Você está na página 1de 2

TECCI PARK

COMPLETE HARMONY

GREEN BUILDING location


The Rajiv Gandhi Saalai aka OMR is a preferred
TECCI Park is designed and developed as a green destination for the discerning IT /ITES majors. The
building and has been awarded the LEED Silver presence of the leading Technical Institutes that
Certificate for Core & Shell by the US Green Tamil Nadu is renowned for has resulted in this
Building Council USGBC. corridor being populated with technically qualified
The intent of the “Green Building” concept is to workforce.
assist in the creation of high performance, healthy, The ECR, and the Velachery Tambaram road run
durable, affordable and environmentally sound parallel to OMR with many inter-connecting roads.
buildings. The distribution of the upper and middle income
homes, the continued southward shift of Chennai, † ABOUT THE PROJECT ¢
Buhari Group a Founding
and commitment from successive Governments to TECCI |‘tekē| (also tek.kie or techy)
Member of the IGBC, Indian
make this an IT hub (SIPCOT), has brought in noun (pl., -ies) informal
Green Building Council has
many IT/BPO majors including TCS, Infosys,
adopted the Green Building Technology @ ECCI is the TECCI
Accenture, Satyam, Wipro, Polaris, eBay and many Park, an information Technology
concepts to Office interiors,
more into this neighbourhood. space offering designed by
Malls, Schools and Colleges,
Architects TEAM 3 of Singapore
Commercial and Office and developed by the multi billion
Buildings, IT Parks, Residences developed by the BUHARI HOLDINGS (P) LTD
dollar Buharia Group through East
group companies. Third Floor, Buharia Buildings, 4 Moores Coast Construction and Industries
Road, Chennai - 600 006. +91 44 4226 1100 Limited ECCI.
fuaad@mac.com +91 99400 66935
STRUCTURAL
Structure OPERATIONAL
RCC Framed Shutters with Raft Foundations Water & Management
and Flat Slabs 900,000 litres Storage sump and a OHT of
Façade 25,000 litres provided
Double Glazed walls with Aluminum cladding Water Treatment Plants and Sewage Treatment
Finishes Plants are provided
External Walls finished with Texture Paint Fire Safety
Flooring ring main Hydrants, alarms, smoke
Granite/ vitrified tiles in lobbies & stairs, detectors sprinklers, and exits provided
Kota for emergency stairs Emergency
Lifts Grundfos & Kirloskar pumps in
20 passenger 1.75/m/sec *MITSUBISHI basement
elevators 5 per Block BMS
Service Lift Building Management System Provided
Service 1 Metric Ton *MITSUBISHI Toilet
elevators 1 per Block Male 8 EWCs & 6 Urinals on each floor
Car Parks Female 10 EWCs on each floor
1/750sq.ft in two Basements, Ground & Stilt Handicap Toilet 1 EWC on
each floor
TECHNICAL per Block
Electric details
External 3,000KVA per block, HT
connection from the TNEB Grids Total project 581000 sqft
Power supply
Transformer 1,600 KVA X 2 per Total floors 2B + G + 8
associates & block to cater 300-350KVA per Floor
floor plates 35,000 sft each
Group Members Generators
1250 KVA X 3nos per block ceiling 3750mm CLEAR
www.ecciltd.com *Powerica with 8 hrs of
www.etaascon.com Fuel Back up
Air conditioning central
www.coalandoil.com 100% Back up power Back up 100%
www.crescentcollege.org Distribution 300-350 KVA power
www.crescentschools.info supply per floor CAR PARKS 1 PER 750SFT
www.dubailifestylecity.ae Air condition GRID SIZE MIN.. 10.5 METRES
www.coastalenergen.com 330TR x 3 + 1 standby
www.wam.co.in Carrier- Air cooled screw chillers LIFTS PER BLOCK 5 NOS 20 PAX
www.4mtrust.org Connectivity
www.bsazakaat.org SERVICE LIFTS 1 PER BLOCK
Exclusive space provided for Bandwidth
Operators

Você também pode gostar