New hydropower projects under construction

in India

ČKD Blansko Engineering, a.s.

Karel Kyzlink, Ladislav Štégner – ČKD Blansko Engineering, Czech Republic


Chokka Rao Godavari Lift Irrigation Scheme – Phase II – India, Andhra Pradesh

Location:
Andhra Pradesh
State of India

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Organizational Chart

Government of Andhra Pradesh


Irrigation and Water Resources Department
Investor

Hindustan Construction Company, Nagarjuna


Construction Company (India)
Contractor and civil companies

Jyoti (India)
Contractor for technology E&M equipment

ČKD Blansko Engineering ČKD Nové Energo


(Czech Republic) (Czech Republic)
Hydraulic and mechanical Supplier of motors
design of pump units

 ČKD Blansko Engineering (member of Litostroj Power group) concluded contract with Jyoti in 2006

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Chokka Rao Godavari Lift Irrigation Scheme – Phase II – India, Andhra Pradesh
• after completion a total of 7 pump stations (14 pump units)
• pumping up to Bomakur area – 150 km
• total delivery head – 480 m
• total pump water quantity – 1210 mil. l/day

Number Delivery head/ Delivery Rated Impeller


Pump station (PS) Rated input
of units delivery piping quantity speed diameter
name at PS [kW]
length [m] [m3s-1] [min-1] [mm]

GANGARAM 2 10 850 131 / 38 090 7 500 Ø1912


BHIMGANAPURAM 2 9 850 123 / 47 728 7 500 Ø1875
SALIVAGU 2 10 550 130 / 40 517 7 500 Ø1907
DHARMASAGAR 2 11 350 138 / 23 000 7 500 Ø1945

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Pump conception and design solution
Pump conception:
• radial centrifugal pump
• one hydraulic design
• pump motors above flood level
• radial-axial bearing on pump cover
• synchronous motor – ČKD Nové Energo,CR

PS GANGARAM
• pump rotor length – 25 m
• 4 guide bearings
• 3pcs hollow shaft ø880/ø800mm
(2pcs - 5600mm, 1pcs - 4900mm)
• 1pc pump shaft ø400mm
• 3pcs connecting shaft ø400mm

PS BHIMGANAPURAM, SALIVAGU,
DHARMASAGAR
• pump rotor length – 14,5 m
• 2 guide bearings
• 1pc hollow shaft ø880/ø800mm – 6800mm
• 1pc pump shaft ø400mm
• 1pc connecting shaft ø400mm

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Pump components manufacturing - Europe

B. HILFRICH GmBH – hollow shafts

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Pump components manufacturing - Europe
Žďas, CR – pump shafts, connecting shafts, coupling, impellers

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Pump components manufacturing - Europe
Eagle Burgmann – shaft seal
RENK – guide bearings, flexible
gear coupling

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Pump components manufacturing - India
GWALIOR TANKS (Bhopal) – draft tube assembly

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Pump components manufacturing - India

VIMAL ALLOYS (Mandri Gobindgarh) – pump lower cover

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Pump components manufacturing - India
Rhine Engineering (Vadodara) – pump spiral casing with diffuser

- inlet dia – 2000 mm


- outer dimensions – c.4700x8055x2450
- weigth – c. 20 000 kg
New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Special impeller manufacturing technology
Impeller manufacturing technology
- used new, so far not applied manufacturing technology
- this technology has been patented by ČKD Blansko Engineering, CR
- Impeller is welded from two halves

Hub

Weld boundry

Crown Weld boundry

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Special impeller manufacturing technology
The main advantages of the applied technology
- weld is located outside the points of stress concentration
- the welding metal consumption and input heat quantity for welding is also
substantially lower than with the so far applied technologies
- hydraulic shape of the hub, crown and blades is very good accessible during
NC machining, all surfaces are finished before welding
- the weld deformation are minimized due to using just one weld for each blade
- weld is good accessible for polishing and NDT checking

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Impeller manufacturing

Casting of the impeller crown

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Impeller manufacturing

NC machining of the impeller crown

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Impeller manufacturing
Impeller welding – position during main welding

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Impeller manufacturing
Final acceptance test of the impellers

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Pump assembly on PS GANGARAM site

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Pump assembly on PS GANGARAM site

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Pump putting in operation

- Currently, two pumps of Gangaram pump station are in operation

- Six pumps of Bhimganapuram, Salivagu and Dharamasagar pump stations


were completely assembled , tested and commissioned, however, the
complex test of pump units was not yet performed due to shortage of water
on pump stations sites

- The existing experience in the pump operation at Gangaram pump station


confirms the correctness of both hydraulic and mechanical design elaborated
by the ČKD Blansko Engineering, CR

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Koyna Left Bank Power Station

Location:
Maharashtra
State of India

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Organizational Chart of the KLBPS project

Government of Maharashtra
Water Resources Department
Investor

IVRCL (India) Vendors for local fabrication


of P-T components as
Contractor and local manufacturing company
Jyoti Ltd. and others

