Installation Guide
Excel is a world-class premium performing end-to-end infrastructure solution
- designed, manufactured, supported and delivered - without compromise.
Introduction
This installation guide has been produced to assist the Excel Partners with the best installation
practices for the Excel Structured Cabling System. The Excel Structured Cabling system meets the
component performance and configuration requirements of EN50173 for the Class of performance
desired. The location is based on a Class 1 environment in terms of M, I, C, E. The design of the
cabling system and containment solution into which it is to be installed should be compliant with the
requirements of the EN50174 and EN50310 standards.
Refer to Excel Partner Area ‘Technical Notes’ at www.excel-networking.com for this document and other technical notes.
2
without compromise.
On site
l Is the containment installed in the correct place and to the right
specification?
l Are you holding daily briefings for the site operatives?
l Is there any temporary fire stopping required during the installation
phase?
l Is there any difference between the reality of the site and the plans?
l Are there any access restrictions or other trades working in the same
areas at the same time?
l Is the earthing and electrical system installed?
l Is there restriction on the use of mobile phones or walkie-talkies?
3
Excel Installation Guide
4
without compromise.
A=SxP
A (Final Separation Distance) = S (Basic Separation Distance) x P (Power Cabling Factor)
5
Excel Installation Guide
NOTE
a The minimum separations may be reduced provided that appropriate cable management systems are used or product suppliers
guarantees are provided
b Where product suppliers guarantees do not exist, analysis shall be performed regarding possible disturbances e.g. frequency range,
harmonics, transients, bursts, transmitted power, etc.
6
without compromise.
Example - What is the minimum width of a 75mm deep cable tray supporting 1000 cables, each with a diameter of 5.5mm?
Multiply this occupied area by 1.2 to give 20% over size for day two expansion
Usable Area or Area required within cable tray (50% fill) = cable tray width x cable tray depth
2
7
Excel Installation Guide
ation
Tray
on is based onCalculation
the information in EN 50174-2:2009 + A1:2011
lculation This
is based
Tray on the isinformation
Calculation
tray calculation in EN 50174-2:2009
based on the information + A1:2011
in EN 50174-2:2009 + A1:2011
=
This tray calculation is based 2 × on the information in EN 50174-2:2009 + A1:2011
=
2×
and h = height of the tray)
width and(where w = width
h = height and htray)
of the = height of the tray) =
2×
ulation the area of a cable is doubled to allow for the fact that a cable is
e calculation
will not fit(in thethe
perfectly
(where warea
above of a and
inwidth cable
containment).
=calculation h =isofheight
the area doubled
a cable of to
theallow
is doubledtray) for the
to allow fact
for the factthat
that a acable
cable is and also will not fit perfectly in
is circular
also willcontainment).
not fit perfectly in containment).
ay be combined
(in the
These into
above
formulae one
calculation
may be combinedthe area of a cable is doubled to allow for the fact that a cable is
into one
ulae may circular
be combined intowill
and also onenot fit perfectly in containment).
2
= 2 2
These formulae may be combined into = one 2
um stack height ofmaximum
Note – the cables stack
is 150 mmof cables is 150 mm
height 2
maximum The
stack height of cables is 150 mm =
number of cables should then be reduced to allow for future installations. 2
bles should then be reduced to allow for future installations.
of cablesNote
should then
– the be reduced
maximum stacktoheight
allow offorcables
futureisinstallations.
150 mm
The number of cables should then be reduced to allow for future installations.
dder
8
y or Ladder
without compromise.
150
Basket Tray or Ladder =
1 + 0. 0007
As basket tray and ladder is non-continuous containment the maximum stack height needs to be reduced. This calculation is based on
the information in EN 50174-2:2009 + A1:2011
e span distance)
150
=
1 + 0. 0007
span distance)
(where “s” is the span distance)
r the maximum number of cables within conduit is based on a calculation
odified from the BICSI Telecommunications Distribution Methods Manual
Conduit
The formulae for the maximum number of cables within conduit is based on a calculation that has been modified from the BICSI
Telecommunications Distribution Methods Manual (TDMM).
umes straight
the maximum runs
The formula withofno
number
assumes bends
cables
straight and
withsmooth
within
runs bends walls.
conduit
no issmooth
and basedwalls.
on a calculation
dified from the BICSI Telecommunications Distribution Methods Manual
2
= 0.4 2
−1
mes straight runs with no bends and smooth walls.
e inside diameter
(where “c” isofthe
the conduit
inside andof“d”
diameter is the diameter
the conduit ofdiameter
and “d” is the the cable)
of the cable)
2 allow for future installations.
