Você está na página 1de 55

The Malaysian Vol.

51
No.3
2016
m2 (x, y) x 3

07 Influences Of Cost Variables On The


Conceptual Cost Estimation Accuracy:
Methods And Techniques
Dwifitra Jumas, Faizul Azli Mohd Rahim and Nurshuhada Zainon

17 Housing Pathways Among Gen Y In


Kuala Lumpur
Zafirah Al Sadat Zyed, Hasniyati Hamzah and Nur Alifah
Baharuddin

30 Interview with RISM Lifetime Achievement


Award for year 2016: Sr Ringo Chan Pak Kuan

39 18th International Surveyor’s Congress


EDITORIAL

I
Greetings everyone.

nline with the 18th International Surveyor’s Congress theme : The resilient professional –
Thriving In a Changing Economy, this issue we feature Sr Ringo Chan, the recipient of the RISM
Lifetime Achievement Award for year 2016. Sr Ringo is not a stranger to us all, for he has been
with RISM in every step of the way from year 1983 until present. Sr Ringo possesses multiple
professional accreditations under his belt besides Fellow of RISM – he is also a registered
quantity surveyor with the Board of Quantity Surveyors Malaysia (BQSM), a Member of Royal
Institute of Chartered Surveyors (RICS) and a Member of the Malaysian Institute of Arbitrators. He
is the founder of a QS consultancy firm, CPK Associates and has been the Principal since 1999. He
currently holds the Secretary of the Education and Accreditation Board post in RISM since 2001.

More on the QS profession, under the Peer Review section, we have an article contributed by
the Project Management, Procurement & Economics Research Group of Univeristy Malaya on
the Influences of Cost Variables On The conceptual Cost Estimation Accuracy: Methods and
Techniques. Conceptual Cost Estimate (CCE) is fundamental in the initial decision making process
for a construction project. The primary function of CCE is to assist the owner about the anticipated
cost of a project for budgeting purposes. In theory, estimating accuracy is indicative of the degree
to which the final price outcome of a project may vary from the single point value used as the
estimated cost of the project. Different projects have different cost factors for consideration;
thus, construction cost estimation process requires an appreciation of project’s evaluation about
the factors influencing the accuracy. This article is a summary of studies carried out on cost
estimation techniques and read on to see what the results shows. Another area of interest for the
QS fraternity, we also have an ECA on a Child Care Centre published in this issue.

Another article that came from University Malaya is from The Department of Estate Management.
The authors have written an article entitled Housing Pathways among Gen Y in Kuala Lumpur.
Gen Y are estimated to represent almost 30% of Malaysian demography. On the housing ladder,
they can be the most mobile compared to other generations. Recently, there have been concerns
about the housing affordability levels of ‘young starters’, i.e. Gen Y who are starting to establish
themselves in the society. Typical of an Asian economy, Malaysia currently practices a binary
housing tenure system comprising home ownership and private renting. Based on the assumed
preference for home ownership, the inability of Gen Y to purchase a house in Kuala Lumpur has
been a cause for concern. This article aims to reveal housing types and areas that are currently
affordable for the Gen Y respondents in Kuala Lumpur.

Under our regular column on Managing Stress, this issue we


feature an article Saying Good Things To Depressed Friends.
Friends in need are friends in deed. Look this up to see how you
can help your friends who are going through a depression.

Under the section on RISM activities, we have the 18th ISC report
including report on the 55th AGM and RISM Annual Dinner. The
line-up of the 56th session council members is also featured in
this issue. This is to enable members to get to know the council
members representing them in the institution.

RISM is not only an institution that cares for its members. RISM
also carries out activities for the public and the needy especially.
RISM Charity Run held on 31st July 2016 is featured in this
issue. Proceeds from the run was contributed to the Yayasan
Muda Selangor. In another charity event, RISM has carried out a
CSR programme where another mini library was built especially
dedicated to the seriously ill children in the Pediatrics Ward. After Sr Ina Abu Bakar FRISM
the success of the previous similar project in HUKM , this time Editor, Editorial Board
around is in the East Cost in Hospital USM, Kota Baru, Kelantan. (Session 2016/2017)
Contents
President
YBhg. Dato’ Sr K. Sri Kandan, DIMP, FRISM, FAIQS, FRICS

Hon. Secretary General


Sr Ang Fuey Lin, FRISM

EDITORIAL BOARD Interview


Editor
Sr Ina Abu Bakar, FRISM Pg30 Interview with RISM Lifetime Achievement Award
Members
for year 2016: Sr Ringo Chan Pak Kuan
Sr Khaidzir Hj. Abdul Rasip, FRISM
Sr Victor Huang Hua, MRISM Peer Review Articles
Sr Dr. Yasmin Mohd Adnan, FRISM
Sr Mohamad Shazali Sulaiman, FRISM
Pg07 Influences Of Cost Variables On The Conceptual
Sr Juwita Radzi, MRISM Cost Estimation Accuracy: Methods And Techniques
Assoc. Prof. Sr Dr. Syahrul Nizam Kamaruzzman, FRISM
Assoc. Prof. Sr Dr. Adi Irfan Che Ani, MRISM
Assoc. Prof. Sr Dr. Norngainy Mohd Tawil, MRISM
Pg17 Housing Pathways Among Gen Y In Kuala Lumpur
Assoc. Prof. Sr Kamaludin Hj. Mohd Omar, MRISM
Assoc. Prof. Sr Dr. Mohd Sanusi S. Ahamad, MRISM
Managing Stress
Pg33 Saying Good Things To Depressed Friends
Secretary to the Board
Zarinah bt. Danial

INTERNATIONAL ADVISORY BOARD


Prof. Chitra Weddikkara
University of Moratuwa, Sri Lanka
Prof. Graeme Newell
University of Western Sydney, Australia
Sr Noushad Ali Naseem Ameer Ali, PPRISM 07
Massey University, Auckland, New Zealand
Professor Michael Riley
Liverpool John Moores University, Liverpool, United Kingdom

Royal Institution of Surveyors Malaysia


3rd Floor, Bangunan Juruukur
No. 64-66, Jalan 52/4
46200 Petaling Jaya
Selangor Darul Ehsan
t: +603 7954 8358 (hunting line) / 7956 9728 / 7955 1773
f: +603 7955 0253
e: editor@rism.org.my
w: www.rism.org.my

17
PUBLISHING CONSULTANT & CREATIVE DESIGN
Paul & Marigold (DeCalais Sdn Bhd)
G-1-1, Plaza Damas, 60, Jalan Sri Hartamas 1
Sri Hartamas, 50480 Kuala Lumpur
T +603 6201 0725/6206 3497
F +603 6210 0756
E: arvind@paulandmarigold.com

‘Sr’ is the abbreviation for surveyors and was first mooted by RISM in
2005 and used by all RISM members since 2006 as a badge of identity
for surveying professionals.

The Malaysian Surveyor is a quarterly publication which covers the


development of the surveying profession, innovations in the surveying
technology and surveyors’ contribution towards the property market and
building industry.

The Institute as a body does not hold itself responsible for statements
made or opinions expressed in the articles and advertisements printed
in this publication, or for the strict accuracy of references to law cases,
which are intended only as a gloss on authorised reports. Rights of trans-
lation and reproduction reserved.
40 30

42

Elemental Cost Analysis


Pg36 Elemental Cost Analysis
RISM Activities
Pg39 18th International Surveyor’s Congress
Pg41 Extraordinary General Meeting (EGM) 44
Pg42 55th Annual General Meeting
Pg43 55th RISM Annual Dinner
Pg44 RISM Charity Run 2016
Pg45 CSR Programme In Paediatric Wards
Pg46 Council Members of the 56th Session
2016/2017

Regulars
Pg48 List of New Members 45

‘Sr’ is the abbreviation for surveyors and was first mooted by RISM in 2005 and used
by all RISM members since 2006 as a badge of identity for surveying professionals.

The Malaysian Surveyor is a quarterly publication which covers the development


of the surveying profession, innovations in the surveying technology and surveyors’
contribution towards the property market and building industry.

The Institute as a body does not hold itself responsible for statements made or
opinions expressed in the articles and advertisements printed in this publication, or
for the strict accuracy of references to law cases, which are intended only as a gloss
on authorised reports. Rights of translation and reproduction reserved.
Peer
Peer Review
Review
Dwifitra Jumas, Faizul Azli Mohd Rahim and Nurshuhada Zainon

Project Management, Procurement & Economics Research Group,


Center for Building, Construction & Tropical Architecture. (BUCTA)
Faculty of Built Environment, Universiti Malaya, 50603 Kuala Lumpur
Email: azli@um.edu.my
Phone: 03-7967 7673

Influences Of Cost Variables On The


Conceptual Cost Estimation Accuracy:
Methods And Techniques
Conceptual Cost Estimation (CCE) is fundamental in the initial decision-making process
for construction project. The primary function of CCE is to assist the owner about the
anticipated cost of a project for budgeting purposes. In theory, estimating accuracy
is indicative of the degree to which the final price outcome of a project may vary from
the single point value used as the estimated cost of the project. Most cost estimation
studies focus on specific estimation methods as generic techniques but little attention
been given to the characteristics and requirements of each project stage. Moreover,
different projects have different cost factors for consideration; thus, construction cost
estimation process requires an appreciation of project’s evaluation about the factors
influencing the accuracy. The results show cost factors for the design and project-
specific factors are very influential in improving the accuracy of cost estimation
compared from estimator-specific factors.

Keywords: Cost variable, conceptual cost estimation, cost estimation, accuracy

7
Peer
Peer Review
Review
The Malaysian Surveyor

I
1.0 Introduction reviewed in literatures and in
practice.
n literature, many issues of A CCE is a
the CCE are related to the 3.0 Conceptual Cost
poor quality of the early stage preliminary Estimation (CCE)
estimated budget provided
by the construction cost
estimation A CCE is a preliminary estimation
consultants involved. Firstly is regarding the regarding the value, quantity, size
because of process standardisation or weight. As the name implies,
and impact of professional judgment value, quantity, “conceptual” is generally made
on formulation of building project
budget price advice (Fortune, 2006).
size or weight. in the early phases of a project.
When performing a CCE, typically,
Once a professional judgment has there are no drawings available.
been involved extensively during What exists is a vague verbal or
the generation of cost estimates, written description of the project
many assumptions were made scope. When preparing this type of
(Rush & Roy 2001a). This judgment estimation, the estimator makes
can be prone to bias, for instance; assumptions about virtually every
subjective, political aims, depends by more causes and inter correlation aspect of the project regarding the
on level of experiences, inconsistent between many different variables value, quantity, size or weight. The
and unstructured processes, (Azman, Samad, & Ismail, 2012; process of assumptions generate
and also difficult to reuse and to Elfaki, Alatawi, & Abushandi, 2014; the cost of work activity or output
modify (Datta & Roy, 2010; Rush Shane, Molenaar, Anderson, & by interpreting data or knowledge
& Roy 2001a). Secondly, previous Schexnayder, 2009), each variables which is usually done by creating a
researchers have studied the factors must be properly addressed in order cost model (Curran, Raghunathan, &
affecting the cost estimation of to maintain an acceptable level Price, 2004; Langmaak et al., 2013;
construction project from various of accuracy during the process. Sonmez, 2011).
perspectives. According to Liu and Therefore, the CCE process required
Zhu (2007): an appreciation of a project’s Choi, Kim, Han, and Kwak (2014)
evaluation about the influencing defines CCE as the conceptual policy
There is importance to identify factors. planning stage that includes asset
critical factors for effective development, budget allocation and
estimation at each project stage; 2.0 Methodology alternative screening especially for
most cost estimation studies focus cost guidance in public project. Other
on specific estimation method This paper reviewed publications primary functions of CCE are to tell
as generic techniques and little obtained electronically through the owner about the anticipated
attention has been paid to the unique major scientific databases which cost. It is also important to project
requirements at each project stage. are Google Scholar (http://scholar. feasibility studies and upon final
google.com.my), Scopus (http:// project success that can be used
Accuracy implies closeness to the www.scopus. com/home.url) and in project evaluations, engineering
actual value. It means lack of error. the Science Direct databases. designs, and cost management
It also comprises two aspects in This paper investigates and (Cheng, Tsai, & Hsieh, 2009; Cheng,
term of “bias” and “consistency” summarises the current use of cost Tsai, & Sudjono, 2010; Lowe, Emsley,
(Ashworth, 1995; Skitmore, 1991). estimation techniques in the building & Anthony, 2006; Sonmez, 2004) or
Bias is concerned with “the average construction project. The extensive even to support bid price estimation
differences between actual value and hierarchical techniques are based (Gunduza, Ugurb, & Ozturk, 2011;
forecasts”; measures of consistency on grouping into the qualitative Wang, Shih, Tsui, & Hsu, 2012).
are concerned with “the degree and quantitative techniques. This
of variation around the average”. paper contributes to the knowledge A generic CCE process is displayed
Since the factors contribute to the base of cost estimation literature graphically in Figure 1. The process
estimation bias could be influenced by presenting different techniques begins with a request made by

8
Influences Of Cost Variables On The Conceptual Cost Estimation Accuracy: Methods And Techniques

Vol.51 No.3 2016

management to estimate the cost   Re-Estimate


of a new project. The first task
for the estimator is to study and
interpret the project scope and
produce an estimating plan. This
stage also involves the formulation
Request for Estimation
of estimating methodology
and determination of additional
information needed. The next task
Study & Interpretation of Information
is to collect additional information
 
that is required for the CCE. This
additional information can be
separated in two categories; current Collect Additional Information
data and historical data. Current
 
data include those relating to current
costs, productivity, project conditions Conceptual Cost Estimation
and future trends. Historical data  
include those relating to past
projects that are similar to the ones Report to Management
that are to be estimated.  

The selection and usage of


these data is a critical part of
the estimating process because Not Approved Decision Preliminary
the selection of inappropriate Making Budget
information with negatively Approved
affect the end quality of estimate
(Phaobunjong, 2002). The estimators
Figure 1: Conceptual Cost Estimation Process,Source: adapted from Bley (1990)
must, at the point, conceptualise the and Phaobunjong (2002)
project, understand the necessary
activities to be done and when to be
done, and compare the project with
previous ones if possible (O’Conner,
1985). With all the information
assembled, the CCE process can 4.0 Cost estimation others depending on the context.
Table 1 summarises the advantages
be performed. The output is a CCE
document as estimating basis
techniques and its and limitations of the different major
to develop project cost. It is very applications estimating techniques and also
important to describe in detail all highlight the applicability in term of
the information, assumptions, In many literatures, there the different stages of construction
adjustments, and procedures are different cost estimation project.
considered in the estimation, as this techniques that can be found. Each
document is necessary to support researcher has developed his own
the estimation, as well as for future classifications, making different
cost evaluation due to changes assumption and considerations.
For example, the cost estimating
In many literatures,
and modifications of project scope
(Bley, 1990). The CCE result is then techniques can broadly classified there are different
as illustrated in figure 2 (Cavalieri,
submitted to management for
decision-making. At this point, the Maccarrone, & Pinto, 2004; Datta cost estimation
estimating process is finished in this & Roy, 2010; Niazi & Dai, 2006).
However, the techniques cannot be
techniques that can
cycle. The process may be reiterated
so as to as to accommodate for used during the whole project life be found.
changes and modifications to the cycle (Duverlie & Castelain, 1999).
project scope. Some techniques are better than

9
Peer
Peer Review
Review
The Malaysian Surveyor

  Cost Estimation Techniques

Qualitative Techniques Quantitative Techniques

Intuitive Techniques Parametric Techniques

Analogical Techniques Analytical Techniques

Figure 1: Classification of Cost Estimation Techniques


Source: adapted from Datta and Roy (2010) and Niazi and Dai (2006)

Table1: Comparison of different cost estimation techniques

Cost Estimation Advantages Limitation


Technique

Intuitive • Quick to produce and flexible • Prone to bias and error


• Few resources in term of time and cost • Inconsistent and unstructured process
• Can be as accurate as other more • Non-deterministic as each expert
expensive method reaches a different estimate

Parametric • Rapidity of execution • Parameter not included can became


• Repeatable and objective important
• Less information required than • Useful in combination with other method
analytical • CERs are too simplistic to predict costs
• Good for budgetary estimates or • Uncertainties are high as CER
baseline assessment specification are not available

Analogy • Reasonably quick and based on actual • Subjective adjustments


data • Accuracy depends on similarity of items
• Requires few data • Difficult to assess effect of design change
• Use knows the origin of the estimate • Blind to cost drivers
• No requirement of full understanding of • More difficult than parametric method
problem as this required cases database,
• Accurate for minor difference from similarity measure, adaptation
analogous case functions and case indexations

Analytical • More accurate than analogy and • Time consuming


parametric • Inappropriate for estimation at early
• Detailed breakdown useful for stage
negotiation

