Client : Jaipur Development Authority

TATA Projects Limited-SUCG Consortium

Summary of REQUEST FOR INSPECTION (RFI) 2/6/2018


EARTHWORK ( Embankment- Cleaning, Grubbing, cutting, filling, Leveling and FDD) (REACH 3 TO 6)
Side
LENGTH / Description Of Work PASS/FAIL/N
SNO FROM TO RFI NO (LHS, Layer No AREA / LOCATION Remarks if any SIGNATURE
QTY R/NA
RHS,Centre) Time for Checking
1 15.000 15.180 180 EW/060218/01 FDD CHECKING RHS 20 3:00 PM
2 15.180 15.210 30 EW/060218/02 FDD CHECKING RHS 17 3:00 PM
3 14.880 15.000 120 EW/060218/03 FDD CHECKING RHS 12 3:00 PM
4 15.080 15.100 20 EW/060218/04 FDD CHECKING LHS 14 3:00 PM
5 15.100 15.180 80 EW/060218/05 FDD CHECKING LHS 28 3:00 PM
6 14.900 15.000 100 EW/060218/06 FDD CHECKING LHS 17 3:00 PM
7 14.750 14.880 130 EW/060218/07 FDD CHECKING RHS BED 3:00 PM
8 11.220 11.280 60 EW/060218/08 FDD CHECKING RHS 1 3:30 PM
9 11.160 11.220 60 EW/060218/09 FDD CHECKING RHS 5 3:30 PM
10 9.700 9.750 50 EW/060218/10 FDD CHECKING RHS 1 4:00 PM
11 10.540 10.700 160 EW/060218/11 FDD CHECKING LHS 1 3:00 PM
12 10.540 10.420 120 EW/060218/12 FDD CHECKING LHS 4 3:00 PM
13 12.625 12.650 25 EW/060218/13 FDD CHECKING LHS 4 11:00 AM
14 12.625 12.650 25 EW/060218/14 FDD CHECKING LHS 5 3:00 PM
15 12.980 13.040 60 EW/060218/15 FDD CHECKING LHS 22 4:00 PM
16 13.060 13.160 100 EW/060218/16 FDD CHECKING LHS 6 4:00 PM
17 13.160 13.260 100 EW/060218/17 FDD CHECKING LHS 4 4:00 PM
18 14.620 14.660 40 EW/060218/18 FDD CHECKING LHS 9 4:30 PM
19 14.550 14.610 60 EW/060218/19 FDD CHECKING LHS 13 4:30 PM
STP