The number of cables should then be reduced to
ables should then be reduced to allow for future
= 0.4 2
− 1 installations.
Heating Effects
inside diameter of the conduit and “d” is the diameter of the cable)
mation
bles see
should Section
then
Energy losses XX
befrom –within
Installation
reduced willGuidelines.
to allow
cabling for
be futureinto
translated installations.
generation of heat. There are many factors which accumulate to create this
effect. The installer needs to be aware that the temperature rise in the cabling at these points can be in the order of 10oC or higher when
all of these factors come together. The temperature rise created is greatest where:
l the cabling is managed into large bundles
mation seel Section XX – Installation Guidelines.
and/or there are a large number of simultaneous users
l and/or cabling is run into constricted spaces such as at wall penetrations
l and/or the cabling is required to support higher energy applications / PoE applications.
l The energy loss due to heating effects is different for Screened and Unscreened cable.
All the performance criteria for the 100m Channel as outlined in EN 50173-2 is based upon it operating at an ambient temperature of
20˚C and for every degree over this level this distance will be reduced. The following formula provided in the above standard gives the
rate of reduction for unscreened cables, in short for temperature increases up to 20˚C above the ambient the Channel should be reduced
by 0.4% and for temperatures increased over 40˚C above the ambient there is an additional 0.6% that has to be added.
Unscreened
This could potentially have a dramatic effect to the performance of installed cabling as recent research shows that the level of heating
can be significant in some cases 30-40˚C above the ambient.
Screened Cabling performs much better, as the research has proved it does not heat up as much as an unscreened cable and when it
does the de-rating formula is much simpler as it is based upon 0.2%.
Screened
L = Length T = Temperature
9
Excel Installation Guide
Cable Installation
From the cabling system design and floor plans, make a cable pulling schedule. Map the pulling schedule onto the floor plans.
l Identify the labels and cable ID so that temporary labelling can be applied.
l It may be faster, cheaper and more accurate to print two sets of the final cable labels, using one set for installation purposes and then
replacing them after testing is completed. This will avoid unsightly ‘Pen Marks’ on the cable.
l Ensure that for each group of finished labels they are aligned and attached so they are readable from the same direction.
l If the installation is a mixture of copper and fibre optic cabling install the copper cabling first.
l Plan the occupation of cabling in the containment and along the route so that crossovers are eliminated and entry points into and
exits from the containment are not congested.
l In any cable run where the cable is to be pulled the run should contain no more than two 90o bends. If more than two 90o bends are
required or the sum of all angles is greater than 180o then there must be more pull points along the cable run where the cable is able
to be managed in and out of the containment.
l Respect the installation bend radius of the cable. Never exceed the recommended maximum pulling load of the cables.
l Determine the pulling in points which will cause damage to the cable, through sharp edges or bends tighter than the installation
bend radius.
l Apply any protection to the containment where damage to the cable sheath may occur. Consider using cable installation aids.
l Bundle size should be kept to a minimum.
l Maximum bundle size is 24 for 4 pair twisted copper cables.
l Smaller bundles make better use of limited containment space.
l With mixed length cables in a cable run always pull in the longest length cables first.
l Secure the stack of cable boxes or reels using a pulling frame or cable stands to hold the packaging in place.
l Pulling force must be respected. Maximum pull force for a single, or bundle of cables, is 110 N (25 lbf ).
l Avoid any cable kinks and maintain proper bend radius control during cabling pulling. If any kinks should occur, kinked cable should
be removed and replaced.
l For safety, only use cable jacks and pulling frames which are designed for and fit for purpose.
l Always control the rate at which cables are pulled off the drum.
l Take great care over the management of cable drum.
10
without compromise.