10
Influences Of Cost Variables On The Conceptual Cost Estimation Accuracy: Methods And Techniques

Vol.51 No.3 2016

Qualitative Techniques user improve the decision-making In fact, most of the significant
Qualitative techniques in cost process and prepare cost estimates factors affecting project costs
estimation can be defined as the for new project based on certain are qualitative including scope of
assumptions and judgments that input information. contract, project risks, management
cost estimators and engineers do and technique, and environmental
during the generation of an estimate. Another study also report that and circumstantial Influence (Y.-M.
These assumptions and judgments the subjective decision making Cheng, 2014), project complexity,
are related to how an estimator processes involved and are project team requirement, contract
refers to past projects as a basis for characterised by qualitative data and requirement (Akintoye, 2000), and
the generation of a new estimate knowledge that is often vague and other factors such as construction
(Datta & Roy, 2010; Niazi & Dai, difficult to structure and quantify time, contractor’s planning
2006; Rush & Roy 2001a). In that (Akintoye, 2000). For Example, Tah et capability, procurement methods
sense, the previous experience of an al. (1994), based on semi-structured and market conditions including
estimator can provide useful help to interviews with seven contractors, level of construction activity. Due
generate reliable cost estimates for investigated current practices of to the qualitative nature of these
a new project. Qualitative technique estimating the indirect costs (indirect factors, they are difficult to structure
can be categorized into intuitive and costs were described as those which and quantify (Elhag, Boussabaine,
analogical techniques: are not traceable to a specific work & Ballal, 2005). Most of these
item, and consist of site overheads, factors are often ignored by current
i. Intuitive: estimates are based on general overheads, profits and forecasting techniques. Only some
the expert estimator’s experience allowances for risks) involved in of those techniques which include
ii. Analogical: estimated made on tendering for construction work. a risk assessment element usually
the definition and the analysis of The study, while recognising the consider some qualitative factors.
the degree of similarity between limitation of the research due to the
the new project and another low rates of response because of the Analogical technique is also a form
from the past project sensitivity and confidential nature of of experts judgment (Phaobunjong,
the subject, concluded by indicating 2002). It involves using the actual
The study done by Lai, Wang, and a high degree of subjectivity involved cost of a previous similar project
Wang (2008) investigated that in in indirect cost estimating. It also as the basis for estimating the
Taiwan, the Public Construction recognised that the percentage cost of the current project (PMI,
Commission (PPC) officers added to the cost estimate is based 1996). One or several projects
decide project budgets principally on the subjective judgment of senior may be used as project reference.
based on their own experience management. The method usually involves very
because the regulation for setting little calculation. Any calculation
construction project budgets performed is typically limited to
only qualitatively describe the using indexes to adjust the costs
governmental administration and determining the average cost for
process; thus, budgeting results can The percentage similar projects. Due to its simplistic
be unreliable. The study suggested
that without using explicit evaluation
added to the nature and limited project scope
information required, the estimate
criteria, project budgets cannot cost estimate has poor accuracy but serves its
be assessed using a consistent purpose for preliminary economic
decision-making process. However, is based on feasibility consideration. However,
Niazi and Dai (2006) identified
two subcategories to improve the
the subjective analogical technique is generally the
least demanding and least costly
study under intuitive technique judgment method. Analogical estimating is
such as case-based methodology most reliable when the reference
or case-based reasoning (CBR) and of senior project or projects are really similar
decision support system (DSS). The
knowledge may be stored in the form
management. in fact and not just in appearance,
and that the estimators involved in
of rules, decision trees, judgments preparing the estimates have the
and more, at a specific location, for needed expertise (PMI, 1996).
example, a database to help the end

11
Peer
Peer Review
Review
The Malaysian Surveyor

Quantitative Techniques
In cost estimation, quantitative
knowledge is defined as cost
elements and known structures
In cost estimation, quantitative
of elements which form the basis knowledge is defined as cost elements
of a cost estimate and that are
measurable (Rush & Roy, 2001b). and known structures of elements
The cost of element is as number
of part or type (Riquelme & Serpell,
which form the basis of a cost estimate
2013; Rush & Roy 2001a; Rush & and that are measurable
Roy, 2001b), such as gross external
floor area, median floor height,
construction duration (Stoy &
Schalcher, 2007; C. Stoy, Pollalis, &
Schalcher, 2008), floor underground
and aboveground, and number of
households (Cheng et al., 2010). models that adopt parametric entire project’s cost. Analytical
Quantitative technique can be method and have been developed. estimating is usually a practical
categorized into parametric and Duverlie and Castelain (1999) and reliable method for determining
analytical techniques: mentioned that this model is costs. According to Niazi and Dai
useful only if used in combination (2006), this technique requires
i. Parametric: estimation based with other models. For instance, detailed information about labour,
on analytical function of a set of a parametric cost model can material, equipment, and overheads
parameters characteristic of the developed using a linear regression as well.
project. These are known to be based on cost data (Ahn et al., 2014;
top-down applications. Sonmez, 2008). Moreover, Hegazy 5.0 Significant
ii. Analytical: based on detailed and Ayed (1998) used the neural
analysis network technique to develop a
variable of cost
parametric cost estimation model factors
The studies about parametric for highway project. Even parametric
estimation were becoming an models have been developed using Several studies have been identified
interesting topic among researchers regression analysis and neural by extant literature of factors
during early stages. Basically, this networks techniques for pre-design influencing the cost estimation.
study has been done by using Cost cost estimation of urban railway A challenge to the estimator is to
Estimating Relationship (CER) (Sonmez & Ontepeli, 2009). On the produce a cost estimation that is
among the project characteristic other hand, Marzouk and Ahmed an accurate. The factors include
and applying an algorithm to (2011) presented a parametric expertise of consultants, quality of
determine an approximation of cost model to provide reliable cost information and flow requirements,
the total project cost (Kwak & estimating at the early stages of the project team’s experience of
Watson, 2005). Moreover, Gunduza pump station construction project the construction type, the tender
et al. (2011) advocated that utilizing case-based reasoning (CBR). period and market condition, extent
parametric estimation method of completion of pre-contract
is a unique technique which can Analytical technique is a process design, and the complexity of design
be used for both analytical and used by estimators to develop an and construction (Odusami and
predictive purposes by taking into approximation of a given project’s Onukwube, 2008), bidding situations,
consideration the effect of potential costs. In analytical estimating, the project characteristics, and
new items to estimate the overall project is carefully broken down experience on similar type of project,
reliability. into the various tasks necessary the estimating process (Shash and
to complete it, and then these Al-Khaldi, 1992), and the experience
Previous researchers have shown are estimated for time and cost of the estimators {AbouRizk, 2002
that many methods can be used expectations based on experience. #103;Lowe, 1994 #135}(Lowe
to fit the parametric functions. These component costs are then and Skitmore 1994; Al-Harbi and
Therefore, many cost estimation assembled into an estimate of the Johnston1994).

12
Influences Of Cost Variables On The Conceptual Cost Estimation Accuracy: Methods And Techniques

Vol.51 No.3 2016

In improving the effectiveness of requirements and procurement Table 2 provides a summary of all
managing the estimation process, methods, and (5) external factors such related study based on five
other researchers attempted to and market conditions. However, points: 1) what the type of building or
classify the large number of cost the above factors can be clustered data is collected, 2) the techniques
factors into categories of factors into two distinct group: (i) estimator- of the model in use, 3) the coverage
with similar attributes (Akintoye specific factors and (ii) design and of cost factors, 4) the finding to
& Fitzgerald, 2000; Y.-M. Cheng, project-specific factors (Akinci & the influence on cost estimation
2014; Elhag et al., 2005; Enshassi, Finchers, 1998; Elfaki et al., 2014). The accuracy and 5) the type of validation.
Mohamed, & Madi, 2005; Liu & estimator specific factor can be one It is very obvious that each type of
Zhu, 2007; Toh, Ting, Ali, & Aliagha, of the three parties; consultant, owner building has different cost factors
2012; Trost & Oberlender, 2003). and contractor which are mostly for consideration. However, the most
The cost factors are identified into based on the estimator’s experience common of cost factor used in the
five categories: (i) information of or background. And design and type of building is total floor area or
consultant and design parameter, project-specific factors can include building area.
(2) project’s characteristics, (3) project size, type of project, ground
client’s characteristics, (4) contract condition, and material costs.

Table 2: Comparison of related studies based on techniques of the model

Authors Type of building or Techniques Cost Factors Finding Validation


data of the mode

Lai et al. A questionnaire was AHP and • Project condition The project owner Applied to
(2008) filled out by five officers simulation • Environmental did not perform well proposed
responsible for reviewing condition in preparing the procedure of
building • Regulation condition proposal public project
• Planning condition
• Estimation condition The accuracy or %
error have not been
mentioned

Stoy et al. 70 Residential buildings Regression • Compactness of the The percentage er- Applied to pre-
(2008) building ror ranges between dict the cost of
• Number of elevator 12 % and 13% new properties
• Size of the project
• Proportion of openings
in external walls
• Region

Cheng, et al Data management and Neural Network • Site area % error of overall Using 23 training
(2009) Engineering work: • Floors underground estimates and total cases and 5
Temporary construction • Floors aboveground category estimates testing cases.
Geotechnical construction • Total floor area are 16% and 6.7%
Structural construction • Soil condition
Decorative construction • Area of exterior wall
Electromechanical infra-
structure

Ji, Park, and 102 apartment projects Regression • Gross floor area The accuracy Applied to 22
Lee (2010) • Number of unit floor improved by 2.84% cases
household from cost/GFA and
• Number of floor 8.24% from cost/
UFA

13
Peer
Peer Review
Review
The Malaysian Surveyor

Jin et al. 99 multi-family housings MRA based Site area The accuracy Comparison with
(2012) revised CBR Ground area improved by 4.39% CBR method
41businessfacilities Building Area for family housing
Numbers of floor and 17.23% for
Underground area business facilities
Ground area
Building area
Number of
underground flours
Landscape area

Ahn et al. 124 building with different AI: CBR and • Number of house- CBR using the weight Comparison
(2014) types of apartment house- Parametric holds of AI resulted in rela- with CBR and
holds based on gross area: • Gross floor area tively higher estimate Parametric
49 m2, 59 m2, 84 m2, and • Number of unit floor accuracy was 4.01%
114 m2 households and 4.34% for regres-
• Number of elevators sion coefficient
• Number of floors The AI method is
• Number of house- flexible as it can
holds of unit floor per reflect the ranges of
elevator attributes according
to the accumulated
database

6.0 Conclusion a need to develop a systematic


Analytical methodology for conceptual cost
estimating, so as to standardise
This paper reviewed the pertinent
literature on cost estimation technique is a and facilitate the estimating
process, making the approach
techniques and its application. The
techniques were classified into
process used more objective. In this way,
two main groups as qualitative and by estimators the accuracy of the estimate
produced can be more accurate
quantitative, which were further
subdivided into two categories to develop an and consistently developed.
The limitation of this review paper
each. The paper examined all the
categories, in detail, with reference
approximation of can be summarised in the data
to the published literature. Most of a given project’s was collected only from one type
of techniques or combined from
related studies used quantitative
technique with the finding of costs. two type of different techniques for
accurate improvement except for one related study. This paper still
quantitative technique with no opens a way for the future study as
mention on the accuracy. a comprehensive source for carrying
out further research in the area.
The significance of cost factors in construction data to be used for
the CCE at early stage was then the CCE. The variable that affects Acknowledgements
discussed with a focus on the related the cost factors depend on the
studies. According to the results of relationship and conditional The study was funded by The
the table 2, the approaches that have dependency among historical Ministry of Research, Technology
been deduced from this survey are data. and Higher Education of the Republic
as follow: iii. Conceptual cost estimating in of lndonesia. Acknowledgements
a building construction project are given to Universitas Bung Hatta,
i. There is a need of defining more is a difficult and generally a Indonesia and Universiti Malaya of
objectives and consistent criteria subjective process with no set Malaysia, for their support.
for the selection of historical standard of practice. There is

14
Influences Of Cost Variables On The Conceptual Cost Estimation Accuracy: Methods And Techniques

Vol.51 No.3 2016

References Cavalieri, S., Maccarrone, P., & Pinto,


R. (2004). Parametric vs. neural
based reasoning method. Advanced
Manufacturing Technology, 15, 859-
AbouRizk, S. M., Babey, G. M., & network models for the estimation 906.
Karumanasseri. (2002). Estimating the of production costs: a case study in
the automotive industry. International Elfaki, A. O., Alatawi, S., & Abushandi, E.
cost of capital project: an empirical
Journal of Production Economics, (2014). Using intelligents techniques in
study of accuracy levels for municipal
91(2), 165-177. construction project cost estimation:
goverment project. Canadian Journal
10-years survey. Advances in Civil
Civil Engineering, 29, 653-661. doi:
Cheng, Tsai, H.-C., & Hsieh, W.-S. Engineering, 2014, 11 pages. doi:
10.1139/L02-046
(2009). Web-based conceptual 10.1155/2014/107926
Ahn, J., Ji, S.-H., Park, M., Lee, H.- cost estimates for construction
projects using Evolutionary Fuzzy Elhag, T. M. S., Boussabaine, A. H.,
S., Kim, S., & Suh, S.-W. (2014).
Neural Inference Model. Automation & Ballal, T. M. A. (2005). Critical
The attribute impact concept:
in Construction, 18, 164–172. determinant of construction
Applications in case-based reasoning
doi:10.1016/j.autcon.2008.07.001 tendering cost: Quantity surveyors
and parametric cost estimation.
standpoint. International Journal of
Automation in Construction,
Cheng, Tsai, H.-C., & Sudjono, E. Project Management, 23, 538-545.
43, 195-203. doi: 10.1016/j.
(2010). Conceptual cost estimates doi:10.1016/j.ijproman.2005.04.002
autcon.2014.03.011
using evolutionary fuzzy hybrid
neural network for projects in Enshassi, A., Mohamed, S., & Madi,
Akinci, B., & Finchers, M. (1998). Factor
construction industry. Expert Systems I. (2005). Factors affecting accuracy
affecting contractors’s risk of cost
with Applications, 37, 4224-4231. of cost estimation of building
overburden. Journal of Management in
doi:10.1016/j.eswa.2009.11.080 contracts in the Gaza Strip. Journal
Engineering, 14(1), 67-76.
of Financial Management of Property
Akintoye, A. (2000). Analysis of Cheng, Y.-M. (2014). An Exploration and Construction, 10(2), 115-125. doi:
factors influencing project cost into cost-influencing factors on 10.1108/13664380580001069
estimating. Construction Management construction projects. International
Journal of Project Management, Fortune, C. (2006). Process
and Economics, 18, 77-89. doi:
32, 850-860. doi: 10.1016/j. standardisation and impact of
10.1080/014461900370979
ijproman.2013.10.003 professional judgement on formulation
Akintoye, A., & Fitzgerald, E. (2000). of building project budget price
A survey of current cost estimating Choi, S., Kim, G. H., Han, S. H., & advice. Construction Management
practices in the UK. Construction Kwak, Y. H. (2014). Conceptual Cost- and Economics, 24, 1091-1098. doi:
Management and Economics, 18(161- Prediction Model for Public Road 10.1080/01446190600851116
172). doi: 10.1080/014461900370799 Planning via Rough Set Theory and
Case-Based Reasoning. Journal Gunduza, M., Ugurb, L. O., & Ozturk, E.
Al-Harbi, K. M., et al. (1994). Building of Construction Engineering and (2011). Parametric cost estimation
construction detailed estimating and Management. doi: 10.1061/(ASCE) system for light rail transit and
management. Journal of Construction CO.1943-7862.0000743 metro trackworks. Expert Systems
Engineering and Management, 120(4): with Applications, 38, 2873-2877.
774-784. Curran, R., Raghunathan, S., & Price, doi:10.1016/j.eswa.2010.08.080
M. (2004). Review of aerospace
Ashworth, A. (1995). Cost studies engineering cost modelling: The Hegazy, T., & Ayed, A. (1998). Neural
of buildings (Second ed.). England: genetic causal approach. Progress in network model for parametric cost
Longman House, Burn Mill Harlow. Aerospace Sciences, 40(8), 487-534. estimation of highway projects.
doi:10.1016/j.paerosci.2004.10.001 Journal of Construction Engineering
Azman, M. A., Samad, Z., & Ismail, S. and Management, 124(3), 210-221.
(2012). The accuracy of preliminary Datta, P. P., & Roy, R. (2010). Cost
cost estimates in Public Works modelling techniques for availability Kwak, Y. H., & Watson, R. J. (2005).
Department (PWD) of Peninsular type service support contracts: A Conceptual estimating tool for
Malaysia. International Journal of literature review and empirical study. technology-driven projects:
Project Management, 31, 994-1005. CIRP Journal of Manufacturing exploring parametric estimating
doi: 10.1016/j.ijproman.2012.11.008 Science and Technology, 3(2), 142-157. technique. Technovation, 25,
doi:10.1016/j.cirpj.2010.07.003 1430-1436. doi:10.1016/j.
Bley, A. F. S. (1990). Improved technovation.2004.10.007
Conceptual Estimating Performance Duverlie, P., & Castelain, J. M. (1999).
Using A Knowledge-Based Approach. Cost estimation during design step: Lai, Y.-T., Wang, W.-C., & Wang, H.-H.
Texas, The University of Texas at parametric method versus case (2008). AHP- and simulation-based
Austin. Doctor of Philosophy.

