Você está na página 1de 2

3P150 CASE : 1 3P150 CASE : 2

MOMENT ABOUT MAJOR AXIS MOMENT ABOUT MINOR AXIS


Ult. Pile Level Arm Moment Depth = 600 mm No of Ult. Pile Level Arm Moment Depth = 600 mm
Piles Cap. (kN) (m) (kNm) Eff. depth, D = 484 mm Piles capacity (m) (kNm) Eff. depth = 472 mm
1 300 0.436 130.80 fcu = 25 N/mm2 1 300 0.225 67.50 fcu = 25 N/mm2
0 300 0.000 0.00 Pilecap Width, B = 900 mm 0 300 0.000 0.00 Pilecap Width = 1320 mm
0 300 0.000 0.00 Pile Working Load = 200 kN 0 300 0.000 0.00 Pile Working Load = 200 kN
0 300 0.000 0.00 col (b/dia) = 125 mm 0 300 0.000 0.00 col (b/dia) = 125 mm
0 300 0.000 0.00 col (d) = 225 mm 0 300 0.000 0.00 col (d) = 225 mm
0 300 0.000 0.00 1.5D = 726 mm 0 300 0.000 0.00 1.5d = 708 mm
0 300 0.000 0.00 0 300 0.000 0.00
130.80 kNm 67.50 kNm

k= 0.02 k= 0.01
z/d = 0.95 z= 459.80 mm z/d = 0.95 z= 448.40 mm
Ast = 711 mm2 or 790 mm2/m Ast = 376.15 mm2
Provide 7 T 12 Ast = 791.68 mm2 Provide 10 Y 12 Ast = 1130.97 mm2
Provide Spacing Sv = 131 mm OK 0.18 % Provide Spacing Sv = 134 mm OK 0.18 %
Ast = 865 mm2/m Ast = 845 mm2

Minimum Steel, 0.13bh/100 = 702 mm2 OK Minimum Steel, 0.13bh/100 = 1029.6 mm2 OK

Punching Shear Punching Shear


COL LOAD , V = 400 kN (ALL) Col. Perimeter, p = 700 mm COL LOAD , V = 400 kN (ALL) Col. Perimeter, p = 700 mm
v / p.d = 1.18 N/mm2 v / p.d = 1.21 N/mm2
vu = 4.00 N/mm2 OK vu = 4.00 N/mm2 OK

Punching Shear (1.5d) Punching Shear (1.5d)


V= 400 kN (ALL) Col. Perimeter, p = 3254 mm V= 400 kN (ALL) Col. Perimeter, p = 3182 mm
v / p.d = 0.25 N/mm2 v / p.d = 0.27 N/mm2
vu = 4.00 N/mm2 OK vu = 4.00 N/mm2 OK

One Way Shear One Way Shear


No of Pile = 1 B= 900 mm No of Pile = 1 B= 1320 mm
V= 300 kN( One Side) v/bd = 0.69 N/mm2 V= 300 kN( One Side) v/bd = 0.48 N/mm2
av1 = 400 mm av1 = 200 mm
2d/av1 = 2.42 2d/av1 = 4.72
vc = 0.36 N/mm2 vc = 0.36 N/mm2
vc x 2d/av = 0.87 N/mm2 OK vc x 2d/av = 1.69 N/mm2 OK
4P200a CASE : 1 4P200a CASE : 2
MOMENT ABOUT MAJOR AXIS MOMENT ABOUT MINOR AXIS
Ult. Pile Level Arm Moment Depth = 700 mm No of Ult. Pile Level Arm Moment Depth = 700 mm
Piles Cap. (kN) (m) (kNm) Eff. depth, D = 584 mm Piles capacity (m) (kNm) Eff. depth = 564 mm
1 600 0.654 392.40 fcu = 25 N/mm2 1 600 0.259 155.40 fcu = 25 N/mm2
0 600 0.000 0.00 Pilecap Width, B = 1175 mm 0 600 0.000 0.00 Pilecap Width = 1890 mm
0 600 0.000 0.00 Pile Working Load = 400 kN 0 600 0.000 0.00 Pile Working Load = 400 kN
0 600 0.000 0.00 col (b/dia) = 225 mm 0 600 0.000 0.00 col (b/dia) = 225 mm
0 600 0.000 0.00 col (d) = 450 mm 0 600 0.000 0.00 col (d) = 450 mm
0 600 0.000 0.00 1.5D = 876 mm 0 600 0.000 0.00 1.5d = 846 mm
0 600 0.000 0.00 0 600 0.000 0.00
392.40 kNm 155.40 kNm

k= 0.04 k= 0.01
z/d = 0.95 z= 554.80 mm z/d = 0.95 z= 535.80 mm
Ast = 1767 mm2 or 1504 mm2/m Ast = 724.72 mm2
Provide 9 T 20 Ast = 2827.43 mm2 Provide 10 Y 16 Ast = 2010.62 mm2
Provide Spacing Sv = 131 mm OK 0.41 % Provide Spacing Sv = 197 mm OK 0.19 %
Ast = 2390 mm2/m Ast = 1022 mm2

Minimum Steel, 0.13bh/100 = 1069.25 mm2 OK Minimum Steel, 0.13bh/100 = 1719.9 mm2 OK

Punching Shear Punching Shear


COL LOAD , V = 1800 kN (ALL) Col. Perimeter, p = 1350 mm COL LOAD , V = 1800 kN (ALL) Col. Perimeter, p = 1350 mm
v / p.d = 2.28 N/mm2 v / p.d = 2.36 N/mm2
vu = 4.00 N/mm2 OK vu = 4.00 N/mm2 OK

Punching Shear (1.5d) Punching Shear (1.5d)


V= 1800 kN (ALL) Col. Perimeter, p = 4179 mm V= 1800 kN (ALL) Col. Perimeter, p = 4059 mm
v / p.d = 0.74 N/mm2 v / p.d = 0.79 N/mm2
vu = 4.00 N/mm2 OK vu = 4.00 N/mm2 OK

One Way Shear One Way Shear


No of Pile = 1 B= 1175 mm No of Pile = 1 B= 1890 mm
V= 600 kN( One Side) v/bd = 0.87 N/mm2 V= 600 kN( One Side) v/bd = 0.56 N/mm2
av1 = 614 mm av1 = 219 mm
2d/av1 = 1.90 2d/av1 = 5.15
vc = 0.47 N/mm2 vc = 0.36 N/mm2
vc x 2d/av = 0.89 N/mm2 OK vc x 2d/av = 1.87 N/mm2 OK