Project Name: Supply and Installation of 25MVA Mobile Substation for Ifraz Water Treatment Plant - Erbil Governorate
3- The Supplied Equipment and Materials of the Substation should be in compliant with Iraqi MOE's Standards and required
specifications and should pass the necessary required tests.
4- The supplied Substation's specifications and list of substation components and Equipment should be approved by MoE Engineering
Committee before Launching the manufacturing process.
5- The Contractor should responsible to conduct the required Factory Inspection under the supervision of the MOE's authorized
Committee before launching the shippment processs
6- Materials and Equipment should be brand new and never used before and registered/approved by Directorate of Electricity, Erbil
Governorate
Unit Price in
S.N. Descriptions of Items/ Required Technical Specifications of Equipment Unit Qty Total in USD
USD
Provision of 11kV Switchgear for Mobile Substation 25 MVA and 11kV
A
equipment with all required connection and accessories
11 Control panel 11kV Switchgear Details of required specs in Annexes A,B,C, Set 1 0.000
and D
Control Panel -On Load Tap Changer Details of required specs in Annexes
12 Set 1 0.000
A,B,C, and D
Metering Panel +11KV K watt/h meter for each out going feeders with all
13 requirements. Details of required specs in Annexes A,B,C, and D Set 1 0.000
Power Transformer 33/11 kV, 25 MVA outdoor type ONNA rated voltage
1 ratio 33/11.5 KV Details of required specs in Annexes A,B,C, and D PC 1 0.000
Subtotal Cost for provision of Transformers and 33 kV Equipment of Mobile Substation 25 MVA 0.000
C Civil Works
Site Preparation and Safety: Supply manpower and equipment for cleaning
and leveling and remove all type of debris to transfer to a dump location
1 L.S. 1 5,000.000 5,000.000
approved by the relevant authority as instructed by the Supervisior
Engineer.
Earth Works: Excavation in all types of surface and soil to the required
2 L.S. 1 1,000.000 1,000.000
profile to prepare the Concrete foundation
Foundations including leveling and casting concrete with all required
3 L.S. 1 2,000.000 2,000.000
materials and equipment to complete the works
Earthing System: Installation of the Cable trenches, pipes and set all
5 required of the Earthing System. L.S. 1 0.000
Conduct the required Factory Inspection and required Tests for the
1- Substation on Site and submission of the manufacturing inspection Report L.S. 1 0.000
(FAT) and commossioning certficate.