Você está na página 1de 24

PERENCANAAN

Anggaran Dana Desa

a
tam
a
an
nc
Re

nU
n
to
Be

la
t

P8
Pla

Ja ,60
m'
x0
0 ,70
u k.
2)
an
a (SL
nc na
Re ca an
a
m'
en nc ng)
,10
on R n Re exis
ti

et x1
to karan
an t Be bong

P5
tB l ur P la
,10
P7
(p em

Pla Sa 1
u k.
0 1)
3.4 (SL
na ing
II ca ist
a
an
en Ex g
nc ting)
n Re exi
tin
s
to karan R
an l an x is an)

P4
t Be bong
0
l ur Ja n E gan
P la
4.0
(p em

Sa e to penan
t B ada
a Pla idak
nc
an .40 (t
Re m' 77
to
n ,60 II
Be x0 a '
,70 0m
an
t 0

P6
nc ng)
Pla n Re exis
4.0
ti
0 to karan
1,1
k.
0x
t Be bong

P3
u P la
2) (p em

(SL . 1,1
na .00 uk a
en
ca 23 1) an
R SL nc
an a( Re .00
l ur ing
c an et
on 17
Sa
ist )
to
n Exnganan
0 R en tB

P2
Be na
a pe

4.0 Pla
ra n
at ad
Pl ak

yo
(tid

lu
Sa
n Bo 0 I
su 2.5

Du 0
3.8
I

.00
na 73
ca
en
nR ul
Be
to
gg
lat an
P1 nT
P
isting

la
nan)
Ex
anga
ton
pen

Ja
ak ada
t Be
(tid
Pla

g
tin
E xis
l an
Ja ing
ist ) .00
Ex anan 39
on ang
e t pen
t B ada
Pla (tidak

GAMPONG LAMDAYA KECAMATAN INGIN JAYA


KABUPATEN ACEH BESAR
2018
REKAPITULASI
KEGIATAN : PEMBANGUNAN SALURAN DAN PLAT BETON
LOKASI : GAMPONG LAMDAYA KECAMATAN INGIN JAYA KABUPATEN ACEH BESAR
TAHUN : 2018

NILAI
NO PEKERJAAN LOKASI VOLUME
(Rp.)

1 Saluran (Type-1) - P 163,5 m' Jalan Tanggul 163,50 x 1,10 m' 197,143,000

2 Saluran (Type-2) - P 125,3 m' Dusun Boyo 125,30 x 0,70 m' 68,564,000

3 Plat Beton (Type-1) - 3 unit Jalan Tanggul 4,00 x 1,10 x 0,2 m' 12,144,000

4 Plat Beton (Type-2) - 3 unit Dusun Boyo 4,00 x 0,70 x 0,15 m' 9,783,000

5 Plat Beton (Type-3) - 3 unit Jalan Utama 4 x 1,20 x 0,2 m' 12,366,000

JUMLAH 300,000,000

DIBULATKAN 300,000,000

Terbilang : Tiga Ratus Juta Rupiah

Banda Aceh, Februari 2018


Disetujui oleh : Diajukan oleh,
Keuchik Gampong Lamdaya Tim Pelaksana

RIZWAN RIZWAN R
U
B T
Jalan Utama S
4.00 4.00 4.00
Plat Beton Rencana Plat Beton Rencana Plat Beton Rencana
Type-3 Type-3 Type-3
Saluran Rencana (Type-2) uk. 0,70 x 0,60 m' Saluran Rencana (Type-2) uk. 0,70 x 0,60 m'
II
Plat Beton Existing Plat Beton Rencana Plat Beton Rencana Plat Beton Rencana
(tidak ada penanganan) (pembongkaran existing) (pembongkaran existing) (pembongkaran existing)
Type-2 Type-2 Type-2
Dusun Boyo II
isti
Ex an)
ng 4.00
o n an
et nang
t B ada pe
Pla (tidak
3.00 3.80 2.50 4.00 23.00 4.00 77.40 4.00 3.40
Saluran Rencana (Type-1) uk. 1,10 x 1,10 m' Saluran Rencana (Type-1) uk. 1,10 x 1,10 m' Saluran Rencana (Type-1) uk. 1,10 x 1,10 m' Saluran Rencana (Type-1) uk. 1,10 x 1,10 m'
Jalan Existing I
Jalan Existing
Plat Beton Rencana Plat Beton Existing Plat Beton Rencana Plat Beton Rencana Plat Beton Existing
(tidak ada penanganan) (tidak ada penanganan)
Type-1 Type-1 I
Type-1
4.00 22.50 4.50 39.00 4.00 73.00 4.00 17.00
Jalan Tanggul
Site Plan
1 : 150 Gampong Lamdaya
Pekerjaan Judul Gambar, Menyetujui, Disiapkan oleh, Gambar Rencana
KEUCHIK GAMPONG LAMDAYA
PEMBANGUNAN SALURAN & PLAT BETON SITE PLAN PERENCANAAN SALURAN DAN PLAT BETON NO. GAMBAR TAHUN ANGGARAN
01 2018
Lokasi
DIRENCANAKAN DIGAMBAR DIPERIKSA
GAMPONG LAMDAYA
KECAMATAN INGIN JAYA KABUPATEN ACEH BESAR RIZWAN RIZWAN R
PROVINSI ACEH
RENCANA ANGGARAN BIAYA (RAB)
ALOKASI DANA DESA GAMPONG LAMDAYA KECAMATAN INGIN JAYA
KABUPATEN ACEH BESAR
Provinsi : Aceh No. RAB : 1
Kabupaten : Aceh Besar Jenis Kegiatan : Saluran
Kecamatan : Ingin Jaya Volume : 163,50 x 1,10 m'
Gampong : Lamdaya Lokasi : Jalan Tanggul

VOLUME JUMLAH
HARGA
PPN PPH
SATUAN Pajak Daerah
NO URAIAN Satuan Harga TOTAL
Total ADD Pasal 22 10% 2%

( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )

1. TENAGA KERJA
1. 1 Kepala Tukang 10.00 10.00 hok 130,000 1,300,000 19,500 1,319,500
1. 2 Tukang 90.00 90.00 hok 120,000 10,800,000 162,000 10,962,000
1. 3 Pekerja 359.00 359.00 hok 87,000 31,233,000 468,495 31,701,495
Sub Total Tenaga Kerja (1) 43,333,000 - - 649,995 43,982,995
2. BAHAN
2. 1 Air 23,553.00 23,553.00 ltr 50 1,177,650 17,665 1,195,315
2. 2 Pasir Urug 13.00 13.00 m3 50,000 650,000 130,000 9,750 789,750
2. 3 Pasir beton 60.00 60.00 m3 165,000 9,900,000 600,000 148,500 10,648,500
2. 4 Kerikil beton 84.00 84.00 m3 165,000 13,860,000 840,000 207,900 14,907,900
2. 5 Pipa PVC 3/4" - 2 m' (@ 0,25 m') 7.00 7.00 btg 60,000 420,000 42,000 462,000
2. 6 Kayu uk. 5/5 - 4 m' 253.00 253.00 btg 47,500 12,017,500 180,263 12,197,763
2. 7 Papan mall 2/20 - 4 m' 198.50 198.50 lbr 55,000 10,917,500 1,091,750 163,763 12,173,013
2. 8 Semen @ 40 Kg 880.00 880.00 zak 58,000 51,040,000 5,104,000 765,600 56,909,600
2. 9 Minyak Bekisting 12.00 12.00 ltr 5,000 60,000 6,000 66,000
2. 10 Paku 36.00 36.00 kg 17,500 630,000 63,000 693,000
2. 11 Kawat Ikat 61.00 61.00 kg 18,500 1,128,500 112,850 1,241,350
2. 12 Besi ø 10 732.00 732.00 btg 48,000 35,136,000 3,513,600 527,040 39,176,640
2. 13 Papan Proyek 1.00 1.00 unit 200,000 200,000 200,000
2. 14 Biaya Pembersihan Akhir 1.00 1.00 ls 500,000 500,000 500,000
2. 15 Biaya Perencanaan 1.00 1.00 ls 1,500,000 1,500,000 1,500,000
2. 16 Biaya Adm./foto Dok 1.00 1.00 ls 500,000 500,000 500,000
Sub Total Bahan (2) 139,637,150 1,570,000 9,933,200 2,020,480 153,160,830

TOTAL (1+2) 197,143,825

DIBULATKAN 197,143,000

Terbilang : Seratus Sembilan Puluh Tujuh Juta Seratus Empat Puluh Tiga Ribu Rupiah

Banda Aceh, Februari 2018


Disetujui oleh : Diajukan oleh,
Keuchik Gampong Lamdaya Tim Pelaksana

RIZWAN RIZWAN R
1 PERHITUNGAN KUANTITAS

Provinsi : Aceh No. RAB : 1


Kabupaten : Aceh Besar Jenis Kegiatan : Saluran
Kecamatan : Ingin Jaya Ukuran/ dimensi : 163,50 x 1,10 m'
Gampong : Lamdaya Lokasi : Jalan Tanggul

NO SKETSA DAN ESTIMASI VOLUME VOLUME SAT.

PENAMPANG SALURAN
20 70 20
300.00
Panjang = 163.50 m'
Tinggi galian = 1.25 m'
Lebar saluran = 1.10 m'
Tebal pasir alas = 0.05 m'
110
100
135
Tinggi beton alas = 0.05 m'
Tebal lantai saluran = 0.15 m'
Tinggi dinding saluran = 1.10 m'
Lebar lantai saluran = 0.70 m'
15
5 Tinggi saluran elev. tanah asli = 1.00 m'
5
Tinggi saluran atas elev. tanah asli = 0.10 m'
70 Lebar plasteran bibir saluran = 0.22 m'
1 Galian Tanah 110

V = P x L
Pot. I -x I T x 25%

1 : 25 Jl. Tanggul
= 163.50 x 1.30 1.25 x 25%
= 66.42 m2

Upah :
a. Pekerja = 0.750 OH × 66.42 m3 = 49.82 hok
b. Mandor = 0.025 OH × 66.42 m3 = 1.66 hok

2 Urugan Kembali
Volume = 0.25 × 66.42 m3

Upah :
a. Pekerja = 0.500 hok/m3 × 66.42 m3 = 33.21 hok
b. Mandor = 0.050 hok/m3 × 66.42 m3 = 3.32 hok

3 Pembongkaran bangunan lama


Volume = Panjang × Lebar × Tinggi x n
Volume = - m' × - m' × - m' × - sisi = - m3

Upah :
a. Pekerja = 6.667 hok/m3 × - m3 = - hok
b. Mandor = 0.333 hok/m3 × - m3 = - hok

4 Urugan Pasir
Volume = Panjang × Lebar × tinggi
Volume = 163.50 m' × 1.30 m' × 0.05 m' = 10.63 m3

Bahan :
a. Pasir Urug = 1.200 m3/m3 × 10.63 m3 = 12.75 m3

Upah :
a. Pekerja = 0.300 hok/m3 × 10.63 m3 = 3.19 hok
b. Mandor = 0.010 hok/m3 × 10.63 m3 = 0.11 hok
NO SKETSA DAN ESTIMASI VOLUME VOLUME SAT.

5 Beton Alas Camp. 1pc : 3ps : 4kr


Volume = Panjang × Lebar × Tinggi x n
Volume = 163.50 m' × 1.30 m' × 0.05 m' = 10.63 m3

Bahan :
a. Semen @40 kg = 6.900 zak/m3 × 10.63 m3 = 73.33 zak
b. Pasir Beton = 0.591 m3/m3 × 10.63 m3 = 6.29 m3
c. Kerikil (Maks 30 mm) = 0.750 m3/m3 × 10.63 m3 = 7.97 m3
d. Air = 215.0 ltr/m3 × 10.63 m3 = 2,284.91 ltr

Upah :
a. Pekerja = 1.650 hok/m3 × 10.63 m3 = 17.54 hok
b. Tukang batu = 0.275 hok/m3 × 10.63 m3 = 2.92 hok
c. Kepala Tukang = 0.028 hok/m3 × 10.63 m3 = 0.30 hok
d. Mandor = 0.083 hok/m3 × 10.63 m3 = 0.88 hok
6 Bekisting Saluran
Volume = Panjang × Lebar × n
Volume = 163.50 m' × 1.10 m' × 2.00 sisi / 3.00 kali pakai = 119.90 m2

Bahan :
a. Kayu Klas III = 0.045 m3/m2 × 119.90 m2 = 5.40 m3
b. Paku 5 - 10 cm = 0.300 kg/m2 × 119.90 m2 = 35.97 kg
c. Minyak Bekesting = 0.100 ltr/m2 × 119.90 m2 = 11.99 ltr

Upah :
a. Pekerja = 0.520 hok/m2 × 119.90 m2 = 62.35 hok
b. Tukang batu = 0.260 hok/m2 × 119.90 m2 = 31.17 hok
c. Kepala Tukang = 0.026 hok/m2 × 119.90 m2 = 3.12 hok
d. Mandor = 0.026 hok/m2 × 119.90 m2 = 3.12 hok

7 Beton Camp. 1pc : 2ps : 3kr


Volume = Panjang × Lebar × Tinggi x n
Volume = 163.50 m' × 1.10 m' × 1.25 m' = 224.81 m3
Volume Void = 163.50 m' × 0.70 m' × 1.10 m' x (1.00) = (125.90) m3
98.92 m3
Bahan :
a. Semen @40 kg = 8.150 zak/m3 × 98.92 m3 = 806.18 zak
b. Pasir Beton = 0.543 m3/m3 × 98.92 m3 = 53.70 m3
c. Kerikil (Maks 30 mm) = 0.762 m3/m3 × 98.92 m3 = 75.40 m3
d. Air = 215.0 ltr/m3 × 98.92 m3 = 21,267.26 ltr

Upah :
a. Pekerja = 1.650 hok/m3 × 98.92 m3 = 163.21 hok
b. Tukang batu = 0.275 hok/m3 × 98.92 m3 = 27.20 hok
c. Kepala Tukang = 0.028 hok/m3 × 98.92 m3 = 2.77 hok
d. Mandor = 0.083 hok/m3 × 98.92 m3 = 8.21 hok
8 Pembesian
Pemasangan jenis tulangan :
K1 K2
Tulangan Melintang (beugel) _ ø 10 - 150
Tulangan Memanjang (pokok) _ ø 10 - 200
BJ ø 10 = 0.62 kg/m'

Perhitungan besi melintang/ tulangan bagi(beugel) Y2


Y1
Panjang besi melintang untuk satu buah :
K1 = 0.05 m'
K2 = 0.05 m'
Y1 = 1.20 m'
Y2 = 1.20 m'
X
X = 1.05 m'
Jumlah = 3.55 m'
NO SKETSA DAN ESTIMASI VOLUME VOLUME SAT.

