Você está na página 1de 9

8 7 6 5 4 2 1

L2.0 LINE OF SLAB OPENING


E
N= =60
56 83
15 .38
1.8 4
51

F F

NOTES:
1. Do not scale this drawing. All dimensions are in millimeters and levels are in meters UNO.
2. All dimensions to be verified on site as per actual site condition, prior to commencement
of any construction or installation work.
3. Generally dimensions are to face of final finishes, with principal build up dimensions
UP indicated.
4.These drawing has been prepared in accordance with IFC & BULLETIN 101.
5. Fabrication and erection tolerances are according to movements &
tolerances report book 17 of 24-internal building movement &
tolerance report, dated january 2011.
6. Materials & finishes considered as per relevant specifications.
(subject to material approval).
7. All hidden steel brackets and sections are hot dip galvanized.
E 8. All aluminum extrusions are powder coated finish
E
(subject to material approval.)
9. All anchor bolts are steel galvanized, installation per ETA
98/001, with holes filled with hilti dynamic set or any suitable gap solutions.

9.5 2
13 .83
27
56 74
N= =60
E
UP

03 PAVILLION STAIR PLAN


SCALE: 1:50
MUSEUM ART GLASS
D D

00 FOR APPROVAL 20.05.17 VIG

E
N= =60
56 83
15 .38
1.8 4
51

C C

ABU DHABI AIRPORTS COMPANY

B B

9.5 2
13 .83
27
56 74
N= =60
E
02 PAVILLION STAIR PLAN
SCALE: 1:50
MUSEUM ART GLASS

ABU DHABI INTERNATIONAL AIRPORT


ELEVATION
SCALE: 1:50

MUSEUM PAVILLION STAIR


A SECTOR 5.19D POINT FIXING A
PARTIAL PLAN & ELEVATION
01

SD-001

- 20.05.17 VIG VR - -

8 7 6 5 4 2 1
8 7 6 5 4 2 1

F F

NOTES:
1. Do not scale this drawing. All dimensions are in millimeters and levels are in meters UNO.
2. All dimensions to be verified on site as per actual site condition, prior to commencement
of any construction or installation work.
3. Generally dimensions are to face of final finishes, with principal build up dimensions
indicated.
4.These drawing has been prepared in accordance with IFC & BULLETIN 101.
5. Fabrication and erection tolerances are according to movements &
tolerances report book 17 of 24-internal building movement &
tolerance report, dated january 2011.
6. Materials & finishes considered as per relevant specifications.
(subject to material approval).
7. All hidden steel brackets and sections are hot dip galvanized.
E 8. All aluminum extrusions are powder coated finish
E
(subject to material approval.)
9. All anchor bolts are steel galvanized, installation per ETA
98/001, with holes filled with hilti dynamic set or any suitable gap solutions.

D D

00 FOR APPROVAL 20/05/17 RK

C C

ABU DHABI AIRPORTS COMPANY

B B

ABU DHABI INTERNATIONAL AIRPORT

MUSEUM PAVILION ART GLASS


A GLASS ENVELOPE AND INNER CORE A
STEEL FRAMING SECTIONS

SD-002 00

- 20/05/17 1:50 RK VR - -

8 7 6 5 4 2 1
8 7 6 5 4 2 1

F F

NOTES:
1. Do not scale this drawing. All dimensions are in millimeters and levels are in meters UNO.
2. All dimensions to be verified on site as per actual site condition, prior to commencement
of any construction or installation work.
3. Generally dimensions are to face of final finishes, with principal build up dimensions
indicated.
4.These drawing has been prepared in accordance with IFC & BULLETIN 101.
5. Fabrication and erection tolerances are according to movements &
tolerances report book 17 of 24-internal building movement &
tolerance report, dated january 2011.
6. Materials & finishes considered as per relevant specifications.
(subject to material approval).
7. All hidden steel brackets and sections are hot dip galvanized.
E 8. All aluminum extrusions are powder coated finish
E
(subject to material approval.)
9. All anchor bolts are steel galvanized, installation per ETA
98/001, with holes filled with hilti dynamic set or any suitable gap solutions.

