Sr No Equipment Breakdown Desc.

1 Sandvik DI600-2 Engine problem, Major revamping work

Under carriage work ,Engine pbm,and compressor


2 Sandvik DI600-1
high temperature pbm
Comp oil leak from comp Air filter,water coming
3 Sandvik DI550
on comp oil tank

1 Komatsu PC1250 Hyd Operation slow

2 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit)

Over black smoke come out from the engine


1 Belaz 240Ton -1906
exchaust

1 IRDG-3442 Engine Seized

2 WT-OR 09N 9586 Fuel Pump Problem

3 Bolero camper-0299 Gear box pbm

1 Volvo FMX440 (143) under Registration paper

2 Volvo FMX440 (68) Accident

3 Volvo FMX440 (83) Air comperssor problem

4 Volvo FMX440 (109) Fan Hub Damaged


Engine overhaul , Gear box Repair & Steering Box
5 Ashok leyland (03)
Repair
6 Ashok leyland (23) Engine Side Abnormal Sound

7 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box

8 Ashok leyland (53) Break Durm lining problem


9 Ashok leyland (52) Accident & windshield

10 AMW(18) Electrical wire Fire

11 AMW(136) Gear box problem & pto pump

12 AMW(137) Gear box problem & PTO pump pbm

13 AMW(175) Gear box problem

14 AMW(179) Engine Problem

15 TN 30 AT 9392 Houseing Main Thread damaged

1 Sandvik DI600-4 Wet drilling water pump fixing work


Under carriage repairing work , Bucket & pin,bush
2 Tata Hitachi EX1200-3
replacement,oil services
Pollavaram Breakdown Report as on 01.03.2017

B/D Status B/D From PR Status PO Status Target Dt.

DRILLING SECTION

PO:4101078348,
Engine sent to Recon-Gmmco 04.07.2016 - 30.03.2017
58

Engine sent to Recon-Gmmco 02.02.2017 - - 25.03.2017

checking work 28.02.2017 - - 01.03.2017

EXCAVATOR & DOZER SECTION

Services 21.11.2016 - - 15.03.2017

Not
- 18.02.2017 - -
Declared

DUMPER SECTION

Fuel injector changing work 23.01.2017 - - 01.03.2017

SUPPORTING EQUIPMENTS

Engine removed 08.02.2017 2500058965 - 10.03.2017

services done fitting work 23.02.2017 - - 01.03.2017

sent to services -M&N Motors 25.02.2017 - - 03.03.2017

TRUCKS

- 23.11.2016 - - 10.03.2017

- 14.02.2017 - - 10.03.2017

- 23.2.2017 - - 05.03.2017

- 24.02.2017 - - 07.03.2017

- 01.01.2017 - PO-4101081036 05.03.2017

- 09.02.2017 - - 08.03.2017

- 18.01.2017 2500058279 - 03.03.2017

1.03.2017 - - 03.03.2017
- 24.02.2017 - - 03.03.2017

- 26.2.2017 - - 03.03.2017

25.2.2017 - - 12.03.2017

- 22.01.2017 - - 09.03.2017

22.02.2017 - - 06.03.2017

_ 05.02.2017 2500058046 05.03.2017

- 20.02.2017 - - 05.03.2017

Major maintenance
Fixing work 01.03.2017 - - 01.03.2017

Bucket removing work 01.03.2017 - - 05.03.2017


Remarks

Engine sent to GMMCO for recon work, Most of the spares available once engine arrived revamping will be
start.

Engine recon work sent to services - Nagpur , Compressor Repairing work under process

Checking work under process

Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
work. ETA of All subassemblies coming on 10th march .

Damage due to fire incident/Machine planned to remove from mines work in progress.

Excessive black smoke come out from the engine exhaust..Fuel injector changing work under process

waiting for new engine

Fuel pump fitting work under process

sent to services -M&N Motors-RJY

Work Under Progress

Work Under Progress

Work Under Progress

Work Under Progress

Waiting for Spares

Nozzle sent for repair

Engine dismantaled Sending to Automotive

work under progress


Waiting for Spares

Inspect

Waiting For spares

Cabin Work Under Progress

Waiting For spares

Engine Nozzle Sent for Repair

Waiting for Spares

Wet drilling water pump changing work under process

Under carriage repairing work,Bucket & pin,bush replacement,oil services work under process
Sr No Equipment Breakdown Desc.

1 Sandvik DI600-2 Engine problem, Major revamping work

Under carriage work ,Engine pbm,and compressor


2 Sandvik DI600-1
high temperature pbm

3 Sandvik DI550 Air Build up pbm

1 Komatsu PC1250 Hyd Operation slow

2 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit)

3 Komatsu PC450-1 (TIL) Hyd operation slow

Over black smoke come out from the engine


1 Belaz 240Ton -1906
exchaust

1 IRDG-3442 Engine Seized

2 Bolero camper-0299 Gear box pbm

1 Volvo FMX440 (143) under Registration paper

2 Volvo FMX440 (68) Accident

3 Volvo FMX440 (83) Air comperssor problem

4 Volvo FMX440 (109) Fan Hub Damaged


Engine overhaul , Gear box Repair & Steering Box
5 Ashok leyland (03)
Repair
6 Ashok leyland (23) Engine Side Abnormal Sound

7 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box

8 Ashok leyland (53) Break Durm lining problem


9 Ashok leyland (52) Accident & windshield

10 AMW(136) Gear box problem & pto pump

11 AMW(137) Gear box problem & PTO pump pbm

12 AMW(175) Gear box problem

13 AMW(179) Engine Problem

14 TN 30 AT 9392 Houseing Main Thread damaged

1 Atlas copco ROC L8-3 Weekly maintenance

Under carriage repairing work , Bucket & pin,bush


2 Tata Hitachi EX1200-3
replacement,oil services
Pollavaram Breakdown Report as on 02.03.2017

B/D Status B/D From PR Status PO Status Target Dt.

DRILLING SECTION

PO:4101078348,
Engine sent to Recon-Gmmco 04.07.2016 - 30.03.2017
58

Engine sent to Recon-Gmmco 02.02.2017 - - 25.03.2017

checking work 01.03.2017 - - 03.02.2017

EXCAVATOR & DOZER SECTION

Services 21.11.2016 - - 15.03.2017

Not
- 18.02.2017 - -
Declared

checking work 01.03.2017 - - 02.03.2017

DUMPER SECTION

Fuel injector changing work 23.01.2017 - - 02.03.2017

SUPPORTING EQUIPMENTS

Engine removed 08.02.2017 2500058965 - 10.03.2017

sent to services -M&N Motors 25.02.2017 - - 03.03.2017

TRUCKS

- 23.11.2016 - - 10.03.2017

- 14.02.2017 - - 10.03.2017

- 23.2.2017 - - 05.03.2017

- 24.02.2017 - - 07.03.2017

- 01.01.2017 - PO-4101081036 05.03.2017

- 09.02.2017 - - 08.03.2017

- 18.01.2017 2500058279 - 03.03.2017

1.03.2017 - - 03.03.2017
- 24.02.2017 - - 03.03.2017

25.2.2017 - - 12.03.2017

- 22.01.2017 - - 09.03.2017

22.02.2017 - - 06.03.2017

_ 05.02.2017 2500058046 05.03.2017

- 20.02.2017 - - 05.03.2017

Major maintenance
Rod changer sensor changing work 01.03.2017 - - 02.03.2017

Track link pin changing work 01.03.2017 - - 05.03.2017


Remarks

Engine sent to GMMCO for recon work, Most of the spares available once engine arrived revamping will be
start.

Engine recon work sent to services - Nagpur , Compressor Repairing work under process

Checking work under process

Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
work. ETA of All subassemblies coming on 10th march .

Damage due to fire incident/Machine planned to remove from mines work in progress.

Checking work under process

Excessive black smoke come out from the engine exhaust..Fuel injector changing work under process

waiting for new engine

sent to services -M&N Motors-RJY

Work Under Progress

Work Under Progress

Work Under Progress

Work Under Progress

Waiting for Spares

Nozzle sent for repair

Engine dismantaled Sending to Automotive

work under progress


Waiting for Spares

Waiting For spares

Cabin Work Under Progress

Waiting For spares

Engine Nozzle Sent for Repair

Waiting for Spares

maintenance work under process

Under carriage repairing work,Bucket & pin,bush replacement,oil services work under process
Sr No Equipment Breakdown Desc.

1 Sandvik DI600-2 Engine problem, Major revamping work

Under carriage work ,Engine pbm,and compressor


2 Sandvik DI600-1
high temperature pbm

1 Komatsu PC1250 Hyd Operation slow

2 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit)

3 Komatsu PC450-1 (TIL) Hyd Pump failure

4 Volvo EC700-1 (TIL) Stick crack

1 CAT Grader 120K (TIL) Fan Hub bearing damaged

1 IRDG-3442 Engine Seized

2 Bolero camper-0299 Gear box pbm

1 Volvo FMX440 (143) under Registration paper

2 Volvo FMX440 (68) Accident

3 Volvo FMX440 (83) Air comperssor problem

4 Volvo FMX440 (109) Fan Hub Damaged


Engine overhaul , Gear box Repair & Steering Box
5 Ashok leyland (03)
Repair
6 Ashok leyland (23) Engine Side Abnormal Sound

7 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box

8 Ashok leyland (09) Head Gasket problem


9 Ashok leyland (24) 2 Axle Houseing Crake

10 Ashok leyland (50) steering box problem

11 Ashok leyland (53) Break Durm lining problem

12 Ashok leyland (52) Accident & windshield

13 AMW(136) Gear box problem & pto pump

14 AMW(137) Gear box problem & PTO pump pbm

15 AMW(175) Gear box problem

16 AMW(179) Engine Problem

17 TN 30 AT 9392 Houseing Main Thread damaged

1 Sandvik DP1100-4 Weekly maintenance

Under carriage repairing work , Bucket & pin,bush


2 Tata Hitachi EX1200-3
replacement,oil services
Pollavaram Breakdown Report as on 03.03.2017

B/D Status B/D From PR Status PO Status Target Dt.

