Descrition:
The lifting power of the Formwork QPMX-50 comes from its hydraulic system, which includes
the oil cylinder
and commutator. Through functioning of hydraulic system, the steel rail and bracket can climb
up alternately,
so the whole formwork system climbs steadily, independent of a crane. It' s easy to operate, and
climbing is fast and safe.
Structure
The Characteristics
can be up to 18 degrees.
3. The system can climb up wholly or separately. The climbing process is steady, synchronous
and safe.
4 .The bracket does not come back to the ground until construction work is finished, and spacing
for work is
reduced while the bumping damage is almost completely prevented, especially for the plywood.
5.The error of structure construction is tiny and easy to correct.
6.The formwork can climb up by itself and cleaning work can be done in situ. The number of
crane lifts are
greatly reduced.
1. Set up the formwork by wall-through tie-rods and pull-push props, embed anchors and do the
first concrete
pouring.
2. Remove the formwork after the first pouring and fix anchor shoes on the finished wall, lift the
brackets and
formwork
to the right position, match the formwork and do the second pouring.
3. Lift formwork and brackets to the higher floor; fix climbing rail and hydraulic system.
4. Match the formwork to the right position and do the third pouring.
5. Strip the formwork and fix anchor shoes on the finished wall, then let the climbing rails climb.
6. Brackets climb up to the right position, then install suspended platform.
7. Match the formwork, do the concrete pouring, and proceed into the standard climbing stage.
Project: Suramadu Bridge(Indonesia)
Date: 09/2006
Product Tags:
http://constructionformwork.sell.ecer.com/pz6e31e55-steady-synchronous-pier-formwork-
shoring-tower-climbing-formwork-hydraulic-system.html
Steady , synchronous Pier formwork , Shoring Tower Climbing Formwork hydraulic
system Images