Cement Consumption Coefficients for What are you looking for? 


Various Construction Works
Subscribe to Our Newsletter
j 91 f 1 h s y o 92
SHARES

Subscribe to our updates and get interesting


Construction works involving cement as one of the material requires cement articles to your email inbox

consumption coefficients for estimation of quantities and cost of such works. Coefficients Email *
of cement consumption works for various construction activities involving cement mortar,
concrete etc. are presented in table.

Subscribe!

Recent Articles

price drop

S. Concrete Calculator – Calculate


Construction Work Details Coefficient
No. Concrete for Slab, Beam,
Column and Footings
2.6
1 P.C.C. (1:5:10)
Bags/cu.mt.

3.4
2 P.C.C. (1:4:8)
Bags/cu.mt.

4.4
3 P.C.C. (1:3:6)
Bags/cu.mt.

6.3
4 R.C.C. M-15 (1:2:4)
Bags/cu.mt.

5 R.C.C. M-20 (1:2:4) 8.00

https://theconstructor.org/concrete/cement-consumption-coefficients/20840/?utm_source=pushengage&utm_medium=push_notification&utm_campaig… 1/5
2/7/2018 Cement Consumption Coefficients for Various Construction Works

Bags/cu.mt. Cement Consumption


Coefficients for Various
12.20
6 R.C.C. M-25 (1:1:2) Construction Works
Bags/cu.mt.

1.32
7 Brick work in CM (1:6)
Bags/cu.mt.

1.90
8 Brick work in CM (1:4)
Bags/cu.mt.

0.213
9 Half Brickwork in (1:4)
Bags/Sq.mt.

0.131
10 Plastering in CM (1:4) – 15mm thick
Bags/Sq.mt.
Terms Used in Plane Table
0.109 Surveying
11 Plastering in CM (1:4) – 12mm thick
Bags/Sq.mt.

0.055
12 Plastering in CM (1:4) – 6mm thick
Bags/Sq.mt.

0.086
13 Plastering in CM (1:6) – 15mm thick
Bags/Sq.mt.

0.072
14 Plastering in CM (1:6) – 12mm thick
Bags/Sq.mt.

0.073
15 Plastering in CM (1:6) – 6 mm thick
Bags/Sq.mt.
Stability of Slopes for
20mm thick sand face plastering in two layers. (13 mm 0.220 Excavations in Different Soil
16
thick plaster in CM 1:4 and 7 mm thick plaster in CM 1:2) Bags/Sq.mt. Types

0.157
17 Plastering in CM (1:3) – 13mm thick
Bags/Sq.mt.

0.117
18 Plastering in CM (1:4) – 13 mm thick
Bags/Sq.mt.

0.228
19 Plastering in CM (1:3) – 20mm thick
Bags/Sq.mt.

0.170
20 Plastering in CM (1:4) – 20mm thick
Bags/Sq.mt.
Stress in Structural Materials,
0.044
21 Floating coat of neat cement Their Types and Sign
Bags/Sq.mt.
Conventions
0.138
22 Brick on edge pitching in CM (1:4)
Bags/Sq.mt.

0.185
23 Brick on edge pitching in CM (1:3)
Bags/Sq.mt.

0.031
24 Flush pointing in brick work with CM (1:3)
Bags/Sq.mt.

0.32
25 40mm thick Damp proof course in M-20
Bags/Sq.mt.

26 25 mm thick IPS in M-15 0.244

https://theconstructor.org/concrete/cement-consumption-coefficients/20840/?utm_source=pushengage&utm_medium=push_notification&utm_campaig… 2/5
2/7/2018 Cement Consumption Coefficients for Various Construction Works

Bags/Sq.mt. What are Different Layers in a


Bituminous Pavement?
0.340
27 40 mm thick IPS in M-15
Bags/Sq.mt.
Ads by Google
50mm thick granite flooring, 1st layer 35mm thick 0.433
28
(1:1.5:3), 2nd layer 15 thick (1:2) Bags/Sq.mt Concrete Wall Design

0.034 Concrete Construction Cost


29 125mm high plaster skirting in CM (1:3)
Bags/R.M.
Concrete Concrete Concrete
25mm thick kota stone over 20mm thick bedding in CM 0.24
30
(1:6) Bags/Sq.mt. Foundation Contractors

40mm thick kota stone over 20 mm thick bedding in CM 0.264 Contractors for Construction
31
(1:6) Bags/Sq.mt.