When installing cable at high level the additional requirements are as follows:
l Protect the edges of the basket or tray before starting to install the cable to ensure no damage is caused.
l Ensure that the edges of the tray or basket have a bend radius that exceeds the installation Bend Radius of the cable concerned, this
may be achieved by artificially increasing the dimension by the use of temporary packing material
l If bundles of cable are being routed from tray at high level to enter a cabinet from the top, some form of ‘waterfall’ must be used to
ensure the bend radius of the cable is not compromised. This can be simply and cost effectively achieved by the use of a section of
split flexible plastic conduit installed along the edge involved. The following image gives an example.
11
Excel Installation Guide
l When installing cable at high level ensure that sufficient engineers are available to carry out the work, it is recommended that cables
are ‘passed’ from one engineer to the next rather than trying to drag them over the tray.
The following image will give an example of this practice.
This table lists the most common part codes for the Excel cable designs. The diameters provided are correct for all part codes to which
this design is applied, for example coloured versions of Category 6 U/UTP.
During Installed
Part
Description Diameter Installation – – Bend
Number
Bend Radius Radius
100-065 Excel Category 5e Unscreened Twisted Pair (U/UTP) Cable - PVC 5.2 mm 42mm 21 mm
100-066 Excel Category 5e Unscreened Twisted Pair (U/UTP) Cable - LSOH 5.2 mm 42mm 21 mm
100-216 Excel Category 5e Screened Twisted Pair (F/UTP) Cable - LSOH 6.4 mm 51mm 26 mm
100-070 Excel Category 6 Unscreened Twisted Pair (U/UTP) Cable - PVC 6.2 mm 50 mm 25 mm
100-071 Excel Category 6 Unscreened Twisted Pair (U/UTP) Cable - LSOH 6.2 mm 50 mm 25 mm
100-076 Excel Category 6 Screened Twisted Pair (F/UTP) Cable - LSOH 7.6 mm 61 mm 30 mm
100-189 Excel Category 6A Unscreened Twisted Pair (U/UTP) Cable – LSOH 8.3 mm 67mm 34mm
100-191 Excel Category 6A Screened Twisted Pair (U/FTP) ' S-Foil' Cable – LSOH 6.7mm 54mm 27mm
100-196 Excel Category 6A Screened Twisted Pair (F/FTP) ' S-Foil' Cable – LSOH 6.9mm 56mm 28mm
12
without compromise.
Individual Component
Earthing Conductor
Cabinet Earthing
Conductor
Cabinet
Earthing Stud
13
Excel Installation Guide
The best practices for communications rooms and data centres recommend provision of an equipotential earthing grid or MESH-BN (a
bonding network in which all associated equipment frames, racks and cabinets and usually the DC power return conductor, are bonded
together as well as at multiple points to the Common Bonding Network).
This grid is used to earth all of the metallic components (frames, racks, floor tiles and pedestals, cable containment, etc) providing:
l a reliable signal reference
l adequate immunity from electromagnetic interference carried by the earthing network
Each rack and frame must be provided with an earthing conductor made back to either the MESH-BN or home run back to the main
communications grounding bar within the room. For some installations this may be the electrical earthing bar in the main power
distribution board.
Within the UK the specification for the rack earth connection is covered by:
BS6701:2010 Telecommunications equipment and telecommunications cabling specification for installation, operation and maintenance.
5-2.2.4 Earthing of racks, frames and cabinets.
Not less than:
l 4mm2 for a rack ≤ 21U
l 16mm2 for a rack > 21U
(please refer to the standard for further details)
14
without compromise.
Patch Panels
Termination procedures at the patch panel:
l It is acceptable for the cables to be dressed as either, 24 cables from one side or split as 12 from each.
l Maintain acceptable bend radius levels
l Do not kink cables
l Do not overtighten the cable ties to deform the cable in any way.
l Where a rear management bar is provided each cable should be individually secured by way of a cable tie, ‘bunching’ or
grouping of cables is deemed to be a poor installation practice.
l For Category 6 and above, best practice dictates all cables shall be individually terminated and secured to the management
bars provided. This has the two benefits of improved performance and ease of re-termination if a wire map error is
discovered during testing without the need to disturb any adjacent outlets on the same panel.
To enhance wire management in the back of the panel, it is recommended that a strain relief bar is mounted to the rack. Along the strain
relief bar use hook and eye cable ties for additional cable management.
Termination procedures for the punch down patch panel:
l Follow installation instruction sheet
l Outer cable jacket should be trimmed to be as close as possible to point of termination
l Last twist should be no further than 13 mm (0.5 inches) from the point of termination.