DRILLING SECTION

PO:4101078348,
Engine sent to Recon-Gmmco 04.07.2016 - 30.03.2017
58

Engine sent to Recon-Gmmco 02.02.2017 - - 25.03.2017

EXCAVATOR & DOZER SECTION

Services 21.11.2016 - - 15.03.2017

- 18.02.2017 - - Not Declared

Hyd pump removed 01.03.2017 - - 07.03.2017

welding work 03.03.2017 - - 03.03.2017

DUMPER & GRADER SECTION

Bearing removed 02.03.2017 - - 03.03.2017

SUPPORTING EQUIPMENTS

Engine removed 08.02.2017 2500058965 - 10.03.2017

sent to services -M&N Motors 25.02.2017 - - 03.03.2017

TRUCKS

- 23.11.2016 - - 10.03.2017

- 14.02.2017 - - 10.03.2017

- 23.2.2017 - - 05.03.2017

- 24.02.2017 - - 07.03.2017

- 01.01.2017 - PO-4101081036 05.03.2017

- 09.02.2017 - - 08.03.2017

- 18.01.2017 2500058279 - 03.03.2017

03.3.2017 - - 09.03.2017
03.3.2017 - - 07.03.2017

3.03.2017 09.03.2017

1.03.2017 - - 03.03.2017

- 24.02.2017 - - 03.03.2017

25.2.2017 - - 12.03.2017

- 22.01.2017 - - 09.03.2017

22.02.2017 - - 06.03.2017

_ 05.02.2017 2500058046 05.03.2017

- 20.02.2017 - - 05.03.2017

Major maintenance
Rock drill changing work ,Hyd hose
03.03.2017 - - 03.03.2017
changing work

Track link pin changing work 01.03.2017 - - 05.03.2017


Remarks

Engine sent to GMMCO for recon work, Most of the spares available once engine arrived revamping will be
start.

Engine recon work sent to services - Nagpur , Compressor Repairing work under process

Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
work. ETA of All subassemblies coming on 10th march .

Damage due to fire incident/Machine planned to remove from mines work in progress.

Waiting for Hyd pump

Stick welding work under process

Waiting for bearing spares

waiting for new engine

sent to services -M&N Motors-RJY

Work Under Progress

Work Under Progress

Work Under Progress

Work Under Progress

Waiting for Spares

Nozzle sent for repair

Engine dismantaled Sending to Automotive

work under progress


Welding work under progress

work under progress

work under progress

Waiting for Spares

Waiting For spares

Cabin Work Under Progress

Waiting For spares

Engine Nozzle Sent for Repair

Waiting for Spares

maintenance work under process

Under carriage repairing work,Bucket & pin,bush replacement,oil services work under process
Pollavaram Breakdown Report as on 04.03.2017

Sr No Equipment Breakdown Desc. B/D Status B/D From PR Status PO Status Target Dt. Remarks

DRILLING SECTION

PO:4101078348, Engine sent to GMMCO for recon work, Most of the spares available once engine arrived revamping will be
1 Sandvik DI600-2 Engine problem, Major revamping work Engine sent to Recon-Gmmco 04.07.2016 - 30.03.2017
58 start.
Under carriage work ,Engine pbm,and compressor
2 Sandvik DI600-1 Engine sent to Recon-Gmmco 02.02.2017 - - 25.03.2017 Engine recon work sent to services - Nagpur , Compressor Repairing work under process
high temperature pbm

EXCAVATOR & DOZER SECTION

Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
1 Komatsu PC1250 Hyd Operation slow Services 21.11.2016 - - 15.03.2017
work. ETA of All subassemblies coming on 10th march .

2 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit) - 18.02.2017 - - Not Declared Damage due to fire incident/Machine planned to remove from mines work in progress.

3 Komatsu PC450-1 (TIL) Hyd Pump failure Hyd pump removed 01.03.2017 - - 07.03.2017 Waiting for Hyd pump

4 Komatsu Wheel Loader WD600 Transmission metal hose crack welding work 04.03.2017 - - 04.03.2017 metal hose welding work under process

DUMPER & GRADER SECTION

1 CAT Grader 120K (TIL) Fan Hub bearing damaged Bearing removed 02.03.2017 - - 04.03.2017 Waiting for bearing spares

SUPPORTING EQUIPMENTS

1 IRDG-3442 Engine Seized Engine removed 08.02.2017 2500058965 - 10.03.2017 waiting for new engine

TRUCKS

under Registration paper,Gear Box & 3rd Axle Diff


1 Volvo FMX440 (143) - 23.11.2016 - - 10.03.2017 Work Under Progress
Pbm

2 Volvo FMX440 (68) Accident - 14.02.2017 - - 10.03.2017 Work Under Progress


Engine overhaul , Gear box Repair & Steering Box
3 Ashok leyland (03) - 01.01.2017 - PO-4101081036 05.03.2017 Waiting for Spares
Repair
4 Ashok leyland (23) Engine Side Abnormal Sound - 09.02.2017 - - 08.03.2017 Nozzle sent for repair

5 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box - 18.01.2017 2500058279 - 03.03.2017 Engine dismantaled Sending to Automotive

6 Ashok leyland (09) Head Gasket problem - 03.3.2017 - - 09.03.2017 work under progress

7 Ashok leyland (24) 2 Axle Houseing Crake - 03.3.2017 - - 07.03.2017 Welding work under progress

8 Ashok leyland (45) cross bar damage - 04.3.2017 - - 08.3.2017 work under progress

9 Ashok leyland (52) Accident & windshield - 24.02.2017 - - 05.03.2017 Waiting for Spares

10 AMW(136) Gear box problem & pto pump - 25.2.2017 - - 12.03.2017 Waiting For spares

11 AMW(137) Gear box problem & PTO pump pbm - 22.01.2017 - - 09.03.2017 Cabin Work Under Progress

12 AMW(175) Gear box problem - 22.02.2017 - - 06.03.2017 Waiting For spares

13 AMW(179) Engine Problem - 05.02.2017 2500058046 05.03.2017 Engine Nozzle Sent for Repair

14 TN 30 AT 9392 Houseing Main Thread damaged - 20.02.2017 - - 05.03.2017 Waiting for Spares

Major maintenance
Wet Drilling and after cooler hose
1 Sandvik DI600-4 Weekly maintenance 04.03.2017 - - 04.03.2017 maintenance work under process
replacement work
Under carriage repairing work , Bucket & pin,bush
2 Tata Hitachi EX1200-3 Track link pin changing work 01.03.2017 - - 05.03.2017 Under carriage repairing work,Bucket & pin,bush replacement,oil services work under process
replacement,oil services

3 Belaz 240Ton-1905 RPM not increase in loading time checking work 03.03.2017 - - 05.02.2017 Electrical connection checking work under progress

4 CAT 773E-2 RRI Tyre retread condition changing work 04.02.2017 - - 04.02.2017 Tyre changing work under progress
Sr No Equipment Breakdown Desc.

1 Sandvik DI600-2 Engine problem, Major revamping work

Under carriage work ,Engine pbm,and compressor


2 Sandvik DI600-1
high temperature pbm

1 Komatsu PC1250 Hyd Operation slow

2 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit)

3 Komatsu PC450-1 (TIL) Hyd Pump failure

1 IRDG-3442 Engine Seized

under Registration paper,Gear Box & 3rd Axle Diff


1 Volvo FMX440 (143)
Pbm

2 Volvo FMX440 (68) Accident


Engine overhaul , Gear box Repair & Steering Box
3 Ashok leyland (03)
Repair
4 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box

5 Ashok leyland (12) cross bar damaged

6 Ashok leyland (24) 2 Axle Houseing Crake

7 Ashok leyland (45) cross bar damage

8 Ashok leyland (52) Accident & windshield

9 AMW(136) Gear box problem & pto pump

10 AMW(137) Gear box problem & PTO pump pbm

11 AMW(175) Gear box problem

12 AMW(179) Engine Problem


13 TN 30 AT 9392 Houseing Main Thread damaged

1 Sandvik DP1100-4 Weekly maintenance

2 Tata Hitachi EX1200-1 Weekly maintenance

3 Belaz 240Ton-1905 RPM not increase in loading time

4 CAT 777D-9 Weekly maintenance


Pollavaram Breakdown Report as on 05.03.2017

B/D Status B/D From PR Status PO Status Target Dt.