15
Peer
Peer Review
Review
The Malaysian Surveyor

budget determination procedure for Cost Estimation Model for Conceptual Engineering Management, 134,
public building construction projects. Cost Estimation of Building 1011-1016. doi: 10.1061/ASCE0733-
Automation in Construction, 17, 623- Consruction Project. Texas: The 93642008134:121011
632. doi:10.1016/j.autcon.2007.10.007 University of Texas at Austin.
Sonmez, R. (2011). Range estimation
Langmaak, S., Wiseall, S., Bru, C., PMI Standard Committee, A Guide of construction costs using neural
Adkins, R., Scanlan, J., & Sóbester, A. To The Project Management Body networks with bootstrap prediction
(2013). An activity-based-parametric of Knowledge, Project Management intervals. Expert Systems with
hybrid cost model to estimate the unit Institute, Newtown Square, PA, 1996 Applications, 38(8), 9913-9917.
cost of a novel gas turbine component. doi:10.1016/j.eswa.2011.02.042
International Journal of Production Riquelme, P., & Serpell, A. (2013).
Economics, 142(1), 74-88. doi: Adding qualitative context factors to Sonmez, R., & Ontepeli, B. (2009).
10.1016/j.ijpe.2012.09.020 analogy estimating of construction Predesign cost estimation of urban
projects. Social and Behavioral railway projects with parametric
Liu, L., & Zhu, K. (2007). Improving cost Sciences, 74, 190-202. doi: 10.1016/j. modeling. Journal of Civil Engineering
estimates of construction projects sbspro.2013.03.037 and Management, 15(4), 405-409.
using phased cost factors. Journal
of Construction Engineering and Rush , C., & Roy , R. (2001a). Expert Stoy, & Schalcher, H.-R. (2007).
Management. doi: 10.1061/ASCE0733- judgement in cost estimating: Residential building projects:
93642007133:191 Modelling the reasoning process. building cost indicators and drivers.
Concurrent Engineering, 9(4), 271-284. Journal of Construction Engineering
Lowe, D. J., Emsley, M. W., & Anthony, doi: 10.1177/1063293X0100900404 and Management, 133(2), 139-
H. (2006). Predicting Construction 145. doi: 10.1061/ASCE0733-
Cost Using Multiple Regression Rush, C., & Roy, R. (2001b). Capturing 93642007133:2139
Techniques. Journal of Construction quantitative & qualitative knowledge
Engineering and Management, 132(7), for cost modelling within a concurent Stoy, C., Pollalis, S., & Schalcher, H.-R.
750-758. doi: 10.1061/ASCE0733- engineering (CE) enviroment. Paper (2008). Drivers for cost estimating in
93642006132:7750 presented at the 8th ISPE International early design: case study of residential
Conference on Concurent Engineering: construction. Journal of Construction
Lowe, D. J. and M. Skitmore (1994). Research and Applications, Anaheim, Engineering and Management, 134(1),
Experiential Learning in Cost California. 32-39. doi: 10.1061/ASCE0733-
Estimating. Construction Management 93642008134:132
and Economics, 12(5): 423-431. Shane, J. S., Molenaar, Anderson, S. R.,
& Schexnayder. (2009). Construction Tah, J. H. M., et al. (1994). A survey of
Marzouk, M. M., & Ahmed, R. M. (2011). project cost escalation factors. Journal inderect cost estimating in practice.
A case-based reasoning approach of Management in Engineering, 25(4), Construction Management and
for estimating the costs of pump 221-229. Economics, 12(1): 31-36.
station projects. Journal of Advanced
Research, 2, 289–295. doi:10.1016/j. Shash, A. A. and Al-Khaldi (1992). The Toh, T. C., Ting, C., Ali, K.-N., & Aliagha,
jare.2011.01.007 production of accurate construction G.-U. (2012). Critical cost factor
cost estimates in Saudi Arabia. Cost of building construction projects
Niazi, A., & Dai, J. S. (2006). Engineering, 38(8): 15-24. in Malaysia. Procedia - Social and
Product cost estimation:techniques Behavioral Sciences, 57, 360-367. doi:
classification and methodology review. Skitmore, M. (1991). Early stage 10.1016/j.sbspro.2012.09.1198
journal of Manufacturing Science construction price forecasting: a
and Engineering, 128, 563-575. doi: review of performance. RICS London. Trost, S. M., & Oberlender, G. D.
10.1115/1.2137750 (2003). Predicting Accuracy of
Sonmez, R. (2004). Conceptual Early Cost Estimates Using Factor
O’Corner, P. D. (1985). Practical cost estimation of building project Analysis and Multivariate Regression.
Reliability Engineering (Second ed.). with regression analysis and neural Journal Construction Engineering
New Jersey: John Wiley & Sons, Inc. network. Canadian Journal Civil Management, 129, 198-204.
Engineering, 31, 677-683. doi: 10.1139/ doi:10.1016/j.eswa.2005.01.006
Odusami, K. T. and H. N. Onukwube L04-029
(2008). Factors affecting the accuracy Wang, W. C., Shih, H., Tsui, Y. K., &
of pre tender cost estimate in Nigeria. Sonmez, R. (2008). Parametric Hsu, C. H. (2012). A factor-based
Cost Engineering, 50(9): 32-35. range estimating of building costs probabilistic cost model to support
using regression models and bid-price estimation. Expert Systems
Phaobunjong, K. (2002). Parametric bootstrap. Journal Construction with Applications, 39 5358–5366.
doi:10.1016/j.eswa.2011.11.049

16
Peer
Peer Review
Review
Zafirah Al Sadat Zyed, Hasniyati Hamzah and Nur Alifah Baharuddin

Department of Estate Management, Faculty of Built Environment,


Universiti Malaya, Kuala Lumpur
Email: zafirahzyed@um.edu.my

Housing Pathways
Among Gen Y In
Kuala Lumpur
This paper aims to reveal the current housing pathway for Kuala Lumpur’s Generation
Y (Gen Y). Gen Y creates a new paradigm in housing research. Being born during
the Information and Connection Technology (ICT) boom, this generation possesses
traits that are unprecedented in terms of their ICT savvy-ness, social connectedness
and sense of entitlement. Gen Y are estimated to represent almost 30% of Malaysian
demography. On the housing ladder, they can be the most mobile compared to other
generations. Recently, there have been concerns about the housing affordability levels
of ‘young starters’, i.e. Gen Y who are starting to establish themselves in the society.
Typical of an Asian economy, Malaysia currently practises a binary housing tenure
system comprising home ownership and private renting. Based on the assumed
preference for home ownership, the inability of Gen Y to purchase a house in Kuala
Lumpur has been a cause for concern. Based on a quantitative approach, this paper

17
Peer
Peer Review
Review
The Malaysian Surveyor

divides the young starters into four distinctive groups, junior-lower affordability
(JL), junior-higher affordability (JH), senior-lower affordability (SL) and senior-higher
affordability (SH) to examine the housing pathway within this gradation. Additionally,
this paper also aims to reveal the housing types and areas that are currently affordable
for the Gen Y respondents in Kuala Lumpur. The questionnaire survey showed renting
being the current predominant tenure across the gradation of respondents. High
rise residential units and areas outside KL were indicated as affordable for renting,
whereas affordability for purchase was found minimal. For policymakers, the findings
enable formulation of policy prescriptions that can facilitate young starters’ access to
adequate and affordable housing.

Keywords: Gen Y, young starters, housing pathway, housing tenure, housing affordability.

H
1.0 Introduction found to be severely unaffordable.
A study by Malaysian Rating
Thus, housing affordability not
only concerns people’s ability to
ousing affordability Corporation Berhad in 2013 reported purchase a house but also concerns
issues among Gen Y that the Price Income Ratio (PIR) the ability to pay rent. In contrast to
currently dominate for Kuala Lumpur and Malaysia home ownership, private renting has
a large part of the worsened from 6.1 to 7.3 and 3.9 received little attention from housing
Malaysian housing to 4.4 respectively within three researchers despite its appearance
discourse. The years (2009 to 2012) (Malaysian in the National Housing Policy and
seriousness of the situation has Rating Corporation Berhad, 2013). the 10th Malaysia Plan. Importantly,
led some parties to describe it as These figures are considered fall the institutional set up for private
a crisis (Hamzah & Adnan, 2014). under “Moderately Unaffordable” to renting is virtually non-existent in the
At the centre of the discussion is “Severely Unaffordable” based on the country. There is no specific law or
Gen Y, a segment recognised for work of Cox and Pavletich (2014). government institution that governs
its unique characteristics that may
Nonetheless, housing affordability
challenge conventional notions of
is often (mistakenly) conflated
housing consumers. Despite the
with non-ability to purchase a
lack of singular definition of Gen Y,
most authors categorise this group
house. This leads to an incomplete
examination of the housing situation
Housing
to refer to those born between 1980
and 2000. Access to affordable
that can result in erroneous policy affordability
prescriptions, for instance, providing
housing is especially important for
the ‘young starters’, those between
assistance for house purchase issues among
25 and 34 years of age who are at
deposit for recipients whose monthly
disposable incomes are insufficient Gen Y currently
the early stage of their adult lives
(Zairul et al., 2015). The so-called
to cover monthly housing costs.
It is important to recognise that
dominate a
housing crisis among Gen Y in most
major cities in Malaysia has been
Malaysia practices a binary housing large part of
tenure system i.e. home ownership
attributed to exponential house
and renting. In reality, housing the Malaysian
price increments that have not been
matched with income levels. Within
affordability concerns people’s
ability to access comfortable and
housing discourse
Malaysia, the levels of unaffordability
proper housing without undue
differ between and across states.
stress on their disposable income.
In Kuala Lumpur, housing has been

18
Housing Pathways Among Gen Y In Kuala Lumpur

Vol.51 No.3 2016

private renting. For instance, there resolving the issues. As illustrated


is no standard tenancy agreement in housing studies in other countries
compared to the statutory Housing (see for instance Atherwood, 2015),
agreement for the purchase of new Gen Y’s housing realities and their
house from developers. affordability is response to the current housing

Similar to other countries, other often (mistakenly) provision system should not be
assumed but instead, carefully
living options for Malaysian Gen Y
include living with parents or family
conflated with examined against their unique
characteristics.
and for students, living at university non-ability to
accommodation. However, the The study by Hamzah and Adnan
young starters normally are young purchase a house. (2014) has adequately summed the
people who have finished their basic definition of Gen Y in terms of their
tertiary education, already started birth years. After reviewing a number
working and are looking to establish of studies on Gen Y, they concluded
themselves in the society. Thus, To frame the query, the paper that the generally accepted range
between the age of 25 and 34, these will proceed with a discussion of of birth years of Gen Y is between
young starters would rent, live with important concepts such as Gen 1980 and 2000. In other words, this
their parents/family or own the Y definition and characteristics would put Gen Y as people who
houses they live in. It is generally and housing pathway before are currently between the ages of
assumed that the housing pathway providing the context of the paper. 16 to 36, which would constitute
for the young starters would begin This paper sets out to establish vast diversity in terms of their living
with either renting or living with their the housing pathway of Gen Y needs and experiences (Lachman,
parents or family and eventually respondents who are divided into 2010). However, this definition is
leading to home ownership. Based age and affordability groups to see too wide for this paper. In looking
on this assumed housing pathway if there would be progression into for a realistic definition of Gen Y
and preference, young people who the assumed ultimate tenure i.e. who would be faced with housing
have worked for a number of years home ownership within the group pathway issues, the current study
are deemed to have saved enough at the higher age and affordability adopts the sub-group called ‘young
for a house purchase deposit and level. Recommendations will be starters’ by Zairul et al. (2015). In
would have earned enough to pay made based on the results on how the 2015 study, the possibility of
for a mortgage. Thus, the failure of to best facilitate Gen Y’s access to a new housing provision system
young people to purchase a house comfortable and proper housing. for Malaysia’s Gen Y was mulled
after working for several years, specifically for working young adults
say five years, would be a cause of 2.0 Gen Y: Definition between 25 and 34 years of age.
alarm to the society. Underpinning The present study adopts the young
this worry is the assumption of and Characteristics starter as the sub-group of Gen Y to
housing unaffordability for the young be examined.
Age segmentation is increasingly
generation.
important in real estate studies Most of the authors describe Gen Y
This paper supports the notion in general. Gen Y is a segment as being tech-savvy and connected
of segmentation within a class of of the population that comprises (Archana & Heejin, 2008; Lachman,
housing consumer. In this paper, two young people who are the most 2010). Besides that, the social
factors influence the categorisation mobile in terms of their social and quotient of Gen Y has also been
of respondents i.e. income and economic standings. Comprising emphasised by researchers. Among
age. It is argued that the living more than a third of Malaysia’s others, Gen Y were said to possess
experiences of young people will demography (Hamzah & Adnan, high moral spirit, patriotic, willing
change alongside the progression 2014), an understanding of this to fight for freedom, sociable and
of age and the assumed parallel group and how they are unique from emphasise the value of home and
income increment. However, the the previous generations can help family (Eisner, 2005). Additionally,
more important contributions of this Malaysian housing researchers and Gen Y were described as social,
paper are in the identification of the policymakers in determining the educated, multi-cultural, high
affordable tenure type, house type housing issues of this particular age performance and civic-minded by
and area. segment and the best approach in Lachman (2010) and independent,

19
Peer
Peer Review
Review
The Malaysian Surveyor

confident, diverse, and collaborative and/or investment, the demand as the varying household forms
by Islam et al. (2011). On a negative will come not only from within the that individuals experience and the
side, Gen Y were labelled as having group but also from parents who housing routes that they take over
a sense of entitlement, pampered, were concerned with assuring a time. Clapham further submits that
high maintenance and outspoken financially secure future for their Gen housing pathway should not be
(Lachman, 2010) and also selfish Y children by acquiring investment looked as being linear and having a
(Islam et al., 2011). A study that vehicles for their children (Bujang stable trajectory pertaining to one’s
mapped their economic behaviour et al., 2015). The parents of Gen Y living accommodations and/or
highlighted the difference in Gen Y’s (baby boomers and Gen X) tend to neighbourhood quality.
financial commitments compared be affluent and have smaller families,
to the earlier generations found that thus being able to better provide their Young people’s housing experiences
the majority of Gen Y’s income went offsprings. are best explored by looking at the
into entertainment, travel and food pathway a young person receives
(McCrindle, 2003). 3.0 What is Housing through the housing system over a
period of time (Clapham et al., 2012).
In 2012, it was estimated that Pathway? According to Ford et al. (2002), there
about 28% of the total Malaysian are five distinct housing ‘pathways’,
Pathway refers to the trend or
population were between 20 each based on the degree of
trajectory that is experienced by
and 34 years of (Department of planning and control exercised by a
either part or the whole of the
Statistics, 2012). This number will young person, the extent and nature
population. There are discernible
make Gen Y a particularly powerful of any constraints, and the degree
pathways pertaining to education,
market segment in terms of their of family support available to them
employment and housing. According
potential income earnings and (Table 1). Furthermore, the capability
to Clapham (2002, p. 63), housing
their professional upward mobility. of young people to plan their entry
pathway is defined as “patterns of
Demographers, market analysts and into the independent life, the extent
interaction (practices) concerning
researchers already recognize that and nature of any constraints, and
housing and home, over time and
this group will take over market in family support level are mostly
space.” Apart from that, Clapham
the twenty-first century. In terms of influenced by the nature of young
(2005) refers housing pathways
house purchase for own occupation people’s experiences.

Table 1: Housing pathway types

Pathway Type Description

Chaotic pathways Marked by an absence of planning, the presence of substantial constraints and the absence of family
support. This pathway consists of a series of temporary and unstable moves, with homelessness a
common feature.

Unplanned pathways Marked by an absence of planning, the presence of substantial constraints, but some degree of family
support. Movement as part of this trajectory is often in response to poor conditions and/or harassment.
This pathway tends to be local in scope.

Constrained pathways Marked by clear planning, substantial constraint and significant family support. This is a pathway which
includes aspirations of owner-occupation and tends to be local or regional in geographical scope.

Planned (non-student) Marked by substantial planning, fewer and more manageable constraints and the presence of family
pathways support. The initial exit from the parental home is anticipated and planned and is typically related to
family formation and access to economic resources from employment. This pathway is generally local
or regional, but occasionally national, in scope.

Student pathways Marked by a high degree of planning, access to the niche student housing market and considerable
family support. This pathway plays out on a national and, increasingly, global level.

Source: Ford et al. (2002)

20
Housing Pathways Among Gen Y In Kuala Lumpur

Vol.51 No.3 2016

Regardless of the context, Gen


Y’s housing pathway is mainly
tied to their housing affordability
Housing affordability will shape the
level, besides being influenced by housing pathway of Gen Y in that
their intrinsic characteristics. The
housing pathway type outlined in high house prices will deter current
Table 1 encompasses basic living
arrangements such as renting, purchase and divert young starters into
living with parents/family and
owner occupation. Some living
cheaper alternatives. If the high costs
arrangement may be country- of purchase prevail in the future, current
specific due to cultural and
institutional influences; for instance, renters will most likely remain renters in
some young people in the US live in
mobile homes (Lachman, 2010). It is
the future whilst those currently residing
recognised that the choice of living with parents/family can either stay or
arrangement among Gen Y may be
due to other factors besides price, rent in the future.
rent and income. For instance, social
researchers make the connection to
living with parents with maintaining,
providing and seeking emotional
or physical support, breakdown Monk, 2011). Housing affordability is further outside the city centres. It
of romantic relationship, failure of often invoked in discussions of the is generally assumed that most
business venture, becoming a single ability of people to purchase their Gen Y could not afford to purchase
parent and ethnic preferences (Glick abodes, where high house prices within the city. However, there is a
& Lin, 1986). Finally, Hirayama and and low incomes are often cited as need to examine this generalisation
Ronald (2008) suggested that Gen Y indicators of housing unaffordability. as housing is segmented by type
need rental housing before entering Nonetheless, high rents have been and location; a house type that is
homeownership. In particular, the shown to have an impact on housing unaffordable to purchase in the
authors propounded public renting affordability, especially among lower CBD may still be affordable outside
for young people to supplement income households (Leopold et al., the CBD that is still within the city
private renting. 2015). Thus, the housing affordability boundary. Additionally, housing that
discourse should encompass both is unaffordable to purchase may still
4.0 Housing house purchase and renting. be affordable to rent. These are the
affordability among Housing affordability will shape the
queries that no past studies have
covered and what this paper will
Kuala Lumpur’s Gen Y housing pathway of Gen Y in that address.
high house prices will deter current
In general, housing is deemed purchase and divert young starters Table 2 shows that Kuala Lumpur
affordable when a household’s non- into cheaper alternatives. If the stands out as “severely unaffordable”
housing needs can still be financed high costs of purchase prevail in among other states in Malaysia,
after housing costs have been met the future, current renters will most with Median Price-Income Ratio
(Monk & Whitehead, 1999; Whitehead likely remain renters in the future (otherwise known as Median
& Monk, 2011). Most authors noted whilst those currently residing with Multiple) at 5.4. This can be
that families who pay more than 30 parents/family can either stay or compared to the country’s Median
percent of their income for housing rent in the future. At present, major Multiple of 4.4, which is classified as
are considered cost-burdened, cities in Malaysia are experiencing “seriously unaffordable” (KRI, 2015).
and may have difficulty to satisfy a lack of supply of affordable and
basic requirements such as food, well-located properties within In summary, the current local
clothing, transportation, and medical urban centres (Bujang et al., 2015). discourse on housing affordability
attention (see for instance Bujang This has led to the current trend basically concerns the ability to
et al., 2015; Ismail et al., 2015; Monk of house purchase in locations purchase a house rather than
& Whitehead, 2011; Whitehead & looking at the other mainstream

