Take Off Sheet Service Quarter

T D S Description T D S
A. SUBSTRUCTURE
1. EXCAVATION & EARTH
WORK

1.1 Excavation for isolated footing


1.00 0.20
below basement level in Rocky Soil

0.25
4.00 1.80 F-1 1.00 0.05
1.80 2.00 0.30
1.30 16.85 m3 0.25
4.00 1.70 LF-1 1.00 0.15
1.70 5.00 0.30
1.30 15.03 m3 0.25
- 1.50 LF-2 1.00 0.38
1.50
1.30 - m
3
0.58

31.88 m3 Total to summary


1.00 15.70
0.25
0.40 1.57
1.00 14.13
2. CONCRETE WORK 0.25
4.00 1.50 2.1 Lean Concrete 0.40 1.41
1.50 F-1 1.00 10.29
9.00 m2 0.25
4.00 1.40 0.40 1.03
1.30 LF-1 1.00 7.23
7.28 m2 0.25
0.40 0.72
1.00 8.70
16.28 m2 Total to summary 0.25
2.2 C-25 Concrete 0.40 0.87
a. Footing pad
4.00 1.30 F-1 3.00 5.90
1.30 0.25
0.40 2.70 m3 0.40 1.77
4.00 1.20 LF-1 1.00 5.08
1.20 0.25
0.60 3.46 m3 0.40 0.51
4.00 1.00 inclined beam on LF1
0.40 7.88
0.25 0.40
6.56 m3 Total to summary
1.2. BackFill 1.00 0.80
Pit excavation-Lean-footing pad
7.23
concrete-footing column
23.93 5.78
23.93 m3 Total to summary 1.00 0.80
8.70
6.96
1.3. 250mm Hard core 3.00 0.80
64.24 5.90
64.24 m2Total to summary 14.16
1.00 0.80
1.4. 100mm thick ground floor slab 5.08
64.24 4.06
64.24 m2Total to summary
63.06
2.3 Formwork
4.00 5.20 a. Footing pad
0.40 F-1
8.32 m2
4.00 4.80
0.60 LF-1
11.52 m2
4.00 1.05 Inclined beam on LF1
1.00
4.20 m2
24.04 m2Total to summary

b. Footing column
1.00 0.90
1.00 C-1
0.90 m2
2.00 1.10
1.00 C-2
2.20 m2
5.00 1.10
1.00 C-3
5.50 m2
8.60 m2 Total to summary

C. Grade beam
1.00 0.80 GB-1
15.70
12.56 m2
1.00 0.80 GB-2
14.13
11.30 m2
1.00 0.80 GB-3
10.29
8.23 m2
T D Total Description T D Total
B. SUPER STRUCTURE
1.1 CONCRETE WORK

a. Concrete work for elvation column 1 15.70

Ground floor column 0.20


2 0.30 C-2 0.40 1.256
0.25 1 14.13
2.90 0.435 m3 0.20
5 0.30 C-3 0.40 1.131
0.25 1 8.74
2.90 1.088 m3 0.20
0.40 0.699
First floor column 1 5.91
0.20
2 0.30 C-2 0.40 0.473
0.20 2 5.14
2.48 0.298 m3 0.20
5 0.30 C-3 0.40 0.822
0.20 1 5.08
2.48 0.744 m3
0.20
0.40 0.406
2.56 m Total for ground& first floor column 1 7.23
3

0.20
b. Concrete work for Beams 0.40 0.578
First floor Beam
1 13.79 FFB1 5.37
0.20
0.40 1.103 m3
1 14.13 FFB2
0.20
0.40 1.131 m3 42.54
1 8.74 FFB-3 42.54
0.20
0.40 0.699 m3
3 5.91 FFB-4
0.20 60.08
0.40 1.419 m3
60.08
1 5.14 FFB-5
0.20
0.40 0.411 m3
1 5.08 FFB6 1 2.72
0.20 1.55
0.40 0.406 m3 0.16 0.67
1 7.23 FFB3' 8 0.026
0.20 1.55 0.32
0.40 0.578 m3 1 3.20
1.65
0.16 0.84
1 3.05
5.75 m Total for first floor Beam 1.55
3

