PROJECT: SEKOLAH AGAMA

LOCATION: MANHOLE SERVICE LOAD: 73 kN

MP 1 Boussinesq (1885

UNIT BEARING
REDUCED LEVEL M-VALUE SPT, N WEIGHT OF COHESION, ∅, (˚) CAPACITY, Z
FOR MP, m (BLOWS) (BLOWS) c' kN/m2, qall
SOIL, kN/m3

26 0 0 0 0 0 0
25.78 0 0 18 3 28 65
25.48 31 4 19 5 28 127
25.18 23 3 19 5 28 161
24.88 25 3 19 5 28 195
24.58 48 5 19 5 28 229
24.50 0.00
24.20 31 4 19 5 28 262 0.30
23.90 29 3 19 5 28 296 0.60
23.60 25 3 19 5 28 330 0.90
23.30 84 10 19 5 28 364 1.20
23.00 25 3 19 5 28 398 1.50
22.70 94 11 19 5 28 432 1.80
22.40 34 4 19 5 28 466 2.10
22.10 37 4 19 5 28 499 2.40
21.80 39 4 19 5 28 533 2.70
21.50 48 5 19 5 28 567 3.00
21.20 33 4 19 5 28 601 3.30
20.90 52 6 19 5 28 635 3.60
20.60 60 7 19 5 28 669 3.90
20.30 44 5 19 5 28 702 4.20
20.00 71 8 19 5 28 736 4.50
19.70 43 5 19 5 28 770 4.80
19.40 33 4 19 5 28 804 5.10
19.10 55 6 19 5 28 838 5.40
18.80 86 10 19 5 28 872 5.70
18.50 94 11 19 5 28 905 6.00
18.20 103 12 19 5 28 939 6.30
17.90 96 11 19 5 28 973 6.60
17.60 90 10 19 5 28 1007 6.90
17.30 76 9 19 5 28 1041 7.20
17.00 84 10 19 5 28 1075 7.50
16.70 90 10 19 5 28 1108 7.80
16.40 75 9 19 5 28 1142 8.10
16.10 74 8 19 5 28 1176 8.40
15.80 69 8 19 5 28 1210 8.70
15.50 84 10 19 5 28 1244 9.00
15.20 97 11 19 5 28 1278 9.30
14.90 106 12 19 5 28 1312 9.60
14.60 124 14 19 5 29 1507 9.90
14.30 400 45 19 5 40 6188 10.20
Note:
Bearing Capacity at 1.5m (MP1) is 398 kN/m 2 and the vertical stress at 1.5m (using Boussinesq's equation) is 16 kN/m
Therefore, Bearing Capacity > Vertical Stress
Ie. 398 kN/m2 > 16 kN/m2
:- Ok to proceed.
Boussinesq (1885) MP

Pressure,
kN/m2 qall > (s)
(s)

∞ FAIL
389 FAIL
97 PASS
43 PASS
24 PASS
16 PASS
11 PASS
8 PASS
6 PASS
5 PASS
4 PASS
3 PASS
3 PASS
2 PASS
2 PASS
2 PASS
2 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS

stress at 1.5m (using Boussinesq's equation) is 16 kN/m 2.


PROJECT: SEKOLAH AGAMA
LOCATION: MANHOLE SERVICE LOAD: 73 kN

MP 2 Boussinesq (1885

UNIT BEARING
REDUCED LEVEL M-VALUE SPT, N WEIGHT OF COHESION, ∅, (˚) CAPACITY, Z
FOR MP, m (BLOWS) (BLOWS) c' kN/m2, qall
SOIL, kN/m3

