Define Trades & Resource Types under Blue hammer (definitions & settings)
Do the rate analysis using resources in Price code worksheet (double clicking on the rate coloumn in Candy BoQ)
Project Name : Waste Water Treatment Works
EXCAVATION
Supply, place and cast into position, hot dip gavanised H.D. bolts
A M20 HD bolts in lengths ex. 750mm and ne 1000mm overall length No. 250
B M30 HD bolts in lengths ex. 1250mm and ne 1500mm overall length kg 6,440
C 6mm thick chequer plate duct covers cut to suitable lengths on site m2 110
CONCRETE
Trades
Trades are the primary subdivision of an estimate - eg Excavation, Concrete, etc. You can de
Eg: E - Excavation
C - Concrete
R - Reinforcement
etc
Resource Types
Each Simple resource must belong to one of the nine Resource Types. Can be upto 9
L - Labor
M -Material
P - Plant
S - Subcontract
s. Can be upto 9
Total Display
Resource
Type Code Description Unit Final rate
L 200 Unskilled Labour (all in) /hr 5.25
L 210 Charge Hand /hr 7.50
P 300 CAT 215 Excavator /hr 230.00
M 500 Diesel /lit 2.75
M 510 20/19 MPa RMC /m3 240.00
M 520 25/19 MPa RMC /m3 245.00
S 900 Metal Works (Smith Metalworks) sum 1.00
*** Resource List in Candy Software
*** Create Reources as sample
Need to discuss