W LONG
ANCHOR BOLTS

C1-F1
C1-F1
ROOF INSULATION CEILING
FIN. COMPRESSED BETWEEN SLAB ON FILL
PURLINS AND RAFTER
D-1 W-2

WF-1
WF-1
CORRIDOR
DOWEL
CLASSROOM FFL WF-1 WF-1
FGL
WELL COMPACTED NGL
COL. FTG. C1-F1 C1-F1 C1-F1
GRAVEL FILL
WALL FTG
DETAIL CROSS SECTION
FOUNDATION PLAN

LINTEL BEAM SPOT DETAIL


LINTEL BEAMS
FOOTING COLUMN WALL FOOTING

*PLANS BY BOD NVPILAR 2008


PLUMBING AND SANITARY CYCLE
( ONE STOREY STRUCTURE )
VENT PIPE
THRU ROOF
HORIZONTAL
VENT PIPE
LAVATORY WATER
CLOSET
KITCHEN
SINK SHOWER
ROOF
IN-HOUSE WATER
GUTTER
SUPPLY PIPE

DOWNSPOUT

CATCH
GATE SEPTIC
BASIN
WATER METER VALVE VAULT

METER SHUT-OFF

WATER PIPE
CONN. TO TO DRAINAGE CATCH CLEAN-
WATER MAIN CANAL/SEWER BASIN OUT SOIL/WASTE PIPE
STORM
DRAINAGE PIPE
CORPORATION COCK

WATER MAIN

*PICTURE FROM BOOKS OF TAGAYUN


NVPILAR 2008
PLUMBING SYSTEM
WATER LINE INCLUDING DRAINAGE, WASTE AND VENTILATION SYSTEM OF BUILDING

VENTILATION THROUGH ROOF ( VTR )

DRY VENT

SHOWER W/ ACCESORIES MAIN VENT

BATH TUB LAVATORIES


FIXTURES

WATER CLOSET
HOT WATER RETURN
FLOOR DRAIN
KITCHEN SINK
FIXTURES

COLD WATER LINE


W/ ACCESORIES FITTINGS
WET VENT
HOT WATER LINE
CLEAN OUT
W/ ACCESSORIES

WATER HEATER WASTE / SOIL PIPE

*PICTURE FROM BOOKS OF FAJARDO. NVPILAR 2008


ELECTRICAL SYSTEM LAYOUT
( ONE STOREY STRUCTURES )

LIGHTING LAYOUT CONVENIENCE OUTLET LAYOUT PANEL BOARD & CABINETS

*PICTURE FROM BOOKS OF FAJARDO.

NVPILAR 2008
PREPARATION OF PROGRAM OF WORKS

CONST. OF ONE STOREY SCHOOL BUILDING


1 2 3 3 2 1 SCOPE OF WORKS % AMOUNT
I. MOBILIZATION / DEMOBILIZATION 1.0 P3,000.00
GA 26 CORR. G I. GA 26 CORR. G I.
ROOFING ROOFING
II. EARTHWORKS 2.29 6,870.00

D-1 D-1 III. SOIL POISONING 0.56 1,680.00


W-1 W-1 W-2 W-2
FRONT ELEVATION REAR ELEVATION IV. DAMPROOFING WORKS 0.47 1,410.00

C1-F1 C1-F1 C1-F1 V. CONCRETE WORKS 29.65 88,950.00


A B C WF-1 WF-1
VI. MASONRY WORKS 3.21 9,630.00
WF-1

WF-1
VII. CARPENTRY WORKS 3.54 10,620.00
C1-F1

C1-F1
SLAB ON FILL
VIII. FAB. MATERIALS & HARDWARE 9.08 27,240.00
WF-1
WF-1

D-1 W-2
CLASSROOM WF-1 WF-1 IX. ROOF FRAMING WORKS 9.87 29610.00
CROSS SECTION C1-F1 C1-F1 C1-F1
X. ROOFING WORKS 7.20 21,600.00
FOUNDATION PLAN
XI. FINISHES 12.23 36,690.00
1 2 3
SCH. OF DOORS & WINDOWS XII. PAINTING WORKS 6.50 19,500.00

C XIII. SANITARY / PLUMBING WORKS 4.06 12,180.00


W-2 W-2
XIV. ELECTRICAL WORKS 5.34 16,020.00
B CLASSROOM
XV. MECHANICAL WORKS 5.00 15,000.00
D-1 W-1 & W-2
D-1 W-1 W-1 D-1 FLUSH TYPE GLASS JALOUSIE TOTAL 100.00 300,000.00
A HOLLOW CORE WINDOWS ON
CORRIDOR DOOR W MARINE ALUMINUM HOUSING
FLOOR PLAN PLYWOOD FACING
ON WOOD FRAME

NVPILAR 2008
BUILDING CONSTRUCTION METHODOLOGY
( BY PERT/CPM DIAGRAM)
PROJECT: ONE(1) STOREY (7m X 7m) MODIFIED SCHOOL BUILDING

PROCUREMENT/DELIVERY OF CONSTRUCTION MATERIALS


D
26

ELECTRICAL/SANITARY ROUGH-IN
J
16
14 INST. ELECT/
12 MECH/SANITARY
CARPENTRY WORKS FIXTURES
P S
2 1
1 2 6
MOVE- 4 17
IN
EARTH CONCRETE MASONRY 8 1O 13 15 MOVE
WORKS WORKS WORKS ROOF FRAMING ROOFING FINISHES PAINTING OUT
A B C F H M N Q T V
2 2 5 3 5 4 4 3 2
WAIT WAIT
WAIT WAIT WAIT
2 4
E G K O R U
1 2 2
SOIL BACKFILL INST. OF PURLINS INST. GUTTER & INST. FAB. MATLS &
HARDWARE
POISONING 5 WAIT
9
FLUSHING
3 11 14
I W
3
DAMPROOFING/SLAB ON FILL
7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
CALENDAR DAYS
LEGEND:

