GENERAL NOTES FOR SITE PLAN: TYPE-3 (TO BE APPLIED TO ALL STEEL MEMBERS & ELEMENTS 3 GENERALLY ,ALL WOODEN WORKS WHEREVER NO PARTICULAR KEY PLAN
DEFINED IN THE SUBMITTED DESIGN APPROVED BY CMW) 15. GENERALLY, ALL TYPE OF BUILDINGS (EXCEPT ACCOMMODATION FINISH INDICATED AT DRAWINGS , SHALL BE PAINTED WITH ONE FLUSH BOLT :
BUILDING )GROUND FLOOR WINDOWS AND VENTILATORS TO BE COAT OF PRIMER (THERMAL INSULATE), TWO UNDERCOATS FOR ALL DOUBLE DOORS 20 mm STAINLESS STEEL LEVER ACTION
1. ALL LOCATIONS & SITE PLANS DRAWINGS TO BE READ IN
FIRE PROOFING PROVIDES "90 MINUTES" FIRE RESISTANCE TO PROVIDED AS FOLLOWS:- AND FINISHING COAT U.V LIQUOR FINISH. FLUSH BOLT SHALL BE PROVIDED WITH KEEP EASY CLEAN
CONJUNCTION WITH ALL OTHER RELEVANT ARCHITECTURAL,
STRUCTURAL STEEL WORK OF GYPSUM BASED WET MIX a) ACCESSORY.
STRUCTURAL & SERVICES
DRAWINGS. CEMENTITIOUS SPRAY-ON APPLIED MATERIAL . DENSITY OF FOUND AT TD-119 FOR ALL STORES BUILDING A TIMBER FLUSH DOORS :
11 NOT LESS THAN 240 KG/M3 (15 PCF). TYPE " ISOLATEK-300 b) ALUMINIUM SECURITY BARS FOR ALL OTHER TYPE OF (for doors size refer to doors types drawings / for details refer to TD-434 ) KICK PLATES : 11
2. CONTRACTOR HAS TO CHECK & VERIFY THE ACTUAL SITE SERIES OR ANY EQUIVALENT APPROVED BY CMW. BUILDINGS. FOR ALL DOORS, 2 mm. THK. 20 cm. HEIGHT UP TO FULL DOOR
DIMENSIONS & THE RIGHT LOCATIONS FOR ALL FACILITIES ON SITE. HOWEVER ABOVE MENTIONED SECURITY BARS FOUND AT THE 1. DOOR FRAME & LEAF COMPONENTS SHALL BE AS FOLLOWS: WIDTH, POWDER COATED ALUMINUM KICKER PLATE TO BE FIXED
IF ANY DISCREPANCIES FOUND CONTRACTOR HAS TO INFORM **** FOR ARCHED, CURVED OR STRAIGHT GALVANIZED DRAWINGS OR NOT CONTRACTOR HAS TO PREPARE DETAILED a. DOOR FRAME COMPONENTS: AT BOTH SIDES OF DOOR. ( STAINLESS STEEL FOR WET AREA )
PRE-PAINTED STEEL SHEETS OF " K-SPAN SYSTEM" OR " UBM DRAWINGS TO BE APPROVED BY C.M.W ENGINEER. a.a. DOOR SUB FRAME : TO BE OF HARD WOOD 20mm THK.
C.M.W. ENGINEER BEFORE OF WORKS & PREPARE REVISED
SYSTEM " OR SIMILAR SYSTEMS ONE OF THE FOLLOWING TYPES FIXED TO FULL WIDTH OF WALL EDGE BY METAL CRAMPS HOOKS :
DRAWINGS IF NEEDED.
SHALL BE APPLIED : OF AT LEAST 12cm LENGTH. TOILET AND BATHROOM DOORS SHALL HAVE TWO NOS. COATS
GENERAL NOTES FOR ALUMINUM OPENINGS AND HAT HOOK OF APPROVED QUALITY.
3. ANY REUSABLE MATERIALS WHICH ARE REMOVED FROM THE SITE
TO BE DELIVERED TO C.M.W. STORES AND STOCKED OR DISCARD TYPE - 4 FIRE PROOFING OF ONE LAYER OF CELLULOSE - "DOORS &WINDOWS: " a.b. DOOR FRAME : TO BE OF BURMA TEAK 45mm THK.