26 0 0 0 0 0 0
25.07 0 0 18 3 28 65
24.77 26 3 19 5 28 127
24.50 0.00
24.20 21 2 19 5 28 161 0.30
23.90 20 2 19 5 28 195 0.60
23.60 16 2 19 5 28 229 0.90
23.30 17 2 19 5 28 262 1.20
23.00 25 3 19 5 28 296 1.50
22.70 24 3 19 5 28 330 1.80
22.40 21 2 19 5 28 364 2.10
22.10 27 3 19 5 28 398 2.40
21.80 24 3 19 5 28 432 2.70
21.50 29 3 19 5 28 466 3.00
21.20 31 4 19 5 28 499 3.30
20.90 34 4 19 5 28 533 3.60
20.60 40 5 19 5 28 567 3.90
20.30 41 5 19 5 28 601 4.20
20.00 36 4 19 5 28 635 4.50
19.70 34 4 19 5 28 669 4.80
19.40 47 5 19 5 28 702 5.10
19.10 51 6 19 5 28 736 5.40
18.80 64 7 19 5 28 770 5.70
18.50 71 8 19 5 28 804 6.00
18.20 74 8 19 5 28 838 6.30
17.90 70 8 19 5 28 872 6.60
17.60 69 8 19 5 28 905 6.90
17.30 47 5 19 5 28 939 7.20
17.00 51 6 19 5 28 973 7.50
16.70 75 9 19 5 28 1007 7.80
16.40 64 7 19 5 28 1041 8.10
16.10 96 11 19 5 28 1075 8.40
15.80 97 11 19 5 28 1108 8.70
15.50 101 11 19 5 28 1142 9.00
15.20 104 12 19 5 28 1176 9.30
14.90 179 20 19 5 32 1923 9.60
14.60 211 24 19 5 33 2231 9.90
14.30 284 32 19 5 36 3339 10.20
14.00 400 45 19 5 40 5882 10.50
Note:
Bearing Capacity at 1.5m (MP2) is 296 kN/m 2 and the vertical stress at 1.5m (using Boussinesq's equation) is 16 kN/m
Therefore, Bearing Capacity > Vertical Stress
Ie. 296 kN/m2 > 16 kN/m2
:- Ok to proceed.
Boussinesq (1885) MP

Pressure,
kN/m2 qall > (s)
(s)

∞ FAIL
389 FAIL
97 PASS
43 PASS
24 PASS
16 PASS
11 PASS
8 PASS
6 PASS
5 PASS
4 PASS
3 PASS
3 PASS
2 PASS
2 PASS
2 PASS
2 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
stress at 1.5m (using Boussinesq's equation) is 16 kN/m 2.
PROJECT: SEKOLAH AGAMA
LOCATION: MANHOLE SERVICE LOAD: 73 kN

MP 3 Boussinesq (1885

UNIT BEARING
REDUCED LEVEL M-VALUE SPT, N WEIGHT OF COHESION, ∅, (˚) CAPACITY, Z
FOR MP, m (BLOWS) (BLOWS) c' kN/m2, qall
SOIL, kN/m3

26 0 0 0 0 0 0
25.48 0 0 18 3 28 65
25.18 60 7 19 5 28 127
24.88 23 3 19 5 28 161
24.58 22 3 19 5 28 195
24.58 0.00
24.28 25 3 19 5 28 229 0.30
23.98 24 3 19 5 28 262 0.60
23.68 21 2 19 5 28 296 0.90
23.38 26 3 19 5 28 330 1.20
23.08 21 2 19 5 28 364 1.50
22.78 24 3 19 5 28 398 1.80
22.48 24 3 19 5 28 432 2.10
22.18 17 2 19 5 28 466 2.40
21.88 29 3 19 5 28 499 2.70
21.58 31 4 19 5 28 533 3.00
21.28 36 4 19 5 28 567 3.30
20.98 40 5 19 5 28 601 3.60
20.68 42 5 19 5 28 635 3.90
20.38 40 5 19 5 28 669 4.20
20.08 43 5 19 5 28 702 4.50
19.78 47 5 19 5 28 736 4.80
19.48 51 6 19 5 28 770 5.10
19.18 64 7 19 5 28 804 5.40
18.88 60 7 19 5 28 838 5.70
18.58 71 8 19 5 28 872 6.00
18.28 76 9 19 5 28 905 6.30
17.98 70 8 19 5 28 939 6.60
17.68 81 9 19 5 28 973 6.90
17.38 84 10 19 5 28 1007 7.20
17.08 71 8 19 5 28 1041 7.50
16.78 75 9 19 5 28 1075 7.80
16.48 70 8 19 5 28 1108 8.10
16.18 84 10 19 5 28 1142 8.40
15.88 97 11 19 5 28 1176 8.70
15.58 101 11 19 5 28 1210 9.00
15.28 112 13 19 5 28 1244 9.30
14.98 169 19 19 5 31 1804 9.60
14.68 107 12 19 5 28 1311 9.90
14.38 120 14 19 5 29 1507 10.20
14.08 142 16 19 5 30 1733 10.50
13.78 178 20 19 5 32 2248 10.80
13.48 215 24 19 5 33 2599 11.10
13.18 400 45 19 5 40 6651 11.40