21
Peer
Peer Review
Review
The Malaysian Surveyor

Table 2: Comparison of housing affordability based on annual household


median income and median all-house price across states in Malaysia, 2014

Area Annual median Median All-House Median Multiple Affordability


income Price Affordability

Terengganu 45,324 250,000 5.5

K.Lumpur 91,440 274,320 5.4


5.1 & Over
P.Pinang 56,424 169,272 5.2 Severely unaffordable

Sabah 44,940 134,820 5.1

Pahang 40,668 200,000 4.9

Kelantan 32,592 157,740 4.8

MALAYSIA 55,020 242,000 4.4


4.1 to 5.0
Perak 41,412 180,000 4.3 Seriously unaffordable

Perlis 42,000 181,000 4.3

Johor 62,364 260,000 4.2

Selangor 74,568 300,000 4.0

N.Sembilan 49,536 188,888 3.8 3.1 to 4.0


Moderately unafford-
Sarawak 45,336 164,667 3.6 able
Kedah 41,412 140,000 3.4

Melaka 60,348 180,000 3.0 3.0 & Under


Affordable

Source: Adapted from KRI (2015)

housing tenure, i.e. private renting


(see for instance Bujang et al.,
5.0 Methodology a house at 25 years old. The non-
probability purposive sampling
2015; KRI, 2015; Zairul et al., 2015). A questionnaire survey was technique guided the selection of
By neglecting the second housing administered on 205 respondents respondents. The questionnaire
tenure, it can cause the examination who were identified based on their obtained the background of
into housing affordability among age group which is between 25 and respondents, respondents’ current
Gen Y in Kuala Lumpur to be 34 years old and currently working residence and respondents’ housing
incomplete. This study attempts to in Kuala Lumpur. This age range pathway patterns.
provide the missing pieces to the represents the ‘young starter’ group
housing affordability discussion i.e. Data from the questionnaire was
as used in the study by Zairul et
if Gen Y can afford to rent within analysed using Microsoft Excel
al. (2015). In this study, young
KL and if so, in what areas of KL. It software to generate descriptive
starters are deemed Gen Y who
also undertakes to show the likely statistics, mainly frequency analysis.
have started working and excluding
progression into owning as Gen Y Mean scores were also used to
students. Since the average age of
moves up the income and seniority examine data trends, especially with
graduation is 23, it can be assumed
ladder. Thus, this paper can reveal secondary data analysis.
that respondents would be ready to
the housing pathway for Gen Y in KL purchase or have already purchased

22
Housing Pathways Among Gen Y In Kuala Lumpur

Vol.51 No.3 2016

6.0 RESULTS AND junior young starter respondents

DISCUSSION
almost doubled the number of senior
young starters, i.e. 134 (65.4% of
At present, major
Profile of respondents
total respondents) and 71 (34.6%) cities in Malaysia
respectively. In terms of gender,
Table 3 summarises the profile of there was a slightly higher number are experiencing
respondents. For the purpose of this
study, the respondents were divided
female respondents at 119 (58%)
compared to 86 male respondents
a lack of supply
into junior young starters (25-29
years old) and senior young starters
(42%). Most respondents were of of affordable
Malay ethnicity (58.0%), followed by
(30-34 years old). The number of Chinese (22.9%) and Indian (13.7%). and well-located
properties
Table 3: Respondents’ details (n=205)

Variable Profile details f %


Eleven respondents (5.4%) indicated
Age 25-29 134 65.4 “Others” as their ethnicity. Most of
30-34 71 34.6 the respondents (86.5%) indicated
‘Married’ as their current marital
Gender Male 86 42.0 status, 11.5% were ‘Single’ and 2.0%
Female 119 58.0 were ‘Widowed’.

Ethnicity Malay 119 58.0 Almost two-thirds of the


Chinese 47 22.9 respondents (62.0%) had bachelor’s
Indian 28 13.7 degree tertiary education, 13.7%
Others 11 5.4 with master’s degree and 3.9%
with PhD. A significant portion
Marital status Single 120 58.5 (20.5%) indicated others, which
Married 85 41.5 comprises SPM, diploma and
Widow/ widower 0 0 professional qualifications. Under
Divorced 0 0 ‘Employment Sector’, more than
half of respondents were in the
Highest Education level Bachelor’s Degree 127 62.0 private sector (56.6%), whilst 25.4%
Master’s Degree 28 13.7 were in the government sector
PhD 8 3.9 and 18% were self-employed. The
Others 42 20.5 remainder of respondents falls under
‘Others’ including Non-Government
Employment sector Government 52 25.4 Organisation (NGO) and Government
Private 116 56.6 Listed Company (GLC). The majority
Self-employed 37 18.0 of respondents (44.4%) indicated
Others 42 20.5 receiving a monthly income of
between RM2,001 to RM4,000.
Gross Monthly Income Below RM2,000 54 26.3 Notably, almost similar respondent
RM2,001-RM4,000 91 44.4 portions indicated the lower income
RM4,001-RM6,000 43 21.0 level of below RM2,000 and a higher
RM6,001-RM8,000 14 6.8 bracket of RM6,001 to RM8,000, at
Above RM8,001 3 1.5 26.3% and 21.0% respectively. Only a
small percentage (1.5%) showed that
No. of Years of Working Less than 1 year 41 20.0 they were earning above RM8,001
Experience 1-5 years 95 46.3 per month. Most of the respondents
6-10 years 54 26.3 had worked between 1-5 years
More than 10 years 15 7.3 (46.3%). For the remainder, 26.3%
had worked for 6-10 years, whilst
Source: This study (2015)

23
Peer
Peer Review
Review
The Malaysian Surveyor

20.0% respondents only started Table 4: Respondents’ housing affordability level


working and had less than a year’s
working experience. Only 7.3% Age Category Gross Monthly Affordability Level
had more than 10 years’ working Income (a) (30% of a)
experience. Lower Higher
Table 4 shows the affordability levels
25-29 years Junior young RM2,001-RM4,000 RM600 RM900
of the young starters according
old starter
to category. The gross monthly
income data enabled the estimation 30-34 years Senior young RM4,001-RM6,000 RM1,200 RM1,800
of the affordability levels for each old starter
junior starter category by using the Source: This study (2015)
industry standard of 30% of gross
monthly income. For the junior young
starters, their mode income bracket
Table 5: Respondents’ current housing tenure
of RM2,001-RM4,000 would enable
the respondents to spend between
Age Current tenure type
RM600 to RM900 on housing costs.
On the other hand, the majority of
the senior young starter respondents 25-29 years old Renting (52.7%)
indicated a higher monthly income Living with parents/family (36.3%)
bracket of RM4,001 to RM6,000 that Homeownership (11%)
would translate into an affordable
housing expenditure of RM1,200 to 30-34 years old Renting (60%)
RM1,800. This affordability level will Living with parents/family (25.7%)
be used in the subsequent sections Homeownership (14.3%)
that will discuss the housing
Source: This study (2015)
pathway and affordable housing type
for respondents.

7.0 Housing pathway Looking at the results, the


8.0 Affordable housing
of the respondents respondents were not earning
for respondents
sufficient income that would enable
This paper is distinct from earlier them to purchase a house. However,
i. Affordability to purchase within KL
housing studies on Gen Y housing in when faced with a choice of either
Malaysia in that it offers an insight renting or staying with parents, This section provides an estimation
into their current housing tenure and, it was apparent that the majority of respondents’ affordability level.
ceteris paribus, their future housing of the Gen Y respondents valued The affordability level discussed
tenure. Table 5 shows the current their freedom and opted to rent. in the above Table 4 frames the
housing tenures as experienced by This is explained by their assertive examinations in this section. As
respondents. For both junior and and independent personality. In indicated in the introduction section,
senior young starters, it can be addition, senior young starters this paper considers housing
seen that the mode housing tenure showed a higher proportion of affordability in terms of both the
was renting. By juxtaposing the renters compared to junior young ability to purchase and also to rent.
housing tenures of both respondent starters. Simultaneously, less senior
categories, it can be surmised that young starters indicated living with Firstly, the actual mortgage amounts
the housing pathway through the parents/family compared to junior according to house types within
gradations were renting-renting. young starters. For more senior KL were estimated to establish the
To elucidate, it is foreseen that the respondents, it can be deduced that baseline income required for house
current junior young starter will their increased income enabled them purchase. The average house prices
continue to rent their homes even to leave their parents’ home to either in KL according to type were obtained
after several years in employment purchase a house or live with friends. from JPPH House Price Index
and become senior young starters. 2015 for this purpose. The monthly

24
Housing Pathways Among Gen Y In Kuala Lumpur

Vol.51 No.3 2016

mortgage estimation was done using young starter, Higher affordability). analysed to estimate the house
online loan calculator. At present, From all the housing types within prices that they could afford to
most commercial banks currently KL, it can be seen that only high-rise purchase. This simulation used the
offer housing loan finance at 4.45% types were within the affordability reverse of the above method, with
to 4.65% per annum (flexi rate), 90% level of part of the respondents, the similar assumptions of 90% finance
margin of finance and a maximum remainder types far beyond the reach margin, 5% interest rate and 35-
term of 35 years. The estimation of of all respondent categories. With year loan term. Through trial and
the monthly mortgage payment was the ability to pay up to RM1,800 for error, potential prices were keyed in
based on a conservative interest rate mortgage, senior young starters could to yield in monthly mortgages that
of 5% to take into account outgoings, just afford the RM1,753 estimated for were closest to the pre-determined
at 90% margin and a maximum term high-rise residential property. Landed affordability levels. Deceptively
of 35 years. Table 6 presents results houses were far beyond respondents’ simple, this method closely mimics
of the exercise ability to purchase, with the exception how commercial banks determine
of some terraced houses located in loan viability and thus is a reliable
As revealed in Table 4, the KL North and KL South for double- indicator of the target house price
affordable housing expenditure income Gen Y households. for the respondents in this study.
of the respondents ranged from Results of the simulation are
RM600 (Junior young starter, Lower The affordability to purchase summarised in Table 7.
affordability) to RM1,800 (Senior among respondents was further

Table 6: Average house prices in Kuala Lumpur according to house type as at Q4 2015

House Types House Price Estimated monthly Gross income


mortgage payment required to purchase*

Terraced house KL Centrala RM991,564 RM4,503 RM15,000


KL Northb RM514,735 RM2,338 RM8,000
KL Southc RM518,363 RM2,354 RM8,000

Semi-detached RM2,002,440 RM9,095 RM30,000


house

Detached RM3,722,614 RM16,909 RM66,000

High-rise RM385,967 RM1,753 RM6,000

Note: Source: JPPH (2015a)


1. a - Section 1 - 100, Mukim Kuala Lumpur & Mukim Ampang
b - Mukim Batu, Mukim Setapak, & Mukim Ulu Klang
c - Mukim Petaling & Mukim Cheras
2. *Rounded to the nearest RM1,000

Table 7: Simulated affordable house prices

Category Lower Higher Affordable Affordable


affordability level (a) affordability level (b) house price for (a) house price for (b)

Junior young starter RM600 RM900 RM132,000 RM198,000

Senior young starter RM1,200 RM1,800 RM264,000 RM396,000

Note:
The simulated prices were rounded to the nearest RM1,000

25
Peer
Peer Review
Review
The Malaysian Surveyor

Table 8: Average monthly house rentals in KL according to house type as at H1 201

House Type Area


KL Central a
KL North b
KL Southc

Single storey terraced RM1,850 RM1,350 RM1,600


Double storey terraced RM2,700 RM1,550 RM1,000
Single storey semi-detached N/A RM2,000 N/A
Double storey semi-detached N/A RM4,800 N/A
Townhouse RM2,400 N/A N/A
Low-cost flat RM550 RM600 RM600
Apartment RM1,400 RM1,300 RM1,000
Condominium (conventional) RM2,450 RM2,300 RM1,550
Notes:
1. a - Section 1 - 100, Mukim Kuala Lumpur & Mukim Ampang
b - Mukim Batu, Mukim Setapak, & Mukim Ulu Klang
c - Mukim Petaling & Mukim Cheras
2. Figures were computed by averaging JPPH’s list of rents according to type and mukim. Final figures were rounded up to the nearest RM50 rather than
RM10 or RM100. Outliers were removed to prevent distortion to the final figure e.g. for double storey terraced in Mukim Kuala Lumpur, Taman Midah
recorded RM1,000 whilst the remainder recorded RM2,500 to RM2,800. Taman Midah was considered an outlier and was removed from the computation.

The affordable prices for JPPH’s categorisation in the annual Townhouse rental was around
respondents ranged from House Price Index report. The data RM2,400 per month. Low-cost flats
RM132,000 to RM396,000. This for strata housing rental were far could be rented from RM550 to
would suggest that it is highly likely more numerous than those of landed RM600 per month, which was the
for the current Gen Y to only be able housing; for instance, condominium least expensive type of housing
to purchase high-rise residential rental data involved 107 schemes to rent. In contrast, the monthly
units within KL. Bearing in mind compared to terraced housing rental for apartments ranged
the current high-rise housing rentals from 16 schemes. from RM1,000 to RM1,400 and
management system, this would conventional condominium from
mean that extra housing expenditure The examination of affordable RM1,550 to RM2,450. The analysis
would be incurred in terms of rental was carried out in two stages. of the affordable rental housing
monthly maintenance charges. Firstly, rental figures according to summarised in Figure 1 yields
house type and location in KL were interesting results. Generally, it was
ii. Affordability to rent within KL determined from JPPH’s First Half observed that low-cost flats in all KL
Property Market Report 2015 as the areas were the most affordable for
The rental affordability examination baseline (Table 8). Selected names of all respondents to rent. Other than
is more detailed than the above the housing schemes that were used low-cost flats, it is found that only
discussion on affordability to in Table 8 are provided in Appendix two other respondent categories
purchase. This is due to the A. Next, the results were compared could afford to rent within KL. Firstly,
confirmed housing pathway of the against the affordability levels of Senior young starters with high
respondents i.e. renting-renting. respondents to reveal the type and affordability level (RM1,800) are
The aim of this examination is to location of houses that they could found to be able to afford renting
identify the type of house together afford to rent in KL. The second terraced houses in KL North and
with the area of KL that respondents stage involved the construction of a KL South and apartment units in all
could afford to rent. The areas are matrix (Figure 1). KL areas. Secondly, Senior young
divided into KL Central (Section
starters with low affordability lavel
1 - 100, Mukim Kuala Lumpur & As shown in Table 8, the average
(RM1,200) were shown to be able to
Mukim Ampang), KL North (Mukim monthly rental for terraced houses
afford apartment units in KL South.
Batu, Mukim Setapak, & Mukim in KL ranged from RM1,000 to
In contrast, Junior young starters
Ulu Klang) and KL South (Mukim RM1,850, whilst the rental for
(RM600 to RM900) could not afford
Petaling & Mukim Cheras). The semi-detached ranged from
all other types of housing besides
category of KL area was based on RM2,000 to RM4,800 per month.
low-cost flats.

26
Housing Pathways Among Gen Y In Kuala Lumpur

Vol.51 No.3 2016

Figure 1: Analysis of respondent type against affordable rental housing by type and location

Area KL Central KL North KL South

JL JH SL SH JL JH SL SH JL JH SL SH

Single storey terraced √ √


Double storey terraced √ √
Single storey semi-detached
Double storey semi-detached
Townhouse
Low-cost flat √ √ √ √ √ √ √ √ √ √ √ √
Apartment √ √ √ √
Condominium (conventional) √

Notes:
JL- Junior young starter with Lower affordability (RM600/mth)
JH- Junior young starter with Higher affordability (RM900/mth)
SL- Senior young starter with Lower affordability (RM1,200/mth)
SH-Senior young starter with Higher affordability (RM1,800/mth)

9.0 Affordable housing KL Central was the most


unaffordable area as discerned from
afford to rent in KL North and KL
for respondents the above results. In contrast, KL
South in housing schemes such as
Taman Tan Yew Lai, Bandar Baru
South was the most affordable area
The above analysis of housing Sri Petaling, Taman Bukit Maluri and
for renting among the respondents,
affordability among Gen Y Taman Segambut that are quite a
followed by KL North. Looking
respondents in KL showed that distance from the CBD. Conversely,
at the locations, the results were
after graduation, most of the the high-rise residential type was
almost predictable. Compared to
respondents were renting. Although more affordable for respondents
the two areas, KL Central is a prime
this was expected among junior due to its higher supply in the city
location that is situated close to
young starters, the trend of renting which translates into lower rental
places of employment and other
continued even after several and prices for apartments and
economic activities. Based on the
years in employment as indicated selected condominiums. Senior
Ricardian rent theory, the higher the
among senior young starters. This young starters were found to even
economic benefits offered by a site
gave rise to the renting-renting afford to purchase and rent selected
can lead to higher rent attainable.
pathway among respondents. The high-rise units at prime locations
Residences in the CBD, Bangsar,
subsequent income-price analysis such as Ixora Apartment at Jalan
Segambut and Sentul are located
provided a compelling explanation to Tun Razak. Nonetheless, high rise
at the heart of the bustling KL City
this result: at present, house prices units incur maintenance charges
that is characterised by high housing
in KL were simply too high for the that owners must bear and include
demand and exorbitant land prices. It
Gen Y respondents whereas renting as housing costs. This amount
is therefore natural that KL Central is
provided a cheaper alternative to may be substantial. As for those
characterised by high-rise residential
access housing. This observation renting in KL South and KL North,
unit types which caters to high to
was opposite the generational the commute to work in the city
high-middle income households.
traits of independence and being centre will incur travel costs, both
pampered by indulgent and affluent It is observed that landed housing in monetary and non-monetary
parents, implying that houses are types are predominantly out of reach terms. In other words, besides
currently too expensive to purchase for the respondents to purchase paying for fuel and toll, commuters
and most will remain out of reach and rent, except for some terraced have to spend more time on the
to Gen Y who have climbed up the houses for those earning close to road and endure social, health
employment and income ladder. the RM6,000 range. Even so, the and psychological effects of long
senior young starters can only commutes and congestion.