NETWORK - A B
ES LS EF LF
ACTIVITY -

EVENT - A
ES LS
DUMMY -

CRITICAL PATH -
NVPILAR 2008
AMOUNT CALENDAR DAYS
SCOPE OF WORKS WT.(%) (PHP) 5 10 15 20 25 30
I. MOBILIZATION/DEMOB 1.00 3,000.00
II. EARTHWORKS 2.29 6,870.00
III. SOIL POISONING 0.56 1,680.00
IV. DAMP PROOFING WORKS 0.47 1,410.00
V. CONCRETE WORKS 29.65 88,950.00
VI. MASONRY WORKS 3.21 9,630.00
VII. CARPENTRY WORKS 3.54 10,620.00
VIII. FAB. MATLS & H’WARE 9.08 10,620.00
IX. ROOF FRAMING WORKS 9.87 27,240.00
X. ROOFING WORKS 7.20 29,610.00
XI. FINISHES 12.23 21,600.00
XII. PAINTING WORKS 6.50 36,690.00
XIII. SANITARY WORKS 4.06 19,500.00
XIV. ELECTRICAL WORKS 5.34 16,020.00
XV. MECHANICAL WORKS 5.00 15,000.00
TOTAL 100.00 300,000.00
PROJECTED CASH FLOW (P)
PROJECTED ACCPLMENT (%)
CUMMULATIVE CASH FLOW(P)
CUMMULATIVE ACCPLMNT(%)

- CRITICAL ACTIVITY

- PARALLEL ACTIVITY
NVPILAR 2008
AMOUNT CALENDAR DAYS
SCOPE OF WORKS WT.(%) (PHP) 5 10 15 20 25 30
I. MOBILIZATION/DEMOB 1.00 3,000.00 1,500.00 1,500.00
II. EARTHWORKS 2.29 6,870.00 3,435.00 3,435.00
III. SOIL POISONING 0.56 1,680.00 1,680.00
IV. DAMP PROOFING WORKS 0.47 1,410.00 1,410.00
V. CONCRETE WORKS 29.65 88,950.00 11,118.75 44,475.00 33,356.25
VI. MASONRY WORKS 3.21 9,630.00 3,210.00 6,420.00
VII. CARPENTRY WORKS 3.54 10,620.00 10,620.00
VIII. FAB. MATLS & H’WARE 9.08 10,620.00 13,620.00 13,620.00
IX. ROOF FRAMING WORKS 9.87 27,240.00 17,766.00 11,844.00
X. ROOFING WORKS 7.20 29,610.00 16,200.00 5,400.00
XI. FINISHES 12.23 21,600.00 36,690.00
XII. PAINTING WORKS 6.50 36,690.00 19,500.00
XIII. SANITARY WORKS 4.06 19,500.00 676.67 3,383.33 3,383.33 3,383.33 1,353.34
XIV. ELECTRICAL WORKS 5.34 16,020.00 890.00 4,450.00 4,450.00 4,450.00 1,780.00
XV. MECHANICAL WORKS 5.00 15,000.00 833.33 4,166.67 4,166.67 4,166.67 1,666.66
TOTAL 100.00 300,000.00
PROJECTED CASH FLOW (P) 17,733.75 53,520.00 53,186.25 45,966.00 90,174.00 39,420.00
PROJECTED ACCPLMENT (%) 5.91 17.84 17.73 15.32 30.06 13.14
CUMMULATIVE CASH FLOW(P) 17,733.75 71,253.75 124,440.00 170406.00 260,580.00 300,000.00
CUMMULATIVE ACCPLMNT(%) 5.91 23.75 41.48 56.80 86.86 100.00

NVPILAR 2008
AMOUNT CALENDAR DAYS
SCOPE OF WORKS WT.(%) (PHP) 5 10 15 20 25 30
100%
I. MOBILIZATION/DEMOB 1.00 3,000.00
II. EARTHWORKS 2.29 6,870.00
86.86
III. SOIL POISONING 0.56 1,680.00
IV. DAMP PROOFING WORKS 0.47 1,410.00
75%
V. CONCRETE WORKS 29.65 88,950.00 ACTUAL
ACCOMPLISHMENT
VI. MASONRY WORKS 3.21 9,630.00
VII. CARPENTRY WORKS 3.54 10,620.00
56.80
VIII. FAB. MATLS & H’WARE 9.08 10,620.00
50%
IX. ROOF FRAMING WORKS 9.87 27,240.00
X. ROOFING WORKS 7.20 29,610.00 TIME ELAPSED 41.48
XI. FINISHES 12.23 21,600.00 SCHEDULED
ACCOMPLIHMENT
XII. PAINTING WORKS 6.50 36,690.00
25%
XIII. SANITARY WORKS 4.06 19,500.00 23.75
XIV. ELECTRICAL WORKS 5.34 16,020.00
XV. MECHANICAL WORKS 5.00 15,000.00
5.91
TOTAL 100.00 300,000.00
PROJECTED CASH FLOW (P) 17,733.75 53,520.00 53,186.25 45,966.00 90,174.00 39,420.00
PROJECTED ACCPLMENT (%) 5.91 17.84 17.73 15.32 30.06 13.14
CUMMULATIVE CASH FLOW(P) 17,733.75 71,253.75 124,440.00 170406.00 260,580.00 300,000.00
CUMMULATIVE ACCPLMNT(%) 5.91 23.75 41.48 56.80 86.86 100.00