Jumlah besi beugel diperlukan untuk saluran sepanjang 164 m' Panjang 164 m'
= =
Jarak Tulangan 0.15 m'

= 1,090.00 bh
≈ 1,090.00 bh
Jumlah panjang besi beugel dibutuhkan = 3.55 m' x 1,090 bh = 3,870 m'
Jika dipakai besi dengan panjang per batang = 10 m'
Diperlukan besi untuk beugel sebanyak 3,870 m'
= = 386.95 btg x 1.10
10 m'
= 425.65 btg
≈ 426.00 btg

Perhitungan besi memanjang/ tulangan pokok


Panjang bidang yang harus dipasang tulangan pokok = panjang 1 bh beugel (tidak termasuk kait)
Lb = Y1 + X + Y2
= 1.20 + 1.05 + 1.20
= 3.45 m'

3.45 m'
Jumlah tulangan memanjang = = 17.25 bh = 17.00 bh
0.20 m'
Jika dipakai besi dengan panjang per batang = 10 m'

164 x 17.000
Diperlukan besi memanjang sebanyak = = 278 x 1.10 = 305.75 btg
10
≈ 306.00 btg

Berat Besi : Tulangan Melintang = 3,870 x 0.6165 = 2,386 kg


Tulangan Memanjang = 164 x 17.00 x 0.6165 = 1,714 kg
4,099 kg

Kawat Ikat = 0.015 x 4,099 = 61.49 kg


≈ 61.00 kg

Upah :
a. Pekerja = 0.070 hok/kg × 409.91 kg = 28.69 hok
b. Tukang besi = 0.070 hok/kg × 409.91 kg = 28.69 hok
c. Kepala Tukang = 0.007 hok/kg × 409.91 kg = 2.87 hok
d. Mandor = 0.004 hok/kg × 409.91 kg = 1.64 hok
I
20
70 110
20 70 20
20
110
100 I Denah Saluran (Type-1)
135
1 : 25 Jl. Tanggul
15
5
5
70
Ø10-150
110
Ø10-200
Pot. I - I
1 : 25 Jl. Tanggul
Pembesian Saluran (Type-1)
1 : 25 Jl. Tanggul
Pekerjaan Judul Gambar, Menyetujui, Disiapkan oleh, Gambar Rencana
KEUCHIK GAMPONG LAMDAYA
PEMBANGUNAN SALURAN & PLAT BETON PEMBANGUNAN SALURAN (SL1) NO. GAMBAR TAHUN ANGGARAN
02 2018
Lokasi
DIRENCANAKAN DIGAMBAR DIPERIKSA
GAMPONG LAMDAYA
KECAMATAN INGIN JAYA KABUPATEN ACEH BESAR RIZWAN RIZWAN R
PROVINSI ACEH
RENCANA ANGGARAN BIAYA (RAB)
ALOKASI DANA DESA GAMPONG LAMDAYA KECAMATAN INGIN JAYA
KABUPATEN ACEH BESAR
Provinsi : Aceh No. RAB : 2
Kabupaten : Aceh Besar Jenis Kegiatan : Saluran Baru
Kecamatan : Ingin Jaya Volume : 125,30 x 0,70 m'
Gampong : Lamdaya Lokasi : Dusun Boyo

VOLUME JUMLAH
HARGA
PPN PPH
SATUAN Pajak Daerah
NO URAIAN Satuan Harga TOTAL
Total ADD Pasal 22 10% 2%

( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )

1. TENAGA KERJA
1. 1 Kepala Tukang 3.00 3.00 hok 130,000 390,000 5,850 395,850
1. 2 Tukang 26.00 26.00 hok 120,000 3,120,000 46,800 3,166,800
1. 3 Pekerja 254.00 254.00 hok 87,000 22,098,000 331,470 22,429,470
Sub Total Tenaga Kerja (1) 25,608,000 - - 384,120 25,992,120
2. BAHAN
2. 1 Air 7,678.00 7,678.00 ltr 50 383,900 5,759 389,659
2. 2 Pasir Urug 7.00 7.00 m3 50,000 350,000 70,000 5,250 425,250
2. 3 Pasir beton 20.00 20.00 m3 165,000 3,300,000 200,000 49,500 3,549,500
2. 4 Kerikil beton 28.00 28.00 m3 165,000 4,620,000 280,000 69,300 4,969,300
2. 5 Pipa PVC 3/4" - 2 m' (@ 0,25 m') 6.00 6.00 btg 60,000 360,000 36,000 396,000
2. 6 Kayu uk. 5/5 - 4 m' 88.00 88.00 btg 47,500 4,180,000 62,700 4,242,700
2. 7 Papan mall 2/20 - 4 m' 116.00 116.00 lbr 55,000 6,380,000 638,000 95,700 7,113,700
2. 8 Semen @ 40 Kg 285.00 285.00 zak 58,000 16,530,000 1,653,000 247,950 18,430,950
2. 9 Minyak Bekisting 6.00 6.00 ltr 5,000 30,000 3,000 33,000
2. 10 Paku 18.00 18.00 kg 17,500 315,000 31,500 346,500
2. 11 Papan Proyek 1.00 1.00 unit 200,000 200,000 200,000
2. 12 Biaya Pembersihan Akhir 1.00 1.00 ls 476,000 476,000 476,000
2. 13 Biaya Perencanaan 1.00 1.00 ls 1,500,000 1,500,000 1,500,000
2. 14 Biaya Adm./foto Dok 1.00 1.00 ls 500,000 500,000 500,000
Sub Total Bahan (2) 39,124,900 550,000 2,361,500 536,159 42,572,559
TOTAL (1+2) 68,564,679

DIBULATKAN 68,564,000

Terbilang : Enam Puluh Delapan Juta Lima Ratus Enam Puluh Empat Ribu Rupiah

Banda Aceh, Februari 2018


Disetujui oleh : Diajukan oleh,
Keuchik Gampong Lamdaya Tim Pelaksana

RIZWAN RIZWAN R
2 PERHITUNGAN KUANTITAS

Kabupaten : Aceh Besar No. RAB : 2


Kecamatan : Ingin Jaya Jenis Kegiatan : Saluran Baru
Gampong : Lamdaya Ukuran/ dimensi : 125,30 x 0,70 m'
Lokasi : Dusun Boyo

NO SKETSA DAN ESTIMASI VOLUME VOLUME SAT.

