Escolar Documentos
Profissional Documentos
Cultura Documentos
PB
PPT PEKERJAAN PLESTERAN PS
PPT
PPL PEKERJAAN PASANG LANTAI CB
PPL
PCB PEKERJAAN CONE BLOCK / PAVING BLOCK AS
PCB
PK PEKERJAAN KAYU AT
PK
PA PEKERJAAN ATAP K
PC
PA PEKERJAAN PENGECATAN
PBK
PC PEKERJAAN BONGKARAN
PBK
AS ANALISA SUPLEMEN KY
PS
SPL PEKERJAAN SANITASI TNM
PBS
PS PEKERJAAN BESI DAN ALUMUNIUM LS
PS
KC
KC
KB
KB
LL
LL
dan UPAH/BAHAN
UPAH
CAT
PIPA
PERALATAN SANITASI
ASBES
ATAP
SEWA ALAT
KAYU
BAHAN TUMBUHAN
LISTRIK
PENGGANTUNG / PENGUNCI
ASPAL
PAKU, BAUT
BAHAN KACA
PERALATAN KEBERSIHAN
LAIN-LAIN
SIA I (PERSERO)
KETERANGAN
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
baru
Sewa
Sewa
Sewa
Sewa
U UPAH
U 1 Tukang kayu
U 2 Tukang batu
U 3 Tukang alumunium
U 4 Tukang besi
U 5 Tukang las
U 6 Tukang cat
U 7 Tukang plitur
U 8 Tukang bor
U 9 Tukang listrik
U 10 Tukang pipa ledeng
Tukang Pancang
U 11 Kepala tukang
U 12 Tukan gali/timbun
U 13 Pekerja
U 14 Mandor
U 15 Pengawas
U 16 Ahli ukur
U 17 Asisten ahli ukur
U 18 Sopir
U 19 Masinis
U 20 Kernet / pembantu sopir
U 21 Mekanik terlatih
U 22 Operator tak terlatih
U 23 Operator terlatih
U 24 Pembantu Operator
U 25 Operator semi terlatih
U 26 Penjaga
U 27 Penyelam
U 28 Tukang Grouting
U 29 Operator mesin sondir
U 30 Analis test sondir
AS ASBES
AS 1 Asbes plat ( 100 x 100 x 0,3 )
AS 2 Asbes gelombang besar ( 225 x 92 x 0,5 )
AS 3 Asbes gelombang besar ( 200 x 92 x 0,5 )
AS 4 Asbes gelombang besar ( 180 x 92 x 0,5 )
AS 5 Asbes gelombang besar ( 240 x 108 x 0,6 )
ASP ASPAL
ASP 1 Aspal cair
ASP 2 Aspal curah
ASP 3 Aspal drum
ASP 4 Aspal modifer / asphalt joint
ASP 5 Drum aspal bekas
ASP 6 Rubber Filler
ASP 7 Filler
ASP 8 Karosene
AT GENTENG
AT 1 Genteng beton besar natural 1m 9 biji
AT 2 Genteng beton besar warna 1m 9 biji
AT 3 Genteng beton kecil natural 1m 11 biji
AT 4 Genteng beton kecil warna 1m 11 biji
AT 5 Genteng beton kecil natural 1m 20 biji
AT 6 Genteng beton kecil warna 1m 20 biji
AT 7 Genteng metal
AT 8 Genteng bubungan beton
AT 9 Bubung stel gelombang
AT 10 Genteng bubungan warna
AT SENG BJLS
AT 1 Seng BJLS 0,20 gelombang P = 180 cm
AT 2 Seng BJLS 0,20 gelombang P = 240 cm
AT 3 Seng plat 3" x 6" BJLS 28
AT 4 Seng gelombang 2" - 5" BJLS 24
AT 5 Alumunium gelombang tebal 0,55
AT 6 Alumunium foil
AT 7 Rabung alumunium standar 40 cm 18 SWG 22
BT 34 Krikil beton
BT 35 Kerikil tidak tersaring
BT 36 Split D 30 - 40 mm