Litostroj Power (Slovenia)


Supplier of E&M technology equipment

ČKD Blansko Engineering Končar (Croatia)


(Czech Republic)
Supplier of motor-generator
Hydraulic and mechanical and electrical equipment
design of pump-turbine

 Litostroj Power concluded contract with IVRCL in December 2010

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Water Ways Solution

 Existing dam with Francis turbines at right bank of Koyna river

 Civil works of new Koyna left bank power station started in 2008

 Concrete lined headrace tunnel – length 450m – 7.6m dia

 Steel lined bifurcation for two pump-turbines – length 20m

 Concrete lined tailrace tunnel – length 290 – 6.5m dia

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Underground Power House Arrangement

 2xDeriaz pump-turbine - D=3,9m , n=187,5rpm

 Butterfly inlet valve with diameter 3,9 m

 Draft tube flap valve - 5,35 m to 2,5 m

 Unit rotor seated in three bearings

 Each unit is equipped with independent cooling

 Blow down air system for condenser operation

PUMP OPERATION
Head range: 33,5 ÷ 83m
Power Input: 40 ÷ 52 MW

TURBINE OPERATION
Head range: 27,5 ÷ 77m
Power Output: 10 ÷ 52 MW

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Pump Turbine Type Selection

 LOW head pump turbines = HIGH head variations (Koyna level variation is 30 ÷ 80 m)

 Operation range in pump mode generally limited by cavitation and operation stability

 Operation range in turbine mode generally limited by pressure pulsations

 Reasonable pump-turbine setting is advised (machine axis under tail water level)

 Dériaz pump-turbine with adjustable runner blades at constant speed = FINAL SOLUTION
Head and power variation

Dériaz pump-turbines with


variable speed
Dériaz pump-turbines with
constant speed
Francis pump-turbines
with variable speed
Francis pump-turbines
with constant speed Investors price

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Hydraulic design procedure

 Experience from older projects for heads up to 60 meters (Lipt.Mara, Czorsztyn, Kadana)

 Number of runner blades = 10, Number of guide vanes = 20, Number of stay vanes = 16

 Simultaneous hydraulic and mechanical design was applied

 Ansys CFX software was used for numerical CFD analysis

 Optimization of the runner geometry improved efficiency and cavitation features

 Operation range was extended in both operational modes

Mode Operational point Requirements

Pump mode Best efficiency point at rated delivery head Efficiency

Pump mode Maximum delivery head Efficiency, Cavitation and Stability

Pump mode Minimum delivery head Efficiency and Cavitation

Turbine mode Best efficiency point at rated head Efficiency

Turbine mode Maximum output at maximum head Efficiency and Cavitation

Turbine mode Maximum output at minimal head Efficiency and Cavitation

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Hydraulic design – pump operation

 Flow in the pump-turbine runner in pump operation mode

 Some amount of cavitation at leading edge (blue colour) is unavoidable

maximum delivery head minimum delivery head

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Hydraulic design – turbine mode

 Flow in the pump-turbine runner in turbine operation mode

 Some amount of cavitation at minimal head (blue colour) is unavoidable

maximum net head minimum net head

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Hydraulic design – model manufacturing

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Model Witnessed Tests

 Development tests were carried out from April to May 2011

 Hydraulic laboratory of ČKD Blansko Litostroj Power in Blansko (Czech Republic)

 Two testing rigs are in operation since the end of 2011 Parameters of universal testing
rig No.1:
Max. test head 120 m
Max. Discharge 1.20 m3s-1
Max. rotation speed 2000 min-1
Max.model power 300 kW
Max. shaft torque 1000 N.m
Min. NPSH 1.5 m

New hydropower projects under construction in India , HydroVision India 2012- New Delhi
Model Witnessed Tests

 Performance guarantees were successfully fulfilled at model witnessed tests (June 2011)

 Measurement of axial thrust and blade and guide vane loading was carried out as well

 Final hydraulic solution was confirmed as applicable for Koyna power station

Model pump-turbine runner Model witnessed tests

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Mechanical design

 Detail stress analysis of all parts using Ansys

 Dimensions of important components were


optimized

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Mechanical design

 Detail stress analysis of all parts using Ansys

 Dimensions of important components were optimized

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Mechanical design

New hydropower projects under construction in India , HydroVision India 2012 - New Delhi
Summary

 New Deriaz pump-turbine for wide head variation was successfully designed

 The hydraulic and mechanical design proceeded simultaneously

 Guaranteed performance parameters were verified by model witnessed test

 ČKD Blansko Enginnering is now in final stage of completing documentation

 The manufacturing in Litostroj Power workshops started

 Project runs successfully and putting into operation is planed for year 2015

New hydropower projects under construction in India , HydroVision India 2012- New Delhi
Thank you for your attention …

ČKD Blansko Engineering, a.s.

Čapkova 2357/5
678 01 Blansko
Czech Republic