27
Peer
Peer Review
Review
The Malaysian Surveyor

10. Conclusion and institutional support. For instance,


there is no landlord and tenant law to
Clapham, D. (2005). David Clapham,
recommendations govern landlord-tenant relations. As
The Meaning of Housing: A
Pathways Approach. Bristol: The
such, there is no standard tenancy
In Malaysia, housing affordability is Policy Press.
agreement and no proper recourse
often associated with the ability to for tenancy conflicts aside from the Clapham, D., Mackie, P., Orford, S.,
enter into home ownership through normal contracts law. Implementing Buckley, K., & Thomas, I. (2012).
mortgage. With the current scenario a residential landlord and tenant Housing options and solutions
of high house prices unmatched law would help in promoting tenure for young people in 2020: Joseph
with income, credit crunch and security and transaction certainty for Rowntree Foundation.
increased economic uncertainties, private renting. Secondly, Gen Y in KL
house purchase has become would benefit from the introduction Cox, W., & Pavletich, H. (2014). 10th
increasingly unattainable for Gen of alternative housing tenures Annual Demographia International
Y in KL. The first reaction would besides private renting. Undoubtedly, Housing Affordability Survey: 2014
be to announce a severe housing the main criticism of renting is Ratings for Metropolitan Markets.
unaffordability among young starters the lack of equity attached to the
in KL. However, this paper corrects rental payment. Alternative tenures, Department of Statistics. (2012).
that perception by suggesting that otherwise known as intermediate Social Statistics Bulletin.
housing affordability concerns tenures, offer part benefits of home
access to comfortable and proper Eisner, S. P. (2005). Managing
ownership. The discussion on an
housing, which means that the Generation Y. IEEE, 39(2), 6-18.
intermediate tenure for Malaysia was
inquiry must also include the ability previously provided in (Hamzah & Ford, J., Rugg, J., & Burrows,
to rent. Daud, 2014). For Gen Y, intermediate R. (2002). Conceptualising the
tenures would be a more acceptable contemporary role of housing in the
Results showed better affordability
alternative to renting, as found in transition to adult life in England.
for house rent within KL among Gen
one of the author’s previous studies Urban Studies, 39(13), 2455-2467.
Y respondents. However, the type
(Hamzah & Adnan, 2014).
and location of affordable housing
Glick, P. C., & Lin, S. L. (1986). More
were far from satisfactory. The
ability to rent mainly high-rise and References young adults are living with their
parents: Who are they? Journal of
mainly in areas far from centres of
Archana, K., & Heejin, L. (2008). Marriage and the Family, 107-112.,
employment would imply higher
Age differences in mobile service 48(1), 107-112.
housing and travel costs, which
perceptions: Comparison of
will eventually corrode housing Hamzah, H., & Adnan, N. (2014).
Generation Y and Baby Boomers.
affordability. It gave rise to the Provisional Attitude of Malaysia Gen
Journal of Services Marketing, 22(7),
question about the quality of life for Y s Towards Alternative Housing
568-577.
the young people who must contend Tenure. International Surveying
with living outside KL for a decent Atherwood, S. (2015). An ecological Research Journal, 4(2), 23-36.
home and somehow cope with the exploration of Generation Y:
strains and demands of commute Residence location choice in the San Hamzah, H., & Daud, M. N. (2014).
and congestion. Francisco Bay Area. Appl. Spatial Towards an Alternative Housing
Analysis, 8, 325–349. Tenure for Malaysia. The Malaysian
In 2014, the government introduced Surveyor, 49(3), 6-14.
public rental scheme for young Bujang, A. A., Anthony Jiram, W.
people via the 1Malaysia Transit R., Abu Zarin, H., & Md. Anuar, F. Hirayama, Y., & Ronald, R. (2008).
Housing in Bukit Jalil. However, H. (2015). Measuring the Gen Y Baby-boomers, baby-busters and
public resources are limited, and Housing Affordability Problem. the lost generation: generational
direct provision of housing by the International Journal of Trade, fractures in Japan’s homeowner
government has been shown to be Economics and Finance, 6(1), 22-26. society. Urban Policy and Research,
costly and inefficient. Thus, more 26(3), 325-342.
pragmatic solutions are required to Clapham, D. (2002). Housing
alleviate the housing affordability Pathways: A Post Modern Analytical Islam, M., Cheong, T. W., Yusuf, D.
problem. Firstly, the existing private Framework. Housing, Theory and H. M., & Desa, H. (2011). A study
renting currently lacks structure and Society, 19(2), 57-68. on ‘Generation Y’ behaviours at

28
Housing Pathways Among Gen Y In Kuala Lumpur

Vol.51 No.3 2016

workplace in Penang. Journal of Lachman, M. L. (2010). Generation Y: United Kingdom: Some implications
Applied Sciences Research, 7(11). America’s New Housing Wave. Urban for housing. Land Economics, 75(1),
Land Institute. 74-93.
Ismail, A., Bujang, A. A., Anthony
Jiram, W. R., Abu Zarin, H., & Jaafar, Leopold, J., Getsinger, L., Blumenthal, Whitehead, C., & Monk, S. (2011).
M. N. (2015). Housing financing P., Abazajian, K., & Jordan, R. (2015). Affordable home ownership after the
facility and affordability level The Housing Affordability Gap for crisis: England as a demonstration
of Bumiputera within Iskandar Extremely Low-Income Renters in project. International Journal of
Malaysia. Journal of Economics, 2013: Urban Institute. Housing Markets and Analysis, 4(4),
Business and Management, 3(9), 326-340.
870-874. Malaysian Rating Corporation
Berhad. (2013). The 2012 Bank Zairul, M. N., Wamelink, J. W. F.,
JPPH. (2015a). The Malaysian House Negara Malaysia Annual Report. Gruis, V., & John, L. H. (2015).
Price Index. Putrajaya: Valuation New industrialised housing model
and Property Services Department McCrindle, M. (2003). The Generation
for young starters in Malaysia:
(JPPH). Map The ABC of XYZ. Australia.
Identifying problems for the
Monk, S., & Whitehead, C. (Eds.). formulation of a new business
JPPH. (2015b). Property Market
(2011). Making housing more model for the housing industry.
Report First Half 2015. Putrajaya:
affordable: The role of intermediate Paper presented at the Asia Pacific
Valuation and Property Services
tenures. UK: Wiley-Blackwell. Network for Housing Research
Department.
(APNHR) 2015, Gwangju, South
KRI. (2015). Making Housing Monk, S., & Whitehead, C. M. E. Korea.
Affordable. Kuala Lumpur: Khazanah (1999). Evaluating the economic
Research Institute (KRI). impact of planning controls in the

Appendix A: Selected housing schemes according to KL area

Area

House type KL Central KL North KL South

Single storey terraced Taman Tun Dr Ismail Taman Bukit Maluri Taman Tan Yew Lai
Bangsar Park, Bangsar Kepong Baru Happy Garden
Taman Bukit Desa Taman Sri Segambut Bandar Baru Sri Petaling

Double storey terraced Desa Sri Hartamas Bandar Menjalara Bandar Baru Sri Petaling
Bangsar Baru Taman Megah Kepong

Single storey semi-detached N/A Taman Wahyu N/A

Double storey semi-detached N/A Amelia Desa Park City N/A

Townhouse Desa Sri Hartamas N/A N/A


Taman Sri Hartamas

Low-cost flat Teratak Muhibah Li Garden Desa Sri Puteri


Mutiara Fadason Seri Sentosa

Apartment Apartment Putra Ria Taman Sri Kuching Avenue Court


Impian Kota Casa Idaman De Tropicana Condo
Ixora Apartment Greenview Apartment Kinrara Mas Apartment
Mawar Apartment Pangsapuri Bukit Segambut Manda’rina Court Apartment
Menara Putra Pangapuri Kiara 3 Sri Sentosa Apartment
Pengsapuri Melur Royal Regeant
Prisma Perdana Apartment Ros Villa Condo
Sri Putramas I & II
Sri Intan 2

Condominium Angkasa Impian 2 Anngun Puri Condominium Bukit OUG Condominium


Bangsar Height Angkupuri Condominium Petaling Indah Condominium
City Garden Condominium Antah Tower Condo Desa Gembira Condominium
Arata Bukit Tunku Casa Idaman Puncak Bayan Condominium
Golden City Condo Casa Prima Condo Sri Desa Condo
Menara Megah Changkat View Condominium Taman Sri Indah
Palm Court Fortune Avenue Condominium
River City Condominium

Source: Property Market Report First Half Q2015 (JPPH, 2015b)


29
Interview
The Malaysian Surveyor

Sr Ringo Chan Pak Kuan


RISM Lifetime Achievement Award for year 2016
Interview conducted by Sr Juwita Radzi

It is our great honor to have Sr Ringo Chan Pak Kuan – the recipient of the RISM
Lifetime Achievement Award for year 2016 to be featured in this issue. Sr Ringo is
not a stranger to us all, for he has been with RISM in every step of the way from year
1983 until present. Born in Kuala Lumpur in 1957, Sr Ringo experienced an inspiring
professional growth with RISM and this institution has witnessed him evolving from
the once mere Graduate Member to the now respectful Fellow. Sr Ringo possesses
multiple professional accreditations under his belt besides Fellow of RISM – he is
also a registered quantity surveyor with the Board of Quantity Surveyors Malaysia
(BQSM), a Member of Royal Institute of Chartered Surveyors (RICS) and a Member of
the Malaysian Institute of Arbitrators. He is the founder of a QS consultancy firm, CPK
Associates and has been the Principal since 1999. He currently holds the Secretary of
the Education and Accreditation Board post since 2001 and was previously a member
of BQSM Education and Accreditation Committee. These positions leads him to work
closely with Institutions of Higher Learning in the development and sustainability of the
QS profession in this country. Graduated with a Diploma in Quantity Surveying from
Cauldon College of Further Education, United Kindom in 1983, Sr Ringo possesses
an outstandingly vast working experience spanning over 32 years covering all various
areas of construction industry. He joined Measat Broadcast Network Systems Sdn.
Bhd. (Astro) in 1992 and was actively involved with the Group projects which included
Maxis TOC and Towers. He played a major role in the construction of Malaysia’s first
satellite television station, Astro in Bukit Jalil and Astro 2 satellite stations in Cyberjaya.
Sr Ringo also gives back to the community by providing free quantity surveying and
project management services such as in remote Sabah and Sarawak. He visits
orphanage and old folk’s homes regularly to raise donations and also organized visits
to orphanage in Cambodia, donating food and other kinds. Due to his contribution to
the nation and profession in general, and RISM in particular, the General Council at
its meeting in 22 April 2016 has unanimously decided to confer the RISM Lifetime
Achievement Award to Sr Ringo Chan Pak Kuan. We took this opportunity to ask Sr
Ringo about his process, his success and his experience as a Quantity Surveyor.

30
Vol.51 No.3 2016

Q&A
Q. What does receiving the Lifetime
Achievement Awards from RISM
mean to you?
I am greatly honoured to receive the Award and am
most grateful to RISM for it. To be frank, I set very
high goals for myself in everything I do (Librans are
perfectionist by nature). I must say, the Award gave
me a great sense of self recognition and satisfaction
in everything I have being undertaking. I may be
in my retiring age now but the Award definitely will
inspire me to keep going and carry on with whatever I
am doing now. I am confident that I have many more
years in me to contribute to RISM and the industry.

Q. How has RISM helped and / or


impacted your work and professional
career?
I joined RISM in 1983 as a Graduate member and
have never looked back since. I used to attend
many of the CPD trainings and seminars organized
by RISM. Back then, these CPD activities were my
mentors. Everyone else was so busy with their works
and they really never have the time nor patience to
I regret to observe attend to you. Not when they are handling like 10 or
more projects at any one time! It was in RISM where
that education has I got to know many of our pioneer surveyors who
become merely a were so willing to share their experiences with us.
Trust me, some of their stories are eyes openers and
commercial commodity definitely widened my horizon about the surveying
profession. Seriously if you think about it, where
nowadays. Higher else but in RISM, can you meet surveyors from every
learning institutions aspect of the industry and network with them.

are only interested to


profit from the students. Q. Do you have any regrets in how you
navigated your professional career
as QS?
No proper training or Regrets, no I don’t think so. However, sometimes I
guidance given resulting do wonder why QS seemed to do all the works in a
construction project, but paid the least! At the same
to poor quality graduates time we are always given the near impossible task
to complete the Tender Documentation within the
entering the industry. shortest time.

31
Interview
The Malaysian Surveyor

Q. What was the harshest critique you have


ever received in your professional career
as QS?
Q. In your opinion, what is/are the most
pressing issues in our field today? Why?
Lack of quality graduates. I regret to observe that
I remember there were few incidents when I was education has become merely a commercial commodity
questioned by the Clients or other consultants. One nowadays. Higher learning institutions are only
such incident was when the Engineer challenged my interested to profit from the students. No proper training
costing on the roof which indicated an over design on his or guidance given resulting to poor quality graduates
part. I stood firm on it and a check with a roof specialist entering the industry.

Q.
concurred with my costing. The harshest critique was
when the Client’s General Manager (who was also a QS) What advice or words of encouragement
walked in to a meeting and threw the monthly report would you give to all surveyors out
prepared by me onto the table and shouted at me calling there?
my report utter rubbish. It almost made me fall off my
chair (I was after all just a young QS graduate). I took the I know things don’t look good out there now and I would
report, flipped through the pages, stared him in the eyes urge all surveyors to maintain their professionalism
and calmly asked him which part of it was rubbish. You at all times. We need to stay focus in maintaining our
know what his answer was, “I don’t know!” ethics and integrity in the industry. I also urge all RISM
members to come forth to contribute to the Institution.

Q. What do you consider as the biggest To all surveyors who are not members of RISM, please
register yourself with RISM. This is your Institution!
success in your life?
I would not consider this the biggest success in my life
but definitely the most satisfying achievement in my
career. It was in 1995 when I was working alongside
Q. Is there anything else you would like to
share with our readers?
4 project managers in the completion of a project Life is like a book. You have being given the beginning.
worth over RM 200.0M in 12 months. That was some The body is your memories and experience. The ending
achievement considering the fact that there were is entirely your choice. Remember to live your life!
shortages in most major building materials at that time.
Today, I have yet to achieve time and financial freedom.
Most if not all of us make decisions based on either time
or money constraints or both throughout our lives. The
day I can make a decision without the need to consider
time and financial constraints will be the biggest success
in my life.

Q. If you were not QS, what career would


you have chosen?
Life is like a book.
I believe I would be a lawyer. I am sure I will make a very
good lawyer but because of my character, definitely not a You have being given
successful one.
the beginning. The body
Q. What advice would you give to your
18-year-old self?
is your memories and
experience. The ending
Respect your parents and learn to understand them.
One day, you will be them yourself. Plan and enjoy your is entirely your choice.
journey to adulthood. A strong foundation will help build
a very tall you. Remember to live
your life!

32
MANAGING STRESS
W. M. A. Wan Hussin

Universiti Sains Malaysia

Saying Good Things


To Depressed Friends
The first few months of 2016 in Malaysia was hotter than before, and the weatherman
associated it with the equinox, when the sun was shining directly over the equator, and
the heat wave was caused by the El Nino phenomenon. The heat might worsen if we
start to say something bad to someone who is depressed.

We may know someone closed to us who are depressed, but we may not be sure as to
what to say to help him. But alleviating his anxieties is a good start, for example, saying
something that come from a place of compassion and acceptance.

How about starting with some of these helpful and kind words?

33
Saying Good Things To Depressed Friends
MANAGING STRESS
The Malaysian Surveyor

S
Offer help caring attributes may come in many
forms depending on who the person
story allows him to relieve the
pressure he is facing. It is even more
tress and depression is, and how close are you with him. prominent if the “talk with” session
place a great weight on The attributes of caring for wife or materialise as it involves a two-way
the person, so there are daughter can be a hug or a gentle communication that may be enough
probably many things touch which speak volumes about to lessen his pain and corrects his
you can do to ease the what you are feeling. A sitting down brain chemistry rather than the ”talk
load he may recover. session with an office mate to offer to” session as this may mean a one-
However, he may be reluctant to help, either through words of advice way communication that lacks the
accept the offer for fear of becoming or offering solutions can give a big respond to his expression.
a burden. It is the honest effort to impact.
A person who is depressed may
offer assistance that can alleviate
To care means to realise the feel weak or something is not right
the stress he may be facing. Offering
experience he is now facing without with him. It may be the character
help may come in many forms
trivialising the case. Try to be sincere flaw that causes the biochemical
but knowing the problems he may
if you don’t understand the real imbalance in the brain. It doesn’t
be facing can lead to better and
situation he is going through but it mean that he is weak, but it means
effective offers to help. How about
matters when you care about him that he needs a great deal of
saying, “Is there anything I can do to
and want to try. It’s the care that strength to fight back, and stronger
help you?”
matters. than he used to be, to be fully
recovered. The most important thing
Care and Lend your ears is allowing him to vent the frustration
understanding rather than allowing them to build up
Sometimes the most effective inside.
The two simple words, “I care”, can solution you can do for a
mean so much to a person who may depressed friend is to simply listen I’m here for you
be feeling like the entire world is sympathetically while he talks
against him. Though it may not be about what is bothering him. The Depression can be a very lonely
easy to get the message across, the chance to express his part of the experience. He may feel as if no one
understands what he is feeling or
even cares to understand. When you
reach out to him and let him know
that you are going to be there for
him, every step of the way counts
as it can be very reassuring. It is
the common feeling among those
who are depressed and under stress
A person who is depressed may feel that makes it even worse when

weak or something is not right with him. the thought that nobody matters.
Try to be sincere that everything
It may be the character flaw that causes does matters. To stay calm and
the biochemical imbalance in the brain. continue to do what you can to love
and support him in whatever way
It doesn’t mean that he is weak, but it he will allow will in a matter of time
means that he needs a great deal of appreciate the assistance you offer
to him.
strength to fight back, and stronger than
To care and to support someone
he used to be, to be fully recovered. who is depressed is one of those
positive affects that refers to one’s
propensity to experience positive
emotions and interact with others
who are closed to them.