Note:
Bearing Capacity at 1.5m (MP3) is 432 kN/m 2 and the vertical stress at 1.5m (using Boussinesq's equation) is 21 kN/m
Therefore, Bearing Capacity > Vertical Stress
Ie. 432 kN/m2 > 21 kN/m2
:- Ok to proceed.
Boussinesq (1885) MP

Pressure,
kN/m2 qall > (s)
(s)

∞ FAIL
389 FAIL
97 PASS
43 PASS
24 PASS
16 PASS
11 PASS
8 PASS
6 PASS
5 PASS
4 PASS
3 PASS
3 PASS
2 PASS
2 PASS
2 PASS
2 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS

stress at 1.5m (using Boussinesq's equation) is 21 kN/m 2.


PROJECT: SEKOLAH AGAMA
LOCATION: MANHOLE SERVICE LOAD: 73 kN

MP 4 Boussinesq (1885

UNIT BEARING
REDUCED LEVEL M-VALUE SPT, N WEIGHT OF COHESION, ∅, (˚) CAPACITY, Z
FOR MP, m (BLOWS) (BLOWS) c' kN/m2, qall
SOIL, kN/m3

26 0 0 0 0 0 0
25.67 26 0 18 3 28 65
25.37 21 2 19 5 28 127
25.07 25 3 19 5 28 161
24.77 24 3 19 5 28 195
24.50 0.00
24.20 24 3 19 5 28 229 0.30
23.90 29 3 19 5 28 262 0.60
23.60 30 3 19 5 28 296 0.90
23.30 31 4 19 5 28 330 1.20
23.00 36 4 19 5 28 364 1.50
22.70 29 3 19 5 28 398 1.80
22.40 24 3 19 5 28 432 2.10
22.10 21 2 19 5 28 466 2.40
21.80 25 3 19 5 28 499 2.70
21.50 26 3 19 5 28 533 3.00
21.20 27 3 19 5 28 567 3.30
20.90 30 3 19 5 28 601 3.60
20.60 36 4 19 5 28 635 3.90
20.30 40 5 19 5 28 669 4.20
20.00 40 5 19 5 28 702 4.50
19.70 42 5 19 5 28 736 4.80
19.40 45 5 19 5 28 770 5.10
19.10 43 5 19 5 28 804 5.40
18.80 44 5 19 5 28 838 5.70
18.50 47 5 19 5 28 872 6.00
18.20 51 6 19 5 28 905 6.30
17.90 64 7 19 5 28 939 6.60
17.60 75 9 19 5 28 973 6.90
17.30 81 9 19 5 28 1007 7.20
17.00 96 11 19 5 28 1041 7.50
16.70 112 13 19 5 28 1075 7.80
16.40 400 45 19 5 40 1108 8.10
Note:
Bearing Capacity at 1.5m (MP4) is 364 kN/m 2 and the vertical stress at 1.5m (using Boussinesq's equation) is 16 kN/m
Therefore, Bearing Capacity > Vertical Stress
Ie. 364 kN/m2 > 16 kN/m2
:- Ok to proceed.
Boussinesq (1885) MP

