LampSite installation guide

Preparation of Tools and Instruments


Marker
Torque screwdriver (M4 to M6) Diagonal pliers
Level

Power cable crimping tool RJ45 crimping tool Wire clipper

Crown saw/hole saw (Φ127 mm)


Rubber mallet Wire stripper

Hammer drill (Φ6, Φ8, Φ12) Torque wrench (Φ10 mm) Protective gloves

Guarded blade utility knife ESD gloves Long measuring tape

Multimeter Network cable tester Vacuum cleaner

Ladder Torque wrench for SMA connector Socket wrench (M6)

2
Installing process of RHUB&pRRU
Start

Prepare for the


installation.

Install the RHUB in a Install the RHUB in Install the RHUB


19-inch cabinet or rack. a 19-inch shelf. on a wall.

Install cables.

Check the RHUB


hardware installation.

Power on the RHUB.

End

3
Typical RHUB install scenario
Installing in a 19-Inch Cabinet or shelf Installing Clearance Installing Environment
Installation
Item Quantity Specifications
Scenario
Installed on a
wall or in a 19- - –5℃ to +50℃
inch rack
Operating 1 RHUB –5℃ to +45℃
temperature
Installed in a
2 RHUBs –5℃ to +43℃
cabinet
3 RHUBs –5℃ to +40℃

Multiple RHUBs
Install space 1U
in a rack
Installing on a wall Relative All installation
- 5% RH to 95% RH
humidity scenarios
The RHUB
–60 m to
works
+1800 m
properly.
maximum
operating
temperature
Altitude - -
1800 m will drop by
to 4000 1°C each
m time the
altitude
increases by
220 m.

4
Install RHUB in cabinet or shelf

Reverse Mode
the front of the mounting
ear is 31 mm away from the
RHUB front panel

Standard Mode
the front of the mounting
ear is aligned with the
RHUB front panel

Removing&Reinstalling Pushing an RHUB Tightening screws


mounting ears into a cabinet/shelf

5
Install RHUB on a wall

Removing mounting Reinstalling mounting Anchor points for installing


ears and screws ears and screws an RHUB on a wall

45 mm-50 mm

Installing an Drilling holes and


RHUB on a wall installing expansion bolts

6
Typical pRRU install scenario and install requirement
Item Specifications
Operating –5°C to +45°C
temperature
Relative 5% to 95% RH
humidity
Altitude –60 m to +4000 m

Celling mount with Celling mount with Celling mount


Wall mount
zero gap some gap through a plate

install on a U- Install on steel Install on a round pole Install on a round pole


shaped keel hangers (8 mm to 40 mm) (40 mm to 114 mm)
Recommended
clearances
(unit:mm)

7
Cable list for RHUB

One End The Other End


Cable
Connector Connected to… Connector Connected to…

PGND cable OT terminal (M4, 6 mm2) Ground screw on the RHUB OT terminal (M6, 6 mm2) Ground terminal on the
external ground bar
RHUB power cable C13 female connector AC power input socket on the 3-pin plug External power socket
RHUB
CPRI port on the LBBP, WBBP, or DLC connector CPRI0 or CPRI1 port on
UBBP in the BBU the RHUB
CPRI0 or CPRI1 port on the DLC connector CPRI0 or CPRI1 port on
RHUB the RHUB
CPRI optical fiber DLC connector
CPRI port on the LBBP, WBBP, or FC, SC, or LC connector ODF
UBBP in the BBU
CPRI0 or CPRI1 port on the FC, SC, or LC connector ODF
RHUB
Ethernet cable RJ45 connector CPRI port on the RHUB RJ45 connector CPRI port on the pRRU
(Optional) RHUB RJ45 connector EXT_ALM port on the RHUB None Alarm signal port of the
alarm cable backup power system

8
Cable list for pRRU

One End The Other End


Cable
Connector Connected to… Connector Connected to…

RJ45 connector Ports CPRI_E0 to CPRI_E7 Ports CPRI_E0 to


Ethernet cable (CAT6a) on the RHUB RJ45 connector CPRI_E1 on the pRRU
(CAT6a)

Lead the Ethernet cable through


the waterproof cover.

9
General Requirements for Cable Layout
• Bending Radius
– The bending radius of a power cable or PGND cable is at least five times the cable diameter.
– The bending radius of an optical fiber is at least 20 times the cable diameter. The minimum bending radius of a branch at each end of an
optical fiber is 30 mm.
– The bending radius of a signal cable is at least five times the cable diameter.
• Cable Binding
– Cables of the same type are bound together.
– Different types of cables must be separately routed with a minimum of 30 mm spacing and cannot be entangled or crossed.
– Cables are bound tightly and neatly and the cable sheath is intact.
– Cable ties face the same direction and all cable ties bound at similar positions must be in a straight line.
– The extra length of each indoor cable tie must be cut off. A slack of 5 mm is reserved for each outdoor cable tie. All cut surfaces have no
sharp edges.
– Labels or nameplates are attached to cable ends, joints, or turns after cables are installed.
• Safety
– Cables are placed away from sharp objects or wall burrs. If these positions are inevitable, protection pipes are required for the cables.
– Cables are routed away from heat sources, or heat-insulation materials are added between cables and heat sources.
– Clearance is reserved at cable turns or positions close to a device to facilitate cable and device maintenance. The recommended
clearance is about 0.1 m.

10
Assembling an RJ45 Connector and a CAT6a Ethernet Cable
25 mm

(1) Twisted pair


(3) Outer
(with aluminum foil (2) Braid
jacket
on each pair)
(5) Cable (6)
(4) RJ45 connector management Binding
frame strap

11
Thank you
Copyright©2015 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements regarding the future financial
and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and
developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for
reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.

Você também pode gostar