SBR CHANNEL -10.5 CUM,SBR WALL -30 CUM,SLUDGE THICKNER -12


20 BASSI STP/060218/20 CUM 9:00 AM

EARTHWORK ( Embankment- Cleaning, Grubbing, cutting, filling, Leveling and FDD) (REACH 7 TO 9)
21 16.335 16.405 70 EW/060218/21 FDD CHECKING LHS 19 12:00 PM
22 26.550 26.600 50 EW/060218/22 FDD CHECKING LHS 2 3:00 PM
23 26.600 26.700 100 EW/060218/23 FDD CHECKING LHS 8 3:00 PM
24 26.700 26.750 50 EW/060218/24 FDD CHECKING RHS 7 3:00 PM
25 26.750 26.900 150 EW/060218/25 FDD CHECKING LHS 15 3:00 PM
26 26.350 26.425 75 EW/060218/26 FDD CHECKING LHS 8 3:00 PM
27 26.500 26.550 50 EW/060218/27 FDD CHECKING LHS BED 3:00 PM
28 26.400 26.475 75 EW/060218/28 FDD CHECKING RHS BED 3:00 PM
29 26.550 26.600 50 EW/060218/29 FDD CHECKING LHS 1 11:00 AM
30 26.350 26.425 75 EW/060218/30 FDD CHECKING LHS 7 11:00 AM
31 26.700 26.750 50 EW/060218/31 FDD CHECKING LHS 6 11:00 AM
32 26.750 26.900 150 EW/060218/32 FDD CHECKING LHS 14 11:00 AM
33 19.275 19.350 75 EW/060218/33 FDD CHECKING LHS BED 11:00 AM
34 19.350 19.400 50 EW/060218/34 FDD CHECKING LHS BED 11:00 AM
35 21.375 21.425 50 EW/060218/35 FDD CHECKING RHS BED 11:00 AM
36 19.400 19.500 100 EW/060218/36 FDD CHECKING LHS 13 11:00 AM
37 19.500 19.550 50 EW/060218/37 FDD CHECKING LHS 8 11:00 AM
38 19.550 19.600 50 EW/060218/38 FDD CHECKING LHS 2 11:00 AM
39 19.600 19.675 75 EW/060218/39 FDD CHECKING LHS 15 11:00 AM
40 19.850 20.000 150 EW/060218/40 FDD CHECKING LHS 6 4:00 PM
41 21.100 21.200 100 EW/060218/41 FDD CHECKING RHS 5 4:00 PM
42 21.225 21.375 150 EW/060218/42 FDD CHECKING LHS 14 4:00 PM
43 21.650 21.725 75 EW/060218/43 FDD CHECKING LHS 8 4:00 PM
44 21.050 21.200 150 EW/060218/44 FDD CHECKING LHS 4 4:00 PM
45 23.525 23.625 100 EW/060218/45 FDD CHECKING LHS 2 4:00 PM
46 24.375 24.475 100 EW/060218/46 FDD CHECKING RHS 10 4:00 PM
47 24.275 24.375 100 EW/060218/47 FDD CHECKING RHS 13 4:00 PM

CONCRETE LINING WORK

48 17.95 17.9 CL/060218/48 CBL-100 CUM LHS


10:00 AM
49 17.19 17.35 CL/060218/49 SLOPE -150 CUM LHS
10:00 AM
50 26.7 26.67 CL/060218/50 60 CUM-SLOPE RHS
2:00 PM
51 24.74 24.69 CL/060218/51 80 CUM SLOPE RHS
4:00 PM
52 26.8 26.7 CL/060218/52 CBL 250 CUM RHS
4:00 PM
53 23.32 23.29 CL/060218/53 SLOPE 60 CUM
5:00 PM
54 15.82 15.75 CL/060218/54 SLOPE 80 CUM
2:00 PM
55 19.925 19.955 CL/060218/55 SLOPE 60 CUM RHS
5:00 PM

BOUNDARY WALL & TRANSITION WALL

56 22.175,DEVINAGAR,22.715 TW/060218/56 WALL 3RD LIFT 70 CUM,45 CUM RHS,6.3 CUM


2:00 PM
57 16.400 16.800 TW/060218/57 BOUNDARY WALL RHS 12:00 PM
58 17.200 17.400 TW/060218/58 BOUNDARY WALL RHS 12:00 PM
59 22.520 22.420 TW/060218/59 BOUNDARY WALL RHS 3:00 PM
60 18.450 18.420 TW/060218/60 BOUNDARY WALL RHS 12:00 PM
SEWER NETWORK
61 MHR-12-R74 TO R76 SN/060218/61 MANHOLE 11:00 AM
62 39.390 TO 39.499 SN/060218/62 PIPE LAYING 11:00 AM
63 14.125 SN/060218/63 PIPE LAYING 11:00 AM
64 19.940 SN/060218/64 PIPE LAYING 2:00 PM
65 11.420 TO 11.495 SN/060218/65 PIPE LAYING 2:00 PM
66 MH R10 TO R15 SN/060218/66 HYDRO TEST 2:00 PM
67 MHR10 L22 SN/060218/67 MANHOLE 2:00 PM
68 MH-R10 L23 SN/060218/68 MANHOLE 2:00 PM
69 23.440 SN/060218/69 PIPE LAYING 2:00 PM
70 17.520 SN/060218/70 CHAMBER 2:00 PM
71 19.340 SN/060218/71 CHAMBER 2:00 PM
72 19.980 SN/060218/72 MANHOLE 2:00 PM
73 21.340 SN/060218/73 MANHOLE 2:00 PM
74 AATISH MARKET IC SN/060218/74 2:00 PM
75 MAHARANI FARM IC SN/060218/75 12:00 PM
76 20.250 SN/060218/76 BOX CULVERT 11:00 AM
STP
DEVRI SLUDGE DEWATERING UNIT-10 2 PM,4 PM
CUM,CENTRIFUGE BUILDING -5 CUM
77 STP/060218/77