BT 37 Split D 10 - 20 mm
BT 38 Split D 1 - 2 cm
BT 39 Batu merah ( 5x11x23 )
BT 40 Batu merah ( 4x9x19 )
BT 41 Tanah liat
BT 42 Tanah urug
BT 43 Tanah timbun
BT 44 Sirtu
BT 45 Batako
BT 46 Bata expose 5 x 11 x 24 cm
BT 47 Terawang / roster 12x11x24 cm
BT 48 Roster 25/25
C CAT
C 1 Cat dasar meni
C 2 Cat tembok melamin
C 3 Cat dasar meni kayu
C 4 Cat alkali resisting primer
C 5 Cat ICI Weathershield
C 6 Cat penutup
C 7 Cat kayu
C Cat Epoxy/Tar
C 8 Dempul kayu typa A (putih) Jago
C 9 Plamur Fuji
C 10 Kalkarium
C 11 Politur jadi
C 12 Teak oil Fuji
C 13 Pernis
C 14 Minyak cat
C 15 Thinner
C 16 Kuas roll
C 17 Kuas ukuran 3,5"
C 18 Kuas ukuran 2,5"
C 19 Kuas ukuran kecil 1"
C 20 Soda api
C 21 Sabun deterjen
C 22 Amplas
C 23 Perekat
KB PERALATAN KEBERSIHAN
KB 1 Sapu lidi
KB 2 Tangkai Sapu
KB 3 Seragam
KB 4 Sarung tangan
KB 5 Masker
KB 6 Gerobak (alat baru)
KB 7 Gerobak (sewa)
KB 8 Serok
KB 9 Gunting pangkas
KB 10 Mesin potong rumput
KB 11 Garpu tanah
KB 12 Arit
KB 13 Sepatu
KB 14 Ember
KB 15 Pacul
KB 16 Sewa kendaraan untuk membuang lumpur
KB 17 Gas oksigen 5 kg
KB 18 Pipa dia. 3/8" - 15 cm
KB 19 Nitobond EC
KB 20 Conbextra EP
KC BAHAN KACA
KC 1 Kaca polos
KC 2 Kaca patri
KC 3 Fiber glass
KC 4 Profil kaca
KY KAYU
KY KAYU LAPIS
KY 12 Akustik soft board 60 x 120
KY 13 Akustik soft board 40 x 60
KY 14 Akustik soft board 30 x 60
KY 15 Melamin wood 90 x 120 cm
KY 16 Melamin wood 120 x 240 cm
KY 17 Formika 4" x 8" x 0,3 cm
KY 18 Triplek
KY 19 Teak wood ( 90 x 240 )
KY 20 Plywood 4 mm
KY 21 Multiplek
KY 21 Kalsiboart 8mm
LG BESI BETON
LG 1 Besi beton polos
LG 2 Besi beton ulir
LG 3 Besi baja profil
LG 4 Besi tuang / cor
LG 5 Besi plat lembaran
LG 6 Besi scuare tube
LG 7 Besi lis kaca (1 x 1) cm
LG 8 Besi gording canal
LG 9 Baja profil IWF
LG 10 Besi strip
LG 11 Besi profil
LG 12 Besi siku rata-rata
LG 13 Besi angkur dia. 8mm
LG KAWAT
LG 1 Kawat beton / bindrat
LG 2 Kawat bronjong
LG 3 Kawat nyamuk
Kawat jaring
LG 4 Kawat las
LG 5 Kawat galvanis
LG 6 Kawat duri
LG 7 Besi jaring kawat baja
LG 8 Kawat harmonika
LG 9 Kawat penggantung rangka hollow
LG 10 Profil Alumunium "T"
LG 11 Baja ringan
LG 12 Pipa hollow 4 x 4 cm tebal 1.2 mm
LG 13 Kusen alumunium uk 2"x4" tebal 1.2 mm sekualitas YKK putih
LG 14 Jendela nako
LG 15 Pintu besi baja
LG 16 Jendela besi baja
LG 17 Jendela besi tahan api
LG 18 Pintu gulung besi
LG 19 Pintu lipat besi
LG 20 Sunscreen alumunium
