Você está na página 1de 4

Please complete the Action Plan of (all) CAR(s) and Sent not more than 5 work days send

to joko.sumpono@sgs.com and
faridah@sgs.com, sukma.mitria@sgs.com

Corrective Action Request


CAR 1 of 3
Major Minor

Organization: PT. Bahagia Jaya Sejahtera

Site(s) audited: Jl. Mayjen HE Sukma No. 58 Date(s) of audit(s): 28 April 2016
Ciawi Bogor Jawa Barat
Auditor(s): Mr. Joko Sumpono
Standard(s): ISO 9001 : 2008
Organization Mr. Agus Duriat (081287633882)
Representative:
Area / Depart- MR
ment / Process:

Document Ref.: QM –BEJE-MR-PM-001 Standard Ref.: 5.4.1 and 5.4.2


Issue/Rev. Status: 01 date 1 January 2014 CAR Close out date: Next Visit

Details of Non-Conformity:

Top management shall ensure that the planning of the quality management system is carried out in order to
meet the requirements given in 4.1, as well as the quality objectives.

 Seen planning (activity plan) has not established to reach desired target (Quality Objective)
 Quality objective for Purchasing FY 2015 has been eliminated however New Target (Quality
Objective) FY 2016 has not determined yet.

Organization Mr. Agus Duriat (081287633882) Auditor: Mr. Joko Sumpono


Representative:
Cause Analysis and Corrective Action taken to prevent recurrence:
Root Cause Analysis :
Why 1 :
Why 2 :
Why 3 :

Corrective Action :

Organization Date:
Representative:

Acceptance of Corrective Action / Comments (use additional sheets if necessary):

Auditor: Date:

Response required (in months) Major Minor


Corrective Action must be addressed within time frame stated. Verification of Define Close Out Define Close Out

Job / Cert. n°: ID-4985 Visit Type: Surveillance Visit n°: 3


Document: GS0401 Issue n°: 5 Page n°: 1 of 4
Please complete the Action Plan of (all) CAR(s) and Sent not more than 5 work days send to joko.sumpono@sgs.com and
faridah@sgs.com, sukma.mitria@sgs.com

action will occur at next visit. Additional follow up may be required as


indicated.

Corrective Action Request


CAR 2 of 3
Major Minor

Organization: PT. Bahagia Jaya Sejahtera

Site(s) audited: Jl. Mayjen HE Sukma No. 58 Date(s) of audit(s): 28 April 2016
Ciawi Bogor Jawa Barat
Auditor(s): Mr. Joko Sumpono
Standard(s): ISO 9001 : 2008
Organization Mr. Agus Duriat (081287633882)
Representative:
Area / Depart- Material Control
ment / Process:

Document Ref.: BEJE-MR-PK-013 Standard Ref.: 7.5.5


Issue/Rev. Status: Rev.00 Date 01/7/13 CAR Close out date: Next Visit

Details of Non-Conformity:
The material stock has not controlled properly as seen It was found that discrepancy number of stock in
Stock card and Data stock harian i.e. Motor electro actual 5 PCs but in daily control is stated 4 PCs. and
Van Belt B56 actual 2 PCs but in daily control is stated 1 PCs.

Organization Mr. Agus Duriat (081287633882) Auditor: Mr. Joko Sumpono


Representative:

Cause Analysis and Corrective Action taken to prevent recurrence:


Root Cause Analysis :
Why 1 :
Why 2 :
Why 3 :

Corrective Action :

Organization Date:
Representative:

Acceptance of Corrective Action / Comments (use additional sheets if necessary):

Auditor: Date:

Response required (in months) Major Minor

Job / Cert. n°: ID-4985 Visit Type: Surveillance Visit n°: 3


Document: GS0401 Issue n°: 5 Page n°: 2 of 4
Please complete the Action Plan of (all) CAR(s) and Sent not more than 5 work days send to joko.sumpono@sgs.com and
faridah@sgs.com, sukma.mitria@sgs.com

Corrective Action must be addressed within time frame stated. Verification of Define Close Out Define Close Out
action will occur at next visit. Additional follow up may be required as
indicated.

Corrective Action Request


CAR 3 of 3
Major Minor

Organization: PT. Bahagia Jaya Sejahtera

Site(s) audited: Jl. Mayjen HE Sukma No. 58 Date(s) of audit(s): 28 April 2016
Ciawi Bogor Jawa Barat
Auditor(s): Mr. Joko Sumpono
Standard(s): ISO 9001 : 2008
Organization Mr. Agus Duriat (081287633882)
Representative:
Area / Depart- MR
ment / Process:

Document Ref.: BEJE-MR-PK-010 Standard Ref.: 7.4.1


Issue/Rev. Status: rev.0 date 01 June 2013. CAR Close out date: Next Visit
Details of Non-Conformity:
Lack of evidence that Purchase order was released based on requisition (Form permintaan pengadaan
barang) as required by procedure however in fact form permintaan pengadaan barang does not always
create prior to purchase order sheet released to supplier i.e Kawat las RD260/2.6mm

It was found identification number of Purchase order has not applied properly seen there is 2 Purchase
order sheet with same identification number i.e. PO No. 018/Purch/BJS/IV/16 dated 2/3/16 address to TB
Sari Agung and PO No. 018/Purch/BJS/IV/16 dated 21/4/16 address to Makmur diesel

Supplier evaluation was not performed consistently example TB. Sari Agung as Material Supplier has not
evaluated yet
Organization Mr. Agus Duriat (081287633882) Auditor: Mr. Joko Sumpono
Representative:

Cause Analysis and Corrective Action taken to prevent recurrence:


Root Cause Analysis :
Why 1 :
Why 2 :
Why 3 :

Corrective Action :

Organization Date:
Representative:

Acceptance of Corrective Action / Comments (use additional sheets if necessary):

Job / Cert. n°: ID-4985 Visit Type: Surveillance Visit n°: 3


Document: GS0401 Issue n°: 5 Page n°: 3 of 4
Please complete the Action Plan of (all) CAR(s) and Sent not more than 5 work days send to joko.sumpono@sgs.com and
faridah@sgs.com, sukma.mitria@sgs.com

Auditor: Date:

Response required (in months) Major Minor


Corrective Action must be addressed within time frame stated. Verification of Define Close Out Define Close Out
action will occur at next visit. Additional follow up may be required as
indicated.

Job / Cert. n°: ID-4985 Visit Type: Surveillance Visit n°: 3


Document: GS0401 Issue n°: 5 Page n°: 4 of 4

Você também pode gostar