0.16 0.76
T D Total Description T D Total
1 5.14
8 0.026 0.5*0.30*0.17=0.026 0.50 2.57
1.60 0.33 m3 1 4.54
1 1.99 Landing 0.20 0.91
3.20 1 5.08
0.15 0.96 m3 0.65 3.30
1 3.40 Landing beam 1 4.18
0.20 0.20 0.84
0.40 0.27 m 3
1 7.23
0.50 3.62
4.14 m Total (Gr. To 1st floor)
3
1 6.33
0.20 1.27
53.70
1.2. form work.
1 15.70
A. Columns 0.65 10.20
Ground floor column 1 14.20
2 1.10 C-2 0.20 2.84
2.90 6.38 m 2
1 14.13
5 1.10 C-3 0.50 7.07
2.90 15.95 m 2
1 12.63
0.20 2.53
First floor column 1 8.74
2 1.10 C-2 0.65 5.68
2.48 5.46 m 2
1 8.14
5 1.10 C-3 0.20 1.63
2.48 13.64 m 2
1 5.91
0.50 2.96
m2 Total for ground& first floor column
41.43 formworks 1 5.31
0.20 1.06
B. Beams 2 5.14
First Floor Beams 0.50 5.14
1 13.79 FFB1 1 4.54
0.65 8.96 m 2
0.20 0.91
1 12.59 bottom 1 7.23
0.20 2.52 m2 0.65 4.70
1 14.13 FFB2 1 6.33
0.50 7.07 m2 0.20 1.27
1 12.93 bottom

0.20 m2
2.59 45.97
1 8.74 FFB3
0.65 5.68 m2
1 8.14 bottom
0.20 1.63 m2
2 5.91 FFB4 42.54
0.50 5.91 m2 42.54
1 5.91
0.65 3.84 m2 60.08
3 5.01 bottom 60.08
0.20 3.01 m2
102.62
T D Total Description T D Total

D) Stair cases & Landing


Gr to 1st Floor
1 2.72 1st flight stair soffit
1.55 4.21 m2
2 2.72 side of 1st flight stair
0.33 1.80 m2
1 1.55 Landing
1.63 2.52 m2
9 1.55 Riser
0.17 2.32 m2
1 3.06 2nd flight stair soffit
1.55 4.74 m2
2 3.06 side of 1st flight stair
0.33 2.03 m2
1 1.55 Landing
1.99 3.09 m2
9 1.55 Riser
0.17 2.32 m2

23.01 m2 Total for staircase


Description

b. Footing Column

C-1

m3
C-2

m3
C-3

m3

m3 Total to summary

c. Grade beam
GB1

m3
GB2

m3
GB3

m3
GB4

m3
GB4'

m3

GB5

m3
GB6

m3

m3 Total to summary
GB-4

m2
GB-4'

m2
GB-5

m2
GB-6

m2

m2 Total to summary
Description

Roof Beams

RB-1

m3
RB2

m3
RB-3

m3
RB-4

m3
RB-5

m3
RB6

m3
RB3'

m3

m3 Total roof Beam

Concrte Work for 150mm thick


First floor slab

m2
m2 Total 150mm first floor slab

Roof slab

m2
m2 Total 150mm first floor slab

Stair cases
Gr to 1st Floor
Stair soffit
m3
0.5*0.30*0.17=0.026
m3
Middle Landing

m3
Stair soffit

m3
Description
FFB5
m2
bottom
m2
FFB6
m2
bottom
m2
FFB3'
m2
bottom
m2
m2 Total for firstfloor Beams
Roof Beams
RB1
m2
bottom
m2
RB2
m2
bottom
m2
RB3
m2
bottom
m2
RB4
m2
bottom
m2
RB5
m2
bottom
m2
RB3'
m2
bottom
m2

m2 Total for roof Beams


formwork
C. Floor Slab
First floor slab

m2
m2 Total 150mm first floor slab
Roof Slab
m2
m2 Total roof slab

m2 Total 150mm first & Roof Slab


Description
PROJECT: Ato Yitbarek B+G+2 Residential Building
SUB-STRUCTURE TAKE OFF SHEET FOR REINFORCEMENTS