DRILLING SECTION

PO:4101078348,
Engine sent to Recon-Gmmco 04.07.2016 - 30.03.2017
58

Engine sent to Recon-Gmmco 02.02.2017 - - 25.03.2017

EXCAVATOR & DOZER SECTION

Services 21.11.2016 - - 15.03.2017

- 18.02.2017 - - Not Declared

Hyd pump removed 01.03.2017 - - 12.03.2017

SUPPORTING EQUIPMENTS

Engine removed 08.02.2017 2500058965 - 10.03.2017

TRUCKS

- 23.11.2016 - - 10.03.2017

- 14.02.2017 - - 10.03.2017

- 01.01.2017 - PO-4101081036 05.03.2017

- 18.01.2017 2500058279 - 03.03.2017

5.3.2017 - - 10.3.2017

- 03.3.2017 - - 07.03.2017

- 04.3.2017 - - 08.3.2017

- 24.02.2017 - - 05.03.2017

- 25.2.2017 - - 12.03.2017

- 22.01.2017 - - 09.03.2017

- 22.02.2017 - - 06.03.2017

- 05.02.2017 2500058046 05.03.2017


- 20.02.2017 - - 05.03.2017

Major maintenance
Hyd pump vibration high ,checking
05.03.2017 - - 05.03.2017
work

Boom cooler crack welding work,AC


checking work.Spare bucket 05.03.2017 - - 05.03.2017
changing work

checking work 03.03.2017 - - 05.02.2017

5000 hrs service ,RRI Tyre changing


05.02.2017 - - 05.02.2017
work
Remarks

Engine sent to GMMCO for recon work, Most of the spares available once engine arrived revamping will be
start.

Engine recon work sent to services - Nagpur , Compressor Repairing work under process

Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
work. ETA of All subassemblies coming on 10th march .

Damage due to fire incident/Machine planned to remove from mines work in progress.

Waiting for Hyd pump

waiting for new engine

Work Under Progress

Work Under Progress

Waiting for Spares

Engine dismantaled Sending to Automotive

work under progress

Welding work under progress

work under progress

Waiting for Spares

Waiting For spares

Cabin Work Under Progress

Waiting For spares

Engine Nozzle Sent for Repair


Waiting for Spares

Hyd pump vibration high ,checking work under process

Boom cooler crack welding work,AC checking work.Spare bucket changing work under process

Electrical connection checking work under progress

Tyre changing work under progress


Pollavaram Breakdown Report as on 06.03.2017

Sr No Equipment Breakdown Desc. B/D Status B/D From PR Status PO Status Target Dt. Remarks

DRILLING SECTION

Engine sent to GMMCO for recon work, Most of the spares available once engine arrived revamping will be
1 Sandvik DI600-2 Engine problem, Major revamping work Engine sent to Recon-Gmmco 04.07.2016 - PO:4101078348,58 30.03.2017
start.
Under carriage work ,Engine pbm,and compressor high
2 Sandvik DI600-1 Engine sent to Recon-Gmmco 02.02.2017 - - 25.03.2017 Engine recon work sent to services - Nagpur , Compressor Air end Repairing work under process
temperature pbm

EXCAVATOR & DOZER SECTION

Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
1 Komatsu PC1250 Hyd Operation slow Services 21.11.2016 - - 15.03.2017
work. ETA of All subassemblies coming on 10th march .

2 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit) - 18.02.2017 - - Not Declared Damage due to fire incident/Machine planned to remove from mines work in progress.

3 Komatsu PC450-1 (TIL) Hyd Pump failure Hyd pump removed 01.03.2017 - - 12.03.2017 Waiting for Hyd pump

SUPPORTING EQUIPMENTS

1 IRDG-3442 Engine Seized Engine removed 08.02.2017 2500058965 - 10.03.2017 waiting for new engine

TRUCKS

1 Volvo FMX440 (143) under Registration paper,Gear Box & 3rd Axle Diff Pbm - 23.11.2016 - - 10.03.2017 Work Under Progress

2 Volvo FMX440 (68) Accident - 14.02.2017 - - 10.03.2017 Work Under Progress

3 Volvo FMX440 (128) Fan Hub Damage 5.3.2017 - - 10.3.2017 Work Under Progress

4 Ashok leyland (03) Engine overhaul , Gear box Repair & Steering Box Repair - 01.01.2017 - PO-4101081036 05.03.2017 Waiting for Spares

5 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box - 18.01.2017 2500058279 - 03.03.2017 Engine dismantaled Sending to Automotive

6 Ashok leyland (12) cross bar damaged 5.3.2017 - - 10.3.2017 work under progress

7 Ashok leyland (24) 2 Axle Houseing Crake - 03.3.2017 - - 07.03.2017 Welding work under progress

8 Ashok leyland (45) cross bar damage - 04.3.2017 - - 08.3.2017 work under progress

9 Ashok leyland (52) Accident & windshield - 24.02.2017 - - 05.03.2017 Waiting for Spares

10 AMW(136) Gear box problem & pto pump - 25.2.2017 - - 12.03.2017 Waiting For spares

11 AMW(137) Gear box problem & PTO pump pbm - 22.01.2017 - - 09.03.2017 Cabin Work Under Progress

12 AMW(175) Gear box problem - 22.02.2017 - - 06.03.2017 Waiting For spares

13 AMW(179) Engine Problem - 05.02.2017 2500058046 05.03.2017 Engine Nozzle Sent for Repair

14 TN 30 AT 9392 Houseing Main Thread damaged - 20.02.2017 - - 05.03.2017 Waiting for Spares

Major maintenance
1 400000524 BELAZ 240 T DUMPER -1905 RPM not increase in loading time 03.03.2017 - - 06.02.2017 Electrical connection checking work under progress

Boom cooler crack welding work,AC


Health Audit Check up & Arm line boring work,Boom collar Hyd side health audit check upBoom cooler crack welding work,AC checking work.Spare bucket changing
2 Tata Hitachi EX1200-1 checking work.Spare bucket 05.03.2017 - - 07.03.2017
crack work under process
changing work
3 PC2000 Arm crack Arm crack welding work 06.03.2017 - - 07.03.2017 Boom cooler crack welding work,AC checking work.Spare bucket changing work under process
4 Bolero camper-5099 Diesel tank Leakages ,general check up welding work 06.02.2017 - - 06.02.2017 Diesel tank welding work under progress
Pollavaram Breakdown Report as on 07.03.2017

Sr No Equipment Breakdown Desc. B/D Status B/D From PR Status PO Status Target Dt. Remarks

DRILLING SECTION

Engine sent to GMMCO for recon work, Most of the spares available once engine arrived revamping will be
1 Sandvik DI600-2 Engine problem, Major revamping work Engine sent to Recon-Gmmco 04.07.2016 - PO:4101078348,58 30.03.2017
start.
Under carriage work ,Engine pbm,and compressor high
2 Sandvik DI600-1 Engine sent to Recon-Gmmco 02.02.2017 - - 25.03.2017 Engine recon work sent to services - Nagpur , Compressor Air end Repairing work under process
temperature pbm

EXCAVATOR & DOZER SECTION

Arm crack welding work,AC checking


1 Komatsu PC2000 Arm crack 06.03.2017 - - 08.03.2017 Arm crack welding work,AC checking work,Swing devices oil services work under process
work,Swing devices oil services
PO:4101060026, Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
2 Komatsu PC1250 Hyd Operation slow Services 21.11.2016 - 25.03.2017
PO:4101080347 work. ETA of All subassemblies coming on 15 th march .

3 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit) - 18.02.2017 - - Not Declared Damage due to fire incident/Machine planned to remove from mines work in progress.

4 Komatsu PC450-1 (TIL) Hyd Pump failure Hyd pump removed 01.03.2017 - - 12.03.2017 Locating for Hyd pump

SUPPORTING EQUIPMENTS

1 IRDG-3442 Engine Seized Engine removed 08.02.2017 2500058965 - 15.03.2017 waiting for new engine

2 DT - Volvo FM440 Diesel reading meter not working checking work 07.03.2017 - - 07.03.2017 checking work under process

TRUCKS

1 Volvo FMX440 (143) under Registration paper,Gear Box & 3rd Axle Diff Pbm - 23.11.2016 2500058058 - 20.03.2017 Waiting for some spares & Work Under Progress

2 Volvo FMX440 (68) Accident - 14.02.2017 - - 20.03.2017 Waiting for some spares & Work Under Progress

3 Volvo FMX440 (128) Fan Hub Damaged - 05.03.2017 2500059364 - 18.03.2017 Waiting for some spares & Work Under Progress

4 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box - 18.01.2017 2500058279 - 16.03.2017 Engine dismantaled Sent to Automotive

5 Ashok leyland (12) cross bar damaged - 05.03.2017 2500060056 - 15.03.2017 Waiting for some spares & Work Under Progress

6 Ashok leyland (45) cross bar damaged - 04.3.2017 2500060056 - 15.03.2017 Waiting for some spares & Work Under Progress

7 Ashok leyland (52) Accident & windshield Tinkering work 24.02.2017 - - 12.03.2017 Waiting for some spares & Work Under Progress

8 AMW(02) Boggie shaft Bed crack - 08.3.2017 - - 16.3.2017 Waiting for some spares & Work Under Progress

9 AMW(03) PTO pump problem - 08.3.2017 2500059796 14.3.2017 Waiting for some spares & Work Under Progress

10 AMW(29) Boggie shaft Bed crack - 08.3.2017 - - 16.3.2017 Waiting for some spares & Work Under Progress

11 AMW(142) Boggie shaft crack - 04.03.2017 - - 15.03.2017 work under progress

12 AMW(175) Gear box problem - 22.02.2017 2500059796 - 06.03.2017 Waiting For spares

13 AMW(179) Engine Problem - 05.02.2017 2500058046 05.03.2017 Engine Nozzle Sent for Repair

Major maintenance
1 Sandvik DP-1100-05 PTO abnormal sound checking work 08.03.2017 - - 08.03.2017 PTO Checking work under process