15
Excel Installation Guide
Colour code
The colour code or punch down followed by Excel for all of their cabling system components is the T568B format.
T568B
16
without compromise.
Top 52 mm 25 mm 30 mm
100-181 Cat 6A
Bottom 52 mm
Low Profile
Side 52 mm
Top 62 mm 30 mm 35 mm
100-182 Cat 6A
Bottom 62 mm
Unscreened
Side 62 mm
Top 30 mm 19 mm 19 mm
100-011 Cat 6
Bottom 30 mm
Keystone IDC
Side 30 mm
Top 33 mm 25 mm 29 mm
100-211 Cat 6
Bottom 33 mm
Toolless Jack
Side 33 mm
Top 29 mm 19 mm 23 mm
100-010 Cat 5e
Bottom 29 mm
Keystone IDC
Side 29 mm
Top 32 mm 25 mm 29 mm
100-203 Cat 5e
Bottom 32 mm
Toolless Jack
Side 32 mm
17
Excel Installation Guide
Top 58 mm 31 mm 36 mm
100-181 Cat 6A
Bottom 58 mm
Low Profile
Side 58 mm
Top 68 mm 36 mm 41 mm
100-182 Cat 6A
Bottom 68 mm
Unscreened
Side 68 mm
Top 36 mm 25 mm 25 mm
100-011 Cat 6
Bottom 36 mm
Keystone IDC
Side 36 mm
Top 39 mm 31 mm 35 mm
100-211 Cat 6
Bottom 39 mm
Toolless Jack
Side 39 mm
Top 35 mm 35 mm 29 mm
100-010 Cat 5e
Bottom 35 mm
Keystone IDC
Side 35 mm
Top 38 mm 31 mm 35 mm
100-203 Cat 5e
Bottom 38 mm
Toolless Jack
Side 38 mm
18
without compromise.
Top 50 mm 30 mm
100-181 Cat 6A
Bottom 50 mm
Low Profile
Side 50 mm
Top 60 mm 30 mm
100-182 Cat 6A
Bottom 60 mm
Unscreened
Side 60 mm
Top 21 mm
100-301 Cat 6
Bottom 21 mm
Unscreened 6c
Side 21 mm
Top 27 mm 22 mm
100-011 Cat 6
Bottom 27 mm
Keystone IDC
Side 27 mm
Top 60 mm 30 mm
100-211 Cat 6
Bottom 60 mm
Toolless Jack
Side 60 mm
Top 26 mm 22 mm
100-010 Cat 5e
Bottom 26 mm
Keystone IDC
Side 26 mm
Top 29 mm 22 mm
100-203 Cat 5e
Bottom 29 mm
Toolless Jack
Side 29 mm
19
Excel Installation Guide
Direction of
Jack Office Angled Keystone Shutter
Incoming Cable
Top 22 mm
100-181 Cat 6A
Bottom
Low Profile
Side
Top 35 mm
100-182 Cat 6A
Bottom
Unscreened
Side
Top 10 mm
100-276 Office Cat
Bottom 20 mm
6 Low Profile
Side 10 mm
Top 23 mm
100-011 Cat 6
Bottom
Keystone IDC
Side
Top 32 mm
100-211 Cat 6
Bottom
Toolless Jack
Side
Top 18 mm
100-297 Cat 6 Low
Bottom 20 mm
Profile 6c
Side
Top 10 mm
100-275 Office Cat
Bottom 19 mm
5e Low Profile
Side 10 mm
Top 23 mm
100-010 Cat 5e
Bottom
Keystone IDC
Side
Top 32 mm
100-203 Cat 5e
Bottom
Toolless Jack
Side
Top 18 mm
100-757 Cat 5e
Bottom 20 mm
Low Profile 6c
Side
20
without compromise.
21
Excel Installation Guide
l location of outlets
l identity of outlets
l fire stopping
l Bill Of Materials
22
without compromise.
Testing
Excel recommends Fluke Networks, this section is written around the use of this range of test equipment.
Channel Testing
The test set must be fitted with a set of Fluke Channel test heads.