DIAMTER OF BAR
Location Ref. Dia. No. of Length
mm bars m 6 8.00 10 12 14 16

FOOTING PAD F-1 12 80 4.150 332


LF-2 12 96 3.500 336
Footing column C-1 16 8 2.000 16
st 8 6 1.000 6.00
C-2 16 20 2.500 50
st 8 12 1.100 13.20
C-3 20 40 4.000
st 8 30 1.100 33.00
ground& first
Floor Column
ground floor C-2 16 16 3.820 61.12
st 8 32 1.100 35.20
C-3 16 40 3.820 152.8
st 14 80 1.100 88
First Floor C-2 14 16 2.880 46.08
st 8 28 1.100 30.80
C-3 14 40 2.880 115.2
st 14 28 1.100 30.8
Beams
Grade Beams
GB-1 16 2 8.000 16
16 2 9.000 18
16 2 10.500 21
16 2 7.000 14
20 2 4.000
st 8 92 1.300 119.60
GB-2 16 2 6.400 12.8
16 2 9.000 18
16 2 9.000 18
16 2 7.000 14
20 2 4.000
st 8 79 1.300 102.70
GB-3 16 2 9.000 18
16 2 5.000 10
16 2 6.500 13
20 2 4.000
st 8 58 1.300 75.40
GB-4 16 4 9.000 36
st 8 46 1.300 59.80
GB-5 16 6 6.400 38.4
16 6 6.000 36
st 8 144 1.300 187.20
GB-6 16 2 5.700 11.4
16 2 5.100 10.2
st 8 28 1.300 36.40
First Floor Beams
FFB-1 16 2 8.000 16
16 2 7.000 14
16 1 2.000 2
16 1 3.000 3
14 1 3.000 3
16 3 10.500 31.5
16 2 5.000 10
St 8 93 1.200 111.60

FFB-2 16 2 6.400 12.8


16 2 9.000 18
14 1 2.000 2
14 1 3.000 3
14 1 2.500 2.5
16 2 4.000 8
16 2 9.000 18
16 2 7.000 14
St 8 97 1.200 116.40
FFB-3 16 4 9.500 38
14 1 3.000 3
St 8 72 1.200 86.40
FFB-4 16 12 6.400 76.8
St 8 96 1.200 115.20
FFB-5 16 2 5.700 11.4
16 2 5.100 10.2
St 8 31 1.200 37.20
FFB-6 16 2 5.700 11.4
16 2 5.100 10.2
St 8 31 1.200 37.20
Roof Beams
RB-1 16 2 8.000 16
16 2 9.000 18
16 1 2.000 2
16 4 3.000 12
16 1 3.000 3
16 3 10.500 31.5
16 2 7.000 14
St 8 111 1.200 133.20

RB-2 16 2 6.400 12.8


16 2 9.000 18
14 1 2.000 2
14 1 3.000 3
16 2 4.000 8
16 2 9.000 18
16 2 7.000 14
St 8 92 1.200 110.40
RB-3 16 4 9.200 36.8
14 1 3.000 3
St 8 53 1.200 63.60
RB-4 16 4 6.400 25.6
St 8 31 1.200 37.20
RB-5 16 4 5.700 22.8
16 4 5.100 20.4
20 6 3.000
St 8 31 1.200 37.20
Ground Floor

Mesh
changed to
equivalent Area 8 49 5.400 264.60
8 22 12.000 264.00
First Floor Slab
1 10 26 1.557 40.482
2 10 35 6.270 219.45
3 10 11 3.000 33
4 8 10 3.660 36.60
5 10 23 3.000 69
6 8 21 5.660 118.86
7 8 23 5.600 128.80
8 10 39 2.400 93.6
9 8 26 6.500 169.00
10 10 37 2.500 92.5
11 10 18 3.200 57.6
12 8 10 10.000 100.00
13 10 12 2.400 28.8
14 12 14 2.400 33.6
Roof Slab
1 10 26 1.557 40.482
2 10 35 6.270 219.45
3 8 10 3.660 36.60
4 10 11 2.400 26.4
5 8 21 5.660 118.86
6 10 26 3.000 78
7 10 34 2.400 81.6
8 8 27 6.500 175.50
9 10 26 3.000 78
10 8 12 4.400 52.80
11 12 31 2.400 74.4
12 8 12 6.000 72.00
Stair Bar
STB1 16 4 4.300 17.2
16 4 4.000 16
st 8 42 1.200 50.40

STAIR X-X 12 15 7.800 117


12 15 2.400 36
12 15 1.500 22.5
12 34 1.550 52.7
12 8 0.770 6.16
STAIR Y-Y 12 15 8.000 120
12 15 2.400 36
12 15 1.600 24
12 15 2.500 37.5
12 34 1.550 52.7
12 8 0.770 6.16
12 41 1.300 53.3