DUMPER HM1035 -27


2 Rear suspension seal kit damaged Seal kit changing work 08.03.2017 - - 08.03.2017 Rear suspension seal kit changing work under process
( WATER SPRINKLER)

3 Komatsu Dozer D155-5 (TIL) weekly maintenance Radiator Cleaning work 08.03.2017 - - 08.03.2017 Radiator cleaning work under process
Pollavaram Breakdown Report as on 08.03.2017

Sr No Equipment Breakdown Desc. B/D Status B/D From PR Status PO Status Target Dt. Remarks

DRILLING SECTION

Engine sent to GMMCO for recon work, Most of the spares available once engine arrived revamping will be
1 Sandvik DI600-2 Engine problem, Major revamping work Engine sent to Recon-Gmmco 04.07.2016 - PO:4101078348,58 30.03.2017
start.
Under carriage work ,Engine pbm,and compressor high
2 Sandvik DI600-1 Engine sent to Recon-Gmmco 02.02.2017 - PO:4101084802 25.03.2017 Engine recon work sent to services - Nagpur , Compressor Air end Repairing work under process
temperature pbm

EXCAVATOR & DOZER SECTION

Arm crack welding work,AC checking


1 Komatsu PC2000 Arm crack 06.03.2017 - - 08.03.2017 Arm crack welding work,AC checking work,Swing devices oil services work under process
work,Swing devices oil services
PO:4101060026, Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
2 Komatsu PC1250 Hyd Operation slow Services 21.11.2016 - 25.03.2017
PO:4101080347 work. ETA of All subassemblies coming on 15 th march .

3 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit) - 18.02.2017 - - 10.04.2017 Damage due to fire incident/Machine planned to remove from mines work in progress.

4 Komatsu PC450-1 (TIL) Hyd Pump failure Hyd pump removed 01.03.2017 - - 12.03.2017 Locating for Hyd pump

TRUCKS

1 Volvo FMX440 (143) under Registration paper,Gear Box & 3rd Axle Diff Pbm - 23.11.2016 2500058058 - 20.03.2017 Waiting for some spares & Work Under Progress

2 Volvo FMX440 (68) Accident - 14.02.2017 - - 20.03.2017 Waiting for some spares & Work Under Progress

3 Volvo FMX440 (128) Fan Hub Damaged - 05.03.2017 2500059364 - 18.03.2017 Waiting for some spares & Work Under Progress

4 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box - 18.01.2017 2500058279 - 16.03.2017 Engine dismantaled Sent to Automotive

5 Ashok leyland (12) cross bar damaged - 05.03.2017 2500060056 - 15.03.2017 Waiting for some spares & Work Under Progress

6 Ashok leyland (45) cross bar damaged - 04.3.2017 2500060056 - 15.03.2017 Waiting for some spares & Work Under Progress

7 Ashok leyland (52) Accident & windshield Tinkering work 24.02.2017 - - 12.03.2017 Waiting for some spares & Work Under Progress

8 AMW(02) Boggie shaft Bed crack - 08.3.2017 - - 16.3.2017 Waiting for some spares & Work Under Progress

9 AMW(03) PTO pump problem - 08.3.2017 2500059796 14.3.2017 Waiting for some spares & Work Under Progress

10 AMW(29) Boggie shaft Bed crack - 08.3.2017 - - 16.3.2017 Waiting for some spares & Work Under Progress

11 AMW(142) Boggie shaft crack - 04.03.2017 - - 15.03.2017 work under progress

12 AMW(175) Gear box problem - 22.02.2017 2500059796 - 06.03.2017 Waiting For spares

13 AMW(179) Engine Problem - 05.02.2017 2500058046 05.03.2017 Engine Nozzle Sent for Repair

SUPPORTING EQUIPMENTS

1 IRDG-3442 Engine Seized Engine removed 08.02.2017 2500058965 - 15.03.2017 waiting for new engine

Major maintenance
1 Sandvik DP-1100-05 PTO abnormal sound checking work 08.03.2017 - - 08.03.2017 PTO Checking work under process

DUMPER HM1035 -27


2 Rear suspension seal kit damaged Seal kit changing work 08.03.2017 - - 08.03.2017 Rear suspension seal kit changing work under process
( WATER SPRINKLER)

3 Komatsu Dozer D155-5 (TIL) weekly maintenance Radiator Cleaning work 08.03.2017 - - 08.03.2017 Radiator cleaning work under process
Pollavaram Breakdown Report as on 09.03.2017

Sr No Equipment Breakdown Desc. B/D Status B/D From PR Status PO Status Target Dt. Remarks

DRILLING SECTION

Engine sent to Recon-Gmmco, Compressor


1 Sandvik DI600-2 Machine yet to be commissioned 04.07.2016 - PO:4101078348,58 31.03.2017 Most of the spares available once Engine & Compressor arrived revamping will be start.
purchase order sent to Sandvik

Under carriage work ,Engine pbm,and compressor high


2 Sandvik DI600-1 Engine sent to Recon-Gmmco, 02.02.2017 - PO:4101084802 31.03.2017 Engine recon work sent to services - Nagpur, Comp repair work done, Track rollers yet to be received
temperature pbm

EXCAVATOR & DOZER SECTION

1 Komatsu PC2000 Starting pbm checking work 09.03.2017 09.03.2017 checking work under process

PO:4101060026, Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
2 Komatsu PC1250 Hyd Operation slow Services 21.11.2016 - 25.03.2017
PO:4101080347 work. ETA of All subassemblies coming on 15 th march .

3 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit) - 18.02.2017 - - 10.04.2017 Damage due to fire incident/Machine planned to remove from mines work in progress.

4 Komatsu PC450-1 (TIL) Hyd Pump failure Hyd pump removed 01.03.2017 - - 12.03.2017 Locating for Hyd pump

Fan motor & pump changing work,Radiator


5 Komatsu Dozer D155-5 (TIL) Radiator over heating pbm 08.03.2017 - - 09.03.2017 Fan motor & pump changing work,Radiator Cleaning work under process
Cleaning work

DUMPER SECTION

1 CAT 777D-10 RRO Tyre Burst RRO Tyre changing work 09.03.2017 - - 09.03.2017 RRO Tyre changing work under process

TRUCKS

1 Volvo FMX440 (143) under Registration paper,Gear Box & 3rd Axle Diff Pbm - 23.11.2016 2500058058 - 20.03.2017 Waiting for some spares & Work Under Progress

2 Volvo FMX440 (68) Accident - 14.02.2017 - - 20.03.2017 Waiting for some spares & Work Under Progress

3 Volvo FMX440 (128) Fan Hub Damaged - 05.03.2017 2500059364 - 18.03.2017 Waiting for some spares & Work Under Progress

4 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box - 18.01.2017 2500058279 - 16.03.2017 Engine dismantaled Sent to Automotive

5 Ashok leyland (12) cross bar damaged - 05.03.2017 2500060056 - 15.03.2017 Waiting for some spares & Work Under Progress

6 Ashok leyland (45) cross bar damaged - 04.03.2017 2500060056 - 15.03.2017 Waiting for some spares & Work Under Progress

7 Ashok leyland (52) Accident & windshield Tinkering work 24.02.2017 - - 12.03.2017 Waiting for some spares & Work Under Progress

8 AMW(03) PTO pump problem - 08.03.2017 2500059796 - 14.03.2017 Waiting for some spares & Work Under Progress

9 AMW(142) Boggie shaft Bed crack - 04.03.2017 2500060097 - 15.03.2017 work under progress

10 AMW(142) Boggie shaft crack - 04.03.2017 - - 15.03.2017 work under progress

11 AMW(175) Gear box problem - 22.02.2017 2500059796 - 16.03.2017 Waiting For spares

12 AMW(179) Engine Problem - 05.02.2017 2500058046 15.03.2017 Engine Nozzle Sent for Repair

SUPPORTING EQUIPMENTS

1 IRDG-3442 Engine Seized Engine removed 08.02.2017 2500058965 - 15.03.2017 waiting for new engine

2 WT -5469 Steering box Bolt cut Steering box removed 08.03.2017 - - 09.03.2017 Waiting for Steering box Bolt

Major maintenance
1 Sandvik DI600-3 weekly maintenance Floating sub seal kit changing work 09.03.2017 - - 09.03.2017 maintenance work under process

2 CAT 777D-06 weekly maintenance 5000 hrs oil services 09.03.2017 - - 09.03.2017 maintenance work under process
Pollavaram Breakdown Report as on 10.03.2017

Sr No Equipment Breakdown Desc. B/D Status B/D From PR Status PO Status Target Dt. Remarks

DRILLING SECTION

Engine sent to Recon-Gmmco, Compressor


1 Sandvik DI600-2 Machine yet to be commissioned 04.07.2016 - PO:4101078348,58 31.03.2017 Most of the spares available once Engine & Compressor arrived revamping will be start.
purchase order sent to Sandvik

Under carriage work ,Engine pbm,and compressor high


2 Sandvik DI600-1 Engine sent to Recon-Gmmco, 02.02.2017 - PO:4101084802 31.03.2017 Engine recon work sent to services - Nagpur, Comp repair work done, Track rollers yet to be received
temperature pbm

EXCAVATOR & DOZER SECTION

PO:4101060026, Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
1 Komatsu PC1250 Hyd Operation slow Services 21.11.2016 - 25.03.2017
PO:4101080347 work. ETA of All subassemblies coming on 15 th march .

