K E R E TA A P I R I N G A N / L I G H T R A I L T R A N S I T

MINISTRY OF TRANSPORTATION TERINTEGRASI DI WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI PT ADHI KARYA (Persero) Tbk.

KUNJUNGAN BANK INDONESIA


23 MARET 2017
1. GENERAL OVERVIEW
LRT JABODEBEK GENERAL OVERVIEW

940 T H O U SA N D T R I P S
BURDENS DKI JAKARTA EVERY WEEKDAYS
LRT JABODEBEK GENERAL OVERVIEW
PERPRES 98 TA H U N 2 0 1 5 CHANGES PERPRES 65 TA H U N 2 0 1 6

SUBSECTION 2
• 1st sentence: Aditional scope of work for Depo
• 2nd sentence: The use of rail road width of 1.435 mm
• 5th sentence: The construction work of Jabodebek LRT is
constructed since signed PERPRESS
SUBSECTION 3
• The change of flow and process of contractual timeline in LRT
JABODEBEK
SUBSECTION 7
• The payment will be done in every service lines. PT Adhi Karya
(Persero) Tbk will be paid after finishing and constructing every
service lines.
• The fund will be allocated from Anggaran Belanja Kementerian
Perhubungan
• The contract agreement is done by the ministry of finance

SUBSECTION 8
• The price includes the bank interest in construction period
(during construction) and the payment period
SUBSECTION 14
• Having License from the related area that is passed by LRT
JABODEBEK routes
SUBSECTION 16
• PT KAI have been assigned as means organizer, operator, and
sustainers
COORDINATION
LRT JABODEBEK G E N E R ACHART
L OVERVIEW

PERPRES 98/2015 The Ministry of


The Ministry of
Percepatan
Accelerating PenyelenggaraanofKereta
the Implementation
Terintegrasi di Wilayah
Depok,Jakarta,
Api Ringan/
Integrated Light
Light Rail
Bogor,
and Bekasi
Rail Transit
Transit
Depok dan Bekasi
Project
(LRT) in Jakarta,
BUMN
Transportation
Keputusan Menteri (Jabodebek LRT) Subsection 10
Perhubungan
Decision RI
No.
No.KP
KP408/2015
408/ 2015
Oversight
Committee
Pasal 15 Menteri
Oversight Perhubungan The Ministry of
Committee The ministry of
PUPERA
Subsection 15 Subsection 11
Transporation
Pemprov DKI, Jabar
Badan Pengawas
Kemen Agraria & Pemkot Konsultan
Kemen. PUPERA Keuangan
Tata Ruang Bekasi,Bogor, Pengawas
Pasal 11 Pembangunan
Pasal 12 Depok Pasal 5
Pasal 13,14 Konsultan
Supervising
Pasal 8
Project-Government The Ministry of
Pengawas
Consultant Auditor Agrarian &
Pasal 5 5 Subsection 8
Subsection Spatial
Subsection 12

PT. Adhi Karya


Badan Usaha The Government
Penyelenggara LRT
(Persero),Tbk of DKI, Jabar,
Pembangunan
Prasarana LRT
*)Tender Pemkot Bekasi,
Pasal 16
PT. Adhi Karya Bogor, Depok
PT. Kereta Api Indonesia Subsection 13,14
(Persero),Tbk Operator
Design & Build Contractor
LRT JABODEBEK GENERAL OVERVIEW
KABUPATEN TANGERANG

PROVINSI DKI JAKARTA


KABUPATEN BEKASI
KOTA TANGERANG
7,8 km
10,5 km
18,3 km

KOTA BEKASI
KOTA Sta. Taman Mini
Sta. Kp. Rambutan TOTAL LENGTH - LRT : 81,6 KM
TANGERANG 14,3 km
SELATAN Sta. Ciracas
6 SERVICE LINE LRT Jabodebek
1. Cawang - Cibubur: 14,3 km
Sta. Cibubur 1 st P h a s e 2. Cawang - Kuningan - D.Atas: 10,5 km
3. Cawang – Bekasi Timur: 18,3 km
4. D.Atas - Palmerah - Senayan: 7,8 km
KOTA DEPOK 2 nd P h a s e
5. Cibubur - Bogor: 25,0 km
6. Palmerah - Grogol: 5,7 km

KABUPATEN BOGOR SCHEDULE


SERVICE LINE 2016 2017 2018 2019
Sta. Cibinong
Cawang – Cibubur (SERVICE LINE 1)
25,0 km
Cawang – D. Atas (SERVICE LINE 2)
Sta. Sentul Sirkuit
Cawang – Bekasi Timur (SERVICE LINE 3)

KOTA BOGOR Total of Stations : 16


Sta. Tanah Baru
Depo
LRT JABODEBEK 1
SERVICE LINE 1

NUMBER OF
STATION 4
Sta.TAMAN MINI Sta. KP.RAMBUTAN CIRACAS
Sta. CIBUBUR
Sta.
KM. 05+732 KM. 07+150 KM. 08+770 KM. 14+230

TOTAL LENGTH

14,5 KM
LRT JABODEBEK 2
SERVICE LINE 2

Dukuh Atas

Setiabudi
Sta. 10+057
NUMBER OF
STATION 7
Sta. 08+537

Rasuna Said
Sta. 07+645

Cikoko
Kuningan Sta. 02+100
Sta. 06+048

Pancoran Ciliwung
Sta. 04+296 Sta. 01+407
Cawang
Sta. 00+500

TOTAL LENGTH

10,5 KM
LRT JABODEBEK SERVICE LINE 3 3
NUMBER OF
STATION 5
Sta.
JATICEMPAKA CIKUNIR 1
Sta. Sta. BEKASI BARAT Sta. BEKASI TIMUR
KM. 06+500 KM. 09+820 KM. 13+845 KM. 18+000

