Joint CCM and CCU roadmap for the adoption of the

revision of the International System of Units

Dr Philippe Richard,
CCM President
and
Prof. Joachim Ullrich,
CCU President
CCM and CCU roadmap for the revised SI
14
CCM CCU
01.07.2017
Convocation Closing date
CGPM Metrologia special edition
15 for new data
Mise en pratique (mep kg) CCM (with references for the mep)
mep kg
approved
updated mep kg
Initial pilot study (kg)
16 approved
(preparation, measurements & report) CCM
CCU CCM
BIPM extraordinary Traceability R4
CCM
calibration with IPK to IPK R3 Consultation / announcement

CODATA (2017 LSA)


XRCD and available WB publish consistent results CCM
R1&2 CCU
BIPM pool established and characterized
CIPM
Pool linked to experiments
EMRP kNOW and NewKILO projects

NMI directors meetings


Convocation
CGPM

2013 2014 2015 2016 2017 2018


2
Conditions from CCM Recommendation G1 (2013)
CCM and CCU roadmap for the revised

Convocation
CGPM Metrologia special edition
15 01.07.2017
Mise en pratique CCM (with references for the mep) Closing date
(mep kg) mep kg for new data
approved
updated mep kg
Initial pilot study (kg)
 16 approved
(preparation, measurements & report) CCM 17
CCM CCM
CCU
Extraordinary R4
CCM
R3 Consultation
calibration with IPK

CODATA (LSA)
XRCD and available WB publish consistent results CCM
R1&2  CCU CCU
106
BIPM pool established  CIPM
and characterized Pool linked to experiments
Convocation
EMRP projects
CGPM
WMD WMD

2014 2015 2016 2017 2018 2019


3
Conditions from CCM Recommendation G1 (2013)
CCM conditions (before redefinition)

R1 Consistency
Three independent experiments (XRCD & WB)
with consistent results with urel < 5·10-8

R2 Uncertainty
at least one result with urel < 2·10-8

R3 Traceability
Extraordinary calibration with IPK @ BIPM

R4 Validation
Validation of the mise en pratique according to
the CIPM-MRA

www.bipm.org 4
Philippe.Richard@metas.ch

www.bipm.org