IMPORTANT:
l Permanent Link Adapters must be ‘serviced’ every 5,000 tests.
l Channel Test heads last for a maximum of 2,000 tests, and cannot be serviced, they should be discarded and new ones purchased.
N.B. This number is based on the amount of matings, i.e. how often a Patch Lead is plugged into them. When testing a channel you
MUST leave that Patch Lead behind or that channel test is no longer valid.
l The test set must be within 12 months of calibration.
l Tests must be run with Graphs Stored enabled and HDTDR / HDTDX recorded for all *PASS/FAIL.
l Calibration of the Permanent Link Adapters shall be carried out in accordance with the recommendations of Fluke using a DTXCAL or
DSPCAL as appropriate and on replacement of a Personality Module.
l All Channel Test Heads, Personality Modules or Personality Module tips must be frequently inspected for damage or undue wear.
l At least one set of Fluke calibration tools DSPCAL, DTXCAL must be kept on site at all times during the project installation and testing
phases. NOTE: this may give you an improvement in XTALK and RL results.
l Power frequency must be set to 50Hz.
l Limits database and software must be as per the product set under test and Excel warranty requirement.
l The test limits for Excel are CENELEC EN50173 series including all latest amendments, modified by the copper cable type under test
(Class D, Class E, etc). If there is any doubt for installed cabling regarding which component performance specification to be used,
confirmation should be sought from the client or Project Manager and referred back to Excel for approval under their warranty
scheme.
l Installers should budget and schedule for replacement of Channel Test Heads, PLA2 tips and Personality Modules. The replacement
rate may be lower than recommended or required depending on wear and condition of the test equipment on site.
23
Excel Installation Guide
Recommendations
l Perform a basic wire map test with a Mod Tap (wire map), or similar, before using the Fluke tester to fault find
l Have a laptop computer on site with the latest version of Fluke Linkware installed
l Identify Main and Remote on the Channel adapters and PLA with a permanent ink pen or label ID system
Excel requires a copy of the test results in Fluke software (flw) or the alternative testers native format. Excel will not accept .pdf files
under any circumstances.
Each report will be stored by Excel.
The Installer will be provided with a copy of the Channel Warranty documentation Excel will endeavour to process Warranty Application
within 5 working days if the process contained in Section 13 of the Excel Encyclopaedia is followed.
24
without compromise.
Testing Set-up
This element is designed to provide the installer with valuable information on how to set up the Fluke DSX 5000 correctly to
provide Excel with the required information to assist us in processing the warranty applications smoothly and without undue
delay. (The process differs only very similar across other testers)
It is an easy to follow step-by- step guide for the less experienced whilst providing a useful reminder for those that have been
testing for many years.
Copper Testing
This will be broken down into a number of sub-topics, Permanent Link, Channel, Harness Links/Consolidation Cables and Patch
Leads. A full description of what each one of these constitutes can be found in the preceding diagrams.
However the first step is to check that your tester is fit for purpose, it has the right software and test limits loaded and has been
calibrated correctly, this is a very simple process with the new Fluke DSX 5000 and shows when the device was last calibrated and
the software revision. It is very simple to check on the Fluke Networks website at Flukenetworks.com and download the latest
version.
NB. As a Touch Screen interface you select by tapping on the icon involved.
On power up you will get the Home Screen (on the left) which shows how the device was set up for the last test. Tap the Tools
icon to bring up that page.
NB. If you ever want to return to the Home Screen at any point you can press the HOME button on the front of the Main Unit.
Go into Tools once there select Version Information, within here you will be able to check both the Main Unit and the module that
is fitted, whether that be Copper or Fibre.
25
Excel Installation Guide
Within Tools you can also set up units of measure, language, date & time etc.
Following this you must reference the Main and Remote Units, again it is a very simple task, attach the PLA004 Permanent Link
Adaptor to the Main and the Channel Adaptor to the remote. Plug them together.
Again within the Tools page select Set Reference you will then be guided through the simple process by the on screen
instructions.
When ready, select the Test icon the unit will then run through the process, which only takes a few seconds and is recommended
prior to starting every days testing.
26
without compromise.
The next task is to set up the PROJECT INFORMATION. Once more this has been simplified and is even quicker to complete.
From the Home Screen select PROJECT, within this screen you will be able to see each of the topics that require input.