NVPILAR 2008
TOTAL CALENDAR DAYS
MANPOWER RATE/DAY
AMOUNT 5 10 15 20 25 30
RES. ENGINEER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CONST. FOREMAN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
LEADMAN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CARPENTER 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
MASON 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2
STEEL MAN 2 2 2 2 2 2 2
WELDER 2 2 2 2 2
TINSMITH 2 2 2 2
PAINTER 2 2 2
PLUMBER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ELECTRICIAN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
LABORER 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
SAFETY OFFICER
FIRST AIDER
NURSES
TOTAL 8 8 6 6 131313 1314 10 10 10 1616 101010 10 10 101012121212121210 8 6

NVPILAR 2008
TOTAL CALENDAR DAYS
EQUIPTMENT RATE/DAY
AMOUNT 5 10 15 20 25 30
MINOR TOOL ACC. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
C0NCRETE MIXER 1 1 1 1
BAR CUTTER 1 1 1 1 1 1 1 1 1 1 1 1 1
CONC. VIBRATOR 1 1 1 1 1

BAR BENDER 1 1 1 1 1 1 1 1 1
WELDING MACHINE 1 1 1 1 1

TOTAL

NVPILAR 2008
MANPOWER REQUIREMENT

TECHNICAL SAFETY & HEALTH SKILLED / UNSKILLED


(DO 56 S.2005)

PROJECT ENGINEER SAFETY ENGINEER CONST. FOREMAN


RESIDENT ENGINEER SAFETY OFFICER LEADMAN
FIRST AIDER CARPENTER
MTQC ENGINEER
NURSES MASON
QTY./COST ENGINEER
STEEL MAN
SANITARY ENGINEER
WELDER
ELECTRICAL ENGINEER TINSMITH
MECHANICAL ENGINEER INSTALLER
PAINTER
PLUMBER
ELECTRICIAN
LABORER

NVPILAR 2008
NVPILAR 2008
PILE FOUNDATION DRILLING, DRIVING, BORING, GRABBING EQUIPMENT

SMALL DRILLING EQPT. DROP HAMMER DRIVING HEAVY BORING RIG W/ VIBRO HEAVY CABLE GRAB
USE FOR MICRO PILES RIG FOR PRE CAST PILES HAMMER FOR BORED PILES FOR BARRETTE PILES

EXCAVATOR-USE IN TRUCK MIXER TANDEM WITH TRUCK MOUNTED/CRAWLER CRANE


LARGE DIMENSION PUMPCRETE USE IN POURING OF -USE TO CARRY & MANEUVER PRE CAST
EXCAVATION & DIGGING HEAVY FOUNDATIONS. PILE & STEEL CAGES.

WHEEL LOADER TANDEM W/ DUMP TRUCK -USE GENERATOR SET / WELDING MACHINE –
FOR HAULING & DISPOSAL OF DEBRIS AND USE AS CONNECTORS ON HEAVY
OTHER EXCAVATED MATERIALS. STRUCTURAL STEEL MEMBERS.

NVPILAR 2008
WHEEL LOADER TANDEM W/ DUMP TRUCK-USE
FOR HAULING & DISPOSAL OF DEBRIS AND
MOBILE CRANES – USE TO OTHER MATERIALS WITHIN THE PERIPHERAL
MANEUVER AROUND & OUTSIDE OF THE BUILDINGS
THE BUILDING TO HOIST
MATERIALS & EQUIPMENT FROM
VARIOUS LOCATIONS

TRUCK MIXER TANDEM WITH PUMPCRETE USE


IN POURING OF HEAVY SUPERSTRUCTURE
MEMBERS.

FORMS & SCAFFOLDING – USE


TOWER CRANE – USE AS AS GUIDE & SUPPORT SYSTEM
CIRCUMFERENTIAL LIFTING IN FORMING & CHECKING
MECHANISM TO TRANSPORT ALIGNMENT OF STRUCTURAL GENERATOR SET / WELDING MACHINE –
VITAL CONSTRUCTION MEMBERS IN & AROUND THE USE AS CONNECTORS ON HEAVY
MATERIALS & EQUIPMENT BUILDINGS. STRUCTURAL STEEL MEMBERS.

NVPILAR 2008
WHEEL LOADER EXCAVATOR/BREAKER BULLDOZER GRADER

ROLLER TRUCK MIXER TRAILER TRUCK DUMP TRUCK

NVPILAR 2008
RING AND BAR BENDER
SAMPLING MOLD BAR CUTTER CONCRETE VIBRATOR

1- BAGGER 2 – BAGGER PORTA LIFT HOLLOW BLOCK MACHINE


CONCRETE MIXER CONCRETE MIXER

PLATE COMPACTOR TAMPING RAMMER WALK BEHIND ROLLER SUBMERSIBLE PUMP

NVPILAR 2008
NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)

%LABOR OF MAT’LS. MANDAYS


SCOPE OF WORKS (APPROXIMATE)

A. MOBILIZATION / DEMOB. 1% OF DC
B. EARTHWORKS
a) Excavation / Backfill -
b) Earth fill 30 %
c) Gravel 30 %

C. TERMITE CONTROL /
WOOD PRESERVATION
a) Soil Poisoning 30 %
b) Wood Preservation 30 %

NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)

