Você está na página 1de 7

A

REPORT ON INDUSTRIAL TRAINING

At

SHREE KALYAN ENTERPRISES


G-1, P.N. 146, Anirudh Apartment, Mahaveer Nagar, Jaipur
From 21th November 2017 to 12th February 2018

Submitted in partial fulfillment of the requirements


For the award of the Degree of

Bachelor of Technology
Of
Poornima University, Jaipur

Session: 2017-2018

Submitted By:
Rahul Kumar Yadav
2015PUSETBEEX03737
III Year, Electrical Engineering

Submitted To:

Department of Electrical and Electronics Engineering


School of Engineering & Technology, Poornima University
Ramchandrapura, Sitapura Ext., Jaipur, Rajasthan

[i]
[ii]
ACKNOWLEDGEMENT

I have undergone the winter industrial training which was planned and scheduled in such a
manner that it would be more beneficial and fruitful for me. It was guided in such a way that it
will become a life time experience for us and this could not be realize without the help and
support provided to me by the Poornima University and the Company (Shree Kalyan
Enterprises) from where I did my industrial training.

I am thankful to Mr. B K Sharma (Dean, SET, PU ), Ms Dipti Lodha (T.P.O., PF) and Ms
Garima Mathur (T.P.O., PU) who provide me this wonderful platform to explore the practical
experience of the industry.

I am also thankful to Mr. Ashish Sinha (HOD, Electrical Engineering) for guiding and
supporting us on every step in this three months industrial training.

We would like to thanks Mr Kapil Shrivastava (DTPC, PU) for the proper guidance during this
industrial training regarding the explanation and proceedings of all the requirements of ITS.

We would like to thanks Mr C.B. Sharma (Project Manager, SKE, Jaipur) – Trainer, for guiding
and explaining the industrial aspects. He gave me the chance to get exposure with the industry
where I did my training.

I would like to thanks all the member who helped me during this training either he/she is a
faculty of PU, staff of SKE, Jaipur any other.

I would also like to express our hearts felt appreciation to all of our friends whom direct or
indirect suggestions help us to develop this project and to entire team members for their valuable
suggestions.

Lastly, thanks to all faculty members of Department of Electrical Engineering for their moral
support and guidance.

RAHUL KUMAR YADAV


2015PUSETBEEX03737
B-Tech (3rd Year)
Electrical Engineering
Poornima University
Jaipur

[iii]
ABSTRACT

All bachelor degree students are required to undergo industrial training for 20 weeks as part of
our curriculum to complete their 4 year course for the Bachelor of Technology.

The attachment will be during the 5th semester of their study. During the 12 weeks period of
training, students will be supervised and monitored their training by two nominated supervisors.

For our industrial training, we did it at Shree Kalyan Enterprises,Anirudh Apartment, Mahaveer
Nagar , Jaipur. The company was established in 2007 to provide high quality services specially
to Govt Deptt.’s, PSU’s, Banks and commercial, industrial, and utility clients in Rajasthan. They
are recognized as the world market leader in Solar power plant, Electrical Auditor, Air
conditioning. The headquarters of the organization is in Jaipur, Rajasthan.

Under the guidance of Mr. C.B. Sharma (Project Manager) i got the opportunity to have
exposure to the work carried out in the organisation and learn a lot from them. Over the period of
3 months of industrial training, the work assigned was Energy Auditing and designing of Air
conditioning system being performed for various projects or jobs in regard to the electrical
valuer provided for the same.

[iv]
Table of Content
TOPICS PAGE NO.
 Title page (i)
 Certificate (ii)
 Acknowledgement (iii)
 Abstract (iv)
 Table of contents (v)
 List of figure (vii)
Chapter-1 Introduction (1-2)
1.1 Aim 1
1.2 Objective 1
1.3 Scope 1
1.4 Selection of industry 1
1.5 Training duration 2
1.6 Training schedule 2
1.7 Conclusion 2

Chapter-2 About organization (3-8)


2.1 Introduction 3
2.2 Background 4
2.3 Product manufacturing 4
2.4 Ball bearings shields type 4
2.5 Mission and vision 5
2.6 Quality policy 5
2.7 Code of conduct 6
Chapter-3 Training attended (9-26)
3.1 Press working 9
3.2 Machine specification 9
3.3 Installation process 10
3.4 Work safety 11
3.5 Press inspection 11
3.6 Machine starting modes 11
3.7 Operating modes 11
3.8 Other devices 12
3.9 Maintenance 13
3.10 Safety measures 14
3.11 Ball bearing shield process 14
3.12 Material issue section 14
3.13 Blanking section 15
3.14 Transfer section 16
3.15 Oiling section 19
3.16 Riveting section 21
3.17 Packing section 21

[v]
3.18 Machine maintenance 23
3.19 Zero defect concept 24
3.20 Lean manufacturing 25
3.21 Safety measures 26
3.22 Raw material issuing process 27
3.23 Raw material rejection process 27
3.24 Oil filtration process 28
3.25 DM Machine process 29
3.26 Quality Measure instrument 29
Chapter-4 Project summary 31
Chapter-5 Conclusion 32
5.1 Challenges 32
5.2 Future scope 32
5.3 Conclusion 32
 References 33

[vi]
List of figures

Figure no. Description Page no.


2.1 Plant photo 3
2.2 Manufacturing Products 5
3.1 C-Frame single crank press 10
3.2 Process Chain 14
3.3 Oil used in oiling 21
3.4 Lean Manufacturing 26
3.5 Oil filtration process 28
3.6 DM Machine 29
3.7 IM machine 29
3.8 Contour Machine 30
4.1 FPS Layout 31

[vii]

Você também pode gostar