Você está na página 1de 1

Inspection Test Report (ITR)

Contract No.:REP-BPXO-14-0668 Contract Title: Raw Water Treatment Facilities

Contractor: Veolia Company: BP/Jacobs

Sub Contractor: Sarooj RFI No.:

ITR No.: KZ01-CW-ITR02-S2V-0000 Rev: 00

STEEL REINFORCEMENT CHECKLIST


Drawing No.: Specification:

Location: Inspection Date/Time:

Description √ as applicable Comment


Yes No N/A

1. Material Mill Certificates, Type 3.1, available for


reinforcement being used

2. Tie wire material used for binding reinforcement


is in accordance with requirements of specification
and material certification is available.

3. Reinforcement condition free from damage,


visible cracks at bends, reduced sections.

4. Reinforcement is washed clean, free of rust,


scale, oil, mud, other debris.
5. Size/diameter of reinforcement used is in
accordance with AFC drawing.
6. Reinforcement bends fabricated to dimensions
and configurations as in accordance with
associated AFC drawings and Bar Bending
Schedule.

7. Reinforcement is placed correctly and with


Reinforcement Chairs/Stirrups aligned and spaced
in accordance with AFC drawing.

8. Reinforcement and Reinforcement


Chairs/Stirrups supported on concrete spacers.

9. Concrete spacer blocks material is in


accordance with requirements of specification.

10. Reinforcement cover is in accordance wih


minimum cover requirements in specification.

Note:

Inspection Result: c Accept


c c Conditional Accept c Reject

SUB-CONTRACTOR CONTRACTOR COMPANY


Inspected by:
SAROOJ VEOLIA BP/JACOBS
Name:
Position
Signature:
Date:

Você também pode gostar