Escolar Documentos
Profissional Documentos
Cultura Documentos
99
Setting up of XRD testing facilities for porcelain insulators.
Development of Internet Protocol (IP) Based train control
communication system.
Development of Lightning & Surge Protection and
Earthing Arrangement for Signal and Telecommunication
equipments.
Development of non-metallic Telecom Cable Termination
box.
Development of track side bogie monitoring system to
monitor bearing and bogie condition.
Development of technology in collaboration with Indian
Institute of Technology to measure wheel dynamic calibration
Rolling Rig.
Development of 500t Universal Spring structure fatigue
testing machine.
Operational Efficacy:
Design and development of 5000 HP WDG5 diesel
locomotive for faster, longer and heavier trains.
Development of improved rubber side bearer for locomotive
bogies to improve fatigue life and reliability.
Framing of technical specification of Guidance for
Optimised Loco Driving (GOLD) - an in-cab service system
– to help loco pilot to save fuel.
Trial of modified bogie for WDP1 locomotive incorporating
certain changes to make it reliable and maintenance
friendly.
Design and development of high performance fuel-efficient
2300 HP freight/industrial/shunting locomotive (WDS7A).
Development of GPS based Destination Board Display-
cum-Passenger Information System (Audio & Visual) for BG
DEMUs for passenger convenience.
100
Development of oil free compressors for electric locomotives
to attain reduced maintenance cost and down time locos,
etc.
Development of Roof Mounted Force Cooled Dynamic
Braking Resistors for AC electric locomotives.
Development of air operated Pantograph, with distinct
advantage of light weight, improved dynamic behaviour and
low maintenance free operation.
Development of stranded type galvanized steel traction bond
and galvanized steel stranded wire for theft prone areas.
Development of Block Proving by Axle Counter to reduce
human dependence in train operation and improve safety.
Indigenous Development:
101
Consultancy:
Review of Equipment Ratings of Traction Sub-station.
Consultancy on design tools for checking the design adequacy
of straight alignment bridges for use on curvatures up to
3 degrees.
Consultancy for addressing failure of cross girder of rail-cum-
road bridge on river Ganga near Mokama.
Consultancies suggesting remedial measures for
rehabilitation of weak formations.
Tests and Trials:
Prototype of four-wheeler tower wagon for preventive
maintenance of overhead equipment approved and regular
inspection and dispatch clearance accorded.
Trials conducted to evaluate effectiveness of mobile jammers
for locomotives along with GPS based speed sensing device
to activate the jammers.
Field trials conducted for guidelines and specifications of
design of formation for heavy Axle Load.
Fatigue testing of newly designed monoblock pre-stressed
concrete sleepers.
Fatigue testing of composite sleepers for 2.0 million cycles of
loading.
Fatigue and bending test of joggled fish plate.
102