LG 21 Roll door
LG 22 Pintu alumunium
LG 23 Vertikal blind
LG 24 Wall paper
LG Scafolding
LAIN-LAIN
LL 1 Tiang bendera
LL -Pondasi umpak
LL -Ompak ornamen
LL -Tiang galvanis 3"
LL -Bendera 120 x 180
LL 2 Rambu lalu lintas (terpasang)
LL 3 Papan nama jalan (terpasang)
LL 4 Sumur peresapan 5 m
LL 5 Air minum, instalasi dalam dengan pipa pralon 1" medium, acesories dihitung sendir
LL 6 Air minum, instalasi luar dengan pipa pralon 1" medium, acesoris dihitung sendiri
LL 7 Asbuton
LL 8 Tumpuan konstruksi
LL 9 Geotextile Polyfelt. TS 70
LL 10 Pelapisan kedap air lantai dengan coating ( terpasang )
LL 11 Pelapisan kedap air lantai dengan membran ( terpasang )
LS LISTRIK
LS 1 Pasang instalasi / titik
LS 2 Penyambungan beban
LS 3 Kabel Snoor 2 x 0,23 "Supreme"
LS 4 Kabel NYA 2,5 sqmm "Supreme"
LS 5 Kabel NYA 1,5 sqmm "Supreme"
LS 6 Kabel NYA 2,5 sqmm "Supreme"
LS 7 Kabel NYA 1,5 sqmm "Supreme"
LS 8 Kabel NYM 2 x 1,5 sqmm "Supreme"
LS 9 Kabel NYM 2 x 2,5 sqmm "Supreme"
LS 10 Kabel NYM 2 x 4 sqmm "Supreme"
LS 11 Kabel NYM 3 x 1,5 sqmm "Supreme"
LS 12 Kabel NYM 3 x 2,5 sqmm "Supreme"
LT TEGEL / KERAMIK
LT 1 Plint tegel abu-abu 15/20
LT 2 Plint tegel abu-abu 10/20
LT 3 Plint tegel abu-abu 10/30
LT 4 Plint tegel abu-abu 10/40
LT 5 Plint tegel warna 10/20
LT 6 Plint tegel warna 10/30
LT 7 Plint tegel warna 10/40
LT 8 Plint ubin teraso 10/30
LT 9 Plint ubin teraso 10/40
LT 10 Plint ubin granit 10/30
LT 11 Plint ubin granit 10/40
LT 12 Plint ubin teralux marmer 10/60
LT 13 Plint ubin teralux marmer 10/40
LT 14 Plint ubin teralux marmer 10/30
LT 15 Tegel keramik 5/20 berglasir
LT 16 Tegel keramik 10/20 berglasir
LT 17 Tegel keramik 10/30 berglasir
P PIPA
P 1 Pipa beton 20 x 30 Panjang 1 m
P 2 Pipa beton 15 x 30 Panjang 1 m
P 3 Pipa tanah dia. 15 cm
P 4 Pipa tanah dia. 20 cm
P 5 Pipa galvanis dia. 1/2"
P 6 Pipa galvanis dia. 3/4"
P 7 Pipa galvanis dia. 1"
P 8 Pipa galvanis dia. 1 1/2"
P 9 Pipa galvanis dia. 3"
P 10 Pipa galvanis dia. 4"
P BAHAN PLASTIK
P 11 Pipa PVC abu-abu dia. 1/2" Wavin
P 12 Pipa PVC abu-abu dia. 3/4" Wavin
P 13 Pipa PVC abu-abu dia. 1" Wavin
P 14 Pipa PVC abu-abu dia. 1 1/2" Wavin
P 15 Pipa PVC abu-abu dia. 2" Wavin
P 16 Pipa PVC abu-abu dia. 2 1/2" Wavin
P 17 Pipa PVC abu-abu dia. 3" Wavin
P 18 Pipa PVC abu-abu dia. 4" Wavin
PG PENGGANTUNG / PENGUNCI
PG 1 Engsel pintu
PG 2 Engsel jendela
PG 3 Grendel
PG 4 Hak angin
PG 5 Engsel angin
