Shaikh Nooruddin Yaqubali.

Career Summary

Experience of more than 12 years as Piping Supervisor in the field of fabrication, erection, welding
activities and quality control, for various construction projects in oil & gas Projects. Well
experienced in dossiers like preparation of test pack, As built control sheet. Also very well
experienced in revising isometrics and P&ID. Familiar with codes and standards like ASME
standards.
HIGHLIGHTS:
 Navis works review.
 Constructsim review.
 Written and verbal communication skills
 Problem solving & Innovative thinking attitude.
 Managing & developing people

Education Qualification:
 4 year sandwich Diploma in Production technology. Passed with first class from
Government Polytechnic MSBTE, Mumbai, India. (April 2002)

Personal Details:
 Date of birth : 30 April’ 1979.
 Nationality : Indian
 Residential add : 406, Sarvodaya srushti, bldg.no.03, Kalyan west dist. Thane.
Maharashtra. India.
 Contact Phone : +971-55 1209391, +91-9702550062.
 Email: noorudin_sheikh@yahoo.com

Work Experience:
 Piping Supervisor: McDermott International, Inc. --- DUBAI, UAE. (From January 2011
to till date.)

 Some of the responsibilities handled at ONSHORE & OFFSHORE.
 Maintaining the standards of safety and quality as per the company procedures.
 Responsible for all aspects of the day-to-day fabrication and erection activities of the
project in terms of safety, Quality and in timely manner.
 Understand the scope of work and coordinates with the different disciplines in order to
mitigate the interference/clashes.
 Aware of the HSE & Quality procedure of various clients such as: Saudi Aramco, ADMA,
KJO.
 Preparing the TRA( task risk accessment) considering the Fabrication, Erection &
Precommissioning activity and ensure all the hazards & risks associated with the activities
are undertaken.
 Coordinating with the design engineers at the engineering stage in order to mitigate/avoid
the hazards & risks during the fabrication & erection activities.
 Monitoring the progress and performance of the fabrication & erection Crew in order to
ensure the productivity, Quality and standards are maintained.
 Coordinate with the PMT groups( Document control department) to ensure the timely
release of drawings and datas.
 Review the forecast plan and look ahead schedules and take necessary action to resolve
the future work related issues.
 Carrying out the HSE & Quality weekly walk through to make sure the standards are
followed and maintained.
 Planning the day to day activities as per the project milestone.
 Facilitate timely problem resolution with the construction crew.
 Preparation of red lines (mark-up) on drawings during construction and submitting to the
end user (proponent) for approval, prior to make the final as-built drawings.
 Preparation of field piping system test packages ,including system limit on P&ID and piping
Isometrics.
 Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic
tests, fulfilling commissioning and Pre-Commissioning requirements for the project.
 Ensure that hydro test reinstatement is to be done as per procedure.
 Ensure that all punch list items are resolved; client handover is satisfactorily concluded and
that there is no prolongation of project.
 Coordinating with Engineering and Construction and liaise with the Client on detail
engineering requirements,
 Handling all piping technical queries and investigating all field pipe work related problems,
including the drawing of field sketches when necessary.
 Raising MTO(s) for all materials required to additional materials for hydro test etc.
 Conducting H2S and Abundant ship drill at offshore.
 Utilizing the PIMS and constructsim software for entering the progress
 Understands the full scope of work, contract type and milestone schedules.
report and obtaining Data.
 Facilitate timely problem resolution with the construction crew.
 Provide direction and make decisions in pursuit of the project and area goals and
objectives.
 Forecast tools and equipment needs in advance of the requirements.
 Ensure labor force allocated on the job is productively used.
 Coordinating with client QC, CSR, engineering.

 Some of the projects handled in MCDERMOT Internattional, Inc:


 SAFANIYA GOSP-1 Project. (Onshore & Offshore)
 KJO Water Injection Facility. (Onshore & Offshore)
 ABU-SAFAH sub-sea pipeline,
 Karan Well head & Auxiliary Platform & Bridges 17/25 and 35/43.

 Fabrication and Erection supervisor: CCIC Qatar- shell GTL project. (Dec 2007 to
Sept 2009.)
Consolidated Contractors Company S.A.L. engages in construction, engineering,
procurement, development, and investment activities in the Middle East region and
internationally. I worked in Fabrication and erection division and some of my responsibilities
are listed below.
 Ensures safety and quality procedures are followed.
 Fabrication and erection of boiler piping (HRSG).
 Fabrication and Erection of Piping spools and piping supports.
 Provide Engineering support when spooling pipe and mobilizing.
 Plan and manage work in an efficient manner.
 Preparing as built as per field change.
 Receiving and storage of materials.
 Responsible for getting all kinds of work permits needed prior to starting the job. And,
responsible for safety issues related to the job.
 Preparing technical query and bill of materials.
 Implementing Site Instructions and field changes efficiently.
 Established and maintained good relationship with client.
 Provided timely review of piping layout and 3D model design.

 Piping Supervisor: Gama Industries Arabia Limited. Petro Rabigh Polymer Plant
Project. Saudi Arabia. Jul 2006 to Dec 2007.
Some of my roles and responsibilities are listed below:
 I was responsible for the material take off and expedite based on the isometric drawings.
 Co coordinating with the contractor for the fabrication and erection of Piping spools.
 Responsible for arranging various kinds of work permits and ensuring safe work practices.
 Resolving constructability issues with the engineer.
 Reconciliation of material on completion of the job.
 Site Supervisor: Lunar Electro- Al Fajer Group. Dubai, UAE. Dec 2003 todec2005:
 Supervision of work at site.
 Coordinating with client rep., civil & consultant.
 Coordinating with Design Department.
 Calculating the material requirement as per drawing.
 Ensuring the optimum utilization of available resources viz. Power tool, cables, emergency
lights, and ladder and man power.
 Forecasting the material shortfall.
 Coordinating with the store department.
 Coordinating with the various departments such as – HVAC, Fire Fighting, Electrical & Civil.
 Involved in Testing & Commissioning activities.
 Maintaining Daily Progress Report.
 Preparing the Snag List.

 Site Engineer (Erection): Tyco Engineering And Construction Co. (India)

Project: Modernization of Marine Oil Terminal at JNPT, Mumbai.( 14th January 2003 to
18th August 2003)
 Supervision of erection activities at site.
 Installation, Testing & Commissioning of Engine Driven Vertical Turbine pump & Jockey
Pump.
 Involved in the installation & Pressure Testing of 24 Inch Dia. & 16 Inch Dia. Hydrant and
Tower monitor Pipeline.
 Holiday Testing for underground Pipeline.
 Preparing punch list.
 Ensuring the safe working condition.
 Taking care of safety norms.
 Coordinating with Client, Civil & Consultant.
 Coordinating with Design Department.

 In plant Trainee: Crompton & Greaves Ltd. Mumbai, India.


(For Six Months)

 In Plant Trainee: Carriage & wagon Work Shop Indian Railway, Matunga, India (For
Six Months)

( Shaikh Nooruddin Yaqubali )