Start Date

4/8/2017 R3/rss2/gss R4

Preliminary- KD1 KD1 16.00 112.00 7/29/2017 KD1 26.00 182.00 10/7/2017
Definative- KD2 KD2 26.00 182.00 10/7/2017 KD2 46.00 322.00 2/24/2018
Preliminary Simu.-KD3 KD3 16.00 112.00 7/29/2017 KD3 26.00 182.00 10/7/2017
Final Simulat- KD4 KD4 22.00 154.00 9/9/2017 KD4 40.00 280.00 1/13/2018
Detail Draw-KD5 KD5 35.00 245.00 12/9/2017 KD5 80.00 560.00 10/20/2018
Workig drawing-KD6 KD6 45 315.00 2/17/2018 KD6 110 770.00 5/18/2019
Major Eqp- KD7 KD7 60 420.00 6/2/2018 KD7 130 910.00 10/5/2019
KD8 KD8 75 525.00 9/15/2018 KD8 0 - 4/8/2017
Commi ASS- KD9 KD9 80 560.00 10/20/2018 KD9 150 1,050.00 2/22/2020
KD10 KD10 0 - 4/8/2017 KD10 0 - 4/8/2017
Scada-KD11 KD11 86 602.00 12/1/2018 KD11 156 1,092.00 4/4/2020
Acceptance test- KD12 KD12 96 672.00 2/9/2019 KD12 164 1,148.00 5/30/2020
Taking Over-KD13 KD13 106 742.00 4/20/2019 KD13 174 1,218.00 8/8/2020
TIME IN W
Key Dates Description
PS

KD-1 Preliminary Design Submission 16

KD-2 Definitive Design Submission 26

KD-3 Submission of Preliminary Simulation Study 16

KD-4 Submission of Final Submission Study 22

Detail Engineering and Submittal of Technical


KD-5 proposals of major equipment to Engineer for 30
approval

KD-6 Submission of Working Drawings / Shop Drawings 35

KD-7 Delivery of Major Equipment to Site 42

Commissioning of Switching Substation and RSS cum


KD-8 TSS cum AMS including EHV cabling

KD-9 Commissioning of ASSs 52

KD-10 Not Used

KD-11 Commissioning of SCADA system 52

Completion of Acceptance Test after integrated


KD-12 60
testing of SCADA system

KD-13 Taking Over of the System 70


TIME IN WEEK FROM LOA DATE

R1 R2 R3 R4

16 26 16 16

26 46 26 46

16 26 16 26

22 40 22 40

30 60 35 80

35 80 45 110

50 100 60 130

65 75

70 115 80 150

76 125 86 156

84 132 96 164

94 142 106 174


Activity ID
NM-C2-R3-PS-IN-BN-02

Activity ID
NM-C2-R3-PS-DE-08
NM-C2-R3-PS-WD-47
NM-C2-R3-PS-WD-AN-10
NM-C2-R3-PS-WD-AN-11
NM-C2-R3-PS-WD-AN-15
NM-C2-R3-PS-WD-LN-42

WBS Code
Reach 3.1.1.6.2.1
Reach 3.1.1.6.2.2
Reach 3.1.1.6.2.3
Reach 3.1.1.6.2.4
Reach 3.1.1.6.2.5
Reach 3.1.1.6.2.7
Reach 3.1.1.6.2.8
Reach 3.1.1.6.2.9
Reach 3.1.1.6.2.10
Reach 3.1.1.6.2.11
Reach 3.1.1.6.2.6
Calendar Activity N Original Du
u7-Day Workweek Earthing Ma 18

Activity Name Start Finish


Submission of BOM of individual ASS equipments 1-Nov-17 ###
Submission of Lighting calculation for viaduct 6-Dec-17 4-Jan-18
Submission of SLD ACDB & DCDB- Ambazari Nagar 5-Jan-18 3-Feb-18
Approval of SLD ACDB & DCDB- Ambazari Nagar 8-Apr-17 14-Apr-17
Submission of Cable Trench- Ambazari Nagar 7-Oct-17 26-Oct-17
Submission of Earthing Layout- Ambazari Lake View 6-Nov-17 ###

WBS Name Total Activities


Series 301_Hingana Depot to Lokmanya Nagar Station 5
Series 302_Lokmanya Nagar Station to Bansi Nagar Station 5
Series 303_Bansi Nagar Station to Vasudew Nagar Station 5
Series 304_Vasudew Nagar Station to Rachana(Ring Road Junction) Station 5
Series 305_Rachana(Ring Road Junction) Station to Subhash Nagar Station 5
Series 306_Subhash Nagar Station to Ambazari Lake View Station 5
Series 307_Ambazari Lake View Station to LAD Chowk Station 5
Series 308_LAD Chowk Station to Shankar Nagar Square Station 5
Series 309_Shankar Nagar Square Station to Institutions of Engineers Station 5
Series 310_Institutions of Engineers Station to Jhansi Rani Square Station 5
Series 311_Jhansi Rani Square Station to Sitaburdi Station 5
Start Finish Primary CoTotal Float
### ### 272.5

Relationsh Lag Total Float Driving Critical


FS 0 -55 No Yes
FS 60 44 Yes No
FS 90 14 Yes No
FS 0 Yes No
FS 0 99 Yes No
FS 30 59 Yes No