2 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit) - 18.02.2017 - - 10.04.2017 Damage due to fire incident/Machine planned to remove from mines work in progress.

3 Komatsu PC450-1 (TIL) Hyd Pump failure Hyd pump removed 01.03.2017 - - 15.03.2017 Locating for Hyd pump

Bucket welding work , joy stick seal changing


4 Volvo EC700-1 (TIL) Boom & Bucket welding work , joy stick seal damaged 10.03.2017 - - 10.03.2017 Boom & Bucket welding work , joy stick work under process
work , AC work

TRUCKS

1 Volvo FMX440 (143) under Registration paper,Gear Box & 3rd Axle Diff Pbm - 23.11.2016 2500058058 - 20.03.2017 Waiting for some spares & Work Under Progress

2 Volvo FMX440 (68) Accident - 14.02.2017 - - 20.03.2017 Waiting for some spares & Work Under Progress

3 Volvo FMX440 (128) Fan Hub Damaged - 05.03.2017 2500059364 - 18.03.2017 Waiting for some spares & Work Under Progress

4 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box - 18.01.2017 2500058279 - 16.03.2017 Engine dismantaled Sent to Automotive

5 Ashok leyland (12) cross bar damaged - 05.03.2017 2500060056 - 15.03.2017 Waiting for some spares & Work Under Progress

6 Ashok leyland (45) cross bar damaged - 04.03.2017 2500060056 - 15.03.2017 Waiting for some spares & Work Under Progress

7 Ashok leyland (52) Accident & windshield Tinkering work 24.02.2017 - - 12.03.2017 Waiting for some spares & Work Under Progress

8 AMW(03) PTO pump problem - 08.03.2017 2500059796 - 14.03.2017 Waiting for some spares & Work Under Progress

9 AMW(175) Gear box problem - 22.02.2017 2500059796 - 16.03.2017 Waiting For spares

10 AMW(179) Engine Problem - 05.02.2017 2500058046 15.03.2017 Engine Nozzle Sent for Repair

SUPPORTING EQUIPMENTS

1 IRDG-3442 Engine Seized Engine removed 08.02.2017 2500058965 PO : 4101084783 15.03.2017 waiting for new engine

2 WT -5469 Steering box Bolt cut Steering box removed 08.03.2017 - - 10.03.2017 Waiting for Steering box Bolt

Major maintenance
1 Sandvik DP1100-1 Machine stopped due to lack of Oil & Filters Oil services over Due 10.03.2017 - - 11.03.2017 waiting for Oil & Filters

2 Sandvik DP1100-2 Machine stopped due to lack of Oil & Filters Oil services over Due 10.03.2017 - - 11.03.2017 waiting for Oil & Filters

3 Sandvik DP1100-3 Machine stopped due to lack of Oil & Filters Oil services over Due 10.03.2017 - - 11.03.2017 waiting for Oil & Filters

4 Sandvik DP1100-4 Machine stopped due to lack of Oil & Filters Oil services over Due 10.03.2017 - - 11.03.2017 waiting for Oil & Filters

5 Sandvik DP1100-5 Machine stopped due to lack of Oil & Filters Oil services over Due 10.03.2017 - - 11.03.2017 waiting for Oil & Filters

6 Volvo EC750-1 Arm Cylinder seal kit changing work weekly maintenance 10.03.2017 - - 10.03.2017 Arm cyl seal kit changing work under process

7 CAT 777D-03 Rear 4 Tyre retread condition Rear Tyre changing work 10.03.2017 - - 10.03.2017 maintenance work under process
Sr No Equipment Breakdown Desc.

1 Sandvik DI600-2 Machine yet to be commissioned

Under carriage work ,Engine pbm,and compressor high


2 Sandvik DI600-1
temperature pbm

1 Komatsu PC1250 Hyd Operation slow

2 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit)

3 Komatsu PC450-1 (TIL) Hyd Pump failure

1 Volvo FMX440 (143) under Registration paper,Gear Box & 3rd Axle Diff Pbm

2 Volvo FMX440 (68) Accident

3 Volvo FMX440 (128) Fan Hub Damaged

4 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box

5 Ashok leyland (12) cross bar damaged

6 Ashok leyland (45) cross bar damaged

7 Ashok leyland (52) Accident & windshield

8 AMW(03) PTO pump problem

9 AMW(175) Gear box problem

10 AMW(179) Engine Problem

1 IRDG-3442 Engine Seized

2 WT -5469 Steering box Bolt cut


3 MSV-0199 Accelerator sensor pbm

1 Tata Hitachi EX1200-2 Bucket replacement

2 Volvo EC750-1 Arm Cylinder seal kit changing work

3 CAT 777D-03 Rear 4 Tyre retread condition


Pollavaram Breakdown Report as on 11.03.2017

B/D Status B/D From PR Status PO Status

DRILLING SECTION

Engine sent to Recon-Gmmco, Compressor


04.07.2016 - PO:4101078348,58
purchase order sent to Sandvik

Engine sent to Recon-Gmmco, 02.02.2017 - PO:4101084802

EXCAVATOR & DOZER SECTION

PO:4101060026,
Services 21.11.2016 -
PO:4101080347

- 18.02.2017 - -

Hyd pump removed 01.03.2017 - -

TRUCKS

- 23.11.2016 2500058058 -

- 14.02.2017 - -

- 05.03.2017 2500059364 -

- 18.01.2017 2500058279 -

- 05.03.2017 2500060056 -

- 04.03.2017 2500060056 -

Tinkering work 24.02.2017 - -

- 08.03.2017 2500059796 -

- 22.02.2017 2500059796 -

- 05.02.2017 2500058046

SUPPORTING EQUIPMENTS

Engine removed 08.02.2017 2500058965 PO : 4101084783

Steering box removed 08.03.2017 - -


checking work 10.03.2017 - -

Major maintenance
Bucket removing work 11.03.2017 - -

weekly maintenance 10.03.2017 - -

Rear Tyre changing work 11.03.2017 - -


Target Dt.

31.03.2017

31.03.2017

25.03.2017

10.04.2017

15.03.2017

20.03.2017

20.03.2017

18.03.2017

16.03.2017

15.03.2017

15.03.2017

12.03.2017

14.03.2017

16.03.2017

15.03.2017

15.03.2017

11.03.2017
11.03.2017

11.03.2017

11.03.2017

11.03.2017
Remarks

Most of the spares available once Engine & Compressor arrived revamping will be start.

Engine recon work sent to services - Nagpur, Comp repair work done, Track rollers yet to be received

Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
work. ETA of All subassemblies coming on 15 th march .

Damage due to fire incident/Machine planned to remove from mines work in progress.

Locating for Hyd pump

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress

Engine dismantaled Sent to Automotive

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress

Waiting For spares

Engine Nozzle Sent for Repair

waiting for new engine

Waiting for Steering box Bolt


checking work under process

Bucket replacement work under process

Arm cyl seal kit changing work under process

maintenance work under process


Pollavaram Breakdown Report as on 12.03.2017

Sr No Equipment Breakdown Desc. B/D Status B/D From PR Status PO Status Target Dt. Remarks

DRILLING SECTION

Engine sent to Recon-Gmmco, Compressor


1 Sandvik DI600-2 Machine yet to be commissioned 04.07.2016 - PO:4101078348,58 31.03.2017 Most of the spares available once Engine & Compressor arrived revamping will be start.
purchase order sent to Sandvik

Under carriage work ,Engine pbm,and compressor high


2 Sandvik DI600-1 Engine sent to Recon-Gmmco, 02.02.2017 - PO:4101084802 31.03.2017 Engine recon work sent to services - Nagpur, Comp repair work done, Track rollers yet to be received
temperature pbm

EXCAVATOR & DOZER SECTION

PO:4101060026, Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
1 Komatsu PC1250 Hyd Operation slow Services 21.11.2016 - 25.03.2017
PO:4101080347 work. ETA of All subassemblies coming on 15 th march .

2 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit) - 18.02.2017 - - 10.04.2017 Damage due to fire incident/Machine planned to remove from mines work in progress.