PENAMPANG SALURAN

15 40 15 Panjang = 125.30 m'


10
Tinggi saluran dalam tanah = 0.70 m'
Lebar saluran bawah = 0.60 m'
Lebar saluran atas = 0.70 m'
50 70 Tebal pasir alas = 0.05 m'
Tinggi beton alas = 0.05 m'
30
Tebal lantai saluran = 0.10 m'
10 Tinggi dinding saluran = 0.60 m'
5
5 Lebar lantai saluran = 0.30 m'
Lebar bukaan atas = 0.40 m'
Tinggi saluran elev. tanah asli = 0.50 m'
60
Ttinggi saluran atas elev. tanah asli = 0.10 m'
70 Lebar plasteran bibir saluran = 0.17 m'
1 Galian Tanah

V = P x L x T x 0%

= 125.30 x 0.90 x 0.70 x 0%


= - m2

Upah :
a. Pekerja = 0.750 OH × - m3 = - hok
b. Mandor = 0.025 OH × - m3 = - hok

2 Urugan Kembali
Volume = 0.25 × - m3

Upah :
a. Pekerja = 0.500 hok/m3 × - m3 = - hok
b. Mandor = 0.050 hok/m3 × - m3 = - hok

3 Pembongkaran bangunan lama


Volume = Panjang × Lebar × Tinggi x n
Volume = 125.30 m' × 1.30 m' × 0.15 m' × 1.00 sisi = 24.43 m3

Upah :
a. Pekerja = 6.667 hok/m3 × 24.43 m3 = 162.90 hok
b. Mandor = 0.333 hok/m3 × 24.43 m3 = 8.14 hok

4 Urugan Pasir
Volume = Panjang × Lebar × tinggi
Volume = 125.30 m' × 0.80 m' × 0.05 m' = 5.01 m3

Bahan :
a. Pasir Urug = 1.200 m3/m3 × 5.01 m3 = 6.01 m3

Upah :
a. Pekerja = 0.300 hok/m3 × 5.01 m3 = 1.50 hok
b. Mandor = 0.010 hok/m3 × 5.01 m3 = 0.05 hok
NO SKETSA DAN ESTIMASI VOLUME VOLUME SAT.

5 Beton Alas Camp. 1pc : 3ps : 4kr


Volume = Panjang × Lebar × Tinggi x n
Volume = 125.30 m' × 0.80 m' × 0.05 m' = 5.01 m3

Bahan :
a. Semen @40 kg = 6.900 zak/m3 × 5.01 m3 = 34.58 zak
b. Pasir Beton = 0.591 m3/m3 × 5.01 m3 = 2.96 m3
c. Kerikil (Maks 30 mm) = 0.750 m3/m3 × 5.01 m3 = 3.76 m3
d. Air = 215.0 ltr/m3 × 5.01 m3 = 1,077.58 ltr

Upah :
a. Pekerja = 1.650 hok/m3 × 5.01 m3 = 8.27 hok
b. Tukang batu = 0.275 hok/m3 × 5.01 m3 = 1.38 hok
c. Kepala Tukang = 0.028 hok/m3 × 5.01 m3 = 0.14 hok
d. Mandor = 0.083 hok/m3 × 5.01 m3 = 0.42 hok

6 Bekisting Saluran
Volume = Panjang × Lebar × n
Volume = 125.30 m' × 0.70 m' × 2.00 sisi / 3.00 kali pakai = 58.47 m2

Bahan :
a. Kayu Klas III = 0.045 m3/m2 × 58.47 m2 = 2.63 m3
b. Paku 5 - 10 cm = 0.300 kg/m2 × 58.47 m2 = 17.54 kg
c. Minyak Bekesting = 0.100 ltr/m2 × 58.47 m2 = 5.85 ltr

Upah :
a. Pekerja = 0.520 hok/m2 × 58.47 m2 = 30.41 hok
b. Tukang batu = 0.260 hok/m2 × 58.47 m2 = 15.20 hok
c. Kepala Tukang = 0.026 hok/m2 × 58.47 m2 = 1.52 hok
d. Mandor = 0.026 hok/m2 × 58.47 m2 = 1.52 hok

7 Beton Camp. 1pc : 2ps : 3kr


Volume = Panjang × Lebar × Tinggi x n
Volume = 125.30 m' × 0.65 m' × 0.70 m' = 57.01 m3
Volume Void = 125.30 m' × 0.35 m' × 0.60 m' x (1.00) = (26.31) m3
30.70 m3

Bahan :
a. Semen @40 kg = 8.150 zak/m3 × 30.70 m3 = 250.19 zak
b. Pasir Beton = 0.543 m3/m3 × 30.70 m3 = 16.66 m3
c. Kerikil (Maks 30 mm) = 0.762 m3/m3 × 30.70 m3 = 23.40 m3
d. Air = 215.0 ltr/m3 × 30.70 m3 = 6,600.18 ltr

Upah :
a. Pekerja = 1.650 hok/m3 × 30.70 m3 = 50.65 hok
b. Tukang batu = 0.275 hok/m3 × 30.70 m3 = 8.44 hok
c. Kepala Tukang = 0.028 hok/m3 × 30.70 m3 = 0.86 hok
d. Mandor = 0.083 hok/m3 × 30.70 m3 = 2.55 hok
15 40 15
10 II
15
50 70
30
10
5
Beton K - 225 30 40
5
15
60
70 II
Pot. II - II Denah Saluran (Type-2)
1 : 25 Dusun Boyo 1 : 25 Dusun Boyo
Pekerjaan Judul Gambar, Menyetujui, Disiapkan oleh, Gambar Rencana
KEUCHIK GAMPONG LAMDAYA
PEMBANGUNAN SALURAN & PLAT BETON PEMBANGUNAN SALURAN (SL2) NO. GAMBAR TAHUN ANGGARAN
03 2018
Lokasi
DIRENCANAKAN DIGAMBAR DIPERIKSA
GAMPONG LAMDAYA
KECAMATAN INGIN JAYA KABUPATEN ACEH BESAR RIZWAN RIZWAN R
PROVINSI ACEH
RENCANA ANGGARAN BIAYA (RAB)
ALOKASI DANA DESA GAMPONG LAMDAYA KECAMATAN INGIN JAYA
KABUPATEN ACEH BESAR
Provinsi : Aceh No. RAB : 3
Kabupaten : Aceh Besar Jenis Kegiatan : Tutup Saluran
Kecamatan : Ingin Jaya Volume : 4,00 x 1,10 x 0,2 m'
Gampong : Lamdaya Lokasi : Jalan Tanggul

VOLUME JUMLAH
HARGA
PPN PPH
SATUAN Pajak Daerah
NO URAIAN Satuan Harga TOTAL
Total ADD Pasal 22 10% 2%

( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )

