Você está na página 1de 9

CHAPTER - I NURSERIES

01 - NURSERIES
Sl. Zonal FSR Description of work with detailed specifications Rate Per/Unit
No. Code in Rs.
01-01 : The rates of collection of different species of the
seed is as follows: Procurement of clean, Graded and
Viable seed including transport.
1 01-01-001 Teak (Clean & Graded) / Tectona grandis 82.87 Kg
2 01-01-002 Tellamaddi / Terminalia arjuna 82.87 Kg
3 01-01-003 Nallamaddi / Terminalia tomentosa 82.87 Kg
4 01-01-004 Eucalyptus / Eucalyptus 210.03 Kg
5 01-01-005 Sandal wood / Santalum album 210.03 Kg
6 01-01-006 Red sanders / Pterocarpus santalinus 82.87 Kg
7 01-01-007 Tuniki / Diospyros melanoxylon 25.87 Kg
8 01-01-008 Yegisa / Pterocarpus marsupium 92.22 Kg
9 01-01-009 Rosewood / Dalbergia latifolia 210.03 Kg
10 01-01-010 Narayepi / Hardwickia binata 92.22 Kg
11 01-01-011 Kunkudu / Sapindus emarginatus 210.03 Kg
12 01-01-012 Neem / Azadirachta indica 42.35 Kg
13 01-01-013 Tamarind / Tamarindus indica 42.35 Kg
14 01-01-014 Buruga / Bombax ceiba 42.35 Kg
15 01-01-015 Kanuga / Pongamia pinnata 66.30 Kg
16 01-01-016 Allaneredu / Syzygium jambolonum 188.95 Kg
17 01-01-017 Neredu / Syzygium cumini 141.67 Kg
18 01-01-018 Dirisanam / Albizzia lebbeck 210.03 Kg
19 01-01-019 Nallatumma / Acacia nilotica 82.87 Kg
20 01-01-020 Sissoo / Dalbergia sissoo 68.23 Kg
21 01-01-021 Subabul / Leucena lecocephala 82.87 Kg
22 01-01-022 Usiri / Emblica officinal 158.27 Kg
23 01-01-023 Veduru(Cleaned)/Dendrocalamus strictus (Bamboo) 210.03 Kg
24 01-01-024 Seematangedu / Cassia siamea 147.34 Kg
25 01-01-025 Tangedu 24.15 Kg
26 01-01-026 Seemathumma / Acacia auriculoformis 259.21 Kg
27 01-01-027 Agave/ Alloveera sukkers having not less than 6 leaves 99.48 100 Nos.
and 15 cm size including transport
28 01-01-028 Cashew (Dry weight) Collection/Anacardium accidental As per Kg
Actuals
29 01-01-029 Casuarina / Casuarina equisitifolio 162.77 Kg
30 01-01-030 Collection of Melia dubia seed 143.10 Kg
31 01-01-031 Stylo Hamata/Hamata (The seed shall be procured from 120.58 Kg
A.P.Seed Devp., Corpn. as per G.O.Ms.No.47, A&C (FP1)
Dt:24-3-1998 communicated in PCCF
Rc.No.12961/98/U3, Dt:3-4-1998). Other misc., seed
(Not covered above) as per actuals (with prior
permission of Circle Head).
Note:When the seed is purchased from Recognised Seed
Suppliers, actual cost to be incurred Observing the
financial rules.
Note:Whenever the seeds are being collected from the
GCC the rates fixed by GCC shall be adopted.

