Você está na página 1de 25

REGRESSION

/MISSING LISTWISE
/STATISTICS COEFF OUTS BCOV R ANOVA COLLIN TOL
/CRITERIA=PIN(.05) POUT(.10)
/NOORIGIN
/DEPENDENT Y1
/METHOD=ENTER X1 X2 X3
/SCATTERPLOT=(*SRESID ,*ZPRED)
/RESIDUALS DURBIN HISTOGRAM(ZRESID) NORMPROB(ZRESID).

Regression

Notes
Output Created 20-Aug-2013 16:37:37
Comments
Active Dataset DataSet0
Filter <none>
Weight <none>
Input
Split File <none>
N of Rows in Working Data
10
File
User-defined missing values are treated
Definition of Missing
as missing.
Missing Value Handling
Statistics are based on cases with no
Cases Used
missing values for any variable used.

REGRESSION
/MISSING LISTWISE
/STATISTICS COEFF OUTS BCOV R
ANOVA COLLIN TOL
/CRITERIA=PIN(.05) POUT(.10)
/NOORIGIN
Syntax
/DEPENDENT Y1
/METHOD=ENTER X1 X2 X3
/SCATTERPLOT=(*SRESID ,*ZPRED)
/RESIDUALS DURBIN
HISTOGRAM(ZRESID)
NORMPROB(ZRESID).

Processor Time 00 00:00:02.246


Elapsed Time 00 00:00:02.561
Resources Memory Required 1980 bytes

Additional Memory Required


896 bytes
for Residual Plots

[DataSet0]
Variables Entered/Removedb

Model Variables Entered Variables Removed Method

alokasi dana bantuan,


1 angkatan kerja, investasi . Enter
swasta

a. All requested variables entered.


b. Dependent Variable: pertumbuhan ekonomi

Model Summaryb

Adjusted R
Model R R Square
Square
1 .786a .617 .426
a. Predictors: (Constant), alokasi dana bantuan, angkatan kerja, investasi swasta
b. Dependent Variable: pertumbuhan ekonomi

ANOVAb

Model Sum of Squares df

Regression .994 3
1 Residual .616 6
Total 1.610 9
a. Predictors: (Constant), alokasi dana bantuan, angkatan kerja, investasi swasta
b. Dependent Variable: pertumbuhan ekonomi

Coefficientsa

Unstandardized Coefficients
Model
B Std. Error
(Constant) 28.354 15.909
investasi swasta .006 .244
1
angkatan kerja 2.222 1.165
alokasi dana bantuan .088 .446
a. Dependent Variable: pertumbuhan ekonomi

Coefficient Correlationsa

alokasi dana
Model
bantuan
alokasi dana bantuan 1.000
Correlations angkatan kerja .054
investasi swasta -.480
1
1
alokasi dana bantuan .199
Covariances angkatan kerja .028
investasi swasta -.052
a. Dependent Variable: pertumbuhan ekonomi

Collinearity Diagnosticsa

Model Dimension Eigenvalue Condition Index

1 3.999 1.000
2 .001 56.357
1
3 .000 212.103
4 .000 445.376
a. Dependent Variable: pertumbuhan ekonomi

Residuals Statisticsa
Minimum Maximum Mean
Predicted Value .6127 1.5617 .9944
Std. Predicted Value -1.149 1.707 .000
Standard Error of Predicted
.134 .294 .195
Value
Adjusted Predicted Value .6491 2.6078 1.0503
Residual -.35961 .48823 .00000
Std. Residual -1.122 1.523 .000
Stud. Residual -1.526 1.691 -.051
Deleted Residual -1.23912 .75146 -.05586
Stud. Deleted Residual -1.781 2.134 -.024
Mahal. Distance .683 6.698 2.700
Cook's Distance .007 3.155 .499
Centered Leverage Value .076 .744 .300
a. Dependent Variable: pertumbuhan ekonomi

Charts
Regression

Notes
Output Created 20-Aug-2013 16:38:15
Comments
Active Dataset DataSet0
Filter <none>
Weight <none>
Input
Split File <none>
N of Rows in Working Data
10
File
User-defined missing values are treated
Definition of Missing
as missing.
Missing Value Handling
Statistics are based on cases with no
Cases Used
missing values for any variable used.
REGRESSION
/MISSING LISTWISE
/STATISTICS COEFF OUTS BCOV R
ANOVA COLLIN TOL
/CRITERIA=PIN(.05) POUT(.10)
/NOORIGIN
Syntax
/DEPENDENT Y2
/METHOD=ENTER X1 X2 X3
/SCATTERPLOT=(*SRESID ,*ZPRED)
/RESIDUALS DURBIN
HISTOGRAM(ZRESID)
NORMPROB(ZRESID).