Sta. CIKUNIR 2
KM. 11+081

TOTAL LENGTH

18,5 KM
LRT JABODEBEK
SCOPE OF
S C O WORK
PE OF WORK3
“A D H I ” a s a D e s i g n & B u i l d C o nt ra c to r

DESIGN IMPLEMENTATION TESTING TRIAL RUNNING

• Study Demand • Detail Design • Installation Test • Technical Performance Test


• Alignment • System Integration • Partial Acceptance Test • Functional Performance
• Station Location • Civil Construction • System Acceptance Test Test
• System Operation • Railway System
• Rolling Stock Manufacturing &
• Infrastructure (Civil & Installation
Station)
• Operation Facility
• Depot
2. TECHNOLOGY
LRT JABODEBEK LRT JABODEBEK TECHNOLOGY TYPICAL VIADUCT
LRT JABODEBEK TECHNOLOGY TRACKWORK

\
Evacuation lane Anti- derailment wall

Concrete Plinth for


ballastless system
LRT JABODEBEK
LRT S TAT I O N
JABODEBEK TECHNICAL VIEW STATION
LRT
LRT JABODEBEK
JABODEBEK TECHNICAL VIEW STATION

 STATION VIEW
TYPICAL STATION CAWANG STATION

• The minimum height for the building is 2700mm


(PERMEN PU No.19/PRT/M/2011 )

• If there is an obstacle such as advertisement’ pole, the minimum distance


is 2400 mm
(PERMEN PU No.19/PRT/M/2011 )

• The distance to the main road is 5.1 m


(PERMEN PU No.19/PRT/M/2011 )
LRT
LRT JABODEBEK
JABODEBEK TTEE H
C HCNNI CI A
CLAVLI EDWATA SSTATION
TAT I O N

The shape of building is


curve and futuristic to give
a modern look but it is
going to be simple and
light as well. The surface of
the building will be using a
sandwich panel sticking to
the building frame. It will
make an efficiency in
function and the use of
material.
LRT JABODEBEK R O O M O R G A N I Z AT I O N STATION
LRT JABODEBEK D E P O T L O C AT I O N

DEPO
PRELIMINARY OPERATION PLAN
Preliminary Operation Plan
LRT JABODEBEK CONCEPT
Concept of LRT Jabodebek OF LRT JABODEBEK OPERATION PLAN
Operation Plan

Bekasi Barat Bekasi Timur

RUTE 2: BEKASI TIMUR – DUKUH ATAS

RUTE 1: CIBUBUR – DUKUH ATAS


LRT JABODEBEK TECHNOLOGY T R A I N C A PA C I T Y

M M
LRT JABODEBEK T E C H N O L O G Y
R A I LWAY S Y S T E M
LRT JABODEBEK INTEGRATION

EXAMPLE

1. DUKUH ATAS STATION

Note:
ST. Dukuh Atas is integrated with other mode of
transportation such as busway, krl, mrt, and so on.

2. KAMPUNG RAMBUTAN STATION

Titik Integrasi Keterangan:


Sky Bridge connects ST. Kampung Rambutan to Kp.
Rambutan terminal.
LRT JABODEBEK STASION PLAZA

 THE PLAZA CONCEPT FOR MANAGING PASSENGERS


1. Stasiun Ciracas CIRACAS STATION

A. A Connected Bridge by LRT


PLAZA CONCEPT
An access from the station to the plaza
B. Plaza As A Managing Area for Passengers
A Plaza is used for a passenger transition area before or
after going to the station building

KUNINGAN STATION

A. A Connected Bridge by LRT


A
An access from the station to the plaza
B
B. Plaza As A Managing Area for Passengers
Plaza is used for a passenger transition area before or
after going to the station building

PLAZA CONCEPT
3. THE SCHEDULE OF CONSTRUCTION AND PROGRESS
4. DOCUMENTATION
SERVICE LINE 1
LRT JABODEBEK CAWANG - CIBUBUR
SERVICE LINE 2
LRT JABODEBEK CAWANG – DUKUH ATAS
SERVICE LINE 3
LRT JABODEBEK CAWANG – BEKASI TIMUR
LRT JABODEBEK PT ADHI KARYA (Persero) Tbk.
R E G U L A S I YA N G B E R L A K U

PT Adhi Karya (Persero) Tbk.


THANK YOU
Visit us at www.adhi.co.id

For further information please contact:


Ki Syahgolang Permata, Corporate Secretary
P. +62 21 797 5312 F. +62 21 797 5311 E. adhi@adhi.co.id

Disclaimer:
Important Notice
 This document was prepared solely and exclusively for the parties presently being invited for the purpose of discussion. Neither this document nor any of its content may be reproduced, disclosed
or used without the prior written consent of PT Adhi Karya (Persero) Tbk.
 This document may contain statements that convey future oriented expectations which represent the Company’s present views on the probable future events and financial plans. Such views are
presented on the basis of current assumptions, are exposed to various risks and are subject to considerable changes at any time. Presented assumptions are presumed correct, and based on the
data available on the date, which this document is assembled. The company warrants no assurance that such outlook will, in part of as a whole, eventually be materialized. Actual results may
diverge significantly from those projected. The information in this document is subject to change without notice, its accuracy is not verified or guaranteed, it may be incomplete or condensed and
it may not contain all material information concerning the Company.
 None of the Company, PT Adhi Karya (Persero) Tbk. or any person connected with any of them accepts any liability whatsoever for any loss howsoever arising from any use of this document or its
contents or otherwise arising in connection therewith.

Você também pode gostar