NQA Contract Review
Reference Number
1. Company Details
Company Name PT. Quality Action Indonesia
Address Jalan Sidosermo Airdas II Kav. D No. 73, Surabaya, East Java ‐ Indonesia
No. Sites
Day‐Time Employees 12 (Not working on shifts)
FTE
Total Employees on Shift # of shifts 0 0
Part‐Time Employees % working 0% 0
Seasonal Employees Days/year 0 0
FTE Employee Numbers 12 Combined / Integrated audit
Stand Alone Combined Integrated
Products 0.00
QMS EMS OHSAS EnMS Integration Reduction (20%)
Other:
Scope
Publishing and printing of magazine, bulletin and other commercial printed matters
2. Skill Codes, Purchase Classifiers & Additional Notes
EAC Codes
EAC08 Publishing companies
Skill Codes: Applicable Skill Codes
Auditor (if known) Role QMS EMS OHSAS EnMS ISMS Fictive
Putra Lead Auditor 15
Iman Kholik Hafitri Auditor 15
Add any notes (including additional justifications) below:
A technical justification must be provided for back‐to‐back audits (less than 7 days between Stage 1 & Stage 2)
Site visits and extra time must be performed for scopes which include servicing and installation
The audit team must have coverage of all the codes applied to the visit
If there are two company names, please clarify if a trading certificate is required or if they are separate companies with the same management system.
Typical Factor Applied Factor Score
Complexity Factor Justification
Score QMS EMS OHSAS EnMS ISMS
Large site for number of staff +1 0 N/A
Staff speaking in more than one language +2 0 N/A
Site / remote work undertaken +1 0 N/A
Additional time required (e.g. use of a technical expert, NC close‐out) +1 0
Very small site for number of staff (e.g. office complex only) ‐1 0 N/A
Complex design (QMS Only) +1 0 N/A N/A N/A N/A
Design excluded (QMS Only) ‐1 ‐1 N/A N/A N/A N/A Due to company was
Other excluded clauses (QMS Only) ‐0.5 per clause 0 N/A N/A N/A N/A
Strict security controls +1 0 N/A
Large scope +1 0 N/A
Limited scope ‐1 0 N/A
Simple structure ‐1 ‐1 N/A All process and service
Parallel working (<50% emps) ‐1 0 N/A
Parallel working (>=50% emps) ‐2 0 N/A
High degree of regulation +1 0 N/A
High stakeholder expectations +1 0 N/A
Off locations auditable workers ‐1 0 N/A
Mature System (A consideration at recertification only) ‐1 ‐1 N/A Recertification
Complex system with many specific processes +1 0 N/A
Prior knowledge of the client management system (1 or more management systems
‐1 0 N/A
already registered with NQA)
Client preparedness for certification (Transfer audits or client holds other certification
‐1 0 N/A
with another C.B.)
Number of users is greater than or equal to 1 million +1 N/A N/A N/A N/A
Number of sites is greater than or equal to 5 +1 N/A N/A N/A N/A
Number of servers is greater than or equal to 100 +1 N/A N/A N/A N/A
Number of application development (software development) and maintenance staff is
+1 N/A N/A N/A N/A
greater than or equal to 100
Lack of availability or outage has significant impact on essential services such as
healthcare – outages are likely to receive prioritised response from national/local +0.5 N/A N/A N/A N/A
government emergency planning arrangements
Sensitive and personally identifiable information +0.5 N/A N/A N/A N/A
Hospitals, finance sector, banks, local government, telecoms providers and others
holding personally identifiable information /sensitive personally identifiable +0.5 N/A N/A N/A N/A
information
Incompliance is likely result in prosecution +1.5 N/A N/A N/A N/A
High classification government information e.g. secret and above; government
+1.5 N/A N/A N/A N/A
emergency broadcast
Government ministries, critical national infrastructure (e.g. broadcast) +1.5 N/A N/A N/A N/A
Stage 1 / Stage 2 Surveillance / Recertification
Typical Factor Total Total Complexity
Risk Complexity Complexity Complexity
Score Score
Score
QMS Low ‐1 ‐4 Limited ‐4 Limited
EMS High 2
OHSAS High 2
EnMS High 2
ISMS
4. Audit Duration
Note: (e.g., additional time added in "Days Sold" field for HACCP requirements)
5. Approval