PG 6 Kait angin
PG 7 Door holder
PG 8 Door stop
PG 9 Penggantung + rel pintu dorong
PG 10 Kunci tanam
PG 11 Kunci tanam antik
PG 12 Kunci tanam biasa
PG 13 Kunci kamar mandi
PG 14 Kunci gembok
PG 15 Kunci selot
PG 16 Kunci silinder
PG 17 Kunci lemari
PG 18 Spring knip
PG 19 Door closer
PK PAKU
PK 1 Paku gording 125 x 5,1 mm
PK 2 Paku usuk 80 x 3,8 mm
PK 3 Paku reng 55 x 3,1 mm
PK 4 Paku eternit 20 x 1,5 mm
PK 5 Water mur
PK 6 Angkur / baut
PK 7 Paku biasa
PK 8 Paku asbes
PK 9 Paku sumbat
PK 10 Paku sekrup 3.5"
PK 11 Paku skrup
PK 12 Paku triplek
PK 13 Paku gypsum
PK 14 Paku hak panjang 15 cm
PK 15 Paku biasa 1/2" - 1"
PS BAK MANDI
PS 1 Bak mandi fiber glass 1,00 m3
PS 2 Bak mandi fiber glass 0,30 m3
PS KLOSET
PS 1 Kloset jongkok porselin type CE8 standar
PS 2 Kloset duduk standar / porselin ( dengan tangki KIA standart) "Toto"
PS 3 Kloset duduk putih dengan tangki "Toto"
PS 4 Kloset jongkok teraso
PS WASTAFEL
PS 1 Wastafel putih (KIA)
PS 2 Badkip
PS 3 Bak cuci teraso
PS 4 Bak cuci stainless steel
PS 5 Water drain + asesories
PS 6 Shower dinding
PS URINOIR
PS 1 Urinoir putih
PS 2 Kran air diameter 3/4" atau 1/2" exs. Toto
PS 3 Seal tape
PS 4 Floordrain
PS 5 Kran air angsa
PS 6 Perlengkapan
PS 7 Tempat sabun
ALT ALAT
ALT 1 Crane Kap. 35 ton
ALT 2 Hammer + Pile driver
ALT 3 Kotrek 2,5 ton
ALT 4 Kunci
ALT 5 Perancah
ALT 6 Waterpass
ALT 7 Piling Barge Driving
ALT 8 Ponton Kap. 1000 ton
ALT 9 Work Boat
ALT 10 Generator 150 kVA
ALT 11 Theodolite
ALT 12 Crawler Crane Kap. 35 ton
ALT 13 Alat Pancang Pile Compactor
ALT 14 Crane Kap. 10-15 Ton
ALT 15 Genset
ALT 16 Bor beton
ALT 17 Sewa alat las
ALT 18 Sewa alat sondir
ALT 19 Sewa alat perakitan tulangan
ALT 20 Sewa Scaffolding
ALT 21 Biaya tes beton per benda uji
ALT 22 Vienetions dan vertikal blinds (tirai)
ALT 23 Karpet
ALT 24 Biaya analisis tes beton perbeda uji
ALT 25 Sewa Compressor untuk pekerjaan grouting
ALT 26 Sewa Mesin Grouting
ALT 27 Sewa mesin gerinda untuk pekerjaan grouting
ALT 28 Sewa mixer ubtuk pekerjaan grouting
ALT 29 Sewa alar bor
ALT 30 Sewa Alat Ukur
ALT 31 Sewa Motor Walls
ALT 32 Alat bantu pekerjaan grouting
ALT 33 Alat bantu pekerjaan pekerjaan marka
ALT 34 Alat bantu pekerjaan pekerjaan expantion joint
ALT 35 Waterstop lebar 230 mm - 320 mm
ALT 36 Waterstop lebar 200 mm
ALT 13 Alat bantu pekerjaan pancang
ALT 37 Waterstop lebar 150 mm
HARGA SATUAN
SATUAN
(Rp.)