AWAY. OR REUSED IT IN THE SITE ACCORDING TO SITE ENGINEER CIMA WITH EFFECTIVE FIRE PROOFING = 60 minutes. REBATED HEAD & JAMBS FIXED WELL BY SCREWS TO THE DOOR STOPPER :
INSTRUCTIONS. 1 THESE NOTES SHOULD BE READ IN ACCORDANCE WITH ALUM . ALL-AROUND SUB-FRAME & PROVIDED WITH 100X20 mm. WALL OR FLOOR MOUNTED TYPE OF APPROVED QUALITY
10 OPENINGS TYPES FOUND AT CONTRACT DRAWINGS OR BURMA TEAK BEADING ARCHITRAVE . 10
4. ANY PLANTS OR TREES WITHIN THE AREA OF NEW CONSTRUCTION TYPE - 5 HEAT AND FIRE PROOFING OF : ASSOCIATED TYPICAL DRAWING ALL TO BE READ AS AN
PUSH PLATES :
TO BE CAREFULLY REMOVED & REPLANTED NEARBY AS PER C.M.W. a) POLYURETHANE FOAM INSULATION 50mm - MB40 INTEGRATED DATA. b. DOOR LEAF COMPONENTS: N
IF FOUND AT DOOR TYPES DRAWINGS IT SHALL BE OF STAINLESS
ENGINEER INSTRUCTIONS. b) MONOKOTE FIRE PROOF Z3306 OF 20mm THK. WITH 2 INSTALLATION OF ALL ALUM .WORK SHALL BE AS PER b.a. LEAF SHUTTER CORE :- DOOR LEAF TO BE 50mm OF
EFFECTIVE FIRE PROOFING = 15 minutes. MANUFACTURER'S RECOMMENDATIONS .CONTRACTOR SHALL TOTAL THICKNESS - LEAF CORE SHALL BE 38mm THK.
STEEL FINISH 2 mm. THK & SIZE TO BE AS SHOWN NOTES:
5. CONTRACTOR HAS TO CHECK & VERIFY ANY EXISTING SERVICES SUBMIT DETAILED SHOP DRAWINGS ,ORIGINAL CATALOGUES TUBULAR CHIPBOARD OF FIRST CLASS, DENSITY 650 kg/m2
GENERAL NOTES FOR ALL ABOVE FIVE NUMBERS OF TYPES OF AND SAMPLES ,SHOWING ALL DETAILS SECTIONS &FIXING DOOR CLOSER :
OF ANY TYPE ( DUCTS, PIPES, CABLES, TABREED etc...) FALLS IN THE DOOR CLOSER OF APPROVED QUALITY TO BE PROVIDED AT ALL
PREMISES OF THE NEW CONTRACT CONSTRUCTIONS HAS TO BE FIRE PROOFING MATERIALS: METHODS FOR C.M.W.APPROVAL b.b. LEAF DOOR FRAME :- STRUCTURAL MARANTI WOOD FOUR
3 ALL ALUMINUM (EXCEPT AT CURTAIN WALLS IF BEEN USED )OF SIDES RAILS OF 38X100mm & INTERMEDIATE ONE SIZE OF THE FOLLOWING DOOR TYPES AT ALL FACILITIES:
EITHER PROTECTED, PRESERVED OR RE-ROUTED AND DIVERTED IF 1) MAIN AND SECONDARY ENTRANCE DOORS
a- CONTRACTOR HAS TO USE THE SAME MATERIALS OR FRAMED GLAZED ,HALF GLAZED ,ALUMINUM FLUSH DOORS 38X200mm ALL SURROUND & FIXED TO CHIPBOARD CORE
NEEDED AS PER C.M.W.SITE ENGINEER INSTRUCTIONS AND IN 2) EMERGENCY EXIT DOORS.
EQUIVALENT APPROVED , ALL TO BE CONFORMING TO ,WINDOWS AND VENTILATORS ALL SHALL BE MANUFACTURED OF USING STAINLESS STEEL FASTENER
9 ACCORDANCE TO THE REQUIREMENTS 3) MAIN DOORS OF ALL WET AREAS AND KITCHENS. 9
OF ANY CONCERNED LOCAL AUTHORITIES DEPARTMENT. STANDARD SPECIFICATIONS FOR THAT WORK AND AS PER HEAVY GAUGE POLYESTER ELECTOR STATIC POWDER COATED
b.c. PLYWOOD SHEET : BOTH CORE AND LEAF FRAME ALL TO 4) DOORS OF ALL UTILITY ROOMS (ELECTRICAL, MECHANICAL,
APPROVED TECHNICAL DATA SHEET FOR THE USED SECTIONS OF APPROVED .QUALITY AND MANUFACTURER
BE COVERED WITH 6.0mm THK. PLYWOOD SHEET COMMUNICATION ,...etc.)