%LABOR OF MAT’LS. MANDAYS


SCOPE OF WORKS (APPROXIMATE)

D. FOUNDATION WORKS
1. SHALLOW FOUNDATION
a) Spread 30 %
b) Mat 30 %
c) Raft 30 %
2. DEEP FOUNDATION
a) Micro Piles 30 %
b) Pre-Cast Driven Piles 30 %
c) Bored Piles 30 %
d) Barrette Piles 30 %

NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)

%LABOR OF MAT’LS. MANDAYS


SCOPE OF WORKS (APPROXIMATE)

E. DAMP PROOFING /
MOISTURE CONTROL
a) On Ground 30 %
b) Below Ground 30 %
F. CONCRETE WORKS
a) Concrete
a.1) Ready Mix 10 – 15 %
a.2) Job Mix 30 %

b) Re-bars 30 %
c) Formworks 30 %

NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)

%LABOR OF MAT’LS. MANDAYS


SCOPE OF WORKS (APPROXIMATE)
G. MASONRY WORKS
a) Concrete Hollow Blocks 30 %

H. CARPENTRY WORKS
a) Ceiling 30 %
b) Partitions 30 %
c) Wooden Framing 30 %
d) Stairs 30 %
e) Cabinets 30 %

NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)

%LABOR OF MAT’LS. MANDAYS


SCOPE OF WORKS (APPROXIMATE)

H. FABRICATED MAT’LS
AND HARDWARES
a) Doors 30% Fab. + 10% Inst.
b) Windows 30% Fab. + 10% Inst.
c) Hardware Accessories 30%
I. ROOF FRAMING WORKS
1. Timber Trusses 30%
2. Steel Trusses
a) Fabrication 30%
b) Installation/Erection 20%
c) Equipment 10 - 25 %
d) Consumables 8%
e) Painting 7%

NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)

%LABOR OF MAT’LS. MANDAYS


SCOPE OF WORKS (APPROXIMATE)
K. ROOFING WORKS
a) Roofing Mat’ls & acc. 30 %
L. FINISHES 30 - 35 %

M. PAINTING / VARNISHING
a) Masonry Paint 30 %
b) Wooden Paint 30 %
c) Metal Paint 30 %
d) Varnishing 30 %

NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)

%LABOR OF MAT’LS. MANDAYS


SCOPE OF WORKS (APPROXIMATE)

N. WATERPROOFING
a) Cement Base (Integral) 30 %
b) Membrane Waterproofing 30 %
c) Liquid Waterproofing 30 %
d) Hydrolithic Waterproofing 30 %
O. SANITARY WORKS
a) Plumbing Lines 30 %
b) Drainage, Waste & Vent 30 %
c) Fixtures & Accessories 15 %

NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)

%LABOR OF MAT’LS. MANDAYS


SCOPE OF WORKS (APPROXIMATE)

P. ELECTRICAL WORKS
a) Wires & wiring 30 %
b) Conduit works 30 %
c) Panel boards & Cabinets 5%
d) Fixtures & Accessories 10 %

NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)

%LABOR OF MAT’LS. MANDAYS


SCOPE OF WORKS (APPROXIMATE)

Q. MECHANICAL WORKS
a) Airconditioning & 10% - Labor(Acc.)
Refrigeration System 15% - Inst. of units

b) Water Pump 30% - Labor (Pipes & fit.)


15% - Inst. of units
c) Automatic Water 30% - Labor (Pipes & fit.)
Sprinkler System 15% - Inst. Of units

d) Electric Elevators 30%

e) Electric Dumbwaiter 30%

NVPILAR 2008
SCOPE OF WORKS IN BUILDING CONSTRUCTION
PART - A- MOBILIZATION
PART - B- EARTHWORKS
PART - C- TERMITE CONTROL & WOOD PRESERVATIONS
PART - D- FOUNDATION WORKS
PART - E- DAMP PROOFING / MOISTURE CONTROL
PART - F- CONCRETE WORKS
PART - G- MASONRY WORKS
PART - H- CARPENTRY WORKS
PART - I - FABRICATED MATERIALS AND HARDWARE
PART - J- ROOF FRAMING WORKS
PART - K- ROOFING WORKS
PART - L- FINISHES
PART - M - PAINTING / VARNISHING
PART - N- WATER PROOFING
PART - O- SANITARY WORKS
PART - P- ELECTRICAL WORKS
PART - Q- MECHANICAL WORKS
PART - R- CONSTRUCTION SAFETY AND HEALTH (DO. 56)
NVPILAR 2008
DPWH STD. SPECS., VOL. I, 1988, ED.
DPWH STD.SPECS.,VOL.II, 2004 ED.
DPWH STD.SPECS.,VOL.III, 1995 ED.

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS

ITEMS OF WORKS IN BUILDING CONSTRUCTION


(BASED ON DPWH STD. SPECS.)

PART A – MOBILIZATION
- M0VING IN OF MANPOWER, EQUIPTMENT & MATERIALS AT THE
PROJECT SITE
PART A – FACILITIES F0R THE ENGINEER
A.1.1- OFFICES & LABORATORIES - L.S.
A.1.2- VEHICLES FOR THE ENGINEER - MO./ EACH
A.1.3- ASSISTANCE TO THE ENGINEER - MONTHS
A.1.4- PHOTOGRAPHS - EACH

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS

ITEMS OF WORKS IN BUILDING CONSTRUCTION


(BASED ON DPWH STD. SPECS.)