3 Volvo EC480-1 (TIL-2) Airfilter oil bath system failure checking work 12.03.2017 - - 15.03.2017 waiting for spares

4 Komatsu PC450-1 (TIL) Hyd Pump failure Hyd pump removed 01.03.2017 - - 15.03.2017 Locating for Hyd pump

TRUCKS

1 Volvo FMX440 (143) under Registration paper,Gear Box & 3rd Axle Diff Pbm - 23.11.2016 2500058058 - 20.03.2017 Waiting for some spares & Work Under Progress

2 Volvo FMX440 (68) Accident - 14.02.2017 - - 20.03.2017 Waiting for some spares & Work Under Progress

3 Volvo FMX440 (89) Second right side hub bearing damaged - 12.03.2017 - - 15.03.2017 Waiting for some spares & Work Under Progress

4 Volvo FMX440 (128) Fan Hub Damaged - 05.03.2017 2500059364 - 18.03.2017 Waiting for some spares & Work Under Progress

5 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box - 18.01.2017 2500058279 - 16.03.2017 Engine dismantaled Sent to Automotive

6 Ashok leyland (12) cross bar damaged - 05.03.2017 2500060056 - 15.03.2017 Waiting for some spares & Work Under Progress

7 Ashok leyland (45) cross bar damaged - 04.03.2017 2500060056 - 15.03.2017 Waiting for some spares & Work Under Progress

8 Ashok leyland (52) Accident & windshield Tinkering work 24.02.2017 - - 12.03.2017 Waiting for some spares & Work Under Progress

9 Ashok leyland (51) Rear Brake lining pbm - 12.03.2017 - - 15.03.2017 Waiting for some spares & Work Under Progress

10 AMW(136) Clutch problem - 12.03.2017 - - 12.03.2017 clutch work under process

11 AMW(24) Tinkering work - 12.03.2017 - - 15.03.2017 Tinkering work under process

12 AMW(179) Engine Problem - 05.02.2017 2500058046 15.03.2017 Engine Nozzle Sent for Repair

SUPPORTING EQUIPMENTS

1 IRDG-3442 Engine Seized Engine removed 08.02.2017 2500058965 PO : 4101084783 15.03.2017 waiting for new engine

2 WT -5469 Steering box Bolt cut Steering box removed 08.03.2017 - - 12.03.2017 Steering box Bolt changing work under process

Major maintenance
Health checkup,Engine mounting bed changing
1 Tata Hitachi EX1200-4 (TIL) maintenance work 12.03.2017 - - 12.03.2017 maintenance work under process
work,bucket replacement,fan belt changing work

2 Komatsu 785-04 maintenance work Engine oil services 12.03.2017 - - 12.03.2017 maintenance work under process

Total leaf spring reset work,Front, rear hub


3 MSV-0399 Major maintenance work 12.03.2017 - - 15.03.2017 maintenance work under process
greasing,clutcth plate checking work
Sr No Equipment Breakdown Desc.

1 Sandvik DI600-2 Machine yet to be commissioned

Under carriage work ,Engine pbm,and compressor high


2 Sandvik DI600-1
temperature pbm

1 Komatsu PC1250 Hyd Operation slow

2 Volvo EC700-1 Turbo line hose failure

3 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit)

4 Volvo EC480-1 (TIL-2) Airfilter oil bath system failure

5 Komatsu PC450-1 (TIL) Hyd Pump failure

1 CAT 773E-02 RRI Tyre burst

1 Volvo FMX440 (143) under Registration paper,Gear Box & 3rd Axle Diff Pbm

2 Volvo FMX440 (68) Accident

3 Volvo FMX440 (89) Second right side hub bearing damaged

4 Volvo FMX440 (128) Fan Hub Damaged

5 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box

6 Ashok leyland (12) cross bar damaged

7 Ashok leyland (45) cross bar damaged

8 Ashok leyland (52) Accident & windshield


9 Ashok leyland (51) Rear Brake lining pbm

10 AMW(136) Clutch problem

11 AMW(24) Tinkering work

12 AMW(179) Engine Problem

1 IRDG-3442 Engine Seized

2 DT-4309 Engine Comp misfiring

1 Sandvik DP1100-3 Weekly maintenance work

2 Tata Hitachi EX1200-4 (TIL) maintenance work

3 CAT 777D-03 maintenance work

4 MSV-0399 Major maintenance work


Pollavaram Breakdown Report as on 13.03.2017

B/D Status B/D From PR Status PO Status

DRILLING SECTION

Engine sent to Recon-Gmmco, Compressor


04.07.2016 - PO:4101078348,58
purchase order sent to Sandvik

Engine sent to Recon-Gmmco, 02.02.2017 - PO:4101084802

EXCAVATOR & DOZER SECTION

PO:4101060026,
Services 21.11.2016 -
PO:4101080347

hose replacement work 12.03.2017 - -

- 18.02.2017 - -

checking work 12.03.2017 - -

Hyd pump removed 01.03.2017 - -

DUMPER SECTION

Rear 4 nos tyre changing work 13.03.2017 - -

TRUCKS

- 23.11.2016 2500058058 -

- 14.02.2017 - -

- 12.03.2017 - -

- 05.03.2017 2500059364 -

- 18.01.2017 2500058279 -

- 05.03.2017 2500060056 -

- 04.03.2017 2500060056 -

Tinkering work 24.02.2017 - -


- 12.03.2017 - -

- 12.03.2017 - -

- 12.03.2017 - -

- 05.02.2017 2500058046

SUPPORTING EQUIPMENTS

Engine removed 08.02.2017 2500058965 PO : 4101084783

checking work 13.03.2017 - -

Major maintenance
Joy stick changing work 13.03.2017 - -

Health checkup,Engine mounting bed changing


12.03.2017 - -
work,bucket replacement,fan belt changing work

Rear 4 nos tyre changing work 12.03.2017 - -

Total leaf spring reset work done,Front, rear hub


12.03.2017 - -
greasing,clutcth plate checking work
Target Dt.

31.03.2017

31.03.2017

25.03.2017

13.02.2017

10.04.2017

15.03.2017

15.03.2017

14.03.2017

20.03.2017

20.03.2017

15.03.2017

18.03.2017

16.03.2017

15.03.2017

15.03.2017

13.03.2017
15.03.2017

12.03.2017

15.03.2017

15.03.2017

15.03.2017

14.03.2017

13.03.2017

13.03.2017

13.03.2017

15.03.2017
Remarks

Most of the spares available once Engine & Compressor arrived revamping will be start.

Engine recon work sent to services - Nagpur, Comp repair work done, Track rollers yet to be received

Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
work. ETA of All subassemblies coming on 15 th march .

new hose replacement work under process

Damage due to fire incident/Machine planned to remove from mines work in progress.

waiting for spares

Locating for Hyd pump

Rear tyre changing work under process

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress

Engine dismantaled Sent to Automotive

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress


Waiting for some spares & Work Under Progress

clutch work under process

Tinkering work under process

Engine Nozzle Sent for Repair

waiting for new engine

checking work under process

maintenance work under process

maintenance work under process

Rear tyre changing work under process

maintenance work under process


Sr No Equipment Breakdown Desc.

1 Sandvik DI600-2 Machine yet to be commissioned

Under carriage work ,Engine pbm,and compressor high


2 Sandvik DI600-1
temperature pbm

1 Komatsu PC1250 Hyd Operation slow

2 Volvo EC700-1 Turbocharger failure

3 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit)

4 Komatsu PC450-1 (TIL) Hyd Pump failure

1 Volvo FMX440 (143) under Registration paper,Gear Box & 3rd Axle Diff Pbm

2 Volvo FMX440 (68) Accident

3 Volvo FMX440 (89) Second right side hub bearing damaged

4 Volvo FMX440 (128) Fan Hub Damaged

5 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box

6 Ashok leyland (12) cross bar damaged

7 Ashok leyland (45) cross bar damaged

8 Ashok leyland (41) Engine head gasket pbm

9 AMW(136) Clutch problem

10 AMW(24) Tinkering work

11 AMW(179) Engine Problem


1 IRDG-3442 Engine Seized

2 DT-4309 Engine Comp misfiring

3 MSV-0199 Engine ECM pbm

1 MSV-0399 Major maintenance work

2 CAT 777D-02 maintenance work

3 CAT 773E-08 weekly maintenance


Pollavaram Breakdown Report as on 14.03.2017

B/D Status B/D From PR Status PO Status

DRILLING SECTION

Engine sent to Recon-Gmmco, Compressor


04.07.2016 - PO:4101078348,58
purchase order sent to Sandvik

Engine sent to Recon-Gmmco, 02.02.2017 - PO:4101084802

EXCAVATOR & DOZER SECTION

PO:4101060026,
Services 21.11.2016 -
PO:4101080347

Turbo removed 12.03.2017 - -

- 18.02.2017 - -

Hyd pump removed 01.03.2017 - -

TRUCKS

- 23.11.2016 2500058058 -

- 14.02.2017 - -

- 12.03.2017 - -

- 05.03.2017 2500059364 -

- 18.01.2017 2500058279 -

- 05.03.2017 2500060056 -

- 04.03.2017 2500060056 -

- 14.03.2017 - -

- 12.03.2017 - -

- 12.03.2017 - -

- 05.02.2017 2500058046

SUPPORTING EQUIPMENTS
Engine removed 08.02.2017 2500058965 PO : 4101084783

checking work 13.03.2017 - -

checking work 12.03.2017 - -

Major maintenance
Total leaf spring reset work done,Front, rear hub
12.03.2017 - -
greasing,clutcth plate checking work

RRO tyre changing work 14.03.2017 - -

maintenance work 14.03.2017 - -


Target Dt.

31.03.2017

31.03.2017

25.03.2017

15.03.2017

10.04.2017

17.03.2017

20.03.2017

20.03.2017

15.03.2017

18.03.2017

16.03.2017

15.03.2017

15.03.2017

15.03.2017

15.03.2017

15.03.2017

15.03.2017
20.03.2017

15.03.2017

15.03.2017

15.03.2017

14.03.2017

14.03.2017
Remarks

Most of the spares available once Engine & Compressor arrived revamping will be start.

Engine recon work sent to services - Nagpur, Comp repair work done, Track rollers yet to be received

Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
work. ETA of All subassemblies coming on 15 th march .

waiting for new Turbo charger

Damage due to fire incident/Machine planned to remove from mines work in progress.