23
Sl. Zonal FSR Description of work with detailed specifications Rate Per/Unit
No. Code in Rs.
32 01-01-032 Cost of Teak Stumps including transport To adopt the rate as per
the instructions issued
from time to time by the
PCCF, AP, Hyd.
33 01-01-033 Cost of Red Sanders Stumps including transport To adopt the rate as per
the instructions issued
from time to time by the
PCCF, AP, Hyd.
01-02 : PRIMARY BEDS
Raising of Primary beds of size 1X1X0.3 m for
raising Eucalyptus, Bamboo and other misc., species
34 01-02-001 Preparation of New site - by clearing misceleneous 4.47 Bed
unvaiable Jungle growth, uprootal of stumps and
removal of surface stones, pebbles etc.
35 01-02-002 Preparation of Old site - by clearing the site by 1.12 Bed
dismantling old beds
36 01-02-003 Digging soil to a depth of 30 cm (as per CSSR 2011-12) 33.16 Bed
37 01-02-004 Cost of sandy soil 50% of dugged quantity and 29.63 Bed
transportation taken from private lands, with 5 kms
lead loading and unloading charges by mannual means
(Sandy soil and FYM. in 5:1 proprtion) 0.125 cum per
bed (as per CSSR 2011-12).
38 01-02-005 Cost and transport of Farm yard manure (Sandy soil As per Cum
and FYM. in 5:1 proprtion) 0.025 cum per bed. actuals
39 01-02-006 Preparation of soil mixture of red earth, sand and farm 9.27 Bed
yard manure in 5:1 proportion and formation of bed by
refilling the excavated portion of the bed and filling of
bed.
40 01-02-007 Cost of seed As per Kg
actuals
41 01-02-008 Sowing of seed and covering the bed with hay including 10.54 Bed
cost and conveyance to a thickness of 2.5 cm
42 01-02-009 Watering the primary nursery beds with rose water cans 11.82 Bed/
for a maximum period of 2 months. month
Note:Watering the primary beds beyond 2 months
especially in the case of North-East monsoon areas
(with prior permission of Circle Head).
43 01-02-010 Weeding the primary beds maximum of 2 times 1.77 Bed/
Note: Weeding the primary beds more than 2 times month
(with prior permission of Circle Head).
44 01-02-011 Curbing the beds all around with Cement Bricks. As per CSSR
01-03 : RAISING OF CASUARINA NURSERY (FOR
DISTRIBUTION)
Raising standard nursery beds of
12.50MX1.20MX0.25M with 3:2:1 proportion of Red
Earth and FYM. The Cubical contents of one bed are
3.75 Cum. The quantity of earth, sand, manure at the
above proportion are 1.85:1.25:0.65 M.

24
Sl. Zonal FSR Description of work with detailed specifications Rate Per/Unit
No. Code in Rs.
45 01-03-001 Clearing the site including uprootal of stumps fresh site 12.18 Bed
46 01-03-002 Clearing the site including uprootal of stump old site 5.76 Bed
47 01-03-003 Cost of earth of 1.85 Cum required for the bed including 398.13 Cum
transport.
48 01-03-004 Cost of sand 1.25 Cum required for one bed including Not provided as the
transport. beds are raised in
sandy soils where sand
is available.
49 01-03-005 Cost of FYM 0.65 Cum per bed including transport 900.47 Cum
01-04 : MAINTENANCE OF CASUARINA NURSERY BEDS :
50 01-04-001 Watering, Weeding, Watch and ward for 4 months for 243.25 Bed/
every 25 in South East areas beds (From April to July) Month
12.50 x 1.20 x 0.25m size beds.
51 01-04-002 In the case of N.E. monsoon areas for Maintenance for 243.25 Bed/
additional (7 months) Apr. to Oct. (one casual labour for Month
every 25 beds).
52 01-04-003 Contingencies (Maintenance of fence, rose cans etc.) 41.64 Bed
01-05 : BAG PLANT NURSERY
Raising of Bag plant nursery in Polythene bags of
different sizes and arranging in beds: (Bed size
10Mx1M)
53 01-05-001 Site preparation for new sites - Clearing of growth, 45.19 Bed
uprootal of stumps and removal of surface stones,
rubbish of all sorts etc.
54 01-05-002 Site preparation for old site - Clearing of growth, weeds, 11.33 Bed
grass etc.
Cost and transport of ingradients for Potting
mixture Red Soil and Clayey Soil in 2:1 ratio as per
CSSR 2011-12
55 01-05-003 10 cm X 17.5 cm (4" X 7") 0.56 cum. 132.90 1000 Nos.
56 01-05-004 12.5 cm X 22.5 cm (5" X 9") 1.12 cum. 265.95 1000 Nos.
57 01-05-005 15 cm X 30 cm (6" X 12") 2.15 cum. 510.45 1000 Nos.
58 01-05-006 20 cm X 30 cm (8" X 12") 3.82 cum for fresh filling only 907.04 1000 Nos.
not for conversion.
59 01-05-007 15 cm X 30 cm (6" X 12") 1.59 cum (2.15-0.56) The rate of adjoining
conversion from root trainers/4"x7" bags to 6"x12" (with Zone-I will be adopted
prior permission of the Circle Head)
60 01-05-008 20cm X 30cm (8"X12") (3.82-0.56) cum conversion from 774.14 1000 Nos.
root trainers/4"X7" bags to 8"X12".
Preparation of potting mixture Red Soil and Clayey
Soil in 2:1 ratio by powdering of various ingradients,
sieving and mixing them in the prescribed
proporation, Opening the bags and filling with
potting mixture and gently pressing the same with
finger tips and arranging in beds.
61 01-05-009 10 cm X 17.5 cm (4" X 7") 0.56 cum. 370.59 1000 Nos.
62 01-05-010 12.5 cm X 22.5 cm (5" X 9") 1.12 cum. 595.81 1000 Nos.
63 01-05-011 15 cm X 30 cm (6" X 12") 2.15 cum. 1134.14 1000 Nos.