PART B - EARTHWORKS
ITEM 800 – CLEARING & GRUBBING - CU. M.
ITEM 801 – REMOVAL OF STRUCTURES & OBSTRUCTIONS - CU. M.

ITEM 802 – EXCAVATION - CU. M.


ITEM 803 – STRUCTURE EXCAVATION - CU. M.
ITEM 804 – EMBANKMENT - CU. M.

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS

ITEMS OF WORKS IN BUILDING CONSTRUCTION


(BASED ON DPWH STD. SPECS.)

PART C – TERMITE CONTROL & WOOD PRESERVATION

ITEM 1000(A) – SOIL POISONING - LITER

ITEM 1000(B) – WOOD PRESERVATION - LITER

ITEM 1000(C) – POWDER TERMICIDE - KILOGRAMS

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART D – FOUNDATION WORKS
ITEM 400(1) – UNTREATED TIMBER PILES, FURNISHED - METER
ITEM 400(2) – TREATED TIMBER PILES, PRESERVATIVE, FURNISHED - METER
ITEM 400(3) – STEEL H-PILES, FURNISHED - METER
ITEM 400(4) – PRECAST CONCRETE PILES, FURNISHED - METER
ITEM 400(5) – PRECAST, PRESTRESSED CONCRETE PILES, FURNISHED - METER
ITEM 400(6) – STRUCTURAL STEEL SHEET PILES, FURNISHED - METER
ITEM 400(7) – PRECAST CONCRETE SHEET PILES, FURNISHED - METER
ITEM 400(8) – UNTREATED TIMBER PILES, DRIVEN - METER
ITEM 400(9) – TREATED TIMBER PILES, DRIVEN - METER
ITEM 400(10) – STEEL H-PILES, DRIVEN - METER
ITEM 400(11) – STEEL PIPES PILES - METER
ITEM 400(12) – STRUCTURAL STEEL SHEET PILES, DRIVEN - METER

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 400(13) – PRECAST CONCRETE SHEET PILES, DRIVEN - METER


ITEM 400(14) – PRECAST CONCRETE PILES, DRIVEN - METER
ITEM 400(15) – PRECAST, PRESTRESSED CONCRETE PILES, DRIVEN - METER
ITEM 400(16) – TEST PILES, FURNISHED AND DRIVEN - METER
ITEM 400(17) – CONCRETE PILES CAST IN DRILLED HOLES - METER
ITEM 400(18) – CONCRETE PILES CAST IN STEEL SHELLS - METER
ITEM 400(19) – CONCRETE PILES CAST IN STEEL PIPES - METER
ITEM 400(20) – PILE SHOES - METER
ITEM 400(21) – SPLICES - METER
ITEM 400(22) – LOAD TEST - METER
ITEM 400(23) – BORED PILES (DIA___ M) - METER
ITEM 400(24) – PERMANENT CASING (DIA___M) - METER

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS

ITEMS OF WORKS IN BUILDING CONSTRUCTION


(BASED ON DPWH STD. SPECS.)

PART E – DAMP PROOFING/MOISTURE CONTROL

SPL (1) – POLYETHELENE SHEETS - SQ. M.

SPL (2) – HYDROLITHIC WATER PROOFING - SQ. M.

NVPILAR 2006
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART F - CONCRETE WORKS


ITEM 404 – REINFORCING STEEL - KGS.
ITEM 406(1) – PRE STRESSED STRUCTURAL CONC. MEMBERS - EACH
ITEM 406(2) – PRE STRESSED CONCRETE - L.S.
ITEM 900 R. C. CONCRETE*** -CU.M.

***- Such prices and payment shall be full compensation for furnishing all
materials, including metal water stops, joint fillers, weep holes, and rock
backing and timber bumpers; for all form and false work; for mixing, placing,
furnishing, and curing the concrete; and for all labor, materials, equipment, tools
and incidentals necessary to complete the item…

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART G – MASONRY WORKS


ITEM 506(1)A- MASONRY UNIT (CHB) - SQ. M.

PART H – CARPENTRY AND JOINERY WORKS


ITEM 1OO3(A) – WOODEN CEILING - BD. FT.
ITEM 1OO3(B) – WOODEN PARTITION - BD. FT.
ITEM 1OO3(C) – WOODEN CABINETS - BD. FT.
ITEM 1OO3(D) – WOODEN STAIRS & OTHERS AS
SPECIFIED ON PLANS - BD. FT.

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART I – FABRICATED MATERIALS & HARDWARE


ITEM 1004 – HARDWARE -
ITEM 1004.2.1 – ROUGH HARDWARE - PCS/KILO
ITEM 1004.2.2 – FINISHING HARDWARE - PCS/SET

ITEM 1005 – STEEL WINDOWS -


ITEM 1005(A) – RESIDENTIAL CASEMENT - SQ.M.
ITEM 1005(B) – HEAVY DUTY SIDE HINGED VENTILATOR - SQ.M.
ITEM 1005(C) – PROJECTED VENTILATOR - SQ.M.
ITEM 1005(D) – AWNING VENTILATOR - SQ.M.

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1006 – STEEL DOORS AND FRAMES -


ITEM 1006(A) – HOLLOW STEEL DOORS - SQ.M./SET
ITEM 1006(B) – FLUSH DOOR - SQ.M./SET
ITEM 1006(C) – GRILLE DOOR - SQ.M./SET
ITEM 1006(D) – STEEL LOUVER DOOR - SQ.M./SET

ITEM 1007 – ALUMINUM GLASS DOORS -

ITEM 1007 – ALUMINUM GLASS DOOR, SLIDING TYPE,


DESIGNATED AS D – ON THE SCHEDULE - SQ.M.