Locating for Hyd pump

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress

Engine dismantaled Sent to Automotive

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress

Waiting for some spares & Work Under Progress

clutch work under process

Tinkering work under process

Engine Nozzle Sent for Repair


waiting for new engine

checking work under process

checking work under process

maintenance work under process

Rear tyre changing work under process

maintenance work under process


Pollavaram Breakdown Report as on 15.03.2017

Sr No Equipment Breakdown Desc. B/D Status B/D From PR Status PO Status Target Dt. Remarks

DRILLING SECTION

Engine sent to Recon-Gmmco, Compressor


1 Sandvik DI600-2 Machine yet to be commissioned 04.07.2016 - PO:4101078348,58 31.03.2017 Most of the spares available once Engine & Compressor arrived revamping will be start.
purchase order sent to Sandvik

Under carriage work ,Engine pbm,and compressor high


2 Sandvik DI600-1 Engine sent to Recon-Gmmco, 02.02.2017 - PO:4101084802 31.03.2017 Engine recon work sent to services - Nagpur, Comp repair work done, Track rollers yet to be received
temperature pbm

3 Atlas copco D35-2 Wrench motor chain cut Track chain replacement work,Rotation motor work 14.03.2017 - - 16.03.2017 Track chain replacement work,Rotation motor work under process

EXCAVATOR & DOZER SECTION

PO:4101060026, Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
1 Komatsu PC1250 Hyd Operation slow Services 21.11.2016 - 25.03.2017
PO:4101080347 work. ETA of All subassemblies coming on 15 th march .

2 Volvo EC700-1 Turbocharger failure Turbo removed 12.03.2017 - - 15.03.2017 Turbo charger reached ,changing work under process

3 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit) - 18.02.2017 - - 10.04.2017 Damage due to fire incident/Machine planned to remove from mines work in progress.

4 Komatsu PC450-1 (TIL) Hyd Pump failure Hyd pump removed 01.03.2017 - - 16.03.2017 Hyd pump reached ,Hyd pump changing work under process

TRUCKS

1 Volvo FMX440 (143) under Registration paper,Gear Box & 3rd Axle Diff Pbm - 23.11.2016 2500058058 - 20.03.2017 Waiting for some spares & Work Under Progress

2 Volvo FMX440 (68) Accident - 14.02.2017 - - 20.03.2017 Waiting for some spares & Work Under Progress

3 Volvo FMX440 (128) Fan Hub Damaged - 05.03.2017 2500059364 - 18.03.2017 Waiting for some spares & Work Under Progress

4 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box - 18.01.2017 2500058279 - 16.03.2017 Engine dismantaled Sent to Automotive

5 Ashok leyland (12) cross bar damaged - 05.03.2017 2500060056 - 15.03.2017 Waiting for some spares & Work Under Progress

6 Ashok leyland (45) cross bar damaged - 04.03.2017 2500060056 - 15.03.2017 Waiting for some spares & Work Under Progress

7 Ashok leyland (41) Engine head gasket pbm - 14.03.2017 - - 15.03.2017 Waiting for some spares & Work Under Progress

8 Ashok leyland (52) Steering oil tank & Steering Return Pipe - 02.02.2017 - - 18.03.2017 Waiting for some spares & Work Under Progress

9 Ashok leyland (56) Leaf Spring pbm - 14.03.2017 - - 20.03.2017 Waiting for some spares & Work Under Progress

10 Ashok leyland (59) Diff pbm - 15.03.2017 - - 25.03.2017 Waiting for some spares & Work Under Progress

11 AMW(21) Relife Valve pbm - 12.03.2017 - - 18.03.2017 Waiting For spares

12 AMW(179) Engine Problem - 05.02.2017 2500058046 - 15.03.2017 Engine Nozzle Sent for Repair

SUPPORTING EQUIPMENTS

1 IRDG-3442 Engine Seized Engine removed 08.02.2017 2500058965 PO : 4101084783 20.03.2017 waiting for new engine

2 DT-4309 Engine Comp misfiring checking work 13.03.2017 - - 16.03.2017 checking work under process

3 MSV-0199 Engine ECM pbm checking work 12.03.2017 - - 15.03.2017 checking work under process

4 Bolero camper - 6516 Running Repair work Suspension work , Wheel Alignment work 15.03.2017 - - 15.03.2017 sent to M&N Motors

Major maintenance
1 Sandvik DP1100-1 Maintenance work LH side Sprocket bolt broken ,Bolt changing work 15.03.2017 - - 16.03.2017 maintenance work under process

2 Tata Hitachi EX1200-3 Maintenance work Wiggins System fitting work 15.03.2017 - - 15.03.2017

3 CAT 777D-01 Major maintenance AFSS checking work 15.03.2017 - - 15.03.2017 maintenance work under process

4 CAT 773E-08 weekly maintenance Grease pump work 15.03.2017 - - 15.03.2017 maintenance work under process
Pollavaram Breakdown Report as on 16.03.2017

Sr No Equipment Breakdown Desc. B/D Status B/D From PR Status PO Status Target Dt. Remarks

DRILLING SECTION

Engine sent to Recon-Gmmco, Compressor


1 Sandvik DI600-2 Machine yet to be commissioned 04.07.2016 - PO:4101078348,58 31.03.2017 Most of the spares available once Engine & Compressor arrived revamping will be start.
purchase order sent to Sandvik

Under carriage work ,Engine pbm,and compressor high


2 Sandvik DI600-1 Engine sent to Recon-Gmmco, 02.02.2017 - PO:4101084802 31.03.2017 Engine recon work sent to services - Nagpur, Comp repair work done, Track rollers yet to be received
temperature pbm

3 Atlas copco D35-2 Wrench motor chain cut Track chain replacement work,Rotation motor work 14.03.2017 - - 16.03.2017 Track chain replacement work,Rotation motor work under process

EXCAVATOR & DOZER SECTION

PO:4101060026, Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
1 Komatsu PC1250 Hyd Operation slow Services 21.11.2016 - 25.03.2017
PO:4101080347 work. ETA of All subassemblies coming on 15 th march .

2 Volvo EC700-1 Turbocharger failure Turbo removed 12.03.2017 - - 18.03.2017 waiting Turbo charger work under process

3 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit) - 18.02.2017 - - 10.04.2017 Damage due to fire incident/Machine planned to remove from mines work in progress.

4 Komatsu PC450-1 (TIL) Hyd Pump failure Hyd pump removed 01.03.2017 - - 16.03.2017 Hyd pump reached ,Hyd pump changing work under process

TRUCKS

1 Volvo FMX440 (143) under Registration paper,Gear Box & 3rd Axle Diff Pbm - 23.11.2016 2500058058 - 20.03.2017 Waiting for some spares & Work Under Progress

2 Volvo FMX440 (68) Accident - 14.02.2017 - - 20.03.2017 Waiting for some spares & Work Under Progress

3 Volvo FMX440 (128) Fan Hub Damaged - 05.03.2017 2500059364 - 18.03.2017 Waiting for some spares & Work Under Progress

4 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box - 18.01.2017 2500058279 - 17.03.2017 Engine dismantaled Sent to Automotive

5 Ashok leyland (12) cross bar damaged - 05.03.2017 2500060056 - 17.03.2017 Waiting for some spares & Work Under Progress

6 Ashok leyland (45) cross bar damaged - 04.03.2017 2500060056 - 17.03.2017 Waiting for some spares & Work Under Progress

7 Ashok leyland (41) Engine head gasket pbm - 14.03.2017 - - 17.03.2017 Waiting for some spares & Work Under Progress

8 Ashok leyland (52) Steering oil tank & Steering Return Pipe - 02.02.2017 - - 18.03.2017 Waiting for some spares & Work Under Progress

9 Ashok leyland (56) Leaf Spring pbm - 14.03.2017 - - 20.03.2017 Waiting for some spares & Work Under Progress

10 Ashok leyland (59) Diff pbm - 15.03.2017 - - 25.03.2017 Waiting for some spares & Work Under Progress

11 AMW(21) Relife Valve pbm - 12.03.2017 - - 18.03.2017 Waiting For spares

12 AMW(179) Engine Problem - 05.02.2017 2500058046 - 17.03.2017 Engine Nozzle Sent for Repair

SUPPORTING EQUIPMENTS

1 IRDG-3442 Engine Seized Engine removed 08.02.2017 2500058965 PO : 4101084783 20.03.2017 waiting for new engine

Engine head ,water pump valve door & Gasket


2 DT-4309 Engine Comp misfiring 13.03.2017 - - 17.03.2017 Engine head ,water pump valve door & Gasket changing work under process
changing work

3 Bolero Camper-5099 Upper arm bush damaged services 16.03.2017 - - 17.03.2017 we r plan to sent M&N Motors

Major maintenance
1 Sandvik DP1100-1 Maintenance work LH side Sprocket bolt broken ,Bolt changing work 15.03.2017 - - 16.03.2017 maintenance work under process

2 Tata Hitachi ZX870-12 Maintenance work 2000 Hrs services 16.03.2017 - - 16.03.2017 maintenance work under process

3 Komatsu 785-03 Major maintenance AFSS refilling work 16.03.2017 - - 16.03.2017 maintenance work under process

4 Komatsu 785-05 weekly maintenance Engine oil services 16.03.2017 - - 16.03.2017 maintenance work under process

5 Komatsu 785-06 weekly maintenance Engine oil services 16.03.2017 - - 16.03.2017 maintenance work under process
Pollavaram Breakdown Report as on 17.03.2017

Sr No Equipment Breakdown Desc. B/D Status B/D From PR Status PO Status Target Dt. Remarks

DRILLING SECTION

Engine sent to Recon-Gmmco, Compressor


1 Sandvik DI600-2 Machine yet to be commissioned 04.07.2016 - PO:4101078348,58 31.03.2017 Most of the spares available once Engine & Compressor arrived revamping will be start.
purchase order sent to Sandvik

Under carriage work ,Engine pbm,and compressor high


2 Sandvik DI600-1 Engine sent to Recon-Gmmco, 02.02.2017 - PO:4101084802 31.03.2017 Engine recon work sent to services - Nagpur, Comp repair work done, Track rollers yet to be received
temperature pbm

EXCAVATOR & DOZER SECTION

PO:4101060026, Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
1 Komatsu PC1250 Hyd Operation slow Services 21.11.2016 - 01.04.2017
PO:4101080347 work. ETA of All subassemblies coming on 25th march .

