College
Date:
Signature___
Mentor:Mr.Fikadu G.
Signature___
Supervisor: Mr.Amanuel_________
Signature___
Acknowledgement
Firstly glory to God who help me in all aspects in my internship program. For his protection and
givingpower in order to accomplish my tasks effectively. Next I would like to thank my
advisorFikadu who helps me by showing the procedures how to write the report and supporting
me.
I am also thankful for Adigrat university department of electrical and computer engineering for
letting me to joinAddis pharmaceutical factory(APF) to understand the practical world and gain
all the practical knowledge’s the university have been teaching me four years.
I want to express heartfelt thanks to Addis pharmaceutical factory for accepting me and
allowing me to learn practical world what I have learned in theory. Finally I want to say especial
thanks to electrical engineering department members of the company specially,Amanuel,
Birhane, Haftom, T/mariam and other operators.
Executive Summary
This report outlines that the activities that I was studied in Addis Pharmaceutical FactoryPLC.
Internship was very important to fulfill therequirements for the degree of Bachelor of Electrical
and Computer Engineering.The report is conducted by observation, oral discussion, and refering
other materials.My internship started on 20 October 2010 and lasted on 20 January, 2010 E.C.
List of Tables
Table 1 computer service for the company ................................................................................... 14
Figure 2Work task executing flow chart ........................................Error! Bookmark not defined.
Table of Contents
Abbreviation .................................................................................................................................. 4
1.6. APF production and the end users of the product .............................................................. 14
Chapter Three--------------------------------------------------------------------------------------------11
Chapter One
Background of the company APF
At the company there are around 1250 workers. The company has a laboratory equipped for
chemical analysis, microbiological testing and which serves to control the quality of raw
materials, intermediates and finished products.
The company has around ten departments such as production department, maintenance and
engineering department, warehouse and material planning department, quality control
department, purchasing and supply department, quality assurance department, research and
development department, human resource managing department, finance and budgeting
department, and marketing and selling department.
To reach 90% capacity utilization based on the existing 30% on the single shift worth in the
coming three years.
1. Understanding and write each and every process of organization routine works (based on the
value chain).
APF is able to produce 91 products – Tablets, Capsules, Vials, Ampoules, Syrups, Suspensions, and
Elixir and Dermatological preparations. The efficiency of the high – tech machineries and the
skilled man – power play important role to the production capacity.
Tablets:
Vials:
7cc 9000vials/hr
20cc
3200vials/hr
Ampoules:
purchasing department
Warehouse department
Quality control department
Quality assurance department
Production department
Marketing department
Maintenance and engineering department
Managing department
Research and Development department
Rejected raw materials
SECRETARY
QCM HRM MP
PM MED FM
&WHM
EEPC
O
Distribution
generator
PC-01 PFC
Tablet
Head LPC Tablet weight 2 Tablet G.C Syrup Ampoule BC
office weight 1 drying
The workshop of the company contains many electrical materials I can make studies and that
help us identify the practical system of the material that I only know theoretically. I have been
time looking to industrial materials that needs maintenances and the materials I use in the
process of the systems like relays, contactors,overload relays, timers, motors and etc . Working
in every section of the company where a problem or an electrical fault but the workshop is the
main head for the maintenance area so I spend my and I have been working in this section or
department for last four months of my internship time.
The proximity sensor senses the bottle whereas position sensor check whether the bottle is at
perfect position to fill itAfter getting signal form the proximity and position sensor the solenoid
valve operate for time period that mentioned in the programming.
Work flow in this maintenance area is major and outstanding in the way that whenever a fault or
any failure in any system of the company exists. The work flow in this section especially because
it gives me more knowledge about the theoretical knowledge I have gained in my schooling life.
The purpose of each production line is converting the approved raw materials into a product and
the purpose of each packing line is packing the product and sending to finished product
warehouse. In each production line there are seven work stations and in each work stations there
are two machines needed to convert the raw materials into a product.
The number of operators in each machine is limited per shift. But manual working system
performs in each packing line and the number of each operator in each packing line is not
limited. Also in each packing line the work performs without any standard time.Each machine
produces about 91 types of drugs which are generally known as tablets, capsules, ampoules,
syrups and ointments. Each production line produces the products based on the customer’s
orderbecause the company’s production system is 80% make by order and the rest 20%is for
those products having longest expire dates.
2.4. Work task I have been executing
The work task that I have been execute is finding problems which can affect to the company
based on productivity on each packing line and finding solutions to each problems through. From
these working section the tasks I have been executing is like whenever a fault in any electrical
system exists in the industrial machine. I joined the team of electrical engineers and I try to solve
the problem, if the problem is not easy to solve I ask the operators who are professional.
Whenever theoretical knowledge’s are realized practically it can be developed and bounded
further. I therefore realize and upgrade my theoretical knowledge through
practice.Theoretical knowledge is a knowledge that I get from different sources,
For example:
I have learnt from the design departmentwhere the final complete work is the output of team
work. Team member has equal role and important to the output. If one of the team members lag
behind the whole work is incomplete.
The leader ship has made the team free to do the given task in a given tasks a given time being
innovative.During the internship, I have observed some important things in team playing.
Those are:
politeness
3.6 Understanding work ethics
I know all work ethics is the most needed criteria in every work place that everybody should
have in all his/her job activities that he/she gave to the society by respecting the rules and
obligations like:-
Panctuality
Responsibility
Transparency
APF works design and supervision enterprise is governmental organization, which is responsible
for providing safe the food supplies of human beings by the company of APF. The basic
principle of this organization is increase product of medical drug factory. The success of work is
done in the company through the display of the excellent works performed by the company and
the good workers.
Chapter Four
4.2Recommendation
Internship a great chance, choice and method of creating true, efficient, competitive ,skilled
person and means of identifying and solving different problems. But in my stay in the
company for the internship program, the implementation was very poor because of the
interconnection of the university and the company. So the university should have strong
interconnection with the company to allow the students to attach the program with no
difficulties.
Some electrical equipment requires modification for example making a generator to start
automatically. Also most of the machines are out of use it is better those machines are
maintained in short period of time.
References:
1. www.ijergs.org
2. Mallaradhya H M, K R Prakash,
3. Hemant Ahuja, Arika Singh, Saubhagya Tandon, Shreya Srivatsava, Sandeep Pal, ‘Automatic
Filling Management System for Industries', International Journal of Emerging Technology and
Advanced Engineering, Volume 4, Special Issue 1, February 2014
.
.
.