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1008 – ALUMINUM GLASS WINDOWS -


ITEM 10O8(1) – ALUMINUM SLIDING WINDOWS - SQ.M.
ITEM 1008(2) – ALUMINUM CASEMENT WINDOWS - SQ.M.
ITEM 1008(3) – ALUMINUM AWNING WINDOWS - SQ.M.

ITEM 1009 – JALOUSIE WINDOWS -


ITEM 1009(1) – GLASS JALOUSIE WINDOWS - SQ.M.
ITEM 1009(2) – WOOD JALOUSIE WINDOWS - SQ.M.
ITEM 1010 – WOODEN DOORS AND WINDOWS -
ITEM 1010(A) – FRAMES(JAMBS, SILLS, HEAD, TRANSOMS
AND MULLIONS - SET
ITEM 1010(B) – DOOR(FLUSH OR PANEL) - SQ.M.
ITEM 1010(C) – WINDOW SACHES - SQ.M.
ITEM 1010(D) – DOOR LOCKS -

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1011 – ROLLING UP DOORS -


ITEM 1011(A) – ROLLING UP DOOR(INDICATE METAL
SIZE AND TYPE OF CURTAIN SLATE) - UNIT/SET

ITEM 1012 – GLASS AND GLAZING -


ITEM 1012(A) – FLOAT GLASS - SQ.M.
ITEM 1012(B) – ORDINARY WINDOW & SHEET GLASS - SQ.M.
ITEM 1012(C) – PLATE GLASS (MIRROR) - SQ.M.

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART J – ROOF FRAMING WORKS
ITEM 402(1) – TIMBER STRUCTURES - SPAN
ITEM 402(2) – TIMBER TRUSSES - BD. FT.

ITEM 403(1) – STRUCTURAL STEEL ,FURNISHED,


FABRICATED AND ERECTED - KGS
ITEM 403(2) – STRUCTURAL STEEL ,FURNISHED,
FABRICATED AND ERECTED - KGS
ITEM 403(3) – STRUCTURAL STEEL ,FURNISHED & FABRICATED - KGS
ITEM 403(4) – STRUCTURAL STEEL ,FURNISHED & FABRICATED - KGS
ITEM 403(5) – STRUCTURAL STEEL ,ERECTED - KGS
ITEM 403(6) – STRUCTURAL STEEL ,ERECTED - KGS
ITEM 403(7) – STRUCTURAL STEEL ,FURNISHED,
FABRICATED AND ERECTED - KGS
* - Where separate payment is to be made for certain metals or for certain particular components,
other than under the general provision for structural steel, designations of those particular cases
shall be inserted in the space provided in the pay names for Item 403(2), 403(4) or 403(6), as the
case may be.

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART K – ROOFING WORKS


ITEM 1013 – CORRUGATED METAL ROOFING -
ITEM 1013(A) – ROOF INSULATION - SQ.M.

ITEM 1013.2.1 – CORRUGATED ROOFING GAUGE 26 - SQ.M .

ITEM 1013.2.2 – FABRICATED METAL ROOFING ACCESSORIES


(A) – RIDGED/HIP ROLLS, FLASHING, GUTTER
& DOWNSPOUT GAUGE 26 - L.M.
(B) – VALLEYS, COUNTER FLASHING GUTTER
& DOWNSPOUT GAUGE 24 - L.M.
ITEM 1013.2.3 – ROOF VENTILATORS - EACH

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1014 – PRE-PAINTED METAL SHEETS -

ITEM 1014(A) – PRE-PAINTED METAL SHEETS - SQ.M.

ITEM 1015 – CLAY ROOF TILES -

ITEM 1015(A) – CLAY ROOF TILES - SQ.M.

ITEM 1017 – ROOF DRAINS WITH STRAINERS - PCS/SET

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART L - FINISHES
ITEM 1018 – CERAMIC TILES
ITEM 1018.2.1.1 – GLAZED TILES AND TRIMS - SQ.M.
ITEM 1018.2.1.2 – UNGLAZED TILES - SQ.M
ITEM 1019 – WOOD TILES
ITEM 1019(A) – NARRA WOOD TILES - SQ.M.
ITEM 1019(B) – TANGUILE WOOD TILES - SQ.M.
ITEM 1019(C) – OTHER SPECIES AS SPECIFIED - SQ.M.
ITEM 1020 – VINYL FLOOR TILES - SQ.M. OR L.M OR # OF PCS.

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1021 - CEMENT FLOOR FINISH


ITEM 1021(A) – PLAIN CEMENT FLOOR FINISH - SQ.M.
ITEM 1021(B) – COLORED CEMENT FLOOR FINISH - SQ.M.
ITEM 1021(A) – CEMENT FLOOR FINISH W/FLOOR HARDINER - SQ.M.
ITEM 1022 - STUCCO FINISH
ITEM 1022(A) - STUCCO FINISH - SQ.M.
ITEM 1023 – GRANOLITHIC MARBLE WORKS
ITEM 1023(A) – CORRIDORS - SQ.M.
ITEM 1023(B) – STAIRS LANDING, RISERS, ETC. - SQ. M. OR L.M.
ITEM 1023(C) – ROOMS AND OTHERS - SQ.M.
ITEM 1024 – PEA GRAVEL WASHOUT FINISH - SQ.M.
ITEM 1024(A) – PEA GRAVEL WASHOUT FINISH - SQ.M.