hari 80,000.00
hari 80,000.00
hari 80,000.00
hari 80,000.00
hari 80,000.00
hari 80,000.00
hari 80,000.00
hari 80,000.00
hari 80,000.00
hari 80,000.00
hari 80,000.00
hari 90,000.00
hari 80,000.00
hari 55,000.00
hari 80,000.00
hari 100,000.00
hari 100,000.00
hari 100,000.00
hari 100,000.00
hari 100,000.00
hari 80,000.00
hari 100,000.00
hari 80,000.00
hari 100,000.00
hari 80,000.00
hari 80,000.00
hari 80,000.00
hari 150,000.00
hari 80,000.00
hari 100,000.00
hari 100,000.00
lbr 15,100.00
lbr
lbr
lbr 29,100.00
lbr 39,100.00
HARGA SATUAN
SATUAN
(Rp.)
lbr 34,000.00
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
kg 9,400.00
kg
kg
kg
bh
m1
kg
ltr
bh
bh
bh
bh
bh
bh
m2 184,000.00
bh
lbr
bh
bh 8,400.00
bh
bh
bh
bh
m2
HARGA SATUAN
SATUAN
(Rp.)
m'
kg
m2
m2 115,000.00
bh
m'
m2 119,700.00
bh 3,800.00
lbr
lbr
lbr 1,288.13
lbr
m2
m2
m1
m1
lbr
btg
ltr
ltr
ltr 6,000.00
ltr 5,400.00
ltr 11,000.00
ltr 42,000.00
kg
kg
ltr 6,000.00
kg
kg
box
HARGA SATUAN
SATUAN
(Rp.)
ltr
ltr
m3 195,300.00
Kg
m3
m2
m3
m2
m2
m2
m2
m2
m2
bh
bh
kg
m3 288,000.00
m 3
276,000.00
m3
m2
m2
bh 600.00
m3 214,200.00
m3 214,200.00
m 3
214,200.00
m3 214,200.00
m3 214,200.00
m3
m3
m3 138,600.00
m3 138,600.00
m 3
94,500.00
m3 120,000.00
m3 120,000.00
m 3
120,000.00
HARGA SATUAN
SATUAN
(Rp.)
m3 195,300.00
m 3
m3 214,200.00
m3 214,200.00
m 3
214,200.00
bj 600.00
bj 500.00
m3
m3
m3 100,800.00
m3 138,600.00
bh 3,600.00
bh
bh
bh
kg 35,300.00
kg 24,000.00
kg 51,800.00
kg
kg 88,200.00
kg
kg 59,200.00
kg
kg 22,700.00
kg
kg
ltr
ltr
ltr
ltr 12,000.00
ltr 12,000.00
bh
bh
bh
bh
kg 39,400.00
kg
lbr 2,500.00
kg 25,200.00
HARGA SATUAN
SATUAN
(Rp.)
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ps
bh
bh
hr
tb
bh
kg
kg
m2 262,500.00
m2
lbr
m' 304,500.00
m3 50,000.00
m3
kg 5,000.00
lbr 68,000.00
roll
m1 6,950.00
m 1
m1
lbr
lbr
HARGA SATUAN
SATUAN
(Rp.)
m3 5,937,500.00
m 3
15,625,000.00
m2 9,200,000.00
m3 9,200,000.00
m 3
m3 5,937,500.00
m3 48,000.00
btg 48,000.00
m3
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr 56,100.00
lbr 283,500.00
lbr 105,000.00
kg 11,600.00
kg 12,300.00
kg 12,100.00
kg
kg 12,500.00
ml
ml
kg 12,100.00
kg 12,100.00
kg 13,300.00
kg 12,100.00
kg 12,100.00
kg
HARGA SATUAN
SATUAN
(Rp.)
Kg 12,500.00
bh
unit
m1
bh
tube 7,500.00
ml
kg
m2 277,200.00
m' 5,000.00
m' 13,000.00
kg 20,000.00
kg
m2 20,000.00
m2
kg 31,800.00
kg
kg 20,000.00
kg
m2
m1
m1
m2 80,000.00
m 1
7,875.00
m1
bh 300,000.00
m2
m2
m2
m2
m2
m2
m2
m' 105,800.00
m 2
m2
HARGA SATUAN
SATUAN
(Rp.)
bh
bh
bh
bh
bh
bh
bh
m3
m3
kg
buah
buah
m'
buah
buah
buah
buah
m1
m1
kg
m
m2
m2
m2
titik
ls
roll
roll
roll
m'
m'
m1
m1
m1
m1
m1
HARGA SATUAN
SATUAN
(Rp.)
