SITE CLEARANCE
Pre cast yard site clearance 25000
Casting Yards Development
Stacking Yard (8.5 m segments) 900 open area
Curing yard 760 open area
Curing Tank 100 open area
Casting bed (2) 8.5 m 700 open area
Stacking Yard (17.2 m segments) 2905 open area
Curing yard 1125 open area
Curing Tank 175 open area
Casting bed (4) 17.2 m 2450 open area
Sequrity room 121 Room
Rebar Cage Fabrication Yard 700 Shed
Material Storage 1225 open area
Batching Plant (2) 700 open area
Other Casting 700 open area
DG & Power Room 55 Shed
Cutting & bending 423.5 Shed
Rebar Storage 605 Shed
Cement Storage 220 Room
Garage& Workshop 253 Shed
Rail length (m) 772m
Gantry (2)
Water Tank
Drainage
Roads circulation 9315
Open Area and Parking (6 car) 75
Buildings
Main Office
Client Office 286 Room
Contractor office 286 Room
Laboratory 220 Room
First Aid 55 Room
Form Work
Fabrication of liners
Fabrication of Pile cap form work
Fabrication of Pier form work
Fabrication of Pier cap work
Fabrication of FW for segment casting
Power Supply
Installation at one point
Internal distribution
Water Supply
Installation at one point
Wiegh Bridge
Civil work
Installation and Commissioning
Fuel Station
Civil work
Installation and Commissioning
Miscellaneous
EMM ( Pollution monitoring &
Mitigation measures)
Traffic safety
Segment no.
Segments 8.5 m 618 Pre Cast
6.5m 115 Pre Cast
17.2m 2084 Pre Cast
17.2 253 Cast in Situ
Remarks
Pre Cast
Cast in Situ
Pre Cast
Cast in Situ
Pre Cast
Cast in Situ
Pre Cast
Cast in Situ
Pre Cast
Cast in Situ
Pre Cast
Cast in Situ
Pre Cast
Cast in Situ
Pre Cast
Cast in Situ
Pre Cast
Cast in Situ
Pre Cast
Cast in Situ
Pre Cast
Cast in Situ
Pre Cast
Cast in Situ
Pre Cast