D D

00 FOR APPROVAL 20/05/17 LV

C C

ABU DHABI AIRPORTS COMPANY

B B

ABU DHABI INTERNATIONAL AIRPORT

MUSEUM PAVILION ART GLASS


A GLASS ENVELOPE DEVELOPED A
ELEVATIONS

SD-005 00

- 20/05/17 1:50 LV VR - -

8 7 6 5 4 2 1
8 7 6 5 4 2 1

F F

NOTES:
1. Do not scale this drawing. All dimensions are in millimeters and levels are in meters UNO.
2. All dimensions to be verified on site as per actual site condition, prior to commencement
of any construction or installation work.
3. Generally dimensions are to face of final finishes, with principal build up dimensions
indicated.
4.These drawing has been prepared in accordance with IFC & BULLETIN 101.
5. Fabrication and erection tolerances are according to movements &
tolerances report book 17 of 24-internal building movement &
tolerance report, dated january 2011.
6. Materials & finishes considered as per relevant specifications.
(subject to material approval).
7. All hidden steel brackets and sections are hot dip galvanized.
E 8. All aluminum extrusions are powder coated finish
E
(subject to material approval.)
9. All anchor bolts are steel galvanized, installation per ETA
98/001, with holes filled with hilti dynamic set or any suitable gap solutions.

D D

DETAIL-7 SECTIONAL PLAN- M


00 FOR APPROVAL 20/05/17 ASC VR

C C

Planning & Development


ABU DHABI AIRPORTS COMPANY

3
SD-00

B B

DUBAI METAL

ABU DHABI INTERNATIONAL AIRPORT


MIDFIELD TERMINAL BUILDING
PART ELEVATION- N
MUSEUM PAVILION STAIR
A SECTIONAL ELEVATION- P SECTOR 5 POINT FIXING A
DETAILS

SD-010 00

20/05/17 1:3 ASC VR 01 01

8 7 6 5 4 2 1
8 7 6 5 4 2 1

1.14B
1.14A

1.14D 1.13A 1.13B


2.14A 2.14B
1.14C

2.13A 2.13B

1.13C 1.12A 1.12B 2.14C 2.14D

2.12A 2.12B
7.31A 2.13C 2.13D
1.12C 1.12D
1.11B
1.11A 5.33A 2.15A 2.15B
5.33B

2.12C 2.12D
7.31C 7.31D 2.11A 2.11B
1.11D 5.33C
1.11C
5.33D

7.11A 7.11B 7.12A 7.12B 7.13A 7.13B 7.14A 7.14B 5.13A 5.13B 5.14A 5.14B 5.15A 5.15B 2.11C
5.11A 5.11B 5.12A 5.12B

7.11C 7.11D 7.12C 7.12D 7.13C 7.13D 7.14C 7.14D 5.11C 5.11D 5.12C 5.12D 5.13C 5.13D 5.14C 5.14D 5.15C 5.15D

7.15A 7.15B 7.16A 7.16B 7.17A 7.17B 7.18A 7.18B 5.16A 5.16B 5.17A 5.17B 5.18A 5.18B 5.19A 5.19B 5.20A 5.20B

7.15C 7.15D 7.16C 7.16D 7.17C 7.17D 7.18C 7.18D 5.16C 5.16D 5.17C 5.17D 5.18C 5.18D 5.19C 5.19D 5.20C 5.20D

7.19A 7.19B 7.20A 7.20B 7.21A 7.21B 7.22A 7.22B 5.21A 5.21B 5.22A 5.22B 5.23A 5.23B 5.24A 5.24B 5.25A 5.25B

F 7.19C 7.19D 7.20C 7.20D 7.21C 7.21D 7.22C 7.22D 5.21C 5.21D 5.22C 5.22D 5.23C 5.23D 5.24C 5.24D 5.25C 5.25D F
7.23A 7.23B 7.24A 7.24B 7.25A 7.25B 7.26A 7.26B 5.26A 5.26B 5.27A 5.27B 5.28A 5.28B 5.29A 5.29B 5.30A 5.30B