34
Vol.51 No.3 2016

It’s fated and there is whole situation towards managing


stress. Saying bad words to others
room for improvement can be threatening and pervasive,
Stress is always and the situation can be much more
To accept fate is the true belief
in God. It’s all fated, so there’s treatable, but stressful and scary.

always a lesson learnt but work ignoring stress The important thing is to reach out
out the improvement. It is an act of
reassuring him that it’s not the end and its long-term to him and let him know that he
matters to you.
of the world but there is hope to effect can be W.M.A. Wan Hussin is a Professor at the School
return to normal. Accepting what had
happened as a fate will reduce the
real damaging. of Civil Engineering, Universiti Sains Malaysia. He
conducts several courses and training programmes
act of pointing fingers to others for Medication and on stress management and delivers public lectures
and talks on management issues for various
what had happened.
therapy are crucial organizations. He is currently a Licensed Land
Surveyor, Malaysian Speaking Professional of the
It is the acceptance of fate that he to the recovery Malaysian Association of Professional Speakers,
a Fellow of the Royal Institution of Surveyors
may believe that there is always a Malaysia and can be reached at
better hope and the good chance wmabwh@gmail.com.

of returning back to normal again.


It may also mean setting a lower
standard then before, and accepting
it when they are not met. Accepting
it as a fate means the drive to
work harder for a better output
as believing that getting a better
outcome is also a fate.

Let’s talk to the doctor


Getting treatment from the doctor is
always important. It is real effective
to seek help as there is nothing
wrong in getting assistance from the
doctor. Stress is always treatable,
but ignoring stress and its long-
term effect can be real damaging.
Medication and therapy are crucial to
the recovery.

So, learn to say good things to relieve


stress of someone depressed

It works as saying good things


to someone who is depressed
can change the way his views on
the stressors around him. The
experience of managing stress is
actually an interaction between the
circumstances around us by saying
good things. Changing the way we
perceive our life’s circumstances and
the way we talk to others who are
depressed can actually change the

35
ELEMENTal COST ANALYSIS
The Malaysian Surveyor

Child Care Centre


ROYAL INSTITUTION OF SURVEYORS MALAYSIA
BUILDING COST INFORMATION CENTRE

4 - Health & Welfare


ELEMENTAL COST ANALYSIS - FORM 1
A - 1 - 1420

JOB TITLE : Proposed Construction, Completion and Commissioning of Child Care Centre and CLIENT : PRIVATE
Associated Works at Sepang, Selangor Darul Ehsan.

LOCATION : Daerah Sepang, Mukim Labu, Selangor Darul Ehsan TENDER DATE : 8/28/2014
INFORMATION TOTAL PROJECT
Project and Contract Information
Project Details and Site Condition : Contract :
The project is developed by a Corporate Company,a Child Care Centre for their staff and located MAHB Form BQ (Rev. 2014) – With Quantities
at the entrance road of their Corporate Office. The condition of site is slump ground that has been
treated.

Market Conditions : COMPETITIVE


Contract particulars : Competitive Tender List
RM Int (JV)/L
Type of Contract : MAHB Form BQ (Rev. 2014) – With Cost Fluctuation: Yes
Quantities 6,300,000.00 L
Basis of Tender : No /
Bills of Quantities / Open / Selected / 5,900,000.00 L
Competition Government
5,893,376.50 L
Bills of Appr. Quant. Negotiated Private /
4,988,800.80 L
Provisional Sums RM 200,000.00
Schedule of rates / Serials
Spec. & Drawings Prime Cost Sums RM -

Contract Period Stipulated by Client: 4 Months Preliminaries RM 303,771.50

Contract Period Offered by Builders: 4 Months Contigencies RM -

Numbers of Tenders Issued : 6 Contract Sum RM 4,988,800.80

Numbers of Tenders Received : 4

ANALYSIS OF SINGLE BUILDING


Design/Shape Information
Accomodation and Design Features:
Square building with one open entrance for user with enclosed wall.

Areas :
Functional unit: 852 m² Design / Shapes
Lower Ground Floor - m² Percentage of Gross Floor Area
Ground floor 1,420 m²
Upper Floors - m² External Wall Area = 1152 (a) Below Ground Floor -
%
Gross Floor Area 1420 m² Gross Floor Area 1420
(b) Single-Storey
100 %
Usable Area 852 m² = 0.81 Construction
Circulation Area 353 m²
Ancillary Area 181 m² (c) Two-storey
- %
Internal Division 34 m² Storey Heights: Construction
Gross Floor Area 1420 m²
Av. Below Ground Floor - m (d) 3-storey Construction
- %
Floor Spaces NOT Enclosed: - m²
At Ground Floor 3.60 m
Roof Area : 1976 m² (e) 20-storey
- %
(Structural and Plant Rooms) Above Ground Floor - m Construction
(average)

Brief Cost
Contract sum RM 4,988,800.80 Functional Unit Costs :
excluding external works RM 4,869.60 per m2
Provisional Sums RM 200,000.00

Prime Cost Sums RM -

Preliminaries RM 303,771.50 being 6.48 % of remainder

Contigencies RM - being - % Contract Sum

Contract Sum less Contingencies RM 4,988,800.80

36
Vol.51 No.3 2016

ROYAL INSTITUTION OF SURVEYORS MALAYSIA


BUILDING COST INFORMATION CENTRE

ELEMENTAL COST ANALYSIS - Form 2


4 - Health & Welfare
A - 1 - 1420
SUMMARY OF ELEMENT COSTS

Gross Floor Area : 1,420 m² TENDER DATE : 28/8/2014


Preliminaries Shown Separately
Total Cost Cost per m2 Element Element Element Reinforced Rein- Formwork
of Element GFA Unit unit rate Ratio per Concrete forcement
RM RM Quantity RM m2 GFA m3 kg m2
1. Substructure
1A Piling 218,458.00 153.79 3,978 m 54.92 2.80
1B Work Below Lowest Floor 613,540.00 431.92 1,420 m2 431.92 1.00
Finish

Group Element Total : 831,998.00 585.71 - - -

2 Superstructure
2A Frame 322,930.70 227.34 1,420 m2 227.34 1.00
2B Upper Floor - - - m2 - -
2C Roof 372,993.40 262.58 1,976 m2 188.76 1.39
2D Stairs - - - - - - - - -
2E External Wall 121,129.70 85.27 1,152 m2 105.15 0.81 - - -
2F Windows & External Doors 242,327.44 170.59 394 m2 615.60 0.28 - - -
2G Internal Walls & Partitions 38,317.60 26.98 1,110 m2 34.52 0.78 - - -
2H Internal Doors 58,173.06 40.95 132 m2 440.30 0.09 - - -

Group Element Total : 1,155,871.90 813.72 - - -

3. Finishes
3A Internal Wall Finishes 116,804.40 82.23 3,562 m² 32.79 0.02
3B Internal Floor Finishes 151,229.10 106.46 1,292 m² 117.05 0.08
3C Internal Ceiling Finishes 147,705.20 103.98 1,518 m² 97.30 0.07
3D External Finishes 203,626.20 143.35 - - -

Group Element Total : 619,364.90 436.02


Tendered
4. Fittings and Furnishing - - P.C.Sums Allowed (RM)
Sums (RM)

5. Services
5A Sanitary Appliances 65,962.20 46.44 275 Nos 239.86 0.19
5B Plumbing Installation 215,252.30 151.53 - - -
5C Refuse Disposal - - - - -
5D Air-conditioning & Ventilation 63,550.00 44.74 - -
-
System
5E Electrical Installation 800,760.00 563.72 - - -
5F Fire Protection Installation 26,890.00 18.93 - - -
5G Lift & Conveyor Installation - - - - -
5H Communication Installation - - - - -
Special Installation (Generator - - - -
5J -
Set System)
5K Builder's Profit & Attendance - - - -
-
on Services
5L Builder's Work in Connection 65,478.60 46.10 - -
-
With Services

Group Element Total : 1,237,893.10 871.46 - -

Sub-total excluding External Works, 3,845,127.90 2,706.91

6. External Works
6A Site Work 426,849.20 300.50 - - -
6B Drainage 168,377.60 118.54 - - -
6C External Services - - - - -
6D Ancillary Buildings 44,674.60 31.45 - - -
6E Recreational Facilities - - - - -
Group Element Total : 639,901.40 450.48
Preliminaries 303,771.50 213.85

TOTAL ( less Contigencies ) 4,788,800.80 3,371.24

37
ELEMENTal COST ANALYSIS
The Malaysian Surveyor

ROYAL INSTITUTION OF SURVEYOR MALAYSIA


BUILDING COST INFORMATION CENTRE

ELEMENTAL COST ANALYSIS - Form 3 4 - Health & Welfare


A - 1 - 1420
BRIEF SPECIFICATION
GROSS FLOOR AREA : 1420 m² TENDER DATE : 28/8/2014

ELEMENT SPECIFICATION
1 Substructure
1A Piling 2000mm x 200mm Precast concrete pile
1B Work Below Lowest Floor Finish Vibrated reinforced concrete Grade 25

2 Superstructure
2A Frame Vibrated reinforced concrete Grade 30
2B Upper Floors - Not Applicable-
2C Roof Reinforced concrete Grade 25 roof slab, metal decking roofing on steel roof truss, uPVC
rainwater downpipe accessories
2D Staircase - Not Applicable-
2E External Walls 14mm thick in clay brick in composition mortar (1:3), 114mm thick in facing brick in composition
mortar (1:3), 800mm high (average) steel railing comprises of 15mm diameter circular hollow
section (CHS), 25mm rectangular hollow section (RHS) and 75mm x 200mm x 800mm high steel
column well
2F Windows & External Doors Natural anodised aluminium frame casement windows with clear glass, Econframe door, stainless
steel grill door and phenolic door
2G Internal Walls & Partition 114mm thick in clay brick in composition mortar (1:3)
2H Internal Doors Econframe door, glass door, aluminium louvered door, stainless steel grill door, phenolic door

3 Finishes
3A Internal Wall finishes MML' ceramic glazed wall tiles, 'ICI' painting
3B Internal Floor Finishes MML' matte homogeneous tiles, 'MML' non slip homogeneous tiles, vinyl tiles, and 'FOSROC
BRUSHBOND' as waterproofing
3C Internal Ceiling Finishes BORAL plaster ceiling board, mineral fibre suspended ceiling, 'ICI Dulux painting
3D External Finishes ICI Dulux Alkali resisting wall sealer, wall stone cladding, 'ALUCODRAND' aluminium composite
panel, SWISSMA PVDF coated aluminum strip ceilings

4 Fittings and Furnishings - Not Applicable-

5 Services
5A Sanitary Appliances Medium range of sanitary fittings - squatting/padestal WC, urinal bowl, basin, basin tap, robe
hook, paper holder, soup dispenser, hand dryer, shower shelf, hand bidet sprayer, floor trap,
shower mixer, handicap grap bar, drainer sink, stainless steel bin, glass mirror
5B Plumbing Installation Cold water and sanitary plumbing.
5C Refuse disposal - Not Applicable-
5D Air-Conditioning & Ventilation Air cooled split unit system, air cooled packaged, electrical wiring and mechanical ventilation
System system.
5E Electrical Installation Complete electrical services, telephone, cctv
5F Fire Protection Installation Fire alarm system and portable fire extinguisher system.
5G Lift & Conveyor Installation - Not Applicable-
5H Communication Installation - Not Applicable-
5J Special Installation - Not Applicable-
5K Builders's Profit & Attendance on - Not Applicable-
Services
5L Builders's Work in Connection With - Not Applicable-
Services

6 External Works
6A Site Works Site preparation and earthworks, Roadworks, Fencing, Landscaping
6B Drainage Stormwater drainage systems, foul drainage system and water reticulation system which include
all the fittings and accessories.
6C External Services - Not Applicable-
6D Ancillary Building Refuse Chamber, Guard House
6E Recreation Facilities - Not Applicable-

38
rism activities
Vol.51 No.3 2016

18th International
Surveyor’s Congress

The 18th International Surveyor’s


Congress (ISC) was held on May 12
and 13, 2016 at the Istana Hotel,
Kuala Lumpur and was officiated by
the Minister of Natural Resources
and Environment, YB Dato’ Sri Dr. Hj.
Wan Junaidi Tuanku Jaafar.

The theme, “The Resilient


Professional – Thriving in a
Changing Economy”, was to look
into the fast changing international
and domestic economic landscapes
in light of the vitality in the financial,
commodity and currency markets;
and the transitory advantages
business participants can exploit
to improve their organisational
effectiveness.

The total of 466 delegates attended


and participated in the two-day
congress, which brought together
surveyors from around the nation.

39
rism activities
The Malaysian Surveyor

There were 32 speakers, including


local and international chairpersons.

The Land Surveyors Board Malaysia


and Royal Institution of Surveyors
Malaysia (RISM) have also
successfully sponsored students
to this congress. This initiative was
introduced for the very first time
to provide some early professional
exposure to tertiary students in the
surveying discipline.

The organising chairperson and


the committee members would
like to express their gratitude to all
participants, session chairs, keynote
speaker and sponsors for their kind
contributions towards the success of
this congress.

It is hoped that the participants


have enjoyed and benefited from the
congress whilst contributing towards
its success.

40
Vol.51 No.3 2016

Extraordinary General Meeting (EGM)

The Extraordinary General Meeting


(EGM) was held on May 14, 2016 at
9am at Mahkota 3, Hotel Istana, Kuala
Lumpur.

The EGM was held to get the general


body’s approval on the application for
additional budget for the renovation
and upgrading works of the existing
four-storey office block of Bangunan
Juruukur DiRaja Malaysia, 64 & 66, Jalan
52/4, Petaling Jaya, Selangor and it was
agreed by the general body.

Another resolution was on the proposed


changes to the Clause 3(1) e) and the
Clause 3(1) (f) in the Constitution and
by-laws on the diversification of entry
route of membership for PMVS Division
to include Property Development and
Investment, Property Management
and Valuation of Intangible Property.
However, there would be no changes to
the Membership Class, RISM Title, RISM
Designation and Voting Rights.

41
rism activities
The Malaysian Surveyor

55th Annual General Meeting


The 55th RISM Annual General
Meeting (AGM) took place right
after the EGM. The AGM proceeded
smoothly with the presentation
and deliberation of the annual
report, minutes of previous AGM
and the financial statement.
Following the AGM, there was
presentation of the diploma of
New Membership Certificates for
the Member’s category. This was
followed by the presentation of the
RISM Professional Examination
Certificates and RISM Best Students
Award.

The AGM concluded with the


presentation of Certificates of
Appreciation to all councillors
and the introduction of incoming
councillors for session 2016/2017
and President YBhg. Dato’ Sr K.
Sri Kandan announced that he will
continue his term for one more
session.

42
Vol.51 No.3 2016

55th RISM Annual Dinner

Later that evening, the 55th RISM Annual


Dinner was held at Mahkota Ballroom,
Hotel Istana, Kuala Lumpur with the
presence of Royal Patron HRH the Sultan
of Selangor. Besides RISM members, the
guests included members from allied
professionals.

The evening witnessed the presentation


of the following Excellence award
to worthy recipients who are RISM
members:

Outstanding Writer on Property


and Construction,
Ms Thean Lee Cheng

Lifetime Achievement Award


Sr Ringo Chan Pak Kuan

Malaysian Surveyor of the Year


Sr John S C Loh

The dinner ended with the cutting of the


anniversary cake and presentation of
memento to HRH the Sultan of Selangor.

43
rism activities
The Malaysian Surveyor

RISM Charity Run 2016


The Royal Institution of Surveyors
Malaysia (RISM) successfully
organised the inaugural RISM
Charity Run 2016 on July 31, 2016 at
Tasik Taman Jaya in Petaling Jaya,
Selangor.

Through events such as this, RISM


aims to raise funds as well as foster
awareness for charitable calls in
Malaysia namely, the Yayasan Raja
Muda Selangor (YRMS).

Taman Jaya in Petaling Jaya. The up of mini library facilities at Pusat


morning also saw celebrity runner Pengajian Al-Islah Orphanage in
Edan Syah, sharing his experience Perlis, the Children’s Ward at Hospital
with avid runners present and also USM in Kota Bharu, Hospital UKM
various family activities. in Kuala Lumpur, to name a few,
The 441 runners from all walks of life and this year’s run will continue to
participated in the run, which offered RISM President YBhg Dato’ Sr K. contribute to the needy as part of its
six categories of participation and Sri Kandan, in his speech, said that social responsibility.
two routes with distances of 7km RISM has been involved in a number
and 3km, at the locality of Tasik of charity events such as the setting At the event, a mock cheque in the
sum of RM50,000 was presented
by YBhg Dato’ Sr Sri Kandan to
YRMS Director YBerusaha Puan
Aminah Abd Rahim. Sponsors who
contributed were Construction
Industry Development Board,
Lembaga Jurukur Tanah
Semenanjung Malaysia, Sunway
Construction Sdn Bhd, Glodon
Software Sdn Bhd, Etiqa Takaful,
Hotel Istana Kuala Lumpur, CBRE
WTW, Rahim & Co. Chartered
Surveyors Sdn Bhd, Henry Butcher
Malaysia Sdn Bhd and ExaStrata
Solutions Sdn Bhd.

44
Vol.51 No.3 2016

CSR Programme In Paediatric Wards


Arising from the successful Mini
Library Projects which were carried
out at Asrama Teratak Rahmat,
Pusat Pengajian Al Islah Perlis and
Paediatric Ward 4D (Oncology &
Haematology), UKM Medical Centre,
Kuala Lumpur, the General Council of
RISM for this Session (2016/2017)
decided to have another Mini Library
project at the Hospital USM in Kota
Bharu, Kelantan. This project was to
bring the joy of books to seriously ill
children in hospitals.

