Design and Project Management

Engineering Co. (DPME)

Design Analysis Report Review Form SAN-F-02


Project Name: ……………………………………………………………………….…..

Location: …………………………………………….…. Date: …/… / ……..

Document to be reviewed  Drawings  Document

1. Design analysis Report (D.A.R) Review

1.1 Introduction  Scope of Work Summary


 Project Description
1.2 Design Criteria  Feed water system
 Sewage system
 Irrigation system
 Rainwater and surface water drainage systems
 Foul water drainage systems
 Steam Heating System
 Natural Gas System
 Fire Fighting Systems
1.3 System/Facility Design (Brief Description)  Plumbing system
 Feed Water System
 Sewage System
 Fire Protection System
 Underground Fire Water Tank
 Fire Water Header
 Sprinklers System
 Fire Fighting Apparatus
 Irrigation system
 Steam heating system
 Natural gas system
1.4 List of Specifications  List of Specifications
1.5 Drawings and Documents List  Drawing list
 Documentation list
1.6 Master Equipment List  Master Equipment List
1.7 Coordination Data  Coordination Data
1.8 Appendices  Appendices

Reviewer Comments:
………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………….
………………………………………………………………………………………………………………………………………
…………

Reviewing Status  Accept  Refuse

Reviewer ……………………………… Signature …………………………….

/conversion/tmp/scratch/380433298.doc Page 1 of 2
Design and Project Management
Engineering Co. (DPME)

Review Date … / … / ……..