Processor Time 00 00:00:02.231


Elapsed Time 00 00:00:02.460
Resources Memory Required 1980 bytes

Additional Memory Required


896 bytes
for Residual Plots

[DataSet0]

Variables Entered/Removedb

Model Variables Entered Variables Removed Method

alokasi dana bantuan,


1 angkatan kerja, investasi . Enter
swasta

a. All requested variables entered.


b. Dependent Variable: ketimpangan

Model Summaryb

Adjusted R
Model R R Square
Square
1 .758a .575 .362
a. Predictors: (Constant), alokasi dana bantuan, angkatan kerja, investasi swasta
b. Dependent Variable: ketimpangan

ANOVAb

Model Sum of Squares df

Regression .158 3
1 Residual .117 6
Total .274 9
a. Predictors: (Constant), alokasi dana bantuan, angkatan kerja, investasi swasta
b. Dependent Variable: ketimpangan

Coefficientsa

Unstandardized Coefficients
Model
B Std. Error
(Constant) .462 6.918
investasi swasta .087 .106
1
angkatan kerja .731 .507
alokasi dana bantuan .388 .194
a. Dependent Variable: ketimpangan

Coefficient Correlationsa

alokasi dana
Model
bantuan
alokasi dana bantuan 1.000
Correlations angkatan kerja .054
investasi swasta -.480
1
alokasi dana bantuan .038
Covariances angkatan kerja .005
investasi swasta -.010
a. Dependent Variable: ketimpangan

Residuals Statisticsa
Minimum Maximum Mean
Predicted Value -.2399 .2033 -.0139
Std. Predicted Value -1.708 1.641 .000
Standard Error of Predicted
.058 .128 .085
Value
Adjusted Predicted Value -.5570 .4694 -.0017
Residual -.12016 .23745 .00000
Std. Residual -.862 1.704 .000
Stud. Residual -1.387 2.023 -.023
Deleted Residual -.48959 .38264 -.01217
Stud. Deleted Residual -1.536 3.276 .099
Mahal. Distance .683 6.698 2.700
Cook's Distance .006 2.605 .494
Centered Leverage Value .076 .744 .300
a. Dependent Variable: ketimpangan

Collinearity Diagnosticsa

Model Dimension Eigenvalue Condition Index


Model Dimension Eigenvalue Condition Index

1 3.999 1.000
2 .001 56.357
1
3 .000 212.103
4 .000 445.376
a. Dependent Variable: ketimpangan

Charts
REGRESSION
/MISSING LISTWISE
/STATISTICS COEFF OUTS BCOV R ANOVA COLLIN TOL
/CRITERIA=PIN(.05) POUT(.10)
/NOORIGIN
/DEPENDENT Y2
/METHOD=ENTER X1 X2 X3 Y1
/SCATTERPLOT=(*SRESID ,*ZPRED)
/RESIDUALS DURBIN HISTOGRAM(ZRESID) NORMPROB(ZRESID).

Regression

Notes
Output Created 20-Aug-2013 16:38:38
Comments
Active Dataset DataSet0
Filter <none>
Weight <none>
Input
Split File <none>
Input

N of Rows in Working Data


10
File
User-defined missing values are treated
Definition of Missing
as missing.
Missing Value Handling
Statistics are based on cases with no
Cases Used
missing values for any variable used.

REGRESSION
/MISSING LISTWISE
/STATISTICS COEFF OUTS BCOV R
ANOVA COLLIN TOL
/CRITERIA=PIN(.05) POUT(.10)
/NOORIGIN
Syntax
/DEPENDENT Y2
/METHOD=ENTER X1 X2 X3 Y1
/SCATTERPLOT=(*SRESID ,*ZPRED)
/RESIDUALS DURBIN
HISTOGRAM(ZRESID)
NORMPROB(ZRESID).

Processor Time 00 00:00:01.950


Elapsed Time 00 00:00:02.320
Resources Memory Required 2308 bytes

Additional Memory Required


888 bytes
for Residual Plots

[DataSet0]

Variables Entered/Removedb

Model Variables Entered Variables Removed Method

pertumbuhan ekonomi,
alokasi dana bantuan,
1 . Enter
investasi swasta, angkatan
kerja

a. All requested variables entered.


b. Dependent Variable: ketimpangan

Model Summaryb

Adjusted R
Model R R Square
Square
1 .915a .836 .706
a. Predictors: (Constant), pertumbuhan ekonomi, alokasi dana bantuan, investasi swasta, angkatan kerja
b. Dependent Variable: ketimpangan
ANOVAb

Model Sum of Squares df

Regression .229 4
1 Residual .045 5
Total .274 9
a. Predictors: (Constant), pertumbuhan ekonomi, alokasi dana bantuan, investasi swasta, angkatan kerja
b. Dependent Variable: ketimpangan

