INTERNSHIP PROPOSAL

Student : KAO KIMLONG


ID : e20130247
Company : Kampot Cement Co., Ltd
Period : 3 months (19.02.18 – 19.05.18)

1. Company Background
 Factory that produce Cement with three production line
 In Quality Assurance have four main stages
o Quality process control I
o Quality process control II
o Physical testing
o Chemical testing
2. Responsibility: I will be working in the Quality Assurance department during my
internship
Quality Process Control I (Clinker quality)
 Sampling system
 Mix mate piling and quality control
 Raw material proportion method
 Raw meal and kiln feed quality control and testing
 Clinker quality control and testing
Quality Process Control II (Cement quality)
 Cement quality control
 Cement properties and It’s main components control
 Method testing: Blaine testing, CS230 analysis and Oxide by XRF/XRD
 PSD control ( Don’t know particle size distribution)
Physical testing
 Blaine testing method
 Setting time
 Compressive strength
 False set testing method
 Air content
 Water retention

1
Chemical testing
 %Moisture Analysis
 LOI Analysis
 Insoluble analysis of cement

3. Possible Thesis Topic


 Particle Size Distribution of cement (optimize on strength of cement)
It’s new technology improvement on fineness of cement by using PSD control method.
The company still using blaine testing on cement to verify with the PSD control because the
company has just installed PSD control two years ago.
The different between Method PSD control and Blaine testing control.
PSD control Blaine control
 Fast detected result  Manual testing
 Use with many sample  Only a sample size
 Reduce time  Wates time
(Every 10 min) (Every 2 hours)
 Save power  High power consumption
 Operation smoothly  Operation not smoothly
 Gain more productivity  Poor productivity