1. TENAGA KERJA
1. 1 Kepala Tukang 1.00 1.00 hok 130,000 130,000 1,950 131,950
1. 2 Tukang 2.00 2.00 hok 120,000 240,000 3,600 243,600
1. 3 Pekerja 4.00 4.00 hok 87,000 348,000 5,220 353,220
Sub Total Tenaga Kerja (1) 718,000 - - 10,770 728,770
2. BAHAN
2. 1 Air 190.00 190.00 ltr 50 9,500 143 9,643
2. 2 Pasir beton 1.00 1.00 m3 165,000 165,000 10,000 2,475 177,475
2. 3 Kerikil beton 1.00 1.00 m3 165,000 165,000 10,000 2,475 177,475
2. 4 Papan mall 2/20 - 4 m' 3.00 3.00 lbr 55,000 165,000 2,475 167,475
2. 5 Kayu uk. 5/7 - 4 m' 2.00 2.00 btg 66,500 133,000 1,995 134,995
2. 6 Kayu uk. 5/5 - 4 m' 3.00 3.00 btg 47,500 142,500 2,138 144,638
2. 7 Semen @ 40 Kg 8.00 8.00 zak 58,000 464,000 46,400 510,400
2. 8 Minyak Bekisting 1.00 1.00 ltr 5,000 5,000 500 5,500
2. 9 Paku 1.00 1.00 kg 17,500 17,500 1,750 19,250
2. 10 Kawat Ikat 2.00 2.00 kg 18,500 37,000 3,700 40,700
2. 11 Besi ø 12 14.00 14.00 btg 67,000 938,000 93,800 1,031,800
2. 12 Papan Proyek 1.00 1.00 unit 200,000 200,000 200,000
2. 13 Biaya Pembersihan Akhir 1.00 1.00 ls 100,000 100,000 100,000
2. 14 Biaya Perencanaan 1.00 1.00 ls 500,000 500,000 500,000
2. 15 Biaya Adm./foto Dok 1.00 1.00 ls 100,000 100,000 100,000
Sub Total Bahan (2) 3,141,500 20,000 146,150 11,700 3,319,350

TOTAL (1+2) 4,048,120

DIBULATKAN 4,048,000

u/ 3 UNIT PLAT BETON TYPE 1 12,144,000

Terbilang : Dua Belas Juta Seratus Empat Puluh Empat Ribu Rupiah

Banda Aceh, Februari 2018


Disetujui oleh : Diajukan oleh,
Keuchik Gampong Lamdaya Tim Pelaksana

RIZWAN RIZWAN R
3 PERHITUNGAN KUANTITAS

Provinsi : Aceh No. RAB : 3


Kabupaten : Aceh Besar Jenis Kegiatan : Tutup Saluran
Kecamatan : Ingin Jaya Ukuran/ dimensi : 4,00 x 1,10 x 0,2 m'
Gampong : Lamdaya Lokasi : Jalan Tanggul

NO SKETSA DAN ESTIMASI VOLUME VOLUME SAT.

PENAMPANG PLAT PENUTUP SALURAN

L (panjang) = 4.00 m'


b h (tinggi plat) = 0.20 m'
b (lebar plat) = 1.10 m'
Ø12-150
h

Ø12-150

1 Pembongkaran bangunan lama


Volume = Panjang × Lebar × Tinggi x n
Volume = - m' × - m' × - m' × - sisi = - m3

Upah :
a. Pekerja = 6.667 hok/m3 × - m3 = - hok
b. Mandor = 0.333 hok/m3 × - m3 = - hok

2 Bekisting Plat Beton


Volume = Panjang × Lebar × n sisi
Volume = 4.00 m' × 1.50 m' / 3.00 kali pakai = 2.00 m2

Bahan :
a. Kayu Klas III = 0.045 m3/m2 × 2.00 m2 = 0.09 m3
b. Paku 5 - 10 cm = 0.300 kg/m2 × 2.00 m2 = 0.60 kg
c. Minyak Bekesting = 0.100 ltr/m2 × 2.00 m2 = 0.20 ltr

Upah :
a. Pekerja = 0.520 hok/m2 × 2.00 m2 = 1.04 hok
b. Tukang batu = 0.260 hok/m2 × 2.00 m2 = 0.52 hok
c. Kepala Tukang = 0.026 hok/m2 × 2.00 m2 = 0.05 hok
d. Mandor = 0.026 hok/m2 × 2.00 m2 = 0.05 hok

3 Beton Camp. 1pc : 2ps : 3kr


Volume = Panjang × Lebar × Tinggi
Volume = 4.00 m' × 1.10 m' × 0.20 m' = 0.88 m3

Bahan :
a. Semen @40 kg = 8.150 zak/m3 × 0.88 m3 = 7.17 zak
b. Pasir Beton = 0.543 m3/m3 × 0.88 m3 = 0.48 m3
c. Kerikil (Maks 30 mm) = 0.762 m3/m3 × 0.88 m3 = 0.67 m3
d. Air = 215.0 ltr/m3 × 0.88 m3 = 189.20 ltr

Upah :
a. Pekerja = 1.650 hok/m3 × 0.88 m3 = 1.45 hok
b. Tukang batu = 0.275 hok/m3 × 0.88 m3 = 0.24 hok
c. Kepala Tukang = 0.028 hok/m3 × 0.88 m3 = 0.02 hok
d. Mandor = 0.083 hok/m3 × 0.88 m3 = 0.07 hok
NO SKETSA DAN ESTIMASI VOLUME VOLUME SAT.

4 Pembesian
Pemasangan jenis tulangan :
Tulangan Melintang (beugel) _ ø 12 - 150
Tulangan Memanjang (pokok) _ ø 12 - 150
BJ ø 12 = 0.89 kg/m'

Perhitungan besi melintang/ tulangan bagi(beugel)


Panjang besi melintang untuk satu buah : X2
K1 = 0.06 m'
K2 = 0.06 m' Ø12-150
K1
Y1 = 0.14 m'
Y2 = 0.14 m' Y1 Y2
X1 = 1.04 m'
X2 = 1.04 m' K2
Ø12-150
Jumlah = 2.48 m' X1

Jumlah besi beugel diperlukan untuk saluran sepanjang 4 m' Panjang 4 m'
= =
Jarak Tulangan 0.15 m'

= 26.67 bh
≈ 27.00 bh → L = 2.48 m'

Jumlah panjang besi beugel dibutuhkan = 2.48 m' x 27 bh = 67 m'


Jika dipakai besi dengan panjang per batang = 10 m'
Diperlukan besi untuk beugel sebanyak 67 m'
= = 6.70 btg x 1.10
10 m'
= 7.37 btg
≈ 7.00 btg

Perhitungan besi memanjang/ tulangan pokok


Panjang bidang yang harus dipasang tulangan pokok = panjang 1 bh beugel (tidak termasuk kait)
Lb = Y1 + X1 + Y2 + X2
= 0.14 + 1.04 + 0.14 + 1.04
= 2.36 m'

2.36 m'
Jumlah tulangan memanjang = = 15.73 bh = 16.00 bh
0.15 m'
Jika dipakai besi dengan panjang per batang = 10 m'