6. CONTRACTOR HAS TO SUBMIT COMPLETE LOCATION AND SITE MATERIAL. (MIN .)THICKNESS 1.5mm
FINISHED WITH ONE OF THE FOLLOWING TWO SYSTEMS :- DOOR CLOSER SHALL BE OF STAINLESS STEEL COVER AND
PLANS DRAWINGS & DETAILS SHOWING THE FACILITIES , ROADS, 4 DOORS OR WINDOWS OPENING SIZE ,OPENING METHOD
b- ALL STORING AND APPLICATION METHODS AS STATED IN THE 1) CLADDING WITH SELECTED 0.6mm TEAK ASH, OAK, ARMS. CAPACITY TO MATCH WITH DOORS SIZE, TYPE AND
GROUNDS, FOOTPATHS FINISHED LEVELS ACCORDING TO &DIRECTION LEAVES &HANDLES SHAPE ,GLAZING PANELS
MATERIAL DATA SHEET SHOULD BE STRICTLY FOLLOWED BY BEACH OR MAPLE VENEER PAINTED WITH APPROVED WEIGHT. PERFORMANCE TEST SHALL BE DONE FOR
REQUIRED GROUND FINISHED LEVEL & ALL OTHER RELATIVE ITEMS SPECS ,DOOR CLOSING DEVICE ,INSTALLED EXHAUST FANS
TRANSPARENT VARNISH . C.M.W.APPROVAL.
THE CONTRACTOR &LOUVERED PANELS...etc ..ALL TO BE READ FROM DOOR
FOR C.M.W. APPROVAL BEFORE COMMENCEMENT OF WORKS.
&WINDOWS TYPES AT CONTRACT DRAWINGS.
c- CONTRACTOR HAS TO ASSIGN TRAINED AND SKILLED LABOR 5 GENERALLY ,ALL EXTERNAL GLAZING FOR ALL OPENINGS TO BE 2) DIRECT PAINTING WITH HIGH QUALITY U.V LACQUER DOOR SIGNS :
7. EXCAVATED MATERIALS OR BACK FILLING TO BE MOVED "IN" OR PAINT. (REFER TO DRAWINGS FOR SELECTED FINISH - DOOR SIGNS TO BE OF 20X7cm (min.) ALL TO BE OF 1.5mm THK.
FOR THE APPLICATION OF THIS WORK. OF DOUBLE GAZING AS FOLLOW (ALL TEMPERED GLASS )
"OUT"THE SITE AS PER C.M.W. ENGINEER INSTRUCTIONS. APPLICATION PROCESS TO BE APPROVED BY C.M.W.) STAINLESS STEEL HAILINE ETCHING IN BLACK BACKGROUND -
a. EXTERNAL GLAZING OF 6MM THK .REFLECTIVE GLASS OF
8 d- CONTRACTOR HAS TO MEET ALL THE REQUIREMENTS OF SIGNS TO BE FRAMED BY POLISHED STAINLESS STEEL SLIDING 8
8. GENERALLY, FOR ALL OTHER SITE WORK , CONTRACTOR HAS TO OUTDOOR VISIBLE LIGHT REFLECTION NOT LESS THAN 35%
HEALTH AND SAFETY REGULATIONS CONSIDERING AND b. VOID GAP OF 12mm IN-BETWEEN GLAZING FILLED BY ARGON bd. LIPPING : BURMA TEAK OF 20mm TO BE PROVIDED FOR CHANNEL FRAME ALLOW TO EASY SIGN REPLACEMENT. DATA
GET C.M.W. SITE ENGINEER APPROVAL BEFORE COMMENCEMENT DOOR SHUTTER WITH MATCHING FINISH. WRITTEN SHALL BE ASSIGNED AS ROOM NUMBER ,ROOM TITLE,
AVOIDING ANY TECHNICAL OR SAFETY ISSUE CONFLICT GAS.