25
Sl. Zonal FSR Description of work with detailed specifications Rate Per/Unit
No. Code in Rs.
64 01-05-012 20 cm X 30 cm (8" X 12") 3.82 cum. For Fresh filling 2413.63 1000 Nos.
Only not for conversion.
65 01-05-013 15 cm X 30 cm (6" X 12") 1.59 cum (2.15-0.56) The rate of adjoining
conversion from root trainers/4"x7" bags to 6"x12" (with Zone-I will be adopted
prior permission of the Circle Head)
66 01-05-014 20 cm X 30 cm (8"X12") (3.82-0.56) cum. Conversion 2059.82 1000 Nos.
from root trainers 4"x7" bags to 8"x12"
67 01-05-015 Cost of polythene bags Tender Rate
68 01-05-016 Picking out seedlings from primary beds and 120.12 1000 Nos.
transplanting in bags.
69 01-05-017 Sowing /dibbling of pre-treated seed directly into the 71.41 1000 Nos.
bags including cost of treatment.
Raising of Bag Plants
Watering the plants twice a day for 10mX1m size bed
(2600-4" X7" bags; 1700-5"X9" bags ; 1100-6"X12" bags
and 800-8"X12" bags)
70 01-05-018 i) 4"x7" bag plants (2600 Nos. per bed) 172.84 Bed/month
71 01-05-019 ii) 5"x9" bag plants (1700 Nos. per bed) 222.04 Bed/month
72 01-05-020 iii) 6"x12" bag plants (1100 Nos. per bed) 277.54 Bed/month
73 01-05-021 iv) 8"x12" bag plants (800 Nos. per bed) 277.54 Bed/month
74 01-05-022 Weeding only two times for 10 m X 1 m size bed (2600 - 42.80 Bed/
4" X 7" bags; 1700-5" X9" bags ; 1100-6"X12" bags and weeding
800-8"X12" bags)
75 01-05-023 Shifting and grading and re-arranging in beds for 196.22 Bed/
10mx1m size bed (2600-4"X7" bags; 1700-5"X9" bags; shifting
and 800-8"X12" bags) only once.
76 01-05-024 Shifting and grading and re-arranging in beds for 236.00 Bed/
10mx1m size bed (6"X12" bags-1100 Nos) only once. shifting
77 01-05-025 Cost of chemicals, insecticides, pesticides etc., As per actuals
Maintenance of bag nursery from April to July
Watering the plants for 10mX1m size bed (2600-4"X7"
bags; 1700-5"X9" bags;1100-6"X12" bags and 800-
8"X12" bags)
Note: Any watering beyond July in case of South-West
monsoon and beyond October in case of North-East
monsoon is tobe allowed (with prior permission of
Circle Head).
78 01-05-026 i) 4"x7" bag plants (2600 Nos. per bed) 172.84 Bed/month
79 01-05-027 ii) 5"x9" bag plants (1700 Nos. per bed) 222.04 Bed/month
80 01-05-028 iii) 6"x12" bag plants (1100 Nos. per bed) 277.54 Bed/month
81 01-05-029 iv) 8"x12" bag plants (800 Nos. per bed) 277.54 Bed/month
82 01-05-030 Weeding maximum four times during maintenance year 42.80 Bed/
for 10mx1m size bed (2600-4"X7" bags; 1700-5"X9" weeding
bags; 1100-6"X12" bags and 800-8"X12" bags)

