We have no objections to the results of the Geotechnical Report but please reflect the following
parameters and conditions in the design as well as drawings ;
Subsoil is dense to very dense , silty / clayey , very sandy to medium coarse gravel
Minimum Embedment Depth of Foundation from 1.50m to have net allowable bearing pressure
from 370 Kpa for isolated pad .
Considering the Sulphate and Chloride content as well as prevailing exposure conditions ,
(b) Minimum Cement Content is not explicitly mentioned ( verify what is Note 3? )
Class B well graded non-cohesive backfilling , size not exceeding 37.5mm and not more than 15%
passing 0.075mm, compacted to 95% or more Modified Proctor Max Dry Density.
Recommended Structural Fill material shall be granular fill ( well graded sand / ravelly sand ) and
coarse aggregate ( well graded gravelly sand mixture ) for their good drainage characteristics and
compactable to form an excellent base .
2 ITEM B : STRUCTURAL CALCULATION
NOTE :
Drawings had been reviewed now without THE APPROVED structural calculations seen.
Bituminous Liquid Tar Epoxy Paint waterproofing to be Minimum 500 Dry Film Thickness ( 3 coats )
In dwg S / 1-9 Side Notes # 2 , please mention that “ Main Building Foundation is Designed for
G + 1 + Roof “ ( instead of just saying 2 Floors )
Please consistently reflect Codal standards ( say BS 8110 ) in your design and drawings as well.
Kindly confirm the Cube strength 28th day compressive strength Fcu for Structural Elements to
be consistent in all drawings ( is it C40 , C35 ? ). We prefer C40
Kindly verify the soil report regarding the Cement type to be used ( whether OPC or SRC ) for
substructure structural elements such as footings , grade slabs , plinth beams , substructure
columns . However , we prefer the more stringent SRC .
Please verify and reconcile Side Notes # 8 in dwg S / 1-9 and Section J - Notes #5 in dwg S / 9-9
regarding the clear cover for structural elements. Ensure the clear concrete covers specially for
substructure to comply with recommendations from the soil test.
Please confirm the Cube strength 28th day compressive strength Fcu for Blinding to be consistent
in all drawings ( is it C15 , C10 ? ). We prefer C20
We recommend for you to ADJUST the COLUMN LINK CONFIGURATION IN ALL COLUMNS to a
more practical arrangement incorporating the Clause 3.12.7.2 of BS8110 ( attached is the sketch
showing the application of this Clause to the Column Links ).
Yield Strength of Steel to be consistently Grade 460 all throughout the drawings
In dwg S / 9-9 , verify the contents of Sections D and E and correct accordingly.
Please supply the missing hatches in the legend for Blockworks in Section K in dwg S / 9-9 and
ensure that they are consistently used in the framing plans.
Please include drawing of water stop on the elevator shaft wall immediately above the surface of
the raft foundation slab which is a critical construction joint as commented in the drawing.
In the dwg S / 8-9 , please explicitly mention the clear concrete cover for the “ Typical Sectional
Elevation of R.C. Column and Footing as per soil report.
NOTE :
Prepared by :