ADMIN BUILDING TIE BEAM -8 CUM,SBR WALKWAY -26


11 AM,9 AM,6
78 RIICO STP/060218/78 CUM,CCT WALL -9 CUM,TRANFORMER FOUNDATION -9
PM,2PM
CUM

EARTHWORK ( Embankment- Cleaning, Grubbing, cutting, filling, Leveling and FDD) (REACH 10,11)
79 31.350 31.400 50 EW/060218/79 FDD CHECKING LHS 4 10:00 AM
80 31.400 31.445 45 EW/060218/80 FDD CHECKING LHS 3 10:00 AM
81 31.270 31.350 80 EW/060218/81 FDD CHECKING LHS 13 4:00 PM
82 31.800 31.875 75 EW/060218/82 FDD CHECKING RHS 5 4:00 PM
83 27.830 27.875 45 EW/060218/83 FDD CHECKING RHS 2 12:30 PM
84 28.865 28.900 35 EW/060218/84 FDD CHECKING RHS 6 10:30 AM
85 29.025 29.060 35 EW/060218/85 FDD CHECKING RHS 3 12:30 PM
86 27.865 27.900 35 EW/060218/86 FDD CHECKING RHS 7 5:30 PM
87 29.025 29.060 35 EW/060218/87 FDD CHECKING LHS 6 5:30 PM
88 27.830 27.875 45 EW/060218/88 FDD CHECKING LHS 7 5:30 PM
CONCRETE LINING WORK
89 33.15 33.21 CL/060218/89 SLOPE CHECKING LHS 11:00 AM
90 34.125 34.17 CL/060218/90 SLOPE CHECKING LHS 12:30 PM
MODEL REACH

91 MODEL REACH MR/060218/91 150 MTR LHS,75 MTR RHS


10:30 AM
CHECK DAM

92 30.025 CD/060218/92 65 CUM


11:00 AM
BAMBALA STORE

93 STORE BS/060218/93 6 NO PANEL STEEL STRUCTURE CHECKING


3:00 PM

BAMBALA STP

PRIMARY UNIT FOOTING M30-10 CUM,SLUDGE THICKNER WALL -9


94 BAMBALA STP STP/060218/94 12:30 PM,10
CUM,SLUDGE THICKNER SOIL COMPACTION TEST
AM,2 PM
STONE PITCHING (REACH 12&13)
BOMBAY HOSPITAL TO
95 SP/060218/95 30 CUM PROFILE BEAM
PADAMPURA 11:00 AM
RALAWATA TO DHUND
96 SP/060218/96 35 CUM PROFILE BEAM
RIVER
11:00 AM
PADAMPURA TO DHUND
97 SP/060218/97 20 PANEL
RIVER
2:00 PM

98 VEDHANI TO GONER SP/060218/98 5 PANEL


11:00 AM
GONER CULVERT TO
99 SP/060218/99 10 PANEL
BARKHEDA
12:00 PM
BARKHEDA TO
100 SP/060218/100 5 PANEL
PADAMPURA
12:00 PM

CHECK DAM

101 38.125 CD/060218/101 CREST WALL 120 CUM 12:00 PM


STP

102
GONER STP STP/060218/102 SBR WALL -38 CUM 4:00 PM