3.11A 3.11B

7.23C 7.23D 7.24C 7.24D 7.25C 7.25D 7.26C 7.26D 5.26C 5.26D 5.27C 5.27D 5.28C 5.28D 5.29C 5.29D 5.30C 5.30D

3.11D

3.11C

7.27A 7.27B 7.28A 7.28B 7.29A 7.29B 7.30A 7.30B 5.34A 5.34B 4.11A 4.11B 3.12A 3.12B

3.13A 3.13B
7.27C 7.27D 7.28C 7.28D 7.29C 7.29D 7.30C 7.30D 5.34C 5.34D 4.11C 4.11D 3.12C 3.12D 3.14A 3.14B

4.12A 4.12B

3.13C 3.13D
3.15A 3.15B

4.12C 4.12D

4.13A
3.15C 3.15D
4.13B

4.13C 4.13D

4.14A
4.14B

4.14C 4.14D

NOTES:
1. Do not scale this drawing. All dimensions are in millimeters and levels are in meters UNO.
2. All dimensions to be verified on site as per actual site condition, prior to commencement
of any construction or installation work.
3. Generally dimensions are to face of final finishes, with principal build up dimensions
indicated.
4.These drawing has been prepared in accordance with IFC & BULLETIN 101.
5. Fabrication and erection tolerances are according to movements &
tolerances report book 17 of 24-internal building movement &
tolerance report, dated january 2011.
6. Materials & finishes considered as per relevant specifications.
(subject to material approval).
7. All hidden steel brackets and sections are hot dip galvanized.
E 8. All aluminum extrusions are powder coated finish
E
(subject to material approval.)
9. All anchor bolts are steel galvanized, installation per ETA
98/001, with holes filled with hilti dynamic set or any suitable gap solutions.

D D

00 FOR APPROVAL 20.05.17 VIG VR

C C

Planning & Development


ABU DHABI AIRPORTS COMPANY

B B

ABU DHABI INTERNATIONAL AIRPORT

A MUSEUM PAVILLION GLASS FIXING FRAME A


BASE PLATE ENLARGED DETAIL

SD-011

- 20.05.17 AS SHOWN VIG VR 01 01

8 7 6 5 4 2 1
8 7 6 5 4 2 1

1.14B
1.14A

1.14D 1.13A 1.13B


2.14A 2.14B
1.14C

2.13A 2.13B

1.13C 1.12A 1.12B 2.14C 2.14D

2.12A 2.12B
7.31A 2.13C 2.13D
1.12C 1.12D
1.11B
1.11A 5.33A 2.15A 2.15B
5.33B

2.12C 2.12D
7.31C 7.31D 2.11A 2.11B
1.11D 5.33C
1.11C
5.33D

7.11A 7.11B 7.12A 7.12B 7.13A 7.13B 7.14A 7.14B 5.13A 5.13B 5.14A 5.14B 5.15A 5.15B 2.11C
5.11A 5.11B 5.12A 5.12B

7.11C 7.11D 7.12C 7.12D 7.13C 7.13D 7.14C 7.14D 5.11C 5.11D 5.12C 5.12D 5.13C 5.13D 5.14C 5.14D 5.15C 5.15D

7.15A 7.15B 7.16A 7.16B 7.17A 7.17B 7.18A 7.18B 5.16A 5.16B 5.17A 5.17B 5.18A 5.18B 5.19A 5.19B 5.20A 5.20B

7.15C 7.15D 7.16C 7.16D 7.17C 7.17D 7.18C 7.18D 5.16C 5.16D 5.17C 5.17D 5.18C 5.18D 5.19C 5.19D 5.20C 5.20D

7.19A 7.19B 7.20A 7.20B 7.21A 7.21B 7.22A 7.22B 5.21A 5.21B 5.22A 5.22B 5.23A 5.23B 5.24A 5.24B 5.25A 5.25B

F 7.19C 7.19D 7.20C 7.20D 7.21C 7.21D 7.22C 7.22D 5.21C 5.21D 5.22C 5.22D 5.23C 5.23D 5.24C 5.24D 5.25C 5.25D F
7.23A 7.23B 7.24A 7.24B 7.25A 7.25B 7.26A 7.26B 5.26A 5.26B 5.27A 5.27B 5.28A 5.28B 5.29A 5.29B 5.30A 5.30B