RISM’s delegation led by the


President, Dato’ Sr K. Sri Kandan,
Deputy President, Dato’ Sr Lau
Wai Seang, Past President and
Organising Chair, Sr Dr. Wan Maimun
Wan Abdullah and several RISM
Councillors, witnessed the launching
of the Mini Library on 25 July 2016
at the Hospital USM, Kuala Kerian,
Kelantan. Goodie bags were also
distributed to the young patients.
About 10 media recorded the event
and interviewed the President and
Organising Chair regarding the project
and RISM. The news coverage
appeared in the local dailies as well
as broadcasted on TV News.

45
rism activities
The Malaysian Surveyor

COUNCIL MEMBERS OF THE 56TH SESSION 2016/2017

YBhg. Dato’ Sr K. Sri Kandan


President

YBhg. Dato’ Sr Lau Wai Seang YBhg. Dato’ Sr Hasan Jamil Sr Ang Fuey Lin Sr Gar Ti Wei
Deputy President Immediate Past President Hon. Secretary General Hon. Secretary General

YBhg. Dato’ Sr Mohd Sr Choy Yue Kwong Sr Wan Ainon Zuraiha Sr Hj. Mohd Amin Mohd Din
Noor Isa Vice President W. A. Khalid Vice President
Vice President Property Management, Vice President Building Surveying Division
Geomatic & Land Valuers & Estate Agency Quantity Surveying
Surveying Division Surveying Division Division

Sr Jonathan Ngu Liew Ing Sr Samuel Chong Choung Henn Sr Dr. Janice Lee Yim Mei
Chair Chair Chair
Sarawak Branch Sabah Branch Johor Branch

Sr Nor Azah Mohd Salleh Sr Wan Zainuddin Hj. Wan Yusoff


Chair Chair
Northern Branch East Coast Branch

46
Vol.51 No.3 2016

Sr Lim Meng Heok Assoc. Prof. Sr Sr Ina Abu Bakar Sr Ishak Ismail
Education & Accreditation Zaiton Yaacob Editorial Board Board of Building
Board Examination Board Management

YBhg. Dato’ YBhg. Dato’ Sr Abdull Sr Dr. Hjh. Rahah Ismail


Sr Hasan Jamil Manaf Hj Hashim Professional Board
Professional Board Professional Board Board of Valers, Appraisers,
Board of Land Surveyors Board of Quantity Surveyors Malaysia
Malaysia Malaysia

Sr Dainna Baharuddin Sr Ringo Chan Pak Kuan Sr Dr. Teng Chee Hua
Councillor Councillor Councillor

Sr Hj. Hashim Hj. Sibelik Sr Lim Choon Yong Sr Allan Sim Song Len
Councillor Councillor Councillor

Prof. Sr Dr. Md Najib Ibrahim Sr Hj Mohd Zahry Shaikh Prof. Sr Dr. Hjh Wan Maimun
Councillor Abdul Rahman Wan Abdullah
Councillor Councillor

47
LIST OF NEW MEMBERS
May – September 2016

QUANTITY SURVEYING Sr Norazuin bt Dolmat Sr Muhammad Azwan b. Abdul Hadi


Unit Perancang Ekonomi SG Contract Services3
Fellow
Sr Hj. Azinal Abidin b. Hj. Ali
Sr Siti Suhaibah bt Mohd. Ghazali Sr Nor Sharina bt Jamal
QS Focus Sdn Bhd
AQS Services Sdn Bhd CKUB, JKR
Sr Chew Shiaw Ping
Sr Yusmady b. Md Junus Sr Ooi Soo Chin
SP Perunding
SPACE, UTM Kuantibina SdnBhd
Sr Ishak b. Hj. Atan
Sr Zainal Abidin b. Mohamed Yusoff Sr Qeok Yi Nian
Perunding DMA Sdn Bhd
Perunding NFL Sdn Bhd Perunding NFL Sdn Bhd
Sr Zaidi Kassim
Sr Azaha b. Awaludin Sr Razilan b. A. Razak
Q Bena Resources Sdn Bhd
JB Bergabung ZAMS QS Construction
Sr Chew Shiaw Ping
Sr Hairani bt Mohd Sabtu Sr Rohaidah bt Roslan
SP Perunding
Opus International (M) Sdn Bhd CKP Jurukur Bahan Sdn Bhd
Sr Chin Keh Liang
Sr Md Nur Zaky b. Zakaria Sr Saliza bt Mohd Masri
JUB Central Sdn Bhd
DISB Builders Sdn Bhd MBPJ
Member
Sr Nik Rohaizan bt Nik Mohd Ariffin Sr Shahrul Azlan b. Rohani @ Abdul Ghani
Sr Ahmad Hisham b. Che Pa
JKR Perak ARH Jurukur Bahan Sdn Bhd
Dewan Bandaraya Kuala Lumpur
Sr Salwa bt Shahruddin Sr Zawiyah bt Kassim
Sr Awatif bt Abdul Ghaffar
JKR Malaysia KPM
Unit Perancang Ekonomi
Sr Shahrul Nazha b. Najmi Graduate
Sr Chen Lee Peng
Opus International (M) Sdn Bhd Abang Mustapha b. Abang Hamkah
YSCA Consultancy Sdn Bhd
Kementerian Pendidikan Malaysia
Sr Tan Cheng Eian
Sr Chen Shiau Foong
Lendlease Projects (M) Sdn Bhd Adiba Fatin bt Abdul Nasir
KPK QS (Sem) Sdn Bhd
Kuantikos Perunding
Sr Abdulla b. Halide
Sr David Yong Vui Lun
Kinabalu Setia Konsult Ahmad Shukri Zaki b. Naziff
Perunding Ukur Bahan AL
JUBM Sdn Bhd
Sr Azury bt Kamaruddin
Sr Fadzir Azuan b. Mahari
Prasarana Malaysia Berhad Amirul Hakimi b. Abdul Kadir
BCQS Consult Sdn Bhd
JUBM Sdn Bhd
Sr Chuah Yiing Min
Sr Hasniza bt Abdul Razak@Abdul Ghani
MQS Consult Annuryani bt Mohamed Raihan
Unit Perancang Ekonomi
Jabatan Pengairan dan Saliran
Sr Dr Saipol Bari b. Abd Karim
Sr Jong Soon Loong
Universiti Malaya Antonio Chung Chun Hee
CKP Nizaruddin Juruukur Bahan Sdn
Vincent Tan & Associates
Sr Hazrin Hisham b. Hassan
Sr Keith Michael Pereira
HAH Associates Bermadette Ling Yee Kiew
Kajima Overseas Asia Pte Ltd (Singapore)
Perunding PCT Sdn Bhd
Sr Hishaiman b. Hussain
Sr Lam Siew Fong
Jab Pengairan & Saliran Malaysia Bibi Amira bt Abd Karim
Langdon & Seah Sdn Bhd
Sato Kogyo Co. Ltd
Sr Irwan b. Abd Rahim
Sr Lee Chin Fern
THP Development Consultantcy Sdn Bhd Cheah Siok Teng
YSCA Consultancy Sdn Bhd
Kumpulan Sepakat Konsult
Sr Kaw Fong Kian
Sr Mohd Azhar Mat Salleh
Prinsiptek (M) Sdn Bhd Cheng Meljyn
CKUB, JKR
Yong Dan Mohamad Faiz Sdn Bhd
Sr Lee Swee Kun
Sr Nazirah bt Abd Rahim
Econcos Consultants Chong Phui Hoong
CKP Nizaruddin Juruukur Bahan Sdn Bhd
AQS Services Sdn Bhd
Sr Masnizan b. Che Mat
Sr Ng Wai Lon
Pusat Pengajian Ukur Bahan, UiTM Fadhli b. Mohamad
Yong Dan Mohamad Faiz Sdn Bhd
JUBM Sdn Bhd
Sr Mohd Nazib b. Md Samri
Sr Noraini bt Mohd Khalid
JKR Negeri Johor Garnette Fedora bt Boniface
Sime Darby Property Berhad
Gamuda Engineering Sdn Bhd
Sr Muhamad Hafizuddin b. Idris
Sr Norazah bt Attan
KA Associates Hiew Yun Nee
QS Foxus Sdn Bhd
SP Perunding

48
Vol.51 No.3 2016

Ho Jia Yuen Sum Man Teng Lim Wei Kiat


Yong Dan Mohamad Faiz Sdn Bhd Yong Dan Mohamad Faiz Sdn Bhd CK Century Cons. Sdn Bhd

Jessia Elnos Jesson Tan Hooi Kheng Loo Weichun


JKR, Sabah Langdon & Seah Sdn Bhd Kumpulan Sepakat Konsult

Jonathan Chong Yii Hean Toh Sim Mun Mohamad Faiz b. Ismi
CSL QS Consult Perunding PCT Sdn Bhd IM Jurukur Bahan

Kok May Yin Wilson Wee Pei Seng Mohd Saifuddin b. Mohd Ridzuan
DK-QS Sdn Bhd SP Perunding MNQS Consult

Kong Sook Lee Wong Siew Thung Mok Shi-Wei


Northcroft Lim Perunding Sdn Bhd QSP Consultants Sdn Bhd Northcroft Lim Perunding

Lam Chia Yen Zanariah bt Mahmood Muhammad Aqeel b. Amirullah


CPK Associates KZM Consult Sdn Bhd MF Associates

Lee Youe Wai Zolkeplee b. Basir @ Daim Muhammad Arief b. Abdul Rahman
AQS Services Sdn Bhd Universiti Pertahanan Nasional Pakatan Ukur Bahan

Li Zi Qian Ahmad Dzarfan b. Alias Muhammad Asyraf b. Ab. Rashid


Universiti Tunku Abdul Rahman Sutomo & Associates KPK QS (Sem.) Sdn Bhd

Lin Bee Hung Ahmad Firdausi Hafiz b. Pawira Muhammad Azim b. Abd Rashid
JUBC Sdn Bhd KPK QS (Sem.) Sdn Bhd AS2 Consult Sdn Bhd

Long Jin Keat Ahmad Khairul Adha b. Jamaludin Nazarudin b. Mashtuki


AQS Services Sdn Bhd Advantage QS Sdn Bhd Subang Jaya Municipal Council

Mohamad Mustaqim b. Mersal Anizah bt Ahmad Noor Adawiyah bt Abdul Munap


KA Associates WZS Kenkeong Perunding Ukur Bahan ASMY

Mohamad Shakir b. Mazlan Azizah bt Md. Hussin Noriza Abdul Samad


JUBM Sdn Bhd Kementerian Pendidikan Malaysia MITG Group

Ng Choong Eu Azizul Hadi b. Saad Nur Ellyana bt Mohd Ariff


Northcroft Lim Perunding Sdn Bhd SPNB Idaman Sdn Bhd Segi University

Ng Poh Li Choo Hui Poh Sia Ee Wen


Gamuda Engineering Sdn Bhd KPK QS (Sem.) Sdn Bhd Siacon Technology Sdn Bhd

Noor Azeyah bt Dato’ Hj Khiyon Evonne Lim Xin Yi Siew Kuan Vun
University of Reading Kumpulan Sepakat Konsult Perunding Kontrak Ting

Nor Afiza bt Jilani Goh Cheng Siew Tan Boon Kin


Jabatan Pengairan dan Saliran Heriot Watt University Kumpulan Sepakat Konsult

Nor Azlin bt Abdul Rahim Iqbal Hadi b. Mansor Tee Wee Lin
JUB Central Sdn Bhd Advantage QS Sdn Bhd Northcroft Lim Perunding

Nur Syahirah bt Mohd Nasir Jong Hui Joo Wafiatun Najihah bt Muhammad Hassan
Advantage QS Sdn Bhd PEB Consulting QS Sdn Bhd Advantage QS Sdn Bhd

Raja Bukhary b. Raja Taihairan Kim Yin Ying Wan Fadhlina Ilyani Wan Rozali
UM Corporate Services RL Bersepadu Sdn Bhd MMC-Gamuda JV

Rossita bt Kartimon Kong Sook Lee Wong Jing Jyh


Jabatan Pengairan dan Saliran Northcroft Lim Perunding Northcroft Lim Perunding

Shariffah Zatil Hidayah bt Syed Jamaludin Lee Wei Yian Yeoh Siew Ling
UiTM, Sarawak Ukur Bahan Konsult Northcroft Lim Perunding

Siti Atasah bt Johari Li See Chuan Zamri Mat Ail


Ranhill Bersekutu Sdn Bhd Northcroft Lim Perunding KPK QS (Sem.) Sdn Bhd

Siti Khadijah bt Armawai Lim Hock Tek Ahmad Aizuddin b. Azman


Jurukur CEM Sdn Bhd KPK QS (Sem.) Sdn Bhd Perunding DMA

49
LIST OF NEW MEMBERS
May – September 2016

Chong Sook Fun Chock Shen Wai Sr Cheong Chee Hong


NINO (M) Sdn Bhd Chok Kok Hoi Penang Island City Council
Goh Shu Xin
Huzairi b. Zainal Azlan Jong Suk Lee Sr Chong Wai Mun
JKR Joshua Lim Yu Meng Knight Frank
Koeh Xiao Han
Lau Hui Ching Kok Pei Wen Sr Chong Woon Keh
KLT QS Consult Sdn Bhd Leong Pui Yee Knight Frank
Liew Chen Lam
Lim Jo Yee Long Tien Heng, Aaron Sr Fadhilah bt Abdul Wahid
KPK QS (Sem.) Sdn Bhd Low Jin Han One Asia Property Consultants (KL) Sdn Bhd
Mohd Hidayat b. Zam Hasri
Lim Khai Ling Muhamad A’kif b. A’ffan Sr Hasnor Salwa bt Harun
TL Associates Neelamalar A/P Subramaniam Subang Jaya Municipal Council
Ng Zhiong Kam
Mohd Azmir b. Mustafa Nur Hidayah bt Mohamad Rosli Sr Jalis b. Jalaluddin
Lebuhraya Borneo Utara Sdn Bhd Siti Fatimah bt Subki Raine & Horne International Zaki + Partners
Voon Yee Sian
Mohd Norhalis b. Mohd Saat W. Nurfaiza Syuhada bt W. Abdul Rahaman Sr Jane Liaw Pei Chen
Jurukur CEM Andrew Hu Ting Fong Knight Frank
Andrew Lai Chin Wen
Muhammad Ashraf b. Amirullah Brian Wong Shi Hong Sr Johny b. Ronggitom
Perunding DMA Chiaw Jenn Hoong Sandakan Municipal Council
Chieng Leh Jiunn
Musliadi b. Mustala Dillon Sii Hong Yaw Sr Lim Mei Hong
NHY Borneo Sdn Bhd Hiaily Hii bt Hirwan Hii Knight Frank
Hii Neng Ung
Nah Phei Sze Hii Ting Kui Sr Mohd Hafidzul b. Zakaria
DK-QS Sdn Bhd Kon Yi Na PPC international, Penang
Lau Ngie Chuong
Nazrul Fariq b. Mohd Kassim Lee Kar Seng Sr Mohd Hafizal b. Ishak
Arcadis Projeks Sdn Bhd Lee Mee Lian UTHM
Liew Sok Hua
Ng Kar Keat Lim Kuan Leang Sr Muhammad Harilazalan b. Hasan
KPK QS (Sem.) Sdn Bhd Lu Jun Cheng Hulu Selangor District Council
Mary Law Suk See
Ng Yen Fah Nurul Fatin Farhanah bt Mahdar Sr Normala bt Mat Ajid
BK Asia Pacific Pang Qin Er JPPH, Selangor
Ramizah bt Azhari
Nur Aisyah bt Mohd Salleh Raymond Ha Shiaw Chung Sr Rosmaniza bt Ibrahim
Perunding DMA Raymond Lu Yew Tiew Ampang Jaya Municipal Council
Shanna Lee Ting Ting
Shahida Adam Vincent Yeo Dong Han Sr Tan Hooi See
AT Associates Wong Lee Wang Raine & Horne International Zaki + Partners
Yew Ngik Min
Tang Lit Hiang Yong Jun How Sr Wee Zhao Yuan
Jurukur CEM Chun Zheng Shen Knight Frank
Julie Bong
Toh Choon John Sr Ezwan b. Bustamin
Northcroft Lim Perunding Sdn Bhd PROPERTY MANAGEMENT, VALUATION KPKT
AND ESTATE AGENCY SURVEYING
Tommy Yeo See Tung Sr Maysarah bt Mohd Yusuf
Fellow
Golden Arches Restaurants Shah Alam Municipal Council
Sr Sharizal Supian
A Jalil & Co Sdn Bhd
Probationer Sr Mohd Faizuri b. Husain
Phillip Tan Chee Yang Perbadanan Prima Malaysia
Sr Kamarulzaman Mat Salleh
Perunding Kos T& K Sdn Bhd
Kuala Lumpur City Hall
Sr Wong Huey Feng
Chong Sook Fun CB Richard Ellis (PTE) LTD
Member
NINO (M) Sdn Bhd
Sr Abdul Haizul Faisal b. Abdul Hamid
Sr Abdul Samat b. Mohamed Ali
Kajang Municipal Council
Tan Huei Ling City Valuers & Consultants Sdn Bhd
Northcroft Lim Perunding
Sr Abdul Jalil b. Omar
Sr Ahmad Kamal Zainal b. Abidin
UTHM
Tie Ling Lin Kuala Lumpur City Hall
YBK Engineering Sdn Bhd
Sr Chai Woon Yin
Sr Ahmad Khairuddin Abdul Hamid
Knight Frank
Student Selayang Municipal Council
Caroline Chin Mei Ling
Sr Che Azmi b. Hassan
Chen Khai Lui
Hulu Selangor District Council