26
Sl. Zonal FSR Description of work with detailed specifications Rate Per/Unit
No. Code in Rs.
83 01-05-031 Shifting and Grading and re-arranging in beds for 10 m 196.22 Bed/
X1 m size bed maximum two shifts (2600-4" X 7" bags; shifting
1700-5"X9" bags and 800-8"X12" bags)
Note: More than 2 shifts is tobe allowed (with prior
permission of Circle Head).
84 01-05-032 Shifting and Grading and re-arranging in beds for 10 m 236.00 Bed/
X1 m size bed maximum two shifts (6"X12" bags-1100 shifting
Nos)
Note: More than 2 shifts is tobe allowed (with prior
permission of Circle Head).
85 01-05-033 Cost of cow dung slurry As per actuals
86 01-05-034 Application of cow dung slurry at the rate of 100 ml to 177.78 1000/time
250 ml. per plant depending upon the size of the plant
monthly twice maximum of 3 times. (Once in raising
and two times in maintenance)
Note: Watering should not be done 12 hours before and
after application of cow dung slurry.
Maintenance of bag nursery from August onwards till
disposal
87 01-05-035 Watering the plants for 10 m X1 m size bed (2600-4" X 111.03 Bed/month
7" bags; 1700-5" X9" bags ; 1100-6"X12" bags and 800-
8"X12" bags)
88 01-05-036 Shifting and grading and re-arranging in beds for 10 m 196.22 Bed/
X1 m size bed (2600-4" X 7" bags; 1700-5" X9" bags and shifting
800-8"X12" bags) (with prior permission of Circle
Head)
89 01-05-037 Shifting and grading and re-arranging in beds for 10 m 236.00 Bed/
X1 m size bed (6"X12" bags-1100 Nos.) (with prior shifting
permission of Circle Head)
90 01-05-038 Contingencies/ Cost of pipes/ Nursery board/ Nursery Subject to maximum of
implements/ Electricity bill/ Running and maintenance 10% of estimate cost
charges of oil engine (Bills to be verified and certified by during raising year and
the ACF/DFO) etc. 5% of the estimate cost
during maint.year
91 01-05-039 Brush wood fencing around the Nursery Site: Thorny 24.12 Rmt
fencing with sturdy thorn material of 10 cm. girth (at
the butt end) and fixing in crow bar holes and
strengthening with stone packing. The avarage height
of fence should be 1.5m and fenceing material should
be fixed in 2 rows (staggered) at 30cm. apart. The fence
should be tightened horizontally by tying with thorny
reepers on both sides. With specific permission of DFO.
92 01-05-040 Maintenace of brushwood fencing 8.05 Rmt
93 01-05-041 Cost of Protection. One watcher is allowed upto 100 Wage rate fixed by
beds nursery under all the schemes and more than 100 the Dist.Collector per
beds one more watcher is allowed. day.
94 01-05-042 Cost of tar coated Bamboo stakes of 2.00 Mt. length and 6.87 Each
2.50 Cm. breadth size for supporting the tall plants
95 01-05-043 Fixing of support stakes to the seedlings 358.44 1000 Nos

27
Sl. Zonal FSR Description of work with detailed specifications Rate Per/Unit
No. Code in Rs.
01-06 : RAISING AGAVE NURSERY BED OF
12mx1.25mx0.15m (660 suckers per bed) :
96 01-06-001 Preparation of Nursery site 1.92 Bed
97 01-06-002 Formation of bed after ploughing and cross ploughing 76.72 Bed
0.30 Mts. Deep and raising the bed 0.15 m height above
the ground level including breaking clods, etc.
Cost of suckers including transport
98 01-06-003 (a) Bulbils 76.72 100 Nos.
99 01-06-004 (b) Suckers 160.15 100 Nos.
100 01-06-005 Planting suckers at 15 cms. spacing 69.18 Bed
101 01-06-006 Line dressing 12.46 Bed
102 01-06-007 Watering the nursery during the dry period. 26.04 Bed
103 01-06-008 Cost of farmyard manure 0.25 cum including transport Actuals Bed
of 5 kms. and application.
01-07 : 1st YEAR AND 2ND YEAR MAINTENANCE OF AGAVE
NURSERY:
104 01-07-001 Watering the nursery during dry period 27.67 Bed/month
105 01-07-002 Weeding the beds 4 times 9.32 Bed/time
01-08 : (II) TEAK NURSERY: Raising of Teak Nursery bed:
(Bed size 10X1X0.25 m)
A) Advance year operations
Preparation of site by clearing growth of unwanted
species, uprootal of stumps and removal of surface
stones etc.
106 01-08-001 New site 44.73 Bed
107 01-08-002 Old site 11.18 Bed
108 01-08-003 Tractor ploughing two times in criss cross direction and 11.85 Bed
levelling the site.
109 01-08-004 Alignment and formation of beds to a height of 25 cm. 85.36 Bed
by dumping the soil from the gap portion in between the
beds and from margins of the nursery and levelling the
bed.
110 01-08-005 Curbing the beds all around with Cement Bricks. As per CSSR
01-09 : B) RAISING YEAR OPERATIONS
111 01-09-001 Cost/Collection of Teak seed @ 5Kgs/bed including Actuals
transportation
112 01-09-002 Pretreatment of teak seed by spreading on ground, 21.56 Bed
alternate wetting and drying for a period of 20 to 30
days or till the outer coat becomes soft and beating with
wooden mallet to remove the seed coat until the ridges
on the seed are visible
113 01-09-003 Sowing of treated teak seed in lines of 10 cms apart at a 28.25 Bed
depth equal to thickness of seed along the width of the
bed and covering the seed with their layer of earth and
further covering with hay to 2.5 cm. thickness.
114 01-09-004 Cost of hay and conveyance to nursery site. 28.89 Bed