Pressure,
kN/m2 qall > (s)
(s)

∞ FAIL
389 FAIL
97 PASS
43 PASS
24 PASS
16 PASS
11 PASS
8 PASS
6 PASS
5 PASS
4 PASS
3 PASS
3 PASS
2 PASS
2 PASS
2 PASS
2 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
stress at 1.5m (using Boussinesq's equation) is 16 kN/m 2.
PROJECT: SEKOLAH AGAMA
LOCATION: MANHOLE SERVICE LOAD: 73 kN

MP 5 Boussinesq (1885

UNIT BEARING
REDUCED LEVEL M-VALUE SPT, N WEIGHT OF COHESION, ∅, (˚) CAPACITY, Z
FOR MP, m (BLOWS) (BLOWS) c' kN/m2, qall
SOIL, kN/m3

26 0 0 0 0 0 0
25.70 41 0 18 3 28 65
25.40 40 5 19 5 28 127
25.10 2 0 19 5 28 161
24.80 21 2 19 5 28 195
24.50 25 3 19 5 28 229 0.00
24.20 24 3 19 5 28 262 0.30
23.90 21 2 19 5 28 296 0.60
23.60 21 2 19 5 28 330 0.90
23.30 26 3 19 5 28 364 1.20
23.00 24 3 19 5 28 398 1.50
22.70 30 3 19 5 28 432 1.80
22.40 31 4 19 5 28 466 2.10
22.10 36 4 19 5 28 499 2.40
21.80 42 5 19 5 28 533 2.70
21.50 40 5 19 5 28 567 3.00
21.20 47 5 19 5 28 601 3.30
20.90 51 6 19 5 28 635 3.60
20.60 54 6 19 5 28 669 3.90
20.30 60 7 19 5 28 702 4.20
20.00 62 7 19 5 28 736 4.50
19.70 70 8 19 5 28 770 4.80
19.40 71 8 19 5 28 804 5.10
19.10 76 9 19 5 28 838 5.40
18.80 44 5 19 5 28 872 5.70
18.50 42 5 19 5 28 905 6.00
18.20 47 5 19 5 28 939 6.30
17.90 51 6 19 5 28 973 6.60
17.60 55 6 19 5 28 1007 6.90
17.30 67 8 19 5 28 1041 7.20
17.00 64 7 19 5 28 1075 7.50
16.70 71 8 19 5 40 1108 7.80
16.40 90 10 19 5 40 1142 8.10
16.10 101 11 19 5 40 1176 8.40
15.80 141 16 19 5 40 1210 8.70
15.50 213 24 19 5 40 1244 9.00
15.20 400 45 19 5 40 1804 9.30
Note:
Bearing Capacity at 1.5m (MP5) is 398 kN/m 2 and the vertical stress at 1.5m (using Boussinesq's equation) is 16 kN/m
Therefore, Bearing Capacity > Vertical Stress
Ie. 398 kN/m2 > 16 kN/m2
:- Ok to proceed.
Boussinesq (1885) MP

Pressure,
kN/m2 qall > (s)
(s)

∞ FAIL
389 FAIL
97 PASS
43 PASS
24 PASS
16 PASS
11 PASS
8 PASS
6 PASS
5 PASS
4 PASS
3 PASS
3 PASS
2 PASS
2 PASS
2 PASS
2 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
1 PASS
0 PASS
0 PASS
0 PASS
0 PASS
stress at 1.5m (using Boussinesq's equation) is 16 kN/m 2.
PROJECT: SEKOLAH AGAMA