2 Tata Hitachi EX1200-4 (TIL) Engine lugging pbm checking work 16.03.2017 - - 17.03.2017 checking work under process

3 Volvo EC700-1 Turbocharger failure Turbo removed 12.03.2017 - - 18.03.2017 waiting Turbo charger work under process

4 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit) - 18.02.2017 - - 30.04.2017 Damage due to fire incident/Machine planned to remove from mines work in progress.

5 Komatsu PC450-1 (TIL) Hyd Pump failure Hyd pump removed 01.03.2017 - - 18.03.2017 Hyd pump reached ,Hyd pump changing work under process

LOADER

1 SDLG Loader -17 Front final drive damaged Final drive gear teeth damaged 16.03.2017 - - 22.03.2017 Waiting for Final drive spares

TRUCKS

1 Volvo FMX440 (143) under Registration paper,Gear Box & 3rd Axle Diff Pbm NOC not submitted 23.11.2016 2500058058 - 10.04.2017 Waiting for some spares & Work Under Progress

2 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box - 18.01.2017 2500058279 - 17.03.2017 Engine dismantaled Sent to Automotive

3 Ashok leyland (05) Accident inspection work

4 Ashok leyland (12) cross bar damaged - 05.03.2017 2500060056 - 17.03.2017 Waiting for some spares & Work Under Progress

5 Ashok leyland (45) cross bar damaged - 04.03.2017 2500060056 - 17.03.2017 Waiting for some spares & Work Under Progress

6 Ashok leyland (56) Leaf Spring pbm - 14.03.2017 - - 20.03.2017 Waiting for some spares & Work Under Progress

7 Ashok leyland (59) Diff pbm - 15.03.2017 - - 25.03.2017 Waiting for some spares & Work Under Progress

8 AMW(10) Steering pump pbm - 12.03.2017 - - 18.03.2017 Waiting For spares

9 AMW(179) Engine Problem - 05.02.2017 2500058046 - 17.03.2017 Engine Nozzle Sent for Repair

SUPPORTING EQUIPMENTS

1 IRDG-3442 Engine Seized Engine removed 08.02.2017 2500058965 PO : 4101084783 20.03.2017 waiting for new engine

Engine head ,water pump valve door & Gasket


2 DT-4309 Engine Comp misfiring 13.03.2017 - - 17.03.2017 Engine head ,water pump valve door & Gasket changing work under process
changing work

Major maintenance
1 Atlas copco L8-3 Weekly Maintenance work cooler cleaning work 17.03.2017 - - 17.03.2017 maintenance work under process

2 Komatsu 785-01 weekly maintenance AFSS sensor cable changing work 17.03.2017 - - 17.03.2017 maintenance work under process

3 Komatsu 785-04 weekly maintenance AFSS sensor cable changing work 17.03.2017 - - 17.03.2017 maintenance work under process

4 CAT 773E-3,9 weekly maintenance Engine oil services 17.03.2017 - - 17.03.2017 maintenance work under process

5 CAT 773E-10 Maintenance work Dump body welding work 17.03.2017 - - 17.03.2017 maintenance work under process
Pollavaram Breakdown Report as on 18.03.2017

Sr No Equipment Breakdown Desc. B/D Status B/D From PR Status PO Status Target Dt. Remarks

DRILLING SECTION

Engine sent to Recon-Gmmco, Compressor


1 Sandvik DI600-2 Machine yet to be commissioned 04.07.2016 - PO:4101078348,58 31.03.2017 Most of the spares available once Engine & Compressor arrived revamping will be start.
purchase order sent to Sandvik

Under carriage work ,Engine pbm,and compressor high


2 Sandvik DI600-1 Engine sent to Recon-Gmmco, 02.02.2017 - PO:4101084802 31.03.2017 Engine recon work sent to services - Nagpur, Comp repair work done, Track rollers yet to be received
temperature pbm

EXCAVATOR & DOZER SECTION

PO:4101060026, Hyd pumps - 4 Nos ,swing motor assy,Travel motor assy,control valve assy sent to L&T for Overhauling
1 Komatsu PC1250 Hyd Operation slow Services 21.11.2016 - 01.04.2017
PO:4101080347 work. ETA of All subassemblies coming on 25th march .
Boom & Arm welding work , Bucket replacement
2 Tata Hitachi EX1200-1 Boom & Arm crack 18.03.2017 - - 19.03.2017 Boom & Arm welding work , Bucket replacement work under process
work ,

3 Volvo EC700-1 Turbocharger failure Turbo removed 12.03.2017 - - 19.03.2017 waiting Turbo charger work under process

4 Volvo EC480-2 (TIL-3) Fire Accident (Short circuit) - 18.02.2017 - - 30.04.2017 Damage due to fire incident/Machine planned to remove from mines work in progress.

5 Komatsu PC450-1 (TIL) Hyd Pump failure Hyd pump removed 01.03.2017 - - 20.03.2017 Hyd pump reached , Spare Hyd pump also pbm checking work under process

LOADER

1 SDLG Loader -17 Front final drive damaged Final drive gear teeth damaged 16.03.2017 - - 22.03.2017 Waiting for Final drive spares

TYRE HANDLER

1 Tyre Handler Coolent mixed with Engine oil checking work 17.03.2017 - - 19.03.2017 checking work under process

TRUCKS

1 Volvo FMX440 (143) under Registration paper,Gear Box & 3rd Axle Diff Pbm NOC not submitted 23.11.2016 2500058058 - 10.04.2017 Waiting for Document

2 Ashok leyland (01) Accident & Engine Over Haul,Steering Gear Box - 18.01.2017 2500058279 - 25.03.2017 Engine fitted ,checking work under process,waiting for some spares

3 Ashok leyland (05) Accident inspection work,Tinkering work 17.03.2017 - - 30.03.2017 Tinkering work,Waiting for some spares & Work Under Progress

4 Ashok leyland (12) cross bar damaged - 05.03.2017 2500060056 - 20.03.2017 Waiting for some spares & Work Under Progress

5 Ashok leyland (45) cross bar damaged - 04.03.2017 2500060056 - 20.03.2017 Waiting for some spares & Work Under Progress

6 Ashok leyland (56) Suspension broken - 14.03.2017 - - 20.03.2017 Waiting for some spares & Work Under Progress

7 Ashok leyland (59) Diff tranfer chase broken Welding work 15.03.2017 - - 25.03.2017 Waiting for some spares & Work Under Progress

8 AMW(10) Steering pump pbm - 12.03.2017 - - 23.03.2017 Waiting For spares

9 AMW(179) Engine Problem - 05.02.2017 2500058046 - 25.03.2017 Engine fitting work under process,waiting for injector pump,brake cam shaft & Axle Hub

SUPPORTING EQUIPMENTS

1 IRDG-3442 Engine Seized Engine removed 08.02.2017 2500058965 PO : 4101084783 22.03.2017 waiting for new engine

Engine head ,water pump valve door & Gasket


2 DT-4309 Engine Comp misfiring 13.03.2017 - - 18.03.2017 Engine head ,water pump valve door & Gasket changing work under process
changing work

3 WT-0599 Diff pbm ,pinion shaft bearing damaged Diff pinion shaft bearing removing work 17.03.2017 - - 19.03.2017 wainting for spares

Major maintenance
1 Atlas copco L8-3 Weekly Maintenance work cooler cleaning work 17.03.2017 - - 18.03.2017 maintenance work under process

2 CAT 777D-1 RRO Tyre Air Bulge RRO tyre changing work 18.03.2017 - - 18.03.2017 RRO tyre changing work under process

3 CAT 777D-2 Rear all Tyre Retread condition Rear all Tyre Retread condition changing work 18.03.2017 - - 18.03.2017 maintenance work under process

4 Volvo FMX440 (68) Major Maintenance work Alternator changing work 17.03.2017 - - 19.03.2017 maintenance work under process
Sr No Equipment Asset No Present HMR

1
MMI / MBB Own Equipments Breakdown Report as on 19.03.20

Breakdown Desc. B/D Status

EXCAVATOR

Haulling Trucks

Dozers & Motor Graders

SUPPORTING EQUIPMENTS

LMV
n Report as on 19.03.2017

B/D From PR Status PO Status Target Dt.

aders

MENTS
Remarks