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1025 – BUSH HAMMERED FINISH


ITEM 1025(A) – BUSH HAMMERED FINISH - SQ.M.
ITEM 1025(B) – FLUTED BUSH HAMMERED FINISH - SQ.M.
ITEM 1026 – PEBBLE WASHOUT FINISH
ITEM 1026(A) – PEBBLE WASHOUT FINISH - SQ.M.
ITEM 1027 – CEMENT PLASTER FINISH
ITEM 1027(A) – CEMENT PLASTER FINISH - SQ.M.
ITEM 1027(B) – SIMULATED RED BRICKS, pn. 142 - SQ.M.
ITEM 1028 – SYNTHETIC ADOBE
ITEM 1028(A) – BUSH HAMMERED SYNTHETIC ADOBE FINISH - SQ.M.
ITEM 1028(B) – FLUTTEDBUSH HAMMERED SYNTHETIC ADOBE FINISH - SQ.M.
ITEM 1028(C) - PIQUETA TOOL FINISH / SYNTHETIC FINISH - SQ.M.

NVPILAR 2006
COST ESTIMATION SYSTEM FOR BUILDINGS

ITEMS OF WORKS IN BUILDING CONSTRUCTION


(BASED ON DPWH STD. SPECS.)

ITEM 1O29 – GRANATITE WASHOUT FINISH


ITEM 1O29(1) – GRANATITE WASHOUT FINISH - SQ.M., LM
ITEM 1030 – ACCOUSTICAL CEILING
ITEM 1030(A) – ACCOUSTICAL CEILING PANEL - SQ.M OR # OF PCS.
ITEM 1031 – ACCOUSTICAL TREATMENT
ITEM 1031.2.1 – ACCOUSTICAL TILE/BOARD/PANEL - SQ.M.
ITEM 1031.2.2 – SPRAYED-ON ACCOUSTICAL MATERIALS - SQ.M.

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART M – PAINTING, VARNISHING & OTHER RELATED WORKS


ITEM 1032 A – PAINTING WOKS
ITEM 1032 A(1) – PAINTING WOKS (MASONRY PAINT) - SQ.M.
ITEM 1032 A(2) – PAINTING WOKS (WOOD PAINT) - SQ.M.
ITEM 1032 A(1) – PAINTING WOKS (ROOF PAINT) - SQ.M.
ITEM 1032 B – VARNISHING - SQ.M.
ITEM 1032 C – SEA-MIST FINISH - SQ.M.
ITEM 1032 D – DUCCO FINISH - SQ.M.
ITEM 1032 E – TEXTURE FINISH - SQ.M.

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART N – WATERPROOFING WORKS


ITEM 1016 - WATERPROOFING
ITEM 1016(A) – CEMENT BASE WATERPROOFING - SQ.M.
ITEM 1016(B) – LIQUID WATERPROOFING - SQ.M.

ITEM 1016(C) – BUILT-UP AND PREFORMED MEMBRANE - SQ.M.

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART O – SANITARY WORKS


ITEM 1001 – STORM DRAINAGE AND SEWERAGE SYSTEM
ITEM 1001.2(A) – PIPE (KIND AND SIZE) - METER
ITEM 1001.2(B) – FITTINGS (KIND AND SIZE) - EACH
ITEM 1001.2(C) – CONCRETE GUTTER - METER
ITEM 1001.2(D) – CONCRETE CANAL - METER
ITEM 1001.2(E) – W.I. GRATING - METER
ITEM 1001.2(F) – CATCH BASIN - EACH
ITEM 1001.2(G) – JUNCTION BOX - EACH

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART P – ELECTRICAL WORKS
ITEM 1100 – CONDUITS, FOXES & FITTINGS
(1)-RSC CONDUIT PIPE- MM DIA W/ COUPLING - LENGTH
(2)-LOCKNUT & BUSHING - PAIRS
(3)-CONDULET TYPE - PIECES
(4)-CONDUIT PIPE ELBOW - PIECES
(5)-CONNECTOR - PIECES
(6)-CONDUIT CLAMP - PIECES
(7)-PVC ADAPTER - PIECES
(8)-G.I. WIRE G.A. #14 - KILOS
(9)-HACKSAW BLADE - PIECES
(10)-PVC TAPE 19MM DIA X 18MM - ROLLS
(11)-RUBBER TAPE 19MM DIA X 227G - ROLLS
(12)-PVC SOLVENT CEMENT @ 400 CC. - CANS
(13)-PVC END BALL - PIECES
(14)-OCTAGONAL JUNCTION BOX - PIECES
(15)-UTILITY BOXES - PIECES
(16)-METAL PULL BOX - PIECES
(17)-SQUARE BOX - PIECES
(18)-TELEPHONE CABINET - SET
(19)-REINFORCED CONCRETE PEDESTAL POLE - LOT
(20)-RED LEAD PAINT - LOT
(21)-WEATHER HEAD W/ TYPE F CONDULET - PIECES
(22)-GROUNDING ROD COPPERWELD 20MM DIA. X 3.00M -LENGTH
(23)-APITONG OR APPROVED EQUAL CRESOTED WOOD POLE - PIECES
(24)-ANCHOR ROD__ MM DIA - PIECES
(25)-ANCHOR LOG__ MM DIA - PIECES
(26)-POWERLOAD STUDS WITH NUTS - PIECES
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1101 – WIRES AND WIRING DEVICES