3.11A 3.11B

7.23C 7.23D 7.24C 7.24D 7.25C 7.25D 7.26C 7.26D 5.26C 5.26D 5.27C 5.27D 5.28C 5.28D 5.29C 5.29D 5.30C 5.30D

3.11D

3.11C

7.27A 7.27B 7.28A 7.28B 7.29A 7.29B 7.30A 7.30B 5.34A 5.34B 4.11A 4.11B 3.12A 3.12B

3.13A 3.13B
7.27C 7.27D 7.28C 7.28D 7.29C 7.29D 7.30C 7.30D 5.34C 5.34D 4.11C 4.11D 3.12C 3.12D 3.14A 3.14B

4.12A 4.12B

3.13C 3.13D
3.15A 3.15B

4.12C 4.12D

4.13A
3.15C 3.15D
4.13B

4.13C 4.13D

4.14A
4.14B

4.14C 4.14D

NOTES:
1. Do not scale this drawing. All dimensions are in millimeters and levels are in meters UNO.
2. All dimensions to be verified on site as per actual site condition, prior to commencement
of any construction or installation work.
3. Generally dimensions are to face of final finishes, with principal build up dimensions
indicated.
4.These drawing has been prepared in accordance with IFC & BULLETIN 101.
5. Fabrication and erection tolerances are according to movements &
tolerances report book 17 of 24-internal building movement &
tolerance report, dated january 2011.
6. Materials & finishes considered as per relevant specifications.
(subject to material approval).
7. All hidden steel brackets and sections are hot dip galvanized.
E 8. All aluminum extrusions are powder coated finish
E
(subject to material approval.)
9. All anchor bolts are steel galvanized, installation per ETA
98/001, with holes filled with hilti dynamic set or any suitable gap solutions.

