DILO 2nd Annual SF6 Gas Management Seminar

Tampa FL, November 2017


Zero Emissions. No
Substitutes.

Managing SF6 gas leaks


in Circuit Breakers
 The true art of SF6 gas leak detection and leak
seal

November 15, 2017

Steve Wickman, PE electric utility independent consultant


John Edmon TDS-Transmission & Distribution Services

www.dilo.com - www.dilodirect.com
Our story for you today

 SF6—what is it?
 Why SF6 in electric utility apparatus?
 Some history
 SF6—good stuff
 SF6—bad stuff
 SF6 leaks—find them and fix them
 Steve‘s experiences with SF6 CBs

© January 2013 Page 2


SF6...what is it?
Sulfur Hexafluoride
Sulfur hexafluoride (SF6)
is an inorganic, colorless,
odorless, non-flammable,
extremely potent
greenhouse gas, which is
an excellent electrical
insulator. SF6 has an
octahedral geometry,
consisting of six fluorine
atoms attached to a
central sulfur atom.

© January 2013 Page 3


Why SF6 in electric utility apparatus?

Some history

© January 2013 Page 4


Why SF6 in electric utility apparatus?

Some history

© January 2013 Page 5


In the early 1950s high-voltage CBs of bulk oil
configurations were becoming the norm

These OCBs had an exemplary record but the


possibility of failure, and the risk of explosion and
oil fires existed

Systems grew & HV OCBs were located


increasingly in urban areas and the consequences
of OCB failure gained importance

© January 2013 Page 6


In the early 1950s the New York Consolidated
Edison Company (Con Edison) in particular started
to push for an oil-less breaker design

In response to this oil-less breaker need, the


Westinghouse Electric Company initiated a program
to develop the GCB using SF6 as the insulating
dielectric & interrupting medium, transforming the
breaker industry

Thirty years later every manufacturer of H-V


breakers adoped SF6 as the medium of choice

© January 2013 Page 7


Early Installations
PP&L 230kV GCB at Brunner
Island substation the first SF6 CB
placed in commercial service

© January 2013 Page 8


Early Installations
ConEdison Hellgate substation May 1960 first two
installed SF6 GCBs 138kV 10,000MVA
ConEdison GCB failure February 1961, previous
experience with oil CBs indicated that total or near total
destruction occurred
This SF6 CB failure was repaired & the CB restored in
two days and subsequently ConEdison placed their first
substantial order for 138kV SF6 CBs

© January 2013 Page 9


SF6

The good stuff...

 Higher dielectric strength than air or


nitrogen
 Provides for compactness in the
design of equipment

The bad stuff...

 Found to be the most potent


greenhouse gas known to date
 Emitted into the atmosphere it
accumulates in an undegraded state
for centuries

© January 2013 Page 10


SF6

Bottom line...

 Allowing it to leak freely into the


atmosphere is not a good thing

US EPA regulations...

 Develop SF6 emissions reduction


strategies
 Inventory of SF6 using eqiupment
 Estimate current emissions

© January 2013 Page 11


SF6—got leaks?