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
buah
buah
buah
buah
m'
unit / ls
titik
set 5,000.00
unit
jam
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
HARGA SATUAN
SATUAN
(Rp.)
bh 2,880.00
bh 3,900.00
bh
bh 11,520.00
bh 69,984.00
m2 157,500.00
m2
bh
m2
bh
bh
bh
m2
bh
m3
m
m
bh
bh
m1
m1
m1
m1
m1
m1
btg
btg
btg
btg
btg
btg
btg
btg
m2
m2
HARGA SATUAN
SATUAN
(Rp.)
m2
m2
m2
m2
m2 4,400.00
bh
bh
bh
m2
m2
40 kg 1,375.00
40 kg 1,875.00
kg 1,875.00
kg 5,000.00
kg
kg
kg
m3
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh 69,300.00
bh
bh
bh
bh
bh
bh
bh
bh
bh
HARGA SATUAN
SATUAN
(Rp.)
bh 2,000.00
kg 16,300.00
kg 16,300.00
kg 16,300.00
kg 16,300.00
kg
bh
kg 16,300.00
bh
bh
bh
kg 16,300.00
kg 16,300.00
kg 16,300.00
kg 16,300.00
kg 16,300.00
bh
bh
bh
bh
set 1,890,000.00
bh
set 535,500.00
bh
bh
bh
set
set
set 882,000.00
bh 31,500.00
bh 5,000.00
bh 78,100.00
bh
set
bh
HARGA SATUAN
SATUAN
(Rp.)
btg
m2
m2
m3
kg
m2
HARGA SATUAN
SATUAN
(Rp.)
hari 3,900,000.00
hari 1,850,000.00
bh 200,000.00
set 125,000.00
hari 350,000.00
unit 400,000.00
hari 1,500,000.00
hari 4,000,000.00
hari 1,000,000.00
hari 1,500,000.00
unit 500,000.00
hari 3,900,000.00
hari 1,800,000.00
hari 2,800,000.00
hari 275,000.00
hari 375,000.00
hr 1,146,000.00
hr
hr
unit
bh
m2
m2
bh
hr
hr
hr
hr
hr
hr
hr
ls
ls
ls
m'
m'
unt 1,000,000.00
m'
HARGA SATUAN
SATUAN
(Rp.)
:Dibuat Oleh
REKAPITULASI A
KODE SATUAN
PP 0
PP1 1 M2
PP2 1 M1
PP3 1 M2
PP4 1 buah
PP5 1 M2
PP6 1 M2
PP7 1 M1
PP8 1 M1
PP9 1 M2
PP10 1 M2
PP11 1 M2
PP12 1 M2
PP13 1 M1
PT
PT1 1 M3
PT2 1 M3
PT3 1 M3
PT4 1 M3
PT5 1 M3
PT6 1 M3
PT7 1 M3
PT8 1 M3
PT9 1 M3
PT10 1 M3
PT11 1 M3
PT12 1 M3
PT13 1 M3
PT14 1 M2
PT15 1 M2
PT16 1 M3
PT17 1 M3
PPS
PPS1 1 M3
PPS2 1 M3
PPS3 1 M3
PPS4 1 M3
PPS5 1 M3
PPS6 1 M3
PPS7 1 M3
PPS8 1 M3
KODE SATUAN
PPS9 1 M3
PPS10 1 M3
PPS11 1 M2
PPS12 1 M2
PPS13 1 M2
PPS14 1 M2
PPS15 1 M2
PD
PD1 1 M2
PD2 1 M2
PD3 1 M2
PD4 1 M2
PD5 1 M2