OF ANY WORK. & FOLLOW ALL HIS INSTRUCTIONS. OCCUPANT TITLE & SYMBOLS OF MEN / FEMALE TOILETS OR
BETWEEN THE APPLIED FIRE PROOFING MATERIAL AND c. INTERNAL GLAZING OF 6mm THICK CLEAR FLOAT ANNEALED
ALL THE MEP WORK DONE WITHIN THE FACILITY. GLASS EXCEPT TOILETS TO BE OF (TRANSLUCENT )OBSCURE b.e WIRED GLASS PANELS & DECORATIVE WORK: ANY SERVICE ROOMS..etc..IN BOTH ARABIC AND ENGLISH (IF NEEDED)
9. FINISH LEVEL FOR ALL NEW ASPHALT ROADS IF FOUND TO BE ENGRAVED OR EXPOSED DECORATIVE WORK AT DOORS WITH SUITABLE READABLE FONT , SIZE & FIXED IN PROMINENT
MATCHED / ADJUSTED WITH THE LEVEL OF NEAREST / CONNECTED GLASS
e- ALL RELATED LAB TESTS , CIVIL DEFENSE APPROVALS AND OR GLASS PANELS (IF FOUND) SHALL BE SHOWN & POSITION ALL AS DIRECTED BY C.M.W.ENGINEER.
EXISTING ROAD OR EXISTING FACILITY. CONTRACTOR HAS TO 6 FOR ALUMINUM FLUSH DOORS SHUTTERS TO BE CONSISTS OF
CERTIFICATES AND GUARANTEE CERTIFICATES FOR AT SPECIFIED AT DOOR TYPES DRAWINGS.
SUBMIT DETAILED DRAWING SHOWING THE NATURAL GROUND ALUMINUM SANDWICH FLAT PANEL 2.2mm thk (min.)AT BOTH SIDES
LEAST 20 YEARS SHOULD BE SUBMITTED TO CMW FOR WITH 2.5cm thk INJECTED POLYURETHANE FOAM INSULATION GENERAL NOTES :
LEVELS AND THE PROPOSED FINISH APPROVAL. 2. KITCHENS & ESCAPE DOORS LEAF TO BE 62mm OF TOTAL
LEVELS FOR C.M.W. APPROVAL. DENSITY 45Kg/m 3 FINISHED WITH APPROVED QUALITY
THICKNESS- LEAF CORE TO BE 50mm SOLID NON-COMBUSTIBLE
7 POLYESTER POWDER COATED PROVIDED WITH ALL NECESSARY 1. GENERALLY FOR ALL DOORS, CONTRACTOR HAS TO SUBMIT 7
3. EXPANSION JOINTS AT WALLS, SLABS, COLUMNS AND BEAMS BOARD CLASS-1 - TWO HOURS FIRE RATED.
10. IN DESIGN & BUILT PROJECTS CONTRACTOR SHOULD STUDY IRONMONGERY INCLUDES LOCKING DEVICES ,HANDLES BOTH IRONMONGERY SAMPLES, SHOP DRAWINGS, AND DETAILS FOR
TO BE FILLED, TREATED & COVERED AS PER STRUCTURAL CHECKING AND APPROVAL.
BUILDING ORIENTATION ACCORDING TO THE SUN MOVEMENT AND ARCHITECTURAL DRAWINGS OR NOTES . HOWEVER, AT FLOOR 3. FOR WET AREAS MAIN DOORS PLYWOOD SHEET SHALL BE
PROVIDE SUN PROTECTION SHADE OR REFLECTOR ON AFFECTED FINISH EXPANSION JOINT TO BE FILLED WITH APPROVED CLADDED WITH 1.0mm. THK. OF LAMINATED SHEET OF APPROVED
BUILDING ELEVATION SIDE AS PER REQUIREMENT. IRONMONGERY 2. ALL STEEL STRUCTURE ROOF SHOULD BE PROVIDE WITH
RUBBER OR MASTI FILL COVERED WITH STAINLESS STEEL STRIP QUALITY AND COLOR AT ONLY INTERNAL SIDE HOWEVER DOORS
TO BE APPLICABLE UNLESS OTHERWISE SPECIFIED IN ALUM GUTTER. CONTRACTOR SHALL SUBMIT FULL DETAIL DRAWING
COMPLETELY LEVELED TO FLUSH WITH FLOOR FINISHES. OF TOILETS, SHOWERS AND CHANGING ROOMS. etc... TO BE
OPENINGS TYPES AT CONTRACT DRAWINGS FOR APPROVAL
GENERAL NOTES FOR CONTRACT DRAWINGS: CLADDED ON BOTH INTERNAL & EXTERNAL SIDES.