 SF6 leaks—find them and fix them

© January 2013 Page 12


SF6 Leak Detection

© January 2013 Page 13


SF6 Leak Detection

© January 2013 Page 14


SF6 Leak Detection

© January 2013 Page 15


SF6 Leak Survey & Sketch

© January 2013 Page 16


Leak Repair Technique on SF6
Apparatus

External clamp

© January 2013 Page 17


External clamp

© January 2013 Page 18


External clamp

© January 2013 Page 19


External clamp

© January 2013 Page 20


External clamp

© January 2013 Page 21


External clamp

© January 2013 Page 22


External clamp

© January 2013 Page 23


External clamp

© January 2013 Page 24


External clamp

© January 2013 Page 25


External clamp

© January 2013 Page 26


External clamp

© January 2013 Page 27


External clamp

© January 2013 Page 28


External clamp

© January 2013 Page 29


External clamp

© January 2013 Page 30


External clamp

© January 2013 Page 31


Clamp repair concept drawing

© January 2013 Page 32


External clamp

© January 2013 Page 33


External clamp

© January 2013 Page 34


SF6 piping leaks in GCB control cabinet

© January 2013 Page 35


SF6 piping leaks—typical measurements

© January 2013 Page 36


SF6 piping leaks

© January 2013 Page 37


SF6 piping leaks

© January 2013 Page 38


GIS leaks

© January 2013 Page 39


GIS leaks

© January 2013 Page 40


SF6 leaks-find them and fix them

Initial leak detection can be performed with CB in service

Detailed survey and measurements without disassembly of


CB
Clamp design and fabrication performed in a day or two and
air freighted to the worksite
Repairs completed in a day or two with minimal outage time
and NO degassing of the CB required...depending on
customer safety/work practice requirements

© January 2013 Page 41


SF6 leak a case study

Steve‘s actual experience ~1980

Westinghouse SFA GCBs 765kV

© January 2013 Page 42


SF6 leak a case study

© January 2013 Page 43


SF6 leak a case study

© January 2013 Page 44


SF6 leak a case study

WWJD?

© January 2013 Page 45


SF6 leak a case study

What Would Jesus Do?


What Would Jesus Drive?
What Would Judas Do?
We Want Jack Daniels

© January 2013 Page 46


SF6 leak a case study

What Would John Do!!!

© January 2013 Page 47


SF6 leak a case study

© January 2013 Page 48


SF6 leak a case study

© January 2013 Page 49


SF6 leak a case study

© January 2013 Page 50


SF6 leak a case study

© January 2013 Page 51


SF6 leak a case study

© January 2013 Page 52


• TRANSMISSION & DISTRIBUTION SERVICES, LLC
28369 DAVIS PARKWAY, SUITE 401
WARRENVILLE, IL 60555
P∙775.586.8300
F∙775.586.1105
Steve Wickman
630.853.3104
swickman@tdsgroup.biz

John Edmon
775.240.1319
johnedmontds@msn.com

© January 2013 Page 53


John Edmon
John Edmon…44 years in the Leak Sealing
business…starting out working for leak
seal firms working in the petrochemical
and electric power house industry. In
1988, upon the suggestion of an Electric
Utility equipment specialists John worked
with at a power plant on the west coast of
the USA, he developed his technique for
sealing low pressure leaks, initially in large
power transformers. The techniques then
flowed over to CBs initially oil CBs. As the
SF6 dielectric medium became more
prevalent in CBs in the industry, John
started applying the same techniques to
SF6 gas apparatus.

© January 2013 Page 54


Steve Wickman
Steve Wickman, PE…37 year career as a
Power Engineer with Commonwealth
Edison in the greater Chicago, IL area.
BSEE from Iowa State University and MBA
from Keller Graduate School of
Management [DeVry University]. His 40+
year engineering career has spanned work
experiences in substation equipment
testing and commissioning, design
engineering, substation construction and
operations management, as well as
project management, work scheduling
and work controls areas. Steve is now
working as an independent consultant in
the electric utility industry.

© January 2013 Page 55


references

Russell N. (Russ) Yeckley and R. Gerald (Jerry) Colclaser, Jr., “First


SF6 Breaker Design, Westinghouse engineers tell the inside story”,
IEEE Power & Energy Magazine, May/June 2016

© January 2013 Page 56


DILO 2nd Annual SF6 Gas Management Seminar
Tampa FL, November 2017
Zero Emissions. No
Substitutes.

Managing SF6 gas leaks


in Circuit Breakers
Presentation By: Steve Wickman and John Edmon
Created On: October 12, 2017

Transmission & Distribution Services, LLC

Suite 401

28369 Davis Parkway

Warrenville, IL 60555

775-586-8300

www.dilo.com - www.dilodirect.com

Você também pode gostar