4 x 16
Diperlukan besi memanjang sebanyak = = 6 x 1.10 = 7.04 btg
10
≈ 7.00 btg

Berat Besi : Tulangan Melintang = 67 x 0.8878 = 59 kg


Tulangan Memanjang = 4 x 16.00 x 0.8878 = 57 kg
116 kg

Kawat Ikat = 0.015 x 116 = 1.74 kg


≈ 2.00 kg

Upah :
a. Pekerja = 0.070 hok/kg × 11.63 kg = 0.81 hok
b. Tukang besi = 0.070 hok/kg × 11.63 kg = 0.81 hok
c. Kepala Tukang = 0.007 hok/kg × 11.63 kg = 0.08 hok
d. Mandor = 0.004 hok/kg × 11.63 kg = 0.05 hok
A
20
20
Beton K - 225 70 110
110
20
20 469
Denah Plat Beton (Type-1)
A
1 : 30 Jl. Tanggul
Ø12-150
Ø12-150 Beton K - 225
110
Pot. A - A
469
1 : 30 Jl. Tanggul
Pembesian Plat Beton (Type-1)
1 : 30 Jl. Tanggul
Pekerjaan Judul Gambar, Menyetujui, Disiapkan oleh, Gambar Rencana
KEUCHIK GAMPONG LAMDAYA
PEMBANGUNAN SALURAN & PLAT BETON PEMBANGUNAN PLAT BETON (P1) NO. GAMBAR TAHUN ANGGARAN
04 2018
Lokasi
DIRENCANAKAN DIGAMBAR DIPERIKSA
GAMPONG LAMDAYA
KECAMATAN INGIN JAYA KABUPATEN ACEH BESAR RIZWAN RIZWAN R
PROVINSI ACEH
RENCANA ANGGARAN BIAYA (RAB)
ALOKASI DANA DESA GAMPONG LAMDAYA KECAMATAN INGIN JAYA
KABUPATEN ACEH BESAR
Provinsi : Aceh No. RAB : 4
Kabupaten : Aceh Besar Jenis Kegiatan : Tutup Saluran
Kecamatan : Ingin Jaya Volume : 4,00 x 0,70 x 0,15 m'
Gampong : Lamdaya Lokasi : Dusun Boyo

VOLUME JUMLAH
HARGA
PPN PPH
SATUAN Pajak Daerah
NO URAIAN Satuan Harga TOTAL
Total ADD Pasal 22 10% 2%

( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )

1. TENAGA KERJA
1. 1 Kepala Tukang 1.00 1.00 hok 130,000 130,000 1,950 131,950
1. 2 Tukang 1.00 1.00 hok 120,000 120,000 1,800 121,800
1. 3 Pekerja 5.00 5.00 hok 87,000 435,000 6,525 441,525
Sub Total Tenaga Kerja (1) 685,000 - - 10,275 695,275
2. BAHAN
2. 1 Air 91.00 91.00 ltr 50 4,550 68 4,618
2. 2 Pasir beton 1.00 1.00 m3 165,000 165,000 10,000 2,475 177,475
2. 3 Kerikil beton 1.00 1.00 m3 165,000 165,000 10,000 2,475 177,475
2. 4 Papan mall 2/20 - 4 m' 2.00 2.00 lbr 55,000 110,000 1,650 111,650
2. 5 Kayu uk. 5/7 - 4 m' 2.00 2.00 btg 66,500 133,000 1,995 134,995
2. 6 Kayu uk. 5/5 - 4 m' 2.00 2.00 btg 47,500 95,000 1,425 96,425
2. 7 Semen @ 40 Kg 4.00 4.00 zak 58,000 232,000 23,200 255,200
2. 8 Minyak Bekisting 1.00 1.00 ltr 5,000 5,000 500 5,500
2. 9 Paku 1.00 1.00 kg 17,500 17,500 1,750 19,250
2. 10 Kawat Ikat 1.00 1.00 kg 18,500 18,500 1,850 20,350
2. 11 Besi ø 12 9.00 9.00 btg 67,000 603,000 60,300 663,300
2. 12 Papan Proyek 1.00 1.00 unit 200,000 200,000 200,000
2. 13 Biaya Pembersihan Akhir 1.00 1.00 ls 100,000 100,000 100,000
2. 14 Biaya Perencanaan 1.00 1.00 ls 500,000 500,000 500,000
2. 15 Biaya Adm./foto Dok 1.00 1.00 ls 100,000 100,000 100,000
Sub Total Bahan (2) 2,448,550 20,000 87,600 10,088 2,566,238

TOTAL (1+2) 3,261,513

DIBULATKAN 3,261,000

u/ 3 UNIT PLAT BETON TYPE 2 9,783,000

Terbilang : Sembilan Juta Tujuh Ratus Delapan Puluh Tiga Ribu Rupiah

Banda Aceh, Februari 2018


Disetujui oleh : Diajukan oleh,
Keuchik Gampong Lamdaya Tim Pelaksana

RIZWAN RIZWAN R
4 PERHITUNGAN KUANTITAS

Provinsi : Aceh No. RAB : 4


Kabupaten : Aceh Besar Jenis Kegiatan : Tutup Saluran
Kecamatan : Ingin Jaya Ukuran/ dimensi : 4,00 x 0,70 x 0,15 m'
Gampong : Lamdaya Lokasi : Dusun Boyo

NO SKETSA DAN ESTIMASI VOLUME VOLUME SAT.

PENAMPANG PLAT PENUTUP SALURAN

L (panjang) = 4.00 m'


b h (tinggi plat) = 0.15 m'
b (lebar plat) = 0.70 m'
Ø12-150
h

Ø12-150

1 Pembongkaran bangunan lama


Volume = Panjang × Lebar × Tinggi x n
Volume = 4.00 m' × 0.70 m' × 0.15 m' × 1.00 sisi = 0.42 m3

Upah :
a. Pekerja = 6.667 hok/m3 × 0.42 m3 = 2.80 hok
b. Mandor = 0.333 hok/m3 × 0.42 m3 = 0.14 hok

2 Bekisting Plat Beton


Volume = Panjang × Lebar × n sisi
Volume = 4.00 m' × 1.00 m' × 1.00 sisi / 3.00 kali pakai = 1.33 m2

Bahan :
a. Kayu Klas III = 0.045 m3/m2 × 1.33 m2 = 0.06 m3
b. Paku 5 - 10 cm = 0.300 kg/m2 × 1.33 m2 = 0.40 kg
c. Minyak Bekesting = 0.100 ltr/m2 × 1.33 m2 = 0.13 ltr

Upah :
a. Pekerja = 0.520 hok/m2 × 1.33 m2 = 0.69 hok
b. Tukang batu = 0.260 hok/m2 × 1.33 m2 = 0.35 hok
c. Kepala Tukang = 0.026 hok/m2 × 1.33 m2 = 0.03 hok
d. Mandor = 0.026 hok/m2 × 1.33 m2 = 0.03 hok

3 Beton Camp. 1pc : 2ps : 3kr


Volume = Panjang × Lebar × Tinggi
Volume = 4.00 m' × 0.70 m' × 0.15 m' = 0.42 m3

Bahan :
a. Semen @40 kg = 8.150 zak/m3 × 0.42 m3 = 3.42 zak
b. Pasir Beton = 0.543 m3/m3 × 0.42 m3 = 0.23 m3
c. Kerikil (Maks 30 mm) = 0.762 m3/m3 × 0.42 m3 = 0.32 m3
d. Air = 215.0 ltr/m3 × 0.42 m3 = 90.30 ltr

Upah :
a. Pekerja = 1.650 hok/m3 × 0.42 m3 = 0.69 hok
b. Tukang batu = 0.275 hok/m3 × 0.42 m3 = 0.12 hok
c. Kepala Tukang = 0.028 hok/m3 × 0.42 m3 = 0.01 hok
d. Mandor = 0.083 hok/m3 × 0.42 m3 = 0.03 hok
NO SKETSA DAN ESTIMASI VOLUME VOLUME SAT.