4. ALL EXTERNAL WALLS MASONRY WORKS TO BE OF HOLLOW a. ALL ALUMINUM DOORS ,WINDOWS AND VENTILATORS
IRONMONGERY INCLUDING LOCKS ,HANDLES ,BOLTS ETC 3. WHEREVER STEEL STRUCTURE ROOFING IS NOT PROVIDED WITH
1. ALL CONTRACT DRAWINGS " ARCHITECTURAL, STRUCTURAL, THERMO INSULATED CONCRETE BLOCKS 25cm thk. WITH 10cm 4. ALL DOORS TO BE PROVIDED WITH COMPLETE NECESSARY
.SHALL BE OF FIRST QUALITY AND NOT INFERIOR TO ANY OF FALSE CEILING ,CONTRACTOR SHOULD PROVIDE A BIRD NET
ELECTRICAL, MECHANICAL & PLUMBING " OR ANY OTHERS TO BE POLYSTYRENE INSULATION BOARDS // BLOCKS OVERALL Max. IRONMONGERY REQUIRED AS PER INDICATED AT PARAGRAPH
THE APPROPRIATE BRITISH STANDARDS B.S 445,B.S MADE OF UV STABILIZED KNOTTED POLYETHYLENE BLACK
U-VALUE of 0.43 W/m2K "C"
6 READ AS AN INTEGRATED DATA - WRITTEN DIMENSIONS TO BE COLOR NET , FLAME RESISTANT , ROT-PROOF , NON-CONDUCTIVE 6
1227,B.S & 1228.B.S 1331 .OR TO ANY OF THEIR EQUIVALENT
FOLLOWED - HARD COPIES SHOULD NOT BE SCALED. MATERIAL INSTALLED AS PER REQUIRED AREA WITH APPROVED
b. NORMAL HOLLOW BLOCKS OF 20cm thk. TO BE USED FOR APPROVED BY C.M.W .MATCHING WITH APPROVED ALUMINUM B TIMBER SOLID DOORS :
FRAME POLYESTER POWDER COATED OF APPROVED QUALITY HARDWARE AND ACCESSORIES , ZIPPER SQUARE OPENINGS TO
2. THESE DRAWINGS ARE COPY RIGHT OF COMMAND OF MILITARY INTERNAL WALLS BE PROVIDED AT THE LOCATION OF HANGING MEP ROOF
c. SOLID 10cm thk, BLOCKS TO BE USED AT TOILETS AND .ALL SPECS .OF IRONMONGERY ITEMS FOR TIMBER DOORS 1. ALL TIMBER SOLID DOORS TO BE OF 100% SOLID AFRICAN
WORKS AND STRICTLY NOT ALLOWED TO BE COPIED ,REPRODUCED FITTINGS TO ALLOW FOR MAINTENANCE ACCESS.
BATHROOMS PARTITIONS UNLESS OTHERWISE SHOWN AT .SHALL BE APPLICABLE FOR ALUM .DOORS &WINDOWS. TEAKWOOD CORE.
OR TRANSMITTED IN ANY FORM BY ELECTRONIC, MECHANICAL - NET OPENINGS MESH SIZE TO BE 19 X 19 mm ALL OF
DRAWINGS b. ALL ALUMINUM DOORS ,WINDOWS AND VENTILATORS TO BE OTHER COMPONENTS TO BE THE SAME SPECS. HERE ABOVE
METHOD OR BY ANY OTHER MEANS , WITHOUT C.M.W. WRITTEN APPROVED QUALITY.
d. ALL MASONRY WORKS TO BE PLASTERED WITH SMOOTH PROVIDED WITH ALL NECESSARY DUST PROOFING FOR FLUSH DOOR
PERMISSION .
CEMENT/SAND 1:3 MIX PLASTER-15mm thk. (min.) UNLESS &WATERTIGHT DEVICES .ACCESSORIES.
4. CONTRACTOR SHOULD USE APPROVED QUALITY PRODUCTS
OTHERWISE MENTIONED USING APPROVED PASTEURIZATION c. ALL IRONMONGERY SHALL BE FIXED WITH SCREW ,BOLTS C IRONMONGERY :
3. CONTRACTOR SHALL BE RESPONSIBLE FOR CO-ORDINATION OF EXCEPT (CHINA MADE)
MATERIAL AND CRACKS CONTROLLING . ADDITIVES ,NUTS ETC .OF THE SAME FINISH AS IRONMONGERY
ALL ARCHITECTURAL AND OTHER SERVICES DRAWINGS TO AVOID
HARDWARE MANUFACTURER. (TO BE APPLICABLE UNLESS OTHERWISE SPECIFIED IN DOORS
5 ANY CONFLICT AT SITE OPERATIONS. ALL DIMENSIONS SHALL BE 5. ALL DOORS ELECTRICAL, MECHANICAL AND COMMUNICATION 00 CONSTRUCTION DOCUMENT 09/17 -- -- 5
VERIFIED ON SITE BEFORE EXECUTION OF WORKS. 5. ALL JUNCTION BETWEEN R.C COLUMN AND BLOCK WORKS TYPES AT CONTRACT DRAWINGS) ROOMS SHOULD BE AS PER DOOR SCHEDULE. REV