D D

00 FOR APPROVAL 20.05.17 VIG VR

C C

Planning & Development


ABU DHABI AIRPORTS COMPANY

B B

ABU DHABI INTERNATIONAL AIRPORT

A MUSEUM PAVILLION GLASS FIXING FRAME A


BASE PLATE ENLARGED DETAIL

SD-012

- 20.05.17 AS SHOWN VIG VR 01 01

8 7 6 5 4 2 1
1.14B
1.14A

1.14D 1.13A 1.13B


2.14A 2.14B
1.14C

2.13A 2.13B

1.13C 1.12A 1.12B 2.14C 2.14D

2.12A 2.12B
7.31A 2.13C 2.13D
1.12C 1.12D
1.11B
1.11A 5.33A 5.33B 2.15A 2.15B

2.12C 2.12D
7.31C 7.31D 2.11A 2.11B
1.11D 5.33C
1.11C
5.33D

7.11A 7.11B 7.12A 7.12B 7.13A 7.13B 7.14A 7.14B 5.13A 5.13B 5.14A 5.14B 5.15A 5.15B 2.11C
5.11A 5.11B 5.12A 5.12B

7.11C 7.11D 7.12C 7.12D 7.13C 7.13D 7.14C 7.14D 5.11C 5.11D 5.12C 5.12D 5.13C 5.13D 5.14C 5.14D 5.15C 5.15D

7.15A 7.15B 7.16A 7.16B 7.17A 7.17B 7.18A 7.18B 5.16A 5.16B 5.17A 5.17B 5.18A 5.18B 5.19A 5.19B 5.20A 5.20B

7.15C 7.15D 7.16C 7.16D 7.17C 7.17D 7.18C 7.18D 5.16C 5.16D 5.17C 5.17D 5.18C 5.18D 5.19C 5.19D 5.20C 5.20D

7.19A 7.19B 7.20A 7.20B 7.21A 7.21B 7.22A 7.22B 5.21A 5.21B 5.22A 5.22B 5.23A 5.23B 5.24A 5.24B 5.25A 5.25B

7.19C 7.19D 7.20C 7.20D 7.21C 7.21D 7.22C 7.22D 5.21C 5.21D 5.22C 5.22D 5.23C 5.23D 5.24C 5.24D 5.25C 5.25D

7.23A 7.23B 7.24A 7.24B 7.25A 7.25B 7.26A 7.26B 5.26A 5.26B 5.27A 5.27B 5.28A 5.28B 5.29A 5.29B 5.30A 5.30B

3.11A 3.11B

7.23C 7.23D 7.24C 7.24D 7.25C 7.25D 7.26C 7.26D 5.26C 5.26D 5.27C 5.27D 5.28C 5.28D 5.29C 5.29D 5.30C 5.30D

3.11D

3.11C

7.27A 7.27B 7.28A 7.28B 7.29A 7.29B 7.30A 7.30B 5.34A 5.34B 4.11A 4.11B 3.12A 3.12B

3.13A 3.13B
7.27C 7.27D 7.28C 7.28D 7.29C 7.29D 7.30C 7.30D 5.34C 5.34D 4.11C 4.11D 3.12C 3.12D 3.14A 3.14B

4.12A 4.12B

3.13C 3.13D
3.15A 3.15B

4.12C 4.12D

4.13A
3.15C 3.15D
4.13B

4.13C 4.13D

4.14A
4.14B

4.14C 4.14D

NOTES:
1. Do not scale this drawing. All dimensions are in millimeters and levels are in meters UNO.
2. All dimensions to be verified on site as per actual site condition, prior to commencement
of any construction or installation work.
3. Generally dimensions are to face of final finishes, with principal build up dimensions
indicated.
4.These drawing has been prepared in accordance with IFC & BULLETIN 101.
5. Fabrication and erection tolerances are according to movements &
tolerances report book 17 of 24-internal building movement &
tolerance report, dated january 2011.
6. Materials & finishes considered as per relevant specifications.
(subject to material approval).
7. All hidden steel brackets and sections are hot dip galvanized.
8. All aluminum extrusions are powder coated finish
(subject to material approval.)
9. All anchor bolts are steel galvanized, installation per ETA
98/001, with holes filled with hilti dynamic set or any suitable gap solutions.

00 FOR APPROVAL 20.05.17 VIG VR

Planning & Development


ABU DHABI AIRPORTS COMPANY

ABU DHABI INTERNATIONAL AIRPORT

MUSEUM PAVILLION GLASS FIXING FRAME


PIPE FIXING ENLARGED DETAIL

SD-013

- 20.05.17 AS SHOWN VIG VR 01 01


8 7 6 5 4 2 1

F F

NOTES:
1. Do not scale this drawing. All dimensions are in millimeters and levels are in meters UNO.
2. All dimensions to be verified on site as per actual site condition, prior to commencement
of any construction or installation work.
3. Generally dimensions are to face of final finishes, with principal build up dimensions
indicated.
4.These drawing has been prepared in accordance with IFC & BULLETIN 101.
5. Fabrication and erection tolerances are according to movements &
tolerances report book 17 of 24-internal building movement &
tolerance report, dated january 2011.
6. Materials & finishes considered as per relevant specifications.
(subject to material approval).
7. All hidden steel brackets and sections are hot dip galvanized.
E 8. All aluminum extrusions are powder coated finish
E
(subject to material approval.)
9. All anchor bolts are steel galvanized, installation per ETA
98/001, with holes filled with hilti dynamic set or any suitable gap solutions.

D D

00 FOR APPROVAL 20.05.17 VIG

C C

ABU DHABI AIRPORTS COMPANY

B B

ABU DHABI INTERNATIONAL AIRPORT

A MUSEUM PAVILLION GLASS FIXING FRAME A


CLAMPING PLATE ENLARGED DETAIL

SD-014

- 20.05.17 VIG VR 01 01

8 7 6 5 4 2 1
8 7 6 5 4 2 1

F F

NOTES:
1. Do not scale this drawing. All dimensions are in millimeters and levels are in meters UNO.
2. All dimensions to be verified on site as per actual site condition, prior to commencement
of any construction or installation work.
3. Generally dimensions are to face of final finishes, with principal build up dimensions
indicated.
4.These drawing has been prepared in accordance with IFC & BULLETIN 101.
5. Fabrication and erection tolerances are according to movements &
tolerances report book 17 of 24-internal building movement &
tolerance report, dated january 2011.
6. Materials & finishes considered as per relevant specifications.
(subject to material approval).
7. All hidden steel brackets and sections are hot dip galvanized.
E 8. All aluminum extrusions are powder coated finish
E
(subject to material approval.)
9. All anchor bolts are steel galvanized, installation per ETA
98/001, with holes filled with hilti dynamic set or any suitable gap solutions.

D D

00 FOR APPROVAL 20.05.17 VIG

C C

ABU DHABI AIRPORTS COMPANY

B B

ABU DHABI INTERNATIONAL AIRPORT

A MUSEUM PAVILLION GLASS FIXING FRAME A


SUPPORT ENLARGED DETAIL

SD-015

- 20.05.17 VIG VR 01 01

8 7 6 5 4 2 1

Você também pode gostar