50
Vol.51 No.3 2016

Sr Azlin bt Alang Ismail Sr Saharnaka b. Yasmain Sr Mohammad Faizal b. Engah


Kuala Lumpur City Hall Kulai Municipal Council Kemaman Municipal Council

Sr Azmi b. Miswan Sr Siti Nor Zuraida bt Che Rodi Sr Mohamad Shahidan Hashim
Johor Bahru City Council Kuala Lumpur City Hall Ipoh City Council

Sr Ba’izah bt Burhan Sr Syafini Mohi Sr Mohd Azmi Zainuddin Zainal Abidin


Kulai Municipal Council Johor Bahru City Council Perak Tengah District Council

Sr Burhanuddin b. Maamor Sr Yahani Yaacob Sr Mohd Nabil b. Mohd Sulaiman


Ipoh City Council Kuala Lumpur City Hall Sabak Bernam District Council

Sr Che Azhar Che b. Abdullah Sr Zaleha Abdul Rahman Sr Mohd Fadhli b. Sulaiman
Kuala Lumpur City Hall Kuala Lumpur City Hall Hang Tuah Jaya Municipal Council

Sr Emi Rahayu bt Omar Sr Zatul Amri b. Zainal Sr Mohd Khalid Awang


Lembaga Kemajuan Johor Tenggara Johor Bahru Tengah Municipal Council Marang District Council

Sr Khadijah bt Hussin Sr Abdul Aziz Abdullah Sr Mohd Nafis Mokhtar


Kuala Lumpur City Hall Kumpulan Jurunilai Sdn Bhd Seremban Municipal Council

Sr Lim Shao Ling Sr Abdul Manaf b. Abu Bakar Sr Mohd Rais Razali
City Valuers & Consultants Sdn Bhd Ipoh City Council Azmi & Co Sdn Bhd

Sr Mahfuzah Md Muslim Sr Abd Razak b. Mohd Haron Sr Mohd Saiful Dawam


Johor Bahru City Council Seremban Municipal Council Kuala Kangsar Municipal Council

Sr Mariah bt Md Taib Sr Azizah bt Ismail Sr Mohamad Ismail


Hang Tuah Jaya Municipal Council Johor Bahru Tengah Municipal Council Kangar Municipal Council

Sr Marziana bt Mat Jelas Sr Cek Norhisam Jusoh Sr Mohd Yomni Idris


Kuala Lumpur City Hall JB Jurunilai Bersekutu Sdn Bhd Prokel Management Sdn Bhd

Sr Mohamad Rozi b. Ibrahim Sr Dr Hj. Soeb b. Pawi Sr Muhammad Nor Fuad Ishak
Mohd Nor & Partners (Johor) Sdn Bhd Kulai Municipal Council Ipoh City Council

Sr Mohd Azuan b. Ahmad Sr Farah Firdaerma bt Mohamed Nasokan Sr Munirah Rosli


Kuala Lumpur City Hall Selayang Municipal Council Seremban Municipal Council

Sr Mohd Helmi b. Mohd Sany Sr Faridah bt Ayob Sr Nashruddin b. Othman


Kuala Lumpur City Hall Johor Bahru City Council Muar Selatan District Council

Sr Mohd Noh b. Atan Sr Fauziah Ahmad Sr Nor Laili Dagang


Johor Bahru City Council Lembaga Kemajuan Johor Tenggara Kemaman Municipal Council

Sr Mohd Salim b. Saleh Sr Fazlin Mariam Mustafa Sr Noorhazalina Md. Rasali


Kinta Selatan District Council Selayang Municipal Council Hang Tuah Jaya Municipal Council

Sr Mohd Zulqarnain b. Masri Sr Harvey Wong Eng Wen Sr Normaiza Idris


Johor Bahru City Council Tropicana Business Park Kemaman Municipal Council

Sr Muhammad Syahir b. A Hanan Sr Helmi b. Abdullah Sr Norshadida Othman


Johor Bahru City Council Kota Bharu Municipal Council Ipoh City Council

Sr Nor Ezalina bt Noorezan Sr Khairulazmi Abdul Rahman Sr Nor Zuliana Abd Rahman
Kuala Lumpur City Hall Ampang Jaya Municipal Council Seremban Municipal Council

Sr Noor Azizan b. Adam Sr Mazli b. Muhammad Nor Sr Nurhayati Md Salleh


Tampin Municipal Council Ipoh City Council Kulai Municipal Council

Sr Noor Faiz b. Kasmani Sr Mariam Salwana Othman Sr Nur Syazwani Eliza Zahidan
Johor Bahru Tengah Municipal Council Kajang Municipal Council Johor Bahru City Council

Sr Nur Mahirah bt Aziz Sr Marfudzah bt Morsin Sr Nuruz Zawani Mohamad Isa


Kajang Municipal Council Seremban Municipal Council Johor Bahru City Council

Sr Nur Syahida bt Anuar Sr Melissa Felix Lee Sr Rohayah Abdul Kadir


Kuala Lumpur City Hall Rahim & Co International Sdn Bhd Ipoh City Council

Sr Rozali b. Mustafa Sr Mitchell Lo Vui Liat Sr Rosmaliza Osman


Baling District Council JS Valuers Property Consultants Sdn Bhd Selayang Municipal Council

51
LIST OF NEW MEMBERS
May – September 2016

Sr Salena bt Sulaiman Sr Senthil Kumaran A/L Balan Hasril Ashraf b. Md Saad


Ministry of Urban Wellbeing, Housing and Local S.T. Hui & Associates Haziyah bt Che Mohd Adna
Government Mohamad Azwan b. Johari
Sr Siti Fairuz Che Pin Mohamad Haizam b. Mohamed Saraf
Sr Salinda bt Jamil UITM Perak Mohammad Nazrin b. Mohd Yusof
JPPH, Selangor Mohd Syazwan b. Rohim
Sr Siti Nadiah Mohd Ali Muhammad Akasyah b. Basharudin
Sr Sharmila Shafie UITM Perak Muhammad Ashraaf b. Harun
Ipoh City Council Muhammad Faheem b. Azhar
Sr Tan Peen Yeow Muhammad Hezry Safwan b. Ramli
Sr Sharina Hamzah Henry Butcher Malaysia Muhammad Ikhmal Alif b. Roslan
Johor Bahru Tengah Municipal Council Muhammad Sufi b. Ismail
Sr Tan Zi Piu Norhayani bt Hashim
Sr Shukroon Hilmi Mohamad @ Endut DTZ Nawawi Tie Leung Nur Afifah bt Yusof
Kuala Terengganu City Council Nur Aziran bt Che Mohd Noor
Graduate Nur Azlien bt Abdul Wahab
Sr Siti Nooraelin Ahmad Lee Chee Aik Nur Farahanie bt Umat
Ipoh City Council Oriental Realty Nur Shahila bt Ahmad
Nur Syahirah bt Abd Wahab
Sr Siti Amnah Kasim Muhammad Syafiq b. Mohd Nor Nurul Aqilah bt Yusof
Johor Bahru City Council JB Jurunilai Bersekutu (Subang Jaya) Nurul Azmany bt Aliyas
Nurulintanfazliana bt Mohammad Ghazali
Sr Sophia Salleh Gavin Jap Wye Chee Nuruljannah bt Mohd Fuad
Johor Bahru Tengah Municipal Council HASB Consultants (Sarawak) Nurul Nabilah bt Abdul Manaf
Rahmat Farid b. Abdul Rahman
Sr Tan Hui Kien Probationer Shalisah bt Khalid
CH Williams Talhar Dato’ Foo Chu Jong Siti Masliyaton bt Abu Bakar
Prinsiptek Corporation Berhad Siti Nabilah bt Sudin
Sr Zanila Ibrahim Syafiqah Nabiha bt Mohd Jais
Kuala Terengganu City Council Ng Wei Hiong Tahirah bt Zakaria
Property Exchange Wan Ahmad Wafiz b. Wan Ibrahim
Sr Zulhanizah Bakatar Adeelyanna bt Din
Hang Tuah Jaya Municipal Council Yap Shong Waey Mohd Sazali Rasidi
Tenaga Nasional Berhad Mustafa Taib
Sr Abdul Halim Mat Saad Nora bt Yasin
Kumpulan Jurunilai Sdn Bhd Aznini bt Ariff Norazah Saipuldin
IW Properties
Sr Aminuddin Hussien GEOMATIC AND LAND SURVEYING
Selayang Municipal Council Eric Husly Hului Hafveat
Fellow
KLCC Property Holdings Berhad
Sr Mohamad Nor b. Said
Sr Asma Senawi
UTM Skudai
UITM Perak Lee Chee Thian
Oriental Realty
Sr Kamaludin b. Mohd Omar
Sr Cheah Shwu Shyuan
UTM Skudai
Jones Lang Wootton Too Teng Jock
Summerfield Property (M) Sdn Bhd
Assoc Prof Sr Ranjit Singh A/L Dhram Singh
Sr Kamarudin Lope Pihie
IUKL
JPPH, Perak Lee Wai Wah
The Chambers Of Lee
Member
Sr Lisawati Abd Karim
Sr Lim Teck Cheong
Kuala Langat District Council Loh Sy Shyan
Fibon Electric Sdn Bhd
IVPS Real Estate Sdn Bhd
Sr Mohd Rashdi Adam
Sr Fatin Shahirah bt Khairudin
Kuantan Municipal Council S’ng Wai Yeen
JUPEM Pahang
ERM Real Estate Sdn Bhd
Sr Norazlina Yusnita A Rahman
Sr Hasniza bt Harun
UITM Perak Tan Wee Siang
Politeknik Merlimau
Maybank Berhad
Sr Nurul Hanis Ahmad @ Mohamed
Sr Jamil Faisal b. Yusoff
UITM Perak Thing Pui Mun
UTM
Jordan Lee & Jaafar
Sr Nurul Huda Ali
Sr Joni b. Jusoh
UITM Perak Yew Lee Siong
Sato Kogyo Pte Ltd (Singapore)
LSL Services
Sr Nurul Sahida Fauzi
Sr Mohamad Rashid b. Roslan
UITM Perak Student
JUPEM Pahang
Amiratul Sahida bt Aznam
Sr Rohaya Abdullah Ayuni Asma bt Abdul Wahib
Mohd Fakarudin b. Kadir
Hang Tuah Jaya Municipal Council Azizah bt Zainun @ Mohamad
UITM
Farah Diana bt Othman

52
Vol.51 No.3 2016

Muazam b. Mustaffa Nor Ainn Alfatihah bt Zamzuri Prof Sr Michael Riley


Suffian Geomatic Services Nor Hazirah bt Zainal Abidin Liverpool John Moores University
Nur Adawiyyah Maziyyah Abu Bakar
Nurul Satirah b. Abd Rahman Nur Afiqah bt Razak Member
JUPEM Pahang Nur Haafizhah bt Mohd Kamal Sr Aslida bt Omar
Nur Hamizah bt Mohd Idgihat -
Raihana bt Abdul Malek Nur Murfiqah bt Mokhtar
Politeknik Ungku Omar Nur Zubaidah bt Musa Graduate
Nuraliah Haziqqah bt Alaziz Dr Nik Noriman b. Zulkepli
Zulkifli b. Abd Halim Nurfairunnajiha bt Ridzuan UNIMAP
JUPEM Pahang Nurfatiha bt Abdul Razak
Rabiatul Adawiyah bt Moktar Nur Fadhilah bt Bahardin
Dr Jaw Siow Wei Shafieq Zikri bt Shamsul Nizam UTM Perak
UTM Skudai Shafiqah bt Dzulkarnain
Siti Sri Suriati bt Ramlee Nur Hanani bt Mohamad
Muhammad Hakim b. Abu Hassan Vanessa Ak Seli Glomac Berhad
Ezam & Associates Abdul Wafi b. Hilmin
Aina Syafiqah bt Jufri Nurul Malina bt Jamaludin
Noor Suhaiza bt Sauti Athanasius Anak Sumping Universiti Malaya
Politeknik Merlimau Dzuliyana bt Zakaria
Fatanah bt Othman Dayang Sufeane bt Shuib
Shah Iran b. Misran Harun b. Bahar P-Con Building Surveyors Sdn Bhd
JUPEM Ikhwan Shah b. Arman Shah
Khairunnajwa bt Khairil Anuar Ikhwan b. Lokman
Graduate Miza Syazwina bt Rabdunieh P-Con Building Surveyors Sdn Bhd
Victor Seow Phoyen Mohamad Amirul b. Abd Rani
Mesra Ukur Sdn Bhd Mohammad Khairulanam b. Suhimi Mohamed Syafiq b. Salleh
Mohamad Affiq b. Azman P-Con Building Surveyors Sdn Bhd
Wan Syakirah bt Wan Deraman Mohd Abbas b. Zakaria
UITM Mohd Azeran b. Abdullah Muhammad Isa b. Kamsani
Mohd Syuib b. Umar P-Con Building Surveyors Sdn Bhd
Muhamad Rosnezam b. Othman Moses Anak Riji
UTM Muhamad Zulhilmi Ilahi b. Fazal Ilahi Muhammad Shazlan Shah b. Ramli
Muhammad Aliff Akram b. Mohd Senari P-Con Building Surveyors Sdn Bhd
Muhammad Rafiqi b. Nooruddin Muhammad Fa’iz b. Mat Sabri
UITM Shah Alam Muhammad Salihin b. Nekmat Nurita bt Saperi
Nazrin b. Jiro Kuala Lumpur City Hall
Muhammad Safwan b. Alias Nik Nur Izzatie bt Abdul Hadi
UITM Shah Alam Nor Fatin bt Ismail Ukkasyah b. Abdul Walad
Nur Afifah Zakiah bt Mohamad P-Con Building Surveyors Sdn Bhd
Nor Illianna Ayuni bt Shamsudin Nur Aini bt Mani
JUPEM Perak Nur Amalina bt Mohd Taha Lilis Shereena bt Safiee
Nur Atirah bt Termizan UiTM Shah Alam
Muhammad Fakhrul Aziz Mohd Fakarudin Nur Fatin Syahira bt Ramli
Juruukur Dr Samad Abu Nur Nazeha bt Ramli Mohd Khairi b. Kurdi
Nur Syairah bt Mohd Zin UiTM Perak
Shakir Tang Chee Chiang Nur Zakirah Rabiha bt Md Rejab
Syarikat Mahyuddin & Siew Sdn Bhd Nuraqeela bt Mohd Arifin Mohd Ridzuwan Firdaus b. Mat Rashid
Nurul Aina bt Rosni Kuala Lumpur City Hall
Sheikh Mohd Khalis b. Sheikh Abd Jalir Nurul Farrah Dila bt Abd Wahid
Semarak Ukur Consultant Nurul Naimah bt Janberi Nor Farah Aida bt Mohamed Zable
Saidatul Ain Syafiqah bt Khairulamiran Hytech Consultancy
Student Sebastian Anak Mathew
Afifah bt Abdul Wahab Siti Balqis bt Mohd Tun Siti Hamidah bt Husain
Afiqah bt Azman Siti Humairah bt Abdul Rahim -
Allysa bt Mat Adnan Siti Nabilah bt Suhaimi
Angelia Then Gel Gel Siti Nur Rahdiah bt Ibrahim Probationer
Farah Diyana bt Mahmodi Siti Zawanah bt Zulkifli Asraf b. Mohd Zin
Lee Jun Jie Stephnie Anak Ambrose Umban Active Hydro Control Sdn Bhd
Mohamad Asyraf b. Mohd Shakir Syahir Afiq b. Saharuddin
Mohamad Taufiq b. Sahir Syazwani Husna bt Mohd Hijazi Dr Wang Hong Kok
Mohd Hadif Hadi b. Mohd Ariffin Syed Haziq b. Syed Muhammad Tunku Abdul Rahman University College
Muhamad Azamirul b. Bachok Wasti bt Mohtar
Muhamad Najib b. Jumhat Student
Muhammad Afiq b. Amirrudin BUILDING SURVEYING Farid Imran b. Tarmizi
Muhammad Nadzuan b. Muhammad Nizar Habibi b. Muthazam
Fellow
Muhammad Zulhilmi b. Mohd Zulizan Mohamad Amirul Fitri b. Mohmad Johar
Sr Mohd Zahry b. Shaikh Abdul Rahman
Nadiyatul Putri bt Abd Hakim Muhammad Amirul b. Mohd Zawawi
Buildsurv Consult (M) Sdn Bhd
Nicky Laila bt Abdullah Wan Fakhrul Afifi b. Wan Ismail

53
INVITATION FOR
ARTICLE CONTRIBUTION
The Malaysian Surveyor Journal ISSN: 2232-1292 (On-line)

The Malaysian Surveyor is a high quality peer Peer Review Process


Manuscripts are subject to review by the Editorial Board and
review journal published quarterly online. The reviewers.
publication aims at bringing together researchers,
academicians, professionals, practitioners and General Guidelines for Submissions
Article submissions should not exceed 10 pages, including all
students to impart and share knowledge in the figures and tables (excludes the references). Abstract should
be no more than 500 words. Articles in Bahasa Malaysia need
form of empirical and theoretical articles and to include an abstract in English.
research papers. It provides an international forum
Kindly email article to:
for the dissemination of professional knowledge editor@rism.org.my
and practices, original research results, new ideas,
practical experience of the surveying profession, For more information, visit the official website of the journal
at http://www.rism.org.my/ContentPages/Journal.aspx
advancements and innovation in the surveying
technology and surveyors’ contribution toward the
property market and building industry. We
welcome original article contribution to The
Malaysian Surveyor.

ROYAL INSTITUTION OF SURVEYORS MALAYSIA


3rd Floor, Bangunan Juruukur, 64 – 66, Jalan 52/4, 46200 Petaling Jaya, Selangor, Malaysia
Tel: 603-7954 8358 / 7955 1773 / 7956 9728 Fax: 603-7955 0253
Website: www.rism.org.my E-mail: secretariat@rism.org.my, editor@rism.org.my

Você também pode gostar