7 ALL FIRE ESCAPE ALUM .DOORS SHALL BE FITTED WITH PUSH NO.
Description DATE DRAWN CHECKED
SHALL BE PROVIDED WITH 150mm STAINLESS STEEL EXPANDED BAR PANIC HANDLE FROM APPROVED MANUFACTURER
4. CONTRACTOR HAS TO SUBMIT DETAILED SHOP DRAWINGS & MESH FIXED PRIOR TO PLASTERING OPERATION 1. ALL TIMBER IRONMONGERY INCLUDING LOCKS, LATCHES, 6. SHOWER TRAY AREA IN BATHROOM / WASH ROOM SHALL BE CLIENT
8 CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF HARDWARE HANDLES, BOLTS & HINGES etc.. SHALL BE OF FIRST QUALITY COMMAND OF MILITARY WORKS
TECHNICAL ORIGINAL CATALOGUES AND SAMPLES OR ANY OTHER 6. DOORS & WINDOWS OPENINGS SOLID BLOCKS OR SOLID FINISHED WITH NON-SLIP CERAMIC TILES OF APPROVED QUALITY
ITEM WITH MANUFACTURES ORIGINAL CATALOGUES WITH AND NOT INFERIOR TO ANY OF THE APPROPRIATE BRITISH COLOR & SIZE. HANGING AND MANUALLY MOVING SHOWER P.O.Box...............Abu Dhabi
REQUIRED DATA ABOUT APPLICATION OR INSTALLATION FOR ALL CONCRETE SHALL BE USED AS STIFFENER ALONG LINTELS, SAMPLES OF EAC ITEM FOR C.M.W .APPROVAL . STANDARDS B.S 445, B.S 1227, B.S.1228 & B.S. 1331 OR TO ANY OF CURTAIN ON ROUND TUBE OF APPROVED QUALITY OF CMW
United Arab Emirates
USED MATERIALS & FINISHES INCLUDED AT CONTRACT SIDES & WINDOWS SILLS. Tel.....................
9 INSTALLATION OF ALL WINDOWS AND CURTAIN WALLS TO BE THEIR EQUIVALENT APPROVED BY C.M.W. ENGINEER CONTRACTOR TO SUBMIT DETAILS TO CMW FOR
DOCUMENTS FROM AT LEAST ( 3 ) REPUTABLE MANUFACTURERS 7. RAIN WATER DRAINAGE SYSTEM ( SLOPE AND DOWN PIPE RAIN Fax No: .....................
STRICTLY FLUSHED WITH EXTERNAL ELEVATION (EXTERNAL APPROVAL PRIOR TO EXECUTION OF THE WORKS.
FOR C.M.W. SELECTION & APPROVAL PRIOR TO WORK EXECUTION. WATER TO BE PROVIDED WHEREVER NECESSARY AND / OR AS FINISH SURFACE , )NO PROJECTION ALLOWED 2. ALL IRONMONGERY SHALL BE FIXED WITH SCREW, BOLTS NUTS DESIGN CONSULTANT:
THESE ITEMS SHALL INCLUDES USED FINISHES OF FLOORS, WALLS, SHOWN AT DRAWINGS & AS PER C.M.W. APPROVAL.
