20 GI Pipes
21 GI Fittings
22 CS ERW Pipes
Piping and Mechanical works
23 CS ERW Fittings
24 CS Seamless pipes
25 CS Seamless fittings
26 SS304 pipes Lot 1 ₹ 23,400,000 ₹ 23,400,000
27 SS304 fittings
28 Valves
29 Structural Steel
30 Miscellanous works
31 Insulation
32 Loading, unloading, shifting and positioning
33 Subtotal ₹ 23,400,000
34 LV SWITCHBOARDS Lot
48 Subtotal ₹ 34,970,000
Subtotals ₹ 152,482,170
Risk (Contingency) @5% ₹ 7,624,108
Total (Scheduled) ₹ 160,106,278
Exclusions:
PSG ₹ 1,500,000
MCDP ₹ 2,000,000
WFI generation skid ₹ 1,500,000
Installation cost for piping and equipment ₹ 1,250,000
Lifts ₹ 5,000,000
HVAC ₹ 15,500,000
Total ₹ 121,243,878
₹ 5,113,152
₹ 897,000
₹ 1,007,136
₹ 1,726,190
₹ 6,480,000
based on available information (whatever is pending) ₹ 4,475,000 ₹ 17,995,400
₹ 500,000
₹ 1,000,000
₹ 2,500,000
₹ 1,500,000
₹ 2,000,000
₹ 1,500,000
₹ 1,250,000
₹ 750,000
₹ 2,500,000
₹ 4,000,000
₹ 6,500,000
₹ 5,000,000
₹ 54,375,000 ₹ 175,618,878
₹ 950,000
₹ 1,200,000
₹ 2,000,000
₹ 4,500,000
₹ 750,000
₹ 1,500,000
₹ 1,500,000
₹ 2,000,000
₹ 1,500,000
₹ 2,000,000
₹ 193,518,878