This screen not only allows for projects to be directly set up on the device itself as well as transferring pre-configured projects
that have been set up within Fluke Linkware. However for this document we will concentrate setting the project up within the
DSX 5000 directly.
From this screen select CHANGE PROJECT, you will then be prompted to either select an existing one or create a new one select
CREATE NEW
27
Excel Installation Guide
Repeat the process for OPERATOR, which allows for the selection from a list of previous users or the creation of a new one.
Permanent Link
We now have to set up the specific test criteria needed for the project.
Once more this is very simple, as the unit senses whether the module attached is either Copper or Fibre and automatically selects
a list of relevant tests. The Home Screen will show the last test carried out.
Select TEST which will bring up the details of the test and then you can either, select one from the list displayed, edit one from
the list or create a new one. For this exercise select NEW TEST.
28
without compromise.
Again this initially brings up the previous test criteria for you to edit and amend
Select CABLE TYPE, This will initially bring up a list of previously used cable types, if the one that you want is not listed select more
and then the Manufacturers tab and then scroll down to EXCEL as Fluke Networks and many other equipment manufacturers list
the details of Excel cables within their testers.
Select the type required, which inserts the relevant NVP etc and automatically takes you back to the previous screen. Follow the
same process for selecting the required test limit.
However there is one slight anomaly in this process, by selecting TEST LIMIT it brings up a list of previously used tests, if the
one required is not on the list, select MORE, which brings up the following screen, you will notice that it does not include EN
(Cenelec).
29
Excel Installation Guide
You must first select REGIONS and then from within that screen EN, this will then bring up all the relevant Cenelec standards to
be selected from.
For Warranty Application Purposes, EXCEL prefers that Cenelec test limits are used.
Also note at the higher Classes there is both PL2 and PL3 listed, ensure you select the correct one. PL3 is to be used whenever a
Consolidation Point is part of the design.
The TEST SETUP Screen also allows contains two other important items that require selection they are:
STORE PLOT which must be selected as ON and HDTDR/HDTDX which must be set to FAIL/PASS*
You are now almost ready to start testing but first of all you must select SAVE to store the information you have just created.
One final additional feature of the DSX 5000 is; within the Home Screen, you have the ability to set up the ID field for those links
you intend to test, this can be done when setting up the project or at this stage simply by selecting NEXT ID: which brings up
the next one in the range that was previously used. Select CHANGE CABLE Ids and then you can either edit the existing range or
create a New ID Set within this last item you can even create a start and first point of the range.
Once you select DONE, it will take you back to the test you have set up
Attach the two PLA004 leads and testing can now commence testing.
30
without compromise.
Either by pressing the White Button on the front or selecting TEST from the Home screen. It is a remarkably quick process.
And the first screen you should see is the PASS screen, which has two tabs the first being WIRE MAP the second being the
PERFORMANCE
To see an individual result just select the parameter and it will bring up the next screen.
You then have the option to view either from the Main or Remote end as well as seeing Worst Values, you can scroll each of the
Pairs along with being able to drag and drop the cursor to specific frequencies, even zooming in a similar way as you do on any
Smartphone.
31
Excel Installation Guide
Channel
Channel Testing is not to be used for Warranty Applications, these guidelines are designed for troubleshooting purposes only.
Testing the channel is very simple and straightforward.
Replace the Permanent Link Heads and replace them with the Channel Heads, and following the guidance previously given in this
section, select a new set of patch leads to be used as reference cords, they should also be a minimum of 2m in length.
NOTE: these Reference Cord/Patch Leads should be replaced with new ones after every 100 tests.
From the Home Screen select the relevant Channel test in the same manner as described previously and select TEST.
The following is a workflow diagram for troubleshooting.
Doesn’t work
No
Horizontal Cabling
Channel Adapter
Measurement
starts here
* Remote channel adapter & RJ45 plug are excluded from the measurement using Digital Signal Processing
The above solution is a compromise between what the standards define and the desire to provide accurate test results for both Harness
Links and Consolidation Cables In this test scenario, no user patch cords are involved. Therefore it is more closely associated with a
permanent link test. This is the process recommended by Fluke Networks.
32
without compromise.
When you set the DSX 5000 to a Permanent Link standard and then press the Test button you will be greeted by the following
screen which correctly warns that the use of the Channel Head is not compatible with a Permanent Link test.