4 Pembesian
Pemasangan jenis tulangan :
Tulangan Melintang (beugel) _ ø 12 - 150
Tulangan Memanjang (pokok) _ ø 12 - 150
BJ ø 12 = 0.89 kg/m'

Perhitungan besi melintang/ tulangan bagi(beugel)


Panjang besi melintang untuk satu buah : X2
K1 = 0.06 m'
K2 = 0.06 m' Ø12-150
K1
Y1 = 0.09 m'
Y2 = 0.09 m' Y1 Y2
X1 = 0.64 m'
X2 = 0.64 m' K2
Ø12-150
Jumlah = 1.58 m' X1

Jumlah besi beugel diperlukan untuk plat sepanjang 4 m' Panjang 4 m'
= =
Jarak Tulangan 0.15 m'

= 26.67 bh
≈ 27.00 bh → L = 1.58 m'

Jumlah panjang besi beugel dibutuhkan = 1.58 m' x 27 bh = 43 m'


Jika dipakai besi dengan panjang per batang = 10 m'
Diperlukan besi untuk beugel sebanyak 43 m'
= = 4.27 btg x 1.10
10 m'
= 4.69 btg
≈ 5.00 btg

Perhitungan besi memanjang/ tulangan pokok


Panjang bidang yang harus dipasang tulangan pokok = panjang 1 bh beugel (tidak termasuk kait)
Lb = Y1 + X1 + Y2 + X2
= 0.09 + 0.64 + 0.09 + 0.64
= 1.46 m'

1.46 m'
Jumlah tulangan memanjang = = 9.73 bh = 10.00 bh
0.15 m'
Jika dipakai besi dengan panjang per batang = 10 m'

4 x 10
Diperlukan besi memanjang sebanyak = = 4 x 1.10 = 4.40 btg
10
≈ 4.00 btg

Berat Besi : Tulangan Melintang = 42.66 x 0.8878 = 37.87 kg


Tulangan Memanjang = 4.00 x 10.00 x 0.8878 = 35.51 kg
73.38 kg
Kawat Ikat = 0.015 x 73.38 = 1.10 kg
≈ 1.00 kg

Upah :
a. Pekerja = 0.070 hok/kg × 7.34 kg = 0.51 hok
b. Tukang besi = 0.070 hok/kg × 7.34 kg = 0.51 hok
c. Kepala Tukang = 0.007 hok/kg × 7.34 kg = 0.05 hok
d. Mandor = 0.004 hok/kg × 7.34 kg = 0.03 hok
A
15
Beton K - 225 40 70
15 15
70
A 400
Denah Plat Beton (Type-2)
15
1 : 30 Dusun Boyo
40
30 15
Ø12-150
Ø12-150 Beton K - 225 40 70
60 15
70
400
Pot. A - A Pembesian Plat Beton (Type-2)
1 : 30 Dusun Boyo 1 : 30 Dusun Boyo
Pekerjaan Judul Gambar, Menyetujui, Disiapkan oleh, Gambar Rencana
KEUCHIK GAMPONG LAMDAYA
PEMBANGUNAN SALURAN & PLAT BETON PEMBANGUNAN PLAT BETON (P3) NO. GAMBAR TAHUN ANGGARAN
05 2018
Lokasi
DIRENCANAKAN DIGAMBAR DIPERIKSA
GAMPONG LAMDAYA
KECAMATAN INGIN JAYA KABUPATEN ACEH BESAR RIZWAN RIZWAN R
PROVINSI ACEH
RENCANA ANGGARAN BIAYA (RAB)
ALOKASI DANA DESA GAMPONG LAMDAYA KECAMATAN INGIN JAYA
KABUPATEN ACEH BESAR
Provinsi : Aceh No. RAB : 5
Kabupaten : Aceh Besar Jenis Kegiatan : Tutup Saluran
Kecamatan : Ingin Jaya Volume : 4 x 1,20 x 0,2 m'
Gampong : Lamdaya Lokasi : Jalan Utama

VOLUME JUMLAH
HARGA
PPN PPH
SATUAN Pajak Daerah
NO URAIAN Satuan Harga TOTAL
Total ADD Pasal 22 10% 2%

( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )

1. TENAGA KERJA
1. 1 Kepala Tukang 1.00 1.00 hok 130,000 130,000 1,950 131,950
1. 2 Tukang 2.00 2.00 hok 120,000 240,000 3,600 243,600
1. 3 Pekerja 4.00 4.00 hok 87,000 348,000 5,220 353,220
Sub Total Tenaga Kerja (1) 718,000 - - 10,770 728,770
2. BAHAN
2. 1 Air 207.00 207.00 ltr 50 10,350 155 10,505
2. 2 Pasir beton 1.00 1.00 m3 165,000 165,000 10,000 2,475 177,475
2. 3 Kerikil beton 1.00 1.00 m3 165,000 165,000 10,000 2,475 177,475
2. 4 Papan mall 2/20 - 4 m' 3.00 3.00 lbr 55,000 165,000 2,475 167,475
2. 5 Kayu uk. 5/7 - 4 m' 2.00 2.00 btg 66,500 133,000 1,995 134,995
2. 6 Kayu uk. 5/5 - 4 m' 3.00 3.00 btg 47,500 142,500 2,138 144,638
2. 7 Semen @ 40 Kg 8.00 8.00 zak 58,000 464,000 46,400 510,400
2. 8 Minyak Bekisting 1.00 1.00 ltr 5,000 5,000 500 5,500
2. 9 Paku 1.00 1.00 kg 17,500 17,500 1,750 19,250
2. 10 Kawat Ikat 2.00 2.00 kg 18,500 37,000 3,700 40,700
2. 11 Besi ø 12 15.00 15.00 btg 67,000 1,005,000 100,500 1,105,500
2. 12 Papan Proyek 1.00 1.00 unit 200,000 200,000 200,000
2. 13 Biaya Pembersihan Akhir 1.00 1.00 ls 100,000 100,000 100,000
2. 14 Biaya Perencanaan 1.00 1.00 ls 500,000 500,000 500,000
2. 15 Biaya Adm./foto Dok 1.00 1.00 ls 100,000 100,000 100,000
Sub Total Bahan (2) 3,209,350 20,000 152,850 11,713 3,393,913

