Steady , synchronous Pier formwork ,

Shoring Tower Climbing Formwork


hydraulic system
 1 Brand Name : ZULIN
 2 Model Number Auto-climbing Formwork; Ring-lock
: Shoring; Box Girder Formwork
Certification : ISO9001-2008
Place of Origin : Beijing, China (Mainland)
MOQ : One 20ft container
Price : negotiate
Payment Terms
T/T L/C (bank transfer)
:
Supply Ability : 100sets/day
Delivery Time : after deposit 15-20 days
Packaging in bulk ,pallet ,bundle or according the
Details : customer demand

Contact Now

Add to Cart

Steady , synchronous and safe Auto Self Climbing Formwork QPMX-50

Descrition:

The lifting power of the Formwork QPMX-50 comes from its hydraulic system, which includes
the oil cylinder

and commutator. Through functioning of hydraulic system, the steel rail and bracket can climb
up alternately,

so the whole formwork system climbs steadily, independent of a crane. It' s easy to operate, and
climbing is fast and safe.

Structure
The Characteristics

1. One oil cylinder unit can lift 50KN.


2. The QPMX-50 system can climb not only vertically but also slantwise, and the forward or
backward inclination

can be up to 18 degrees.
3. The system can climb up wholly or separately. The climbing process is steady, synchronous
and safe.
4 .The bracket does not come back to the ground until construction work is finished, and spacing
for work is

reduced while the bumping damage is almost completely prevented, especially for the plywood.
5.The error of structure construction is tiny and easy to correct.
6.The formwork can climb up by itself and cleaning work can be done in situ. The number of
crane lifts are

greatly reduced.

Standard Climbing Process

1. Set up the formwork by wall-through tie-rods and pull-push props, embed anchors and do the
first concrete

pouring.
2. Remove the formwork after the first pouring and fix anchor shoes on the finished wall, lift the
brackets and

formwork

to the right position, match the formwork and do the second pouring.
3. Lift formwork and brackets to the higher floor; fix climbing rail and hydraulic system.
4. Match the formwork to the right position and do the third pouring.
5. Strip the formwork and fix anchor shoes on the finished wall, then let the climbing rails climb.
6. Brackets climb up to the right position, then install suspended platform.
7. Match the formwork, do the concrete pouring, and proceed into the standard climbing stage.
Project: Suramadu Bridge(Indonesia)

Client: China Road & Bridge Corporation

Date: 09/2006

Formwork Type: Hydraulic Automatic Climbing Formwork


We choose Zulin, because he offer us excellent design plan and satisfy us
Comments of client: from each aspect. We like Zulin, because his design is not only safe but
also high efficiency.

Product Tags:

bridge deck formwork

bridge formwork systems

http://constructionformwork.sell.ecer.com/pz6e31e55-steady-synchronous-pier-formwork-
shoring-tower-climbing-formwork-hydraulic-system.html
Steady , synchronous Pier formwork , Shoring Tower Climbing Formwork hydraulic
system Images