Coefficientsa

Unstandardized Coefficients
Model
B Std. Error
(Constant) 10.132 5.813
investasi swasta .089 .072
1 angkatan kerja 1.489 .436
alokasi dana bantuan .418 .132
pertumbuhan ekonomi .341 .121
a. Dependent Variable: ketimpangan

Coefficient Correlationsa

pertumbuhan
Model
ekonomi
pertumbuhan ekonomi 1.000
alokasi dana bantuan .080
Correlations
investasi swasta .010
angkatan kerja -.614
1
pertumbuhan ekonomi .015
alokasi dana bantuan .001
Covariances
investasi swasta .000
angkatan kerja -.032
a. Dependent Variable: ketimpangan

Collinearity Diagnosticsa

Model Dimension Eigenvalue Condition Index

1 4.890 1.000
2 .109 6.691
1 3 .001 76.279
4 .000 241.986
5 .000 615.733
a. Dependent Variable: ketimpangan

Residuals Statisticsa

Minimum Maximum Mean


Predicted Value -.1960 .2575 -.0139
Std. Predicted Value -1.141 1.700 .000
Standard Error of Predicted
.046 .090 .065
Value
Adjusted Predicted Value -.3242 .4288 -.0112
Residual -.12644 .12057 .00000
Std. Residual -1.335 1.273 .000
Stud. Residual -2.049 1.768 -.008
Deleted Residual -.29776 .23241 -.00268
Stud. Deleted Residual -4.578 2.582 -.173
Mahal. Distance 1.252 7.242 3.600
Cook's Distance .001 1.138 .254
Centered Leverage Value .139 .805 .400
a. Dependent Variable: ketimpangan

Charts
Std. Error of the
Durbin-Watson
Estimate
.32048 3.105

Mean Square F Sig.

.331 3.225 .103a


.103

ntsa

Standardized
Collinearity Statistics
Coefficients t Sig.
Beta Tolerance VIF
1.782 .125
.012 .024 .982 .262 3.810
.826 1.907 .105 .340 2.941
.066 .197 .850 .572 1.747

angkatan kerja investasi swasta

.054 -.480
1.000 -.737
-.737 1.000
.028 -.052
1.357 -.209
-.209 .059

sa
Variance Proportions
alokasi dana
(Constant) investasi swasta angkatan kerja
bantuan
.00 .00 .00 .00
.01 .32 .00 .00
.04 .03 .10 .87
.96 .66 .90 .13

Std. Deviation N
.33228 10
1.000 10

.060 10

.57847 10
.26167 10
.816 10
1.083 10
.58735 10
1.221 10
2.286 10
.993 10
.254 10
Std. Error of the
Durbin-Watson
Estimate
.13935 2.262

Mean Square F Sig.

.053 2.706 .138a


.019
ntsa

Standardized
Collinearity Statistics
Coefficients t Sig.
Beta Tolerance VIF
.067 .949
.425 .819 .444 .262 3.810
.659 1.444 .199 .340 2.941
.702 1.997 .093 .572 1.747

angkatan kerja investasi swasta

.054 -.480
1.000 -.737
-.737 1.000
.005 -.010
.257 -.040
-.040 .011

Std. Deviation N
.13234 10
1.000 10

.026 10

.26976 10
.11378 10
.816 10
1.096 10
.25653 10
1.402 10
2.286 10
.881 10
.254 10

sa
Variance Proportions
alokasi dana
(Constant) investasi swasta angkatan kerja
bantuan
.00 .00 .00 .00
.01 .32 .00 .00
.04 .03 .10 .87
.96 .66 .90 .13
Std. Error of the
Durbin-Watson
Estimate
.09469 1.870
Mean Square F Sig.

.057 6.393 .033a


.009

ntsa

Standardized
Collinearity Statistics
Coefficients t Sig.
Beta Tolerance VIF
1.743 .142
.435 1.232 .273 .262 3.811
1.342 3.414 .019 .212 4.723
.757 3.156 .025 .569 1.758
.826 2.827 .037 .383 2.613

alokasi dana
investasi swasta angkatan kerja
bantuan
.080 .010 -.614
1.000 -.478 -.007
-.478 1.000 -.587
-.007 -.587 1.000
.001 .000 -.032
.018 -.005 .000
-.005 .005 -.018
.000 -.018 .190

agnosticsa
Variance Proportions
alokasi dana pertumbuhan
(Constant) investasi swasta angkatan kerja
bantuan ekonomi
.00 .00 .00 .00 .00
.00 .00 .00 .00 .40
.01 .49 .00 .00 .20
.03 .10 .05 .95 .04
.96 .41 .95 .04 .37
Std. Deviation N
.15962 10
1.000 10

.015 10

.20871 10
.07058 10
.745 10
1.048 10
.14990 10
1.819 10
2.111 10
.371 10
.235 10

Você também pode gostar