TOTAL (1+2) 4,122,683

DIBULATKAN 4,122,000

u/ 3 UNIT PLAT BETON TYPE 3 12,366,000

Terbilang : Empat Juta Seratus Dua Puluh Dua Ribu Rupiah

Banda Aceh, Februari 2018


Disetujui oleh : Diajukan oleh,
Keuchik Gampong Lamdaya Tim Pelaksana

RIZWAN RIZWAN R
5 PERHITUNGAN KUANTITAS

Provinsi : Aceh No. RAB : 5


Kabupaten : Aceh Besar Jenis Kegiatan : Tutup Saluran
Kecamatan : Ingin Jaya Ukuran/ dimensi : 4 x 1,20 x 0,2 m'
Gampong : Lamdaya Lokasi : Jalan Utama

NO SKETSA DAN ESTIMASI VOLUME VOLUME SAT.

PENAMPANG PLAT PENUTUP SALURAN

L (panjang) = 4.00 m'


b h (tinggi plat) = 0.20 m'
b (lebar plat) = 1.20 m'
Ø12-150
h

Ø12-150

1 Pembongkaran bangunan lama


Volume = Panjang × Lebar × Tinggi x n
Volume = - m' × - m' × - m' × - sisi = - m3

Upah :
a. Pekerja = 6.667 hok/m3 × - m3 = - hok
b. Mandor = 0.333 hok/m3 × - m3 = - hok

2 Bekisting Plat Beton


Volume = Panjang × Lebar × n sisi
Volume = 4.00 m' × 1.60 m' / 3.00 kali pakai = 2.13 m2

Bahan :
a. Kayu Klas III = 0.045 m3/m2 × 2.13 m2 = 0.10 m3
b. Paku 5 - 10 cm = 0.300 kg/m2 × 2.13 m2 = 0.64 kg
c. Minyak Bekesting = 0.100 ltr/m2 × 2.13 m2 = 0.21 ltr

Upah :
a. Pekerja = 0.520 hok/m2 × 2.13 m2 = 1.11 hok
b. Tukang batu = 0.260 hok/m2 × 2.13 m2 = 0.55 hok
c. Kepala Tukang = 0.026 hok/m2 × 2.13 m2 = 0.06 hok
d. Mandor = 0.026 hok/m2 × 2.13 m2 = 0.06 hok

3 Beton Camp. 1pc : 2ps : 3kr


Volume = Panjang × Lebar × Tinggi
Volume = 4.00 m' × 1.20 m' × 0.20 m' = 0.96 m3

Bahan :
a. Semen @40 kg = 8.150 zak/m3 × 0.96 m3 = 7.82 zak
b. Pasir Beton = 0.543 m3/m3 × 0.96 m3 = 0.52 m3
c. Kerikil (Maks 30 mm) = 0.762 m3/m3 × 0.96 m3 = 0.73 m3
d. Air = 215.0 ltr/m3 × 0.96 m3 = 206.40 ltr

Upah :
a. Pekerja = 1.650 hok/m3 × 0.96 m3 = 1.58 hok
b. Tukang batu = 0.275 hok/m3 × 0.96 m3 = 0.26 hok
c. Kepala Tukang = 0.028 hok/m3 × 0.96 m3 = 0.03 hok
d. Mandor = 0.083 hok/m3 × 0.96 m3 = 0.08 hok
NO SKETSA DAN ESTIMASI VOLUME VOLUME SAT.

4 Pembesian
Pemasangan jenis tulangan :
Tulangan Melintang (beugel) _ ø 12 - 150
Tulangan Memanjang (pokok) _ ø 12 - 150
BJ ø 12 = 0.89 kg/m'

Perhitungan besi melintang/ tulangan bagi(beugel)


Panjang besi melintang untuk satu buah : X2
K1 = 0.06 m'
K2 = 0.06 m' Ø12-150
K1
Y1 = 0.14 m'
Y2 = 0.14 m' Y1 Y2
X1 = 1.14 m'
X2 = 1.14 m' K2
Ø12-150
Jumlah = 2.68 m' X1

Jumlah besi beugel diperlukan untuk saluran sepanjang 4 m' Panjang 4 m'
= =
Jarak Tulangan 0.15 m'

= 26.67 bh
≈ 27.00 bh → L = 2.68 m'

Jumlah panjang besi beugel dibutuhkan = 2.68 m' x 27 bh = 72 m'


Jika dipakai besi dengan panjang per batang = 10 m'
Diperlukan besi untuk beugel sebanyak 72 m'
= = 7.24 btg x 1.10
10 m'
= 7.96 btg
≈ 8.00 btg

Perhitungan besi memanjang/ tulangan pokok


Panjang bidang yang harus dipasang tulangan pokok = panjang 1 bh beugel (tidak termasuk kait)
Lb = Y1 + X1 + Y2 + X2
= 0.14 + 1.14 + 0.14 + 1.14
= 2.56 m'

2.56 m'
Jumlah tulangan memanjang = = 17.07 bh = 17.00 bh
0.15 m'
Jika dipakai besi dengan panjang per batang = 10 m'

4 x 17
Diperlukan besi memanjang sebanyak = = 7 x 1.10 = 7.48 btg
10
≈ 7.00 btg

Berat Besi : Tulangan Melintang = 72 x 0.8878 = 64 kg


Tulangan Memanjang = 4 x 17.00 x 0.8878 = 60 kg
125 kg

Kawat Ikat = 0.015 x 125 = 1.87 kg


≈ 2.00 kg

Upah :
a. Pekerja = 0.070 hok/kg × 12.46 kg = 0.87 hok
b. Tukang besi = 0.070 hok/kg × 12.46 kg = 0.87 hok
c. Kepala Tukang = 0.007 hok/kg × 12.46 kg = 0.09 hok
d. Mandor = 0.004 hok/kg × 12.46 kg = 0.05 hok
A
20
Saluran Existing
20
Beton K - 225 80 120
120
20
20 400
Denah Plat Beton (Type-3)
A
1 : 30 Jl. Utama
Saluran Existing
Saluran Existing
Ø12-150
Ø12-150 Beton K - 225
120
Pot. A - A
400
1 : 30 Jl. Utama
Pembesian Plat Beton (Type-3)
1 : 30 Jl. Utama
Pekerjaan Judul Gambar, Menyetujui, Disiapkan oleh, Gambar Rencana
KEUCHIK GAMPONG LAMDAYA
PEMBANGUNAN SALURAN & PLAT BETON PEMBANGUNAN PLAT BETON (P6) NO. GAMBAR TAHUN ANGGARAN
06 2018
Lokasi
DIRENCANAKAN DIGAMBAR DIPERIKSA
GAMPONG LAMDAYA
KECAMATAN INGIN JAYA KABUPATEN ACEH BESAR RIZWAN RIZWAN R
PROVINSI ACEH

Você também pode gostar