28
Sl. Zonal FSR Description of work with detailed specifications Rate Per/Unit
No. Code in Rs.
Watering regime for raising and maintenance of Teak
beds is revised from 50 to 64 in high rainfall areas
and 70 in other areas considering the non-rainy
days. The details of water regime is as follows:
115 01-09-005 i) For first 20 days after sowing, every day (1st May to 6.49 Bed/
20th May - 20 waterings) watering
116 01-09-006 ii) Next 20 days once in every 2 days (21st May to 10th 6.49 Bed/
June- 10 waterings) watering
117 01-09-007 iii) Upto December (non rainy days) (11th June to 31st 6.49 Bed/
December) (Limited to 20 waterings in high rainfall watering
areas and 26 waterings in other areas)
118 01-09-008 iv) Upto March once in 15 days 2 waterings/month (1st 6.49 Bed/
January to 31st March - 6 waterings) watering
119 01-09-009 Keeping the beds free from weeds by weeding out the 12.18 Bed/time
grass and other miscellenous weed growth.
(Weedings @ 1 weeding per month)
120 01-09-010 Cost of fertilisers Actuals
121 01-09-011 Application of fertilisers. 3.11 Bed
122 01-09-012 Cost of Thimmet Actuals
Application of thimmet @ 150 gm. Per bed against
grub attack twice.
123 01-09-013 a) 50 gm. At the time of sowing seed 15.86 Bed
124 01-09-014 b) 100 gm. At the time of bigining of the grub attack 15.86 Bed
(With specific permission of DFO)
125 01-09-015 Deleafing of woolf plants 4 times as and when necessary 3.25 Bed
126 01-09-016 Brush wood fencing around the nursery area: 24.12 Rmt
Thorny fencing with sturdy thorn material of 10 cm.
girth (at the butt end) and fixing in crow bar holes and
strengthening with stone packing. The avarage height
of fence should be 1.5m and fenceing material should
be fixed in 2 rows (staggered) at 30cm. apart. The fence
should be tightened horizontally by tying with thorny
reepers on both sides.

127 01-09-017 Maintenance of Brush wood fencing 8.05 Rmt


01-10 : B) 1st year maintenance of Teak Nursery
128 01-10-001 Watering the beds from April to July once in 15 days - 2 6.49 Bed/
waterings/month (8 waterings) watering
129 01-10-002 Applications of insecticides/pesticides to control insect 3.11 Bed
/ pest diseases for each application.
130 01-10-003 Cost of insecticides Actuals Kg
131 01-10-004 Cost of Protection. One watcher is allowed upto 100 Wage rate fixed by
beds nursery under all the schemes and more than 100 the Dist.Collector per
beds one more watcher is allowed. day.