MP 1 MP 2 MP 3 MP 4 MP 5

REDUCED REDUCED REDUCED REDUCED REDUCED


M-VALUE SPT, N M-VALUE SPT, N M-VALUE SPT, N M-VALUE SPT, N M-VALUE SPT, N
LEVEL FOR LEVEL FOR LEVEL FOR LEVEL FOR LEVEL FOR
MP, m (BLOWS) (BLOWS) MP, m (BLOWS) (BLOWS) MP, m (BLOWS) (BLOWS) MP, m (BLOWS) (BLOWS) MP, m (BLOWS) (BLOWS)

26 0 0 26 0 0 26 0 0 26 0 0 26 0 0
25.78 31 0 25.07 26 0 25.48 60 0 25.67 26 0 25.70 41 0
25.48 23 3 24.77 21 2 25.18 23 3 25.37 21 2 25.40 40 5
25.18 25 3 24.47 20 2 24.88 22 3 25.07 25 3 25.10 2 0
24.88 48 5 24.17 16 2 24.58 25 3 24.77 24 3 24.80 21 2
24.58 31 4 23.87 17 2 24.28 24 3 24.47 24 3 24.50 25 3
24.28 29 3 23.57 25 3 23.98 21 2 24.17 29 3 24.20 24 3
23.98 25 3 23.27 24 3 23.68 26 3 23.87 30 3 23.90 21 2
23.68 84 10 22.97 21 2 23.38 21 2 23.57 31 4 23.60 21 2
23.38 25 3 22.67 27 3 23.08 24 3 23.27 36 4 23.30 26 3
23.08 94 11 22.37 24 3 22.78 24 3 22.97 29 3 23.00 24 3
22.78 34 4 22.07 29 3 22.48 17 2 22.67 24 3 22.70 30 3
22.48 37 4 21.77 31 4 22.18 29 3 22.37 21 2 22.40 31 4
22.18 39 4 21.47 34 4 21.88 31 4 22.07 25 3 22.10 36 4
21.88 48 5 21.17 40 5 21.58 36 4 21.77 26 3 21.80 42 5
21.58 33 4 20.87 41 5 21.28 40 5 21.47 27 3 21.50 40 5
21.28 52 6 20.57 36 4 20.98 42 5 21.17 30 3 21.20 47 5
20.98 60 7 20.27 34 4 20.68 40 5 20.87 36 4 20.90 51 6
20.68 44 5 19.97 47 5 20.38 43 5 20.57 40 5 20.60 54 6
20.38 71 8 19.67 51 6 20.08 47 5 20.27 40 5 20.30 60 7
20.08 43 5 19.37 64 7 19.78 51 6 19.97 42 5 20.00 62 7
19.78 33 4 19.07 71 8 19.48 64 7 19.67 45 5 19.70 70 8
19.48 55 6 18.77 74 8 19.18 60 7 19.37 43 5 19.40 71 8
19.18 86 10 18.47 70 8 18.88 71 8 19.07 44 5 19.10 76 9
18.88 94 11 18.17 69 8 18.58 76 9 18.77 47 5 18.80 44 5
18.58 103 12 17.87 47 5 18.28 70 8 18.47 51 6 18.50 42 5
18.28 96 11 17.57 51 6 17.98 81 9 18.17 64 7 18.20 47 5
17.98 90 10 17.27 75 9 17.68 84 10 17.87 75 9 17.90 51 6
17.68 76 9 16.97 64 7 17.38 71 8 17.57 81 9 17.60 55 6
17.38 84 10 16.67 96 11 17.08 75 9 17.27 96 11 17.30 67 8
17.08 90 10 16.37 97 11 16.78 70 8 16.97 112 13 17.00 64 7
16.78 75 9 16.07 101 11 16.48 84 10 16.67 400 45 16.70 71 8
16.48 74 8 15.77 104 12 16.18 97 11 16.37 16.40 90 10
16.18 69 8 15.47 179 20 15.88 101 11 16.07 16.10 101 11
15.88 84 10 15.17 211 24 15.58 112 13 15.77 15.80 141 16
15.58 97 11 14.87 284 32 15.28 169 19 15.47 15.50 213 24
15.28 106 12 14.57 400 45 14.98 107 12 15.17 15.20 400 45
14.98 124 14 14.27 14.68 120 14 14.87 14.90
14.68 400 45 13.97 14.38 142 16 14.57 14.60
14.38 13.67 14.08 178 20 14.27 14.30
14.08 13.37 13.78 215 24 13.97 14.00
13.78 13.07 13.48 400 45 13.67 13.70
13.48 12.77 13.18 13.37 13.40
13.18 12.47 12.88 13.07 13.10
PROJECT: SMK 2
LOCATION: STAIRCASE SERVICE LOAD: 134 kN