18mm thick kota stone over 12 mm thick bedding in CM 0.264 Related Articles
32
(1:6) Bags/Sq.mt.

0.088
33 6 mm thick glazed tiles fixing
Bags/Sq.mt.

0.218
34 25mm thick CM screed in CM (1:5)
Bags/Sq.mt.

20mm thick mosaic tiles over 25mm thick bedding in CM 0.228


35
(1:6) Bags/Sq.mt.
FUNCTIONS OF CONCRETE
18mm thick mosaic tiles over 20mm thick bedding in CM 0.200
36 ADMIXTURES
(1:6) Bags/Sq.mt.

18mm thick marble skirting over 12mm thick bedding in 0.160


37
CM (1:6) Bags/Sq.mt.

Water Proofing treatment with 50mm thick screed in CM


1.18
38 (1:5), 115 thick brick bats in CM (1:3), third layer of 25
Bags/Sq.mt.
mm thick in CM (1:3)

Fixing of rainwater Pipes

0.048
110 mm diameter PVC
39 Bags/Opening
What are the Factors Affecting
0.075 Workability of Concrete?
160mm diameter PVC
Bags/Opening

Joining & Fixing of CI rainwater Pipes

0.176
100 mm diameter
40 Bags/100 mtr.

0.264
150 mm diameter
Bags/100 mtr.

Fixing wooden Frame/Steel frame doors in M-15 0.129


41
concrete of block size. 350 x 100 x 100 mm Bags/Door

Fixing of steel louvers/windows in M-15 grade concrete 0.008 PRESTRESSED CONCRETE


42
of block 150 x 50 x 50 at 750 mm c/c. Bags/Sq.mt POLES

0.70 Bags/
43 Fixing of rolling shutters.
100 Sq.Mt.

https://theconstructor.org/concrete/cement-consumption-coefficients/20840/?utm_source=pushengage&utm_medium=push_notification&utm_campaig… 3/5
2/7/2018 Cement Consumption Coefficients for Various Construction Works

44 Providing and Fixing of 50mm thick RCC jali. 0.329


Bags/Sq.mt.

0.051
45 Fixing of 50 mm thick RCC Jali.
Bags/Sq.mt.

Fixing of glazed earthen ware Orissa pan type water


46 0.5 Bags/No’s
closet.

0.05
47 Fixing of white glazed EWC.
Bags/No’s Various Types of Joints in
Concrete Construction
0.03
48 Fixing of large flat back urinal.
Bags/No’s

0.03
49 Fixing of hand wash basin/sink
Bags/No’s

0.05
50 Fixing of floor trap of 100/100 mm
Bags/No’s

Jointing and fixing of soil waste Pipe.

0.132
80mm diameter.
Bags/RM
SPALL REPAIR PROCEDURES
51 0.176
100mm diameter.
Bags/RM

0.264
150mm diameter.
Bags/RM

Fixing of GI water pipes concealed work.

0.642
15 mm diameter
Bags/100M

0.770
20 mm diameter
52 Bags/100M

0.90
25 mm diameter
Bags/100M

0.96
32 mm diameter
Bags/100M

Construction of brick masonry valve chambers of size


300 x 300 x 600 mm CM (1:4) fixing cover in M-15 0.700
53
concrete, M-15 foundation concrete 13mm thick plaster Bags/No’s
on inside & outside exposed surface.

Construction of brick masonry inspection chamber of size


54 750 x 750 x 1000 mm in CM (1:4) RCC of M-15, 13mm 5.0 Bags/No’s