Brief of

132kV GIS Grid Station New Islamabad International Airport &


Feeding Transmission line
1- Project Financing
 PC-1 amount Rs. 665.2 million
 Rs. 332.6 million by Civil aviation authority
 Rs. 332.6 million by Government of Pakistan against PSDP

2- Scope of Work
A- Grid Station :-
 2 Nos. 132/11.5kV, 20/26 MVA Power Transformers.
 3 Nos. Transformer Bays.
 2 Nos. 132kV Line Bays.
 2 Nos. 11kV Incoming Panels, 2 Nos. 11kV Bus Coupler Panels, 16
Nos. 11kV Outgoing Panels.
 1 Nos. stand by 40 KVA Diesel Generator
I. Total Estimated Cost= Rs. 605.2 million
II. Contractor= M/S SIEYUAN-NAEEM (J.V) Co. China
III. Status= Commissioned on 8th August, 2015 (On No Load Basis)
B- Transmission line :-
 Total Towers= 46 Nos.
 Length of Transmission line = 6.5 km
 Double Circuit and with Rail as a conductor
I. Total Estimated Cost= Rs. 60 million
II. Contractor= M/s Gravity Engineers Pvt. Ltd. Lahore
III. Status= Completed
C- Residential Colony:-
 06 Nos. Category-IV Type Triple story Flats
I. Total Estimated Cost= Rs. 40 million
II. Contractor= NAEEM & Co.
III. Status= Finishing work is in Progress.