Hari, tanggal : 24/9/2017 Surveyor : Kelompok 3 Lokasi : Kantong Lumpur Dam Gembleng Elevasi 118 dpl Nama Sumber Mata Air/ Sungai : Sungai Bomo Elevasi : 118 m dpl Cuaca : cerah ANALISA HASIL SURVEY SEBAGAI BERIKU: DIKETAHUI DATA DIAMETER BOLA : 4 CM
BOLA BAGIAN TERENDAM AIR (CM)
I 3.1 II 3 III 3.2 IV 3 V 3.1 Rata-Rata 3.08
PENCATATAN KECEPATAN PELAMPUNG
PANJANG PIAS SALURAN : 50 M
PERCOBAAN WAKTU (DETIK
I 54.41 II 53.6 II 52 IV 58.5 V 63.23 Rata-Rata 56.348 PENCATATAN ELEVASI DASAR SUNGAI DARI MUKA AIR SUNGAI Cross luas Lebar(m) No h (cm) h (m) h (rata-rata) Section (m2) 1 13 0.13 2 53 0.53 A-A 4 3 67 0.67 0.441 1.764 4 74 0.74 5 13.5 0.135 1 31 0.31 2 34 0.34 B-B 4.6 3 32 0.32 0.324 1.4904 4 36 0.36 5 29 0.29 1 19 0.19 2 61 0.61 C-C 4.5 3 60 0.6 0.401 1.8045 4 44 0.44 5 16.5 0.165 Rata- Rata 0.3886667 1.6863 PENYELESAIAN 𝐊𝐄𝐃𝐀𝐋𝐀𝐌𝐀𝐍 𝐁𝐎𝐋𝐀 𝟑.𝟎𝟖 ∝= = 𝟑𝟖.𝟗 = 𝟎. 𝟎𝟖 𝐊𝐄𝐃𝐀𝐋𝐀𝐌𝐀𝐍 𝐀𝐈𝐑
𝒌 = 𝟏 − 𝟎. 𝟏𝟏𝟔{(√𝟏 − 𝒙) − 𝟎. 𝟏
= 𝟏 − 𝟎. 𝟏𝟏𝟔{(√𝟏 − 𝟎. 𝟎𝟖) − 𝟎. 𝟏
= 0.884 x 0.86 = 0.76 Q=AxVxk =1.69 x 0.887 x 0.76 = 1.14 mᵌ/s