(1)- ELECTRIC WIRE - METER OR
ROLLS
(2)- SINGLE POLE TUMBLER SWITCH - PIECES
(3)- TWO-GANG TUMBLER SWITCH - PIECES
(4)- THREE-GANG TUMBLER SWITCH - PIECES
(5)- THREE-WAY TUMBLER SWITCH - PIECES
(6)- DUPLEX CONVENIENCE RECEPTACLES - SET
(7)- HEAVY DUTY CONVENIENCE RECEPTACLES - SET
(8)- STD. TELEPHONE OUTLET BAKELITE COVER W/ 9.52 CENTER HOLE - PIECES
(9)- WDO TYPE AIRCONDITIONING OUTLET 3- PRONG POLARIZED TYPE - PIECES
(10)- BARE COPPER WIRE -
METERS
(11)- GROUNDING CLAMPS FOR ELECTRIC WIRES - PIECES
(12)- MESSENGER WIRE -
METERS
(13)- GUY WIRE -
METERS
(14)- VIBRATING BELL - SET
(15)- TRAFFIC LIGHT CONTROL PANEL - SET
(16)- TRAFFIC LIGHT METAL ENCLOSURES COMPLET WITH RED &
GREEN LIGHT PROVIDED WITH REFLECTORS & 152MM
DIAMETER VIBRATING BELL - SET
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
ITEM 1102 – POWER LOAD CENTER, SWITCHGEAR & PANEL BOARDS

(1)- PANEL BOARD (CIRCUIT BREAKER TYPE) - SET


(2)- PANEL BOARD (SAFETY SWITCH TYPE) - SET
(3)- LOW-VOLTAGE SWITCHGEAR (LVS) COMPLETE W/ METERING
DEVICES AND ACCESSORIES - SET
(4)- POWER FUSES -
PIECES
(5)- LIGHTING ARRESTERS - PIECES
(6)- AIR BREAK SWITCH - SET
(7)- ENCLOSED ACB NEMA TYPE 1 - SET
(8)- ENCLOSED ACB NEMA TYPE 3R - SET
(9)- AUTOMATIC TRANSFER SWITCH - SET
(10)- MANUAL TRANSFER SWITCH WITHOUT FUSES - PIECES
(11)- MOTOR CONTROLLER - SET

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART Q – MECHANICAL WORKS


ITEM 1200 – AIR CONDITIONING AND REFRIGERATION SYSTEM
(A)- COMPRESSOR, CONDENSER AND EVAPORATOR - SET
(B)- DIFFUSSER, GRILLES AND VALVES - PIECES
(C)- PIPES - LENGTH
(D)- DUCTS AND INSULATIONS - SQ.M.
(E)- PIPE INSULATIONS - METER

ITEM 1201 – WATER PUMPING


(A)- PUMP AND WATER TANK - SET
(B)- AIR COMPRESSOR - SET
(C)- PIPES - LENGTH
(D)- VALVES AND FITTINGS - PIECE

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS

ITEMS OF WORKS IN BUILDING CONSTRUCTION


(BASED ON DPWH STD. SPECS.)

ITEM 1202 – AUTOMATIC WATER SPRINKLER SYSTEM


(A)- FIRE AND JOCKEY PUMPS - SET
(B)- SPRINKLER HEAD, VALVES AND FITTINGS - PIECE
(C)- PIPES - LENGHT

ITEM 1203 – ELECTRIC ELEVATOR


(A)- TRACTION OR HYDRAULIC MACHINE AND CAR - SET
(B)- HOISTWAY DOORS, COUNTER WEIGHT, GUIDE RAILS,
ANNUNCIATORS, AND HALL POSITION INDICATORS - PIECE
(C)- ELECTRICAL WIRES AND CONDUITS - LENGTH

ITEM 1204 – ELECTRIC DUMPWAITER


(A)- MACHINE - SET
(B)- CAR, DOOR AND CABLE - PIECE
(C)- ELECTRICAL WIRES AND CONDUITS - LENGHT

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1205 – OXYGEN, NITROUS OXIDE, VACUUM & FUEL GAS SYSTEM
(A)- OXYGEN, NITROUS OXIDE, GAS MANIFOLD AND
DUPLEX VACUUM PUMP - SET
(B)- HUMIDIFIER, VACUUM TRAP BOTTLE, OUTLETS, VALVES - PIECE
(C)- PIPES AND TUBINGS -
LENGHT
ITEM 1206 – HEATING SYSTEM
(A)- BOILERS, FUEL PUMP, STORAGE TANKS AND FUEL DAY TANK
INCLUDING FOUNDATION - SET
(B)- PIPES - LENGTH
(C)- VALVES AND FITTINGS - PIECES

ITEM 1207 - BOILERS


(A)- STEAM BOILERS, AIR COMPRESSOR, HEAT EXCHANGER
AND FUEL PUMP - SET
(B)- PIPES WITH INSULATION - LENGTH
(C)- VALVES AND FITTINGS - PIECE

NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS

ITEMS OF WORKS IN BUILDING CONSTRUCTION


(BASED ON DPWH STD. SPECS.)

PART R- CONSTRUCTION SAFETY AND HEALTH (DO 56)


SPL -1 – PERSONAL PROTECTIVE EQUIPTMENT (PPE) - PCS.

SPL -2 – SAFETY AND HEALTH PERSONNEL - NOS.

SPL -3 – SIGNAGES AND BARRICADES - PCS.

NVPILAR 2008
NVPILAR 2008

Você também pode gostar