TOTAL LENGTH 0 3172.92 1158.36 1340.02 301.58 1196.12

WEIGHT PER M. 0.222 0.39 0.617 0.888 1.209 1.579

TOTAL WEIGHT Kg. 0 1252.51 714.48 1190.19 364.59 1888.67


6 8.00 10 12 14 16

DIAMETER OF BAR
Total weight = 5908.81 kg.
Total weight with #REF!crease for wastage= #REF! kg.
20 24 Remark

160

8
8

8
18
202.00 0.00

2.467 3.553

498.37 0
20 24
Bill of Quantity for Service Quarter
Item no Executed
Description Unit Quantity Rate

A. SUBSTRUCTURE
1.EXCAVATION AND EARTH WORK
1.01 Clear of the site to remove top soil to an average depth
of 20cm. m2 0.00 23
1.05 Pit excavation in soft rock to a depth greater than
150cm but not excedding 250cm
m3 110
1.05 Pit excavation in Hard rock to a depth greater than
150cm but not excedding 250cm
m3 31.88 550
1.09 Fill around foundation with selected granular material
imported from out side and compacted in layers but
under hard core
m3 23.93 395
1.12 Cart away m3 0.00 101
1.11 supply and pack 25cm thick hard core bedding to semi
basement slab in basaltic or equivalent stone approved
by the consultant hard-core well rolled consolidated
and blinded with crushed stones.
m2 64.24 300
Carried to summary

2. STONE MASONARY WALL


2.01 Supply and copnstruct 50cm stone masonry foundation
wall beded and joinited in 1:4 cement mortar ration
below natural ground level. m3 0.00 1,400
Carried to summary

3. CONCRETE WORK
3.01 5cm thick lean concrete C-5, 150kg cement per meter
cube of concrete under
a) Footing pads m2 16.28 137
3.02 Concrete quality C-25 with min. cement content of
360kg /m3 of concrete filled in to formwork and
vibrated around reinforcements, formwork and
reinforcements shall be measured separately.

a) In Footing Pads. m3 6.56 2,900


b) In Foundation Column m3 0.58 2,900
c) In Grade Beams m3 7.88 2,900
d) 100mm thick ground floor Slab m2 64.24 300
3.03 Provide and fix in position steel panel form work for
a) footing pads.
m2 24.04 280
b) footing column
m2 8.60 280
c) Grade beams
m2 63.06 280

Carried to summary
B. SUPER STRUCTURE
1.CONCRETE WORK
1.01 Concrete quality C-25 with min. cement content of
360kg /m3 of concrete filled in to formwork and
vibrated around reinforcements, formwork and
reinforcements shall be measured separately.

a) elevation columns m3 2.56 2,900


b) Intermediate beams m3 5.75 2,900
c) roof beams m3 5.37 2,900
d) In 15 cm suspended floor slab m2 102.62 450
e) In staircase and landing m3 4.14 2,900
Provide, cut and fix in position sawn zigba formwork
1.04 or equivalent for
a) Elevation columns m2 41.43 290
b) Intermediate beams m2 53.70 290
c) Roof beam m2 45.97 290
d) In staircase & landing m2 23.01 290
e) first & Roof slab m2 102.62 290
1.05 Provide and put in place steel reinforcements of the
following diameter and type according to structural
drawing, price shall includes tying wire and brushing
bars off elements compromising essential bondage
with concrete
a) 6mm plain bar kg 0.00 38
b) 8mm deformed bar kg 1252.51 38
c) 10mm deformed bar kg 714.48 38
d) 12mm deformed bar kg 1190.19 38
e) 14mm deformed bar kg 364.59 38
f) 16mm deformed bar kg 1888.67 38
g) 20mm deformed bar kg 498.37 38
Carried to summary
Grand Total
Executed
Amount

17,531.80

9,451.17
-

19,272.00
46,254.97

-
-

2,230.36

-
19,024.00
1,667.50
22,854.61
19,272.00

6,731.20
2,408.00
17,657.92

91,845.59
7,435.89
16,666.42
15,558.85
46,179.00
12,019.92

12,013.54
15,571.84
13,332.07
6,673.18
29,759.80

-
47,595.38
27,150.24
45,227.22
13,854.42
71,769.46
18,938.06
399,745.29
537,845.84