Micropiles - Timeline
z 1952 - First introduced in Italy for foundation restoration
(underpinning) of WWII damaged buildings
z 1960’s – Widely used in Europe for underpinning old
sensitive structures
z mid 70’s – First introduced in USA (New York &
Boston)
z 1980’s – Being introduced in East Asia
z Today – ‘Micro-mini Revolution’ worldwide

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 1
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

Micropile Applications
z Rock Socketting – where driven piles cannot
penetrate.
z Supporting New Loads in Congested Areas
z Seismic Retrofit
z Arresting Structural Settlement
z Resisting Uplift/Dynamic Loads
z Underpinning
z Excavation Support in Confined Areas

Different Types of Micropiles

Flexibility – Suits
the soil, Suits your
needs…

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 2
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

Benefits of Micropiles

No.1
Reason
When you have
problems of low
headroom and
restricted
access…

Benefits of Micropiles
No.2 Reason :
High Performance
•Loading fr 3 – 500 tons!
•Higher As/Ac compared to RC Driven pile
As Micropile 4-8% vs As RC Pile <3%
-> Better in Bending, Lateral Loading
Shear resistance, Seismic performance

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 3
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

Benefits of Micropiles

High
As/Ac

Good for

High
Lateral/
Seismic
Loading

Benefits of Micropiles
No.3 Reason :
Can Penetrate Anything
• Drilling thru stiff clay, sandstone, timber,
granite (except buried steel).
•Easier penetration in rock compared to bored pile.

By various creative ways


of drilling…

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 4
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

Benefits of
Micropiles Can penetrate
anything…
Wash Boring – Roller (Tricone) Bit

Auger

Buried
Steel
Down Hole Hammer

Use Down-Hole-Hammer with Air Compressor to drill thru Rock/Granite

Benefits of Micropiles
No.4 Reason :
Flexibility
(Many Ways) to adjust to
difficult soils…
• Enhance End Bearing
•‘Cross-Breed’ with other Ground
Improvement technique…

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 5
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

Typical Pile Loading


Capacity (Geotech+Structural)
Depending on soil & pile structure, some typical
working loads :
z Dia 250mm, Rebar 6T25, 5m socket in
Granite rock - (70+ tons)
z Dia 250mm, API Pipe As/Ac=8%, 40m in soft
soils - (100 tons)
z Dia 150mm, Rebar 3T25, 20m thru soft clay
+ hard sandy silt end-bearing - (50 tons)

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 6
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

DESIGN PILE CAPACITY


In SOIL (Typical Design using SPT Values)
Skin Friction, fs = 2N kN/m2
End Bearing, fb = 400N/3 or 10000 kN/m2

DESIGN PILE CAPACITY


In ROCK (Socketing)
Skin Friction – Use extrapolation of SPT
(e.g.Granite N=300-500, Sandstone N=200)
fs = 2N kN/m2
Or use Rowe & Armitage (1987):
Skin Fric, fs=0.45 to 0.6(qu)0.5
Zhang & Einstein (1998):
End Bearing, fb = 3.0 to 6.6(qu)0.5

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 7
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

Structural Capacity of Piles


Typical Reinforcement = Rebar T16, 20, 25, 32

Ultimate Axial Load:


fu = 0.4*fcu*Ac + 0.75*fy*As

Example : 6Y25 rebar in φ250mm micropile, grout


grade 30MPa, fy=500 N/mm2
fu = 1693kN = 169tons

CO$T
RM$150–350 /meter
Price Depends on :
z Reinforcement Type
z Rock Socketing ?
z Volume (φ) of hole
z Grouting Method (any post grouting)
z Location - Accessibility
z Length/Quantity of piles

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 8
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

Production
Typical Production
Wash Boring Φ250mm x 25m,
Drag/roller bit, 4T25 cage,
silty soil,3m casing 2 piles/day

-ditto- sandstone/granite socket 2m, DTH


Hammer 2-3 piles/day

Typical Manpower Requirement


e.g. 100 micropiles, wash bore, φ250mm, 20m, 2 rigs.

Rig (2 No.) 1x2 driller


2x2 helpers Can cut down to
only 8-9 men for
Fabrication 1 welder concurrent
2 general workers activity planning
& utilising ready
Grouting etc 2 @ grout mixer mix or slurry
1 @ agitator tank pump mixer,
steel pipe &
1 pump operator
crane.
1 hoseman
Production >4
TOTAL 14 men piles/day/rig

Production 3 piles/day/rig
Overall cost reduction ~ 20-30% by increased production.

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 9
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

Typical Site Setup


Grouting
Clearing of Plant
new area for Entrance/
setting out Delivery

Air
Compressor
Preparing
to grout
pile here

Ac
Water Tank

ce
Current

ss
Drilling

Rd
Location

Fabrication
Yard
Drilling
Pump

Small Quantity – Small Piles


For small sites,
use simpler
rigs with lower
torque, faster
RPM…
(depending on soil type)
e.g. SI rigs

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 10
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

Small/Constrained sites -
SI Rig/ Portable Drill frame
e.g. ‘Jacro’ is the solution!

Big Quantity, Small machines…

Tmn Kotamas, Kota Tinggi, Johor

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 11
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

Small Quantity, Big machine…

JB Inner Ring Road


Johor Bahru

Big Quantity, Big machine…

Vibro unit…

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 12
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

Drilling Tools
Drilling Rig (Flexible) – Size, Rotary Torque, RPM, maneuverity
Drilling Type – Wash Bore, Dry Auger, DTH hammer (Rock Drill)
Drill Bit & Rods – Drag Bit, Roller Bit, DTH (flat/convex), Tubex.
Pump – Recirculating fluid – Diaphragm pump / Piston pump.

Jack-in- Micropile

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 13
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

Monitor drilling parameters :


Thrust Force on Drilling bit
Drilling Fluid Flow Rate & Pressure
Rotary/top drive RPM
Rotary/top drive torque
Air Compressor Output Pressure
Recirculating Fluid Viscosity

Why?
Thrust Force : The thrust force is the force acting along the
axis of the drill during cutting. The thrust force plays a significant
role in the buckling of the drill.

Torque/RPM : The Torque/RPM signifies the power needed


by the machine tool to drill the hole. Also, Torque acting on the
drill can result in torsional vibrations affecting hole quality.

500kV Transmission Line


Micropiling Works

T8
Line
2

b4

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 14
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

500kV Transmission Line


Micropiling Works

T8
Line
2
After

500kV Transmission Line


Micropiling Works

T13
Line
2

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 15
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

500kV Transmission Line


Micropiling Works

T8
Line
2

500kV Transmission Line


Micropiling Works

T38
Line
1

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 16
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

500kV Transmission Line


Micropiling Works

T38
Line
1

500kV Transmission Line


Micropiling Works

Uplift
Load
Test

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 17
Third Arm Engineering Sdn Bhd -
Your Ground Improvement Solutions

Solutions for the Difficult Ground

www.geoprofound.com

Tel : 016-7236492, 07-2364932


alaneth@gmail.com 18

Você também pode gostar