CEILINGS, SKIRTING, DOORS, WINDOWS, CUPBOARDS, COUNTERS, etc... OF THE SAME FINISH AS IRONMONGERY HARDWARE 7. UNLESS OTHERWISE FOUND IN THE DRAWINGS ALL FACILITIES
4 KITCHEN CABINETS, BENCHES, DEMON TABLE PARTITION, LOCKERS,
8. WATER PROOFING AT ROOF & ALL WET AREAS FLOOR SLABS DOUBLE GLAZING AND THERMAL EXTERNAL WALLS: MANUFACTURE. WITH ACCESSIBLE ROOFS FROM GROUND LEVEL OR FROM ANY 4
SHALL BE OF 4mm thk. TORCH WELDED POLYESTER FIBBER OTHER HIGHER LEVELS TO BE PROVIDED WITH A STEEL CAT
BENCHES, HANDRAILS , ALL ALUMINUM SECTIONS, GLASS PANELS, REINFORCED WATERPROOF MEMBRANE OF APPROVED
CURTAIN WALLS, IRONMONGERY AND ACCESSORIES..etc.. PLUS CONTRACTORS SHOULD PROVIDE HIGH PERFORMANCE DOUBLE 3. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF HARDWARE LADDER WITH SAFETY CAGE. THE LADDER LOCATION AND
QUALITY & APPLIED AS PER MANUFACTURES INSTRUCTIONS CONTRACTOR:
GLAZING FOR ALL EXTERNAL GLAZING OPENINGS AND THERMAL ITEMS WITH MANUFACTURES ORIGINAL CATALOGUES WITH DETAILED SHOP DRAWINGS TO BE APPROVED BY CMW
ANY OTHER USED ITEMS. AND TO BE TESTED FOR MINIMUM 24 HOURS, ALL TO BE INSULATED EXTERNAL WALLS AS WELL. TO HELP IN REDUCING THE SAMPLES OF EACH ITEM FOR C.M.W. APPROVAL. ENGINEER.
MISCELLANEOUS NOTES : APPROVED BY C.M.W. SITE ENGINEER COOLING LOAD AND REDUCTION OF NOISE TRANSMISSION.
9. 12mm thk. GRANITE THRESHOLD TO BE PROVIDED AT FULL 4. COMPLETE NECESSARY IRONMONGERY FOR TIMBER DOORS
1. FOR STEEL WORKS ( IF INCLUDED ) WIDTH OF DOOR OPENING OF WET AREAS ENTRANCE DOOR THE U VALUES SHALL COMPLY WITH ESTIDAMA REGULATIONS SHALL BE AS SPECIFIED AS FOLLOWS : DRAWING TITLE:
a. IN CASE OF FIRE PROOFING WORK IS NOT APPLIED , ALL STEEL (KITCHENS, BATHROOMS AND TOILETS..etc) GENERAL NOTES
SECTION ( EXCEPT COLD FORMED ELEMENTS FROM 10. WHERE TWO DIFFERENT FLOOR FINISHED MEET THEY SHALL BE .1 Roof : Max. Assembly Heat Transfer Coefficient of 0.44 W/m2K 5. KICK PLATE SHALL BE PROVIDED FOR WET AREA AND OFFICE
PRE-GALVANIZED COILS) TO BE SAND BLASTED AND PAINTED SEPARATED BY 5.0 X 1.5cm thk. FLUSH STAINLESS STEEL .2 External Walls : Max . Heat transfer coefficient 0.57 W/m2K . DOORS
WITH APPROVED ANTI RUST EPOXY PAINTS ( 270 MICRONS min. DIVIDING STRIP SECURELY ANCHORED IN FULL DEPTH OF .3 Glazing at all external opening:
3 PURPOSE OF ISSUE DESIGN STAGE 3
TDFT) SCREED & FINISHING SURFACE Max. Heat transfer coefficient 2.20 W/m2K ., LOCKS :
11.GENERALLY , MAIN CONTRACTOR SHALL BE SOLELY and SHGC of 0.40 (solar heat gain coefficient ) MORTICE LOCK, CASE & SKIRTING PLATES ALL TO BE FOR TENDERING CONSTRUCTION DOCUMENT
2 . STRUCTURAL STEEL WORK FIRE PROOFING RESPONSIBLE FOR CO-ORDINATION AND QUALITY ASSURANCE Air curtains and Air locks may provided To reduce infiltration.as per STAINLESS STEEL TYPE "KHAFLIE", "WELLCA" OR " CES" - ORIGINAL DRAWING
SHEET SIZE SCALE SHEET NO.
OF ALL HIS SUB CONTRACTORS WORKS. ONLY WORKS THAT design specs. GERMANY - OR ANY SIMILAR APPROVED. TOILET DOORS LOCK
TYPE-1 (TO BE APPLIED TO ALL STEEL MEMBERS & ELEMENTS MEET SATISFACTION OF C.M.W. SHALL BE ACCEPTED. TO BE WITH EMERGENCY RELEASE AND OCCUPATION A1 AS SHOWN 1 OF 1
DEFINED IN THE SUBMITTED DESIGN APPROVED BY CMW ) 12.GENERALLY, All FOOTPATH INTERLOCKING TILES TO BE 6.0 cm THE CONTRACTOR MAY USE ANY ALTERNATE MATERIALS OR INDICATOR SIGN BOLT.