29
Sl. Zonal FSR Description of work with detailed specifications Rate Per/Unit
No. Code in Rs.
132 01-10-005 Contingencies/ Cost of Pipes/ Nursery Board/ Nursery As per actuals (Subject
implements/ Electricity Bill/ Running and Maintenance to maximum of 10% of
Charges of Oil Engine (Bills to be verified and certified estimate cost during
by the ACF/DFO) etc. raising year and 5% of
the estimate cost
during maintenance
year)
01-11 : HORTICULTURE NURSERIES : COCONUT NURSERY
BEDS OF SIZE 6Mx1.50Mx0.30M=100 Nos.
RAISING OF COCONUT BED NURSERY :
133 01-11-001 Clearing the site including uprootal for fresh site 10.54 Bed/
100Nos.
134 01-11-002 Clearing the site including uprootal for old site 5.62 Bed/
100Nos.
135 01-11-003 Digging sunken Beds of 6.00 m x 1.50 x 0.30 m and 83.85 Bed/
depositing the earth between the beds duly forming 100Nos.
channels for flooding the beds. The espacement
between the bed to bed should be 0.45 cm width where
the channel is to be formed.
136 01-11-004 Cost of sand for filling the sunken beds of 377.74 Bed/
6.00MX1.50MX 0.30 m including transport. 100Nos.
137 01-11-005 Cost of Pesticides / Fungicides As per market rate
138 01-11-006 Cost of Coconut As per the rate
recommended and the
seed certified by the
A.D, Horticulture Dept.
139 01-11-007 Dibbling Coconuts in Sunken beds keeping in the slant 141.23 Bed/
position at 0.30 spacing spreading the sand and 100Nos.
Gamaxine (MAY/JUNE).
140 01-11-008 Watering on alternative days and weeding once in a 124.67 Bed/
week and up keeping beds by spreading screened soil month
so as to have thin layer on the nuts, till sprouting 5,000
Coconut 50 beds May to March (11 Months).
141 01-11-009 Contingencies 42.73 Bed
01-12: 1st YEAR MAINTENANCE OF COCONUT BEDS:
142 01-12-001 Watering the beds and weeding upto the time of 124.67 Bed/
distribution 5 months (from April to August) month
143 01-12-002 Pricking seedlings for 100 Nos. for distribution 11.67 100 Nos.
144 01-12-003 Contingencies including cost of fertilizers and 42.45 Bed
application
Note : Maintenance of coconut beds beyond Aug.
should be done with prior approval of the Conservator of
Forests submitting specific proposals for the left over
quantity with proportionate rate.
01-13 : MANGROVE NURSERY : RAISING OF BAG NURSERY
145 01-13-001 Cost of Polythene bags 5”x 9” size Tenders Kg
146 01-13-002 Clearing the nursery site with uprootal of stumps 69.04 1000 bags

30
Sl. Zonal FSR Description of work with detailed specifications Rate Per/Unit
No. Code in Rs.
147 01-13-003 Clearing the old nursery site 13.56 1000 bags
148 01-13-004 Deepening of burried old beds to have sunken beds 120.58 1 Cum
149 01-13-005 Digging soil to a depth of 20 Cms. in the area adjacent 290.88 1000 bags
to the nursery, watering, puddling, carrying the puddled
soil to the bag filling spot.
150 01-13-006 Filling the puddled soil into the bags of 5"x9"size and 1027.85 1000 bags
arranging the bags in the sunken beds.
151 01-13-007 Collection of seedlings from river currents and banks of 167.03 1000 bags
creeks
152 01-13-008 Planting seedlings in the beds 177.85 1000 bags
153 01-13-009 First shifting, grading and weeding 260.19 1000 bags
154 01-13-010 2nd to 5th shifting including grading and weeding 485.59 1000 bags
155 01-13-011 Replacement of casualities to a maximum extent of 25% 160.97 1000 bags
156 01-13-012 Watering and Watch & Ward in the nursery 1No. for 6 368.96 1000 bags
months i.e., October to March.
157 01-13-013 Contingencies such as maintenance of oil engine and 200.45 1000 bags
other unforeseen expenditure .
01-14 : MAINTENANCE OF MANGROVE NURSERY : (APRIL
TO AUGUST)
158 01-14-001 Shifting, Grading and rearranging the beds (4 shifts) 481.35 1000 bags
159 01-14-002 Watering and Watch & Ward 1 No from April to August 311.42 1000 bags
for 5 Months (approximately for 1.10 lakh bag nursery).
160 01-14-003 Maintenance of Oil Engine & Other unforcing 103.46 1000 bags
contingencies

31

Você também pode gostar