BH 20 MP 55 Boussinesq (1885)

BEARING BEARING Point Load


REDUCED LEVEL REDUCED LEVEL Point Load, Depth, z Radial offset, r Radial/Depth
CAPACITY, CAPACITY, = influence
FOR BH, m FOR MP, m P (kN) r/z P/z2
kN/m2, qall kN/m2, qall factor, Ip

70.55 0 70.55 0 134 0.00


69.23 21 134 0.00 0 ∞ ∞ ∞
69 21 134 0.23 0 0 0.48 2533
68.93 34 134 0.30 0 0 0.48 1489
68.6 76 134 0.60 0 0 0.48 372
68 123 134 0.90 0 0 0.48 165
68 212 134 1.20 0 0 0.48 93
67.7 285 134 1.50 0 0 0.48 60
67.5 255 134 1.73 0 0 0.48 45
67.4 374 134 1.80 0 0 0.48 41
67.1 544 134 2.10 0 0 0.48 30
66.8 787 134 2.40 0 0 0.48 23
66.5 998 134 2.70 0 0 0.48 18
66.2 1650 134 3.00 0 0 0.48 15
66 468 134 3.23 0 0 0.48 13
134 4.73 0 0 0.48 6
64.5 681 134 6.23 0 0 0.48 3
63 797 134 7.73 0 0 0.48 2
61.5 881 134 9.23 0 0 0.48 2
60 1322 134 10.73 0 0 0.48 1
58.5 1726 134 12.23 0 0 0.48 1
57 3655 134 13.73 0 0 0.48 1
55.5 4678 134 15.23 0 0 0.48 1
54 5933 134 16.73 0 0 0.48 0
52.5 7474 134 18.23 0 0 0.48 0
51 8145 134 19.73 0 0 0.48 0
49.5 8816 134 21.23 0 0 0.48 0
48 9487 134 22.73 0 0 0.48 0
46.5 10157 134 24.23 0 0 0.48 0
45 12459 134 25.73 0 0 0.48 0
43.5 13231 134 27.23 0 0 0.48 0
42 14003 134 28.73 1 0 0.48 0
40.5 17059 134 30.23 2 0 0.47 0
39 20795 134 31.73 3 0 0.47 0
37.5 21829 134 33.23 4 0 0.46 0
37.5 22862 134 34.73 5 0 0.45 0
37.5 23895 134 36.23 6 0 0.45 0
Note:
Bearing Capacity at 1.5m (BH20) is 255 kN/m 2 and the vertical stress at 1.5m (using Boussinesq's equation) is 29 kN/m 2.
Therefore, Bearing Capacity > Vertical Stress
Ie. 255 kN/m2 > 29 kN/m2
:- Ok to proceed.
Boussinesq (1885) BH MP

Pressure, kN/m2
qall > (s) qall > (s)
(s)

∞ FAIL
1209 FAIL
711 FAIL
178 FAIL
79 PASS
44 PASS
28 PASS
21 PASS
20 PASS
15 PASS
11 PASS
9 PASS
7 PASS
6 PASS
3
2 PASS
1 PASS
1 PASS
1 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS
0 PASS

Você também pode gostar