Select YES.
The affect of the remote channel adapter is removed in the above measurement. The channel adapter will normally add a
significant amount of NEXT to the measurement unless it is cancelled out. The DSX 5000 uses Digital Signal Processing to cancel
out the NEXT in the adapter in accordance with The Standards. Return loss in the mated connection is also minimized, as the
adapters contain RL calibration coefficients representing a nominal RJ45 plug.
Therefore it must be noted that the TRUE value of the RJ45 plug is ignored by this test and to ensure optimum performance the
Solid Core Patch Cords that are used to construct these Links/Cables are tested as such within the Factory.
Patch Leads
The purpose of certification testing is to ensure that a link, channel, or
component meets industry performance standards. Installers certify
permanent links and the network owners install patch cords at a later date
to complete the channel.
Patch cord certification brings together a compliant permanent link
and patch cord to make a standards compliant channel. Patch cord
certification can be performed in the factory or the field with the right Test
Equipment and Adapters.
As with permanent links and channels, the test equipment used for
certification must be set to the correct test limit and the relevant category l Image features Category 6 Patch Cord Adapters
Patch Cord Test Heads are used.
The Fluke Networks has a range of Patch Cord Test Head Sets available, Cat5e, Cat6 and Cat6A They all come in a version that can
test both Screened and Unscreened cables. Also note unlike the Permanent Link and Channel Adaptors, they are Specific Main
and Remote Heads, check you have them the correct way around as the DSX will warn of an incorrect set up.
From the Home Screen select a new Test Limit as has been described in this document, this time select Patch Cords, this will then
bring up all the Categories.
33
Excel Installation Guide
Select the required length and then SAVE, and select from the list and you can start testing.
34
without compromise.
Channel Description
A channel is defined as the “up to 100m” connection between two active components.
Physically the channel includes horizontal cable outlets (possibly a patch panel), Interconnect (fan out cables) and any cross connect
(patch cords), equipment or work area patch cords. There are limits imposed for key electrical parameters such as Attenuation, XTALK, RL,
ELFEXT, etc, the channel is not limited to a maximum of 4 connectors or junctions. However should a channel configuration require more
than 4 connectors then approval must be given, at design stage, by Excel for their warranty support.
Testing of a channel can take two forms:
l Confidence test where the patch cords are removed or replaced following the test
l Full test where the final configuration is tested and left in place
A channel test serves to validate either conformity with the generic cabling standards or application support.
The term “Reference Cord” is defined here as a new Excel patch cord that will only be used for up to 100 tests. After 100 tests the
Reference Cord must be destroyed and replaced with another new Excel Reference Cord.
Before a Channel test is performed all components in the Permanent Link must have been configured and validated for component
compliance.
Marginal or star passes on all other criteria are to be treated as failures.
35
Excel Installation Guide
Horizontal cable
Equipment
Equipment
Terminal
Equipment cord
TO
Work area cord
Mandatory tests:
Element Test
Permanent Link Permanent Link
TO
Optional tests:
C hannel C hannel
TO
b) Crossconnect – TO model
Channel = 100 m maximum
Horizontal cable
Equipment
Equipment
Terminal
Mandatory tests:
Element Test
Optional tests:
C hannel C hannel
TO
36
without compromise.
c) Interconnect – CP - TO model
Channel = 100 m maximum
Horizontal cable
Equipment
Equipment
Terminal
Equipment cord
CP TO
Work area cord
CP cable
Mandatory tests:
Element Test
CP
Permanent Link
C P C able
(PL head to C h head)
Optional tests:
CP TO
C hannel C hannel
CP TO
d) Crossconnect – CP - TO model
Horizontal cable
Equipment
Equipment
Terminal
CP TO
Patch cord Work area cord
Switch/Harness link CP cable
Mandatory tests:
Element Test
CP
Permanent Link
C P C able
(PL head to C h head)
Optional tests:
CP TO
C hannel C hannel
CP TO
37
European Headquarters Middle East & Africa Headquarters
Excel House PO Box 293695
Junction Six Industrial Park Office 11A, Gold Tower
Electric Avenue Cluster I
Birmingham B6 7JJ Jumeirah Lake Towers
England Dubai
United Arab Emirates
FS 547274
EMS 542863
MF978_03/15