DRAWN BY DESIGNED BY APPROVED BY
THK. WHILE INTERLOCKING USED IN CAR TRAFFIC AREAS METHODS PROOFING COMPLIES WITH THE PERFORMANCE CRITERIA
FIRE PROOFING PAINT OF A WATER BORNE THIN FILM (ROADS, PARKING,...etc) TO BE OF 8.0cm THK. OR AS PER ROAD AS PER SPECIFICATION. THE ALTERNATE MATERIAL OR METHODS MASTER KEYS : -- -- AM

INTUMESCENT COATING PROVIDES "120 MINUTES" FIRE DRAWINGS. ALL ARE SUBJECT TO C.M.W APPROVAL. THREE KEYS TO BE PROVIDED FOR EACH LOCK WITH 2 NOS. OF PROJECT NO. CAMP ID FACILITY CODE
RESISTANCE TO STRUCTURAL STEEL WORK OF FULL COATING 13.IN CASE THE CONTRACT INCLUDING THE INSTALLATION OF MASTER KEYS FOR EACH TYPE OF DOOR LOCKS.
2 SYSTEM ( PRIMER+BASE COATS+TOP COATES) . TYPE "COSMO WOODEN CUPBOARDS " AS MAY BE FOUND IN ACCOMMODATION GENERAL NOTES FOR TIMBER DOORS : 00000 000000 -- 2
370-120" OR TYPE "PHOENIX 370-120" OR ANY EQUIVALENT FACILITY FOR EXAMPLE OR ANY OTHER FACILITIES" HANDLES :
APPROVED BY CMW. DRAWING NO. REVISION No.
CONTRACTOR HAS TO FOLLOW THE DRAWING AND SPECS 1 THESE NOTES SHOULD BE READ IN ACCORDANCE WITH PAIR OF HEAVY DUTY STAINLESS STEEL LEVER HANDLES
FOUND - FRONT (AND SIDE) WOODEN FIXED PANELS SHOULD BE TIMBER DOORS TYPES FOUND AT CONTRACT DRAWINGS & (22mm. DIA). CMW-00000-C000- GN-A-0001 00
TYPE-2 ( TO BE APPLIED TO ALL MAIN STEEL MEMBERS & DONE CLOSING THE VOID ABOVE THE UPPER EDGE OF ASSOCIATED TYPICAL DRAWING (TD . )434-ALL TO BE READ AS AUTHORITIES APPROVAL
ELEMENTS DEFINED IN THE SUBMITTED DESIGN APPROVED BY CUPBOARD UP TO BOTTOM OF SLAB (OR) 20 CM UP TO FALSE AN INTEGRATED DATA. HANDLE COVER PLATES :
CMW CEILING
STAINLESS STEEL LOCK PLATES OF 150X150 mm. FLAT PLATE.&
14. ALL ROOF MOUNTED MEP EQUIPMENTS HIGHER THAN THE 2 INSTALLATION OF ALL TIMBER DOORS SHALL BE AS PER 1O X 150 mm. FOR TOILETS AND KITCHENS.
FIRE PROOFING PAINT OF A PALE BLUE WATER BORNE THIN PARAPET WALL SHOULD BE ENCLOSED WITH MASONRY WALL MANUFACTURER'S RECOMMENDATIONS .CONTRACTOR SHALL
FILM INTUMESCENT COATING PROVIDES "90 MINUTES" FIRE OF 10cm THK OF THE SAME EQUIPMENTS HEIGHT , SUBMIT DETAILED SHOP DRAWINGS AND SAMPLES SHOWING HINGES :
RESISTANCE TO STRUCTURAL STEEL WORK OF FULL REASONABLE ACCESS OPENINGS & MAINTENANCE ALL DOORS STRUCTURE ,FULL SCALE SECTIONS &FIXING
1 EACH SHUTTER TO BE PROVIDED WITH TWO PAIRS4 ( NUMBERS 1
COATING SYSTEM ( PRIMER + BASE COATS+TOP COATES). TYPE " AROUND SPACE TO BE PROVIDED - ALL PAINTED WITH THE METHODS FOR C.M.W.APPROVAL. min ). OF STAINLESS STEEL HINGES BEARING TYPE OF
COSMO 270-120 " OR "PHOENIX 270-120" OR ANY EQUIVALENT SAME EXTERNAL PAINT SPECIFIED - NEEDED COLUMNS OR
APPROVED QUALITY- SIZE AND NUMBERS TO BE MATCHED WITH
APPROVED BY CMW. STIFFENERS TO BE DESIGNED BY THE CONTRACTOR FOR
DOOR SIZE AND WEIGHT
APPROVAL .