KODE SATUAN
PD6 1 M2
PD7 1 M2
PD8 1 M2
PD9 1 M2
PD10 1 M2
PD11 1 M2
PD12 1 M2
PD13 1 M2
PD14 1 M2
PD15 1 M2
PD16 1 M2
PD17 1 M2
PD18 1 M2
PD19 1 M2
PD20 1 M2
PD21 1 M2
PD22 1 M2
PD23 1 M2
PD24 1 M2
PD25 1 M2
PD26 1 M2
PB
PB1 1 M3
PB2 1 M3
PB3 1 M3
PB4 1 M3
PB5 1 M3
PB6 1 M3
PB7 1 M3
PB8 1 M3
PB9 1 M3
PB10 1 M3
PB11 1 M3
PB12 1 M3
PB13 1 M3
PB14 1 M3
PB15 1 M3
PB16 1 M3
PB17 1 M3
PB18 1 M1
PB19 1 M1
PB20 1 M1
PB21 1 KG
PB22 1 KG
PB23 1 KG
PB24 1 KG
KODE SATUAN
PB25 1 M2
PB26 1 M2
PB27 1 M2
PB28 1 M2
PB29 1 M2
PB30 1 M2
PB31 1 M2
PB32 1 M2
PB33 1 M2
PB34 1 M1
KODE SATUAN
PB35 1 M1
PB36 1 M1
PB37 1 M1
PB38 1 M1
PPT
PPT1 1 M2
PPT2 1 M2
PPT3 1 M2
PPT4 1 M2
PPT5 1 M2
PPT6 1 M2
PPT7 1 M2
PPT8 1 M2
PPT9 1 M2
PPT10 1 M2
PPT11 1 M2
PPT12 1 M2
PPT13 1 M2
PPT14 1 M2
PPT15 1 M2
PPT16 1 M2
PPT17 1 M2
PPT18 1 M2
PPT19 1 M2
PPL
PPL1 1 M2
PPL2 1 M2
PPL3 1 M1
PPL4 1 M1
PPL5 1 M1
PPL6 1 M1
PPL7 1 M1
PPL8 1 M1
PPL9 1 M1
PPL10 1 M1
PPL11 1 M1
PPL12 1 M1
PPL13 1 M1
PPL14 1 M1
PPL15 1 M1
KODE SATUAN
PPL16 1 M1
PPL17 1 M2
PPL18 1 M2
PPL19 1 M2
PPL20 1 M2
PPL21 1 M2
PPL22 1 M2
PPL23 1 M2
PPL24 1 M2
PPL25 1 M2
PPL26 1 M2
PPL27 1 M1
PPL28 1 M1
PPL29 1 M1
PPL30 1 M1
PPL31 1 M2
PPL32 1 M2
PPL33 1 M2
PPL34 1 M2
KODE SATUAN
PPL35 1 M2
PPL36 1 M2
PPL37 1 M2
PPL38 1 M2
PPL39 1 M2
PPL40 1 M2
PPL41 1 M2
PPL42 1 M2
PPL43 1 M1
PPL44 1 M1
PPL45 1 M1
PPL46 1 M1
PCB
PCB1 1 M2
PCB2 1 M2
PCB3 1 M2
PCB4 1 M2
PCB5 1 M2
PCB6 1 M2
PCB7 1 M3
PCB8 1 bh
PCB9 1 M3
PCB10 1 M3
PCB11 1 M3
PK
PK1 1 M3
PK2 1 M3
PK3 1 M2
PK4 1 M2
PK5 1 M2
PK6 1 M2
PK7 1 M'
PK8 1 M'
PK9 1 M'
PK10 1 M'
PK11 1 M'
PK12 1 M'
PK13 1 M'
PK14 1 M2
PK15 1 M2
PK16 1 M2
PK17 1 M2
PK18 1 M2
PK19 1 M2
PK20 1 M2
KODE SATUAN
PK21 1 M2
PK22 1 M2
PK23 1 M2
PK24 1 M2
PK25 1 M2
PK26 1 M2
PK27 1 M2
PK28 1 M2
PBS
PBS1 1 Kg
PBS2 1 Kg
PBS3 1 Kg
PBS4 1 Kg
PBS5 1 Kg
PBS6 1 Kg
PBS7 1 Kg
PBS8 1 Unit
PBS9 1 Unit
PBS10 1 Kg
PBS11 1 M2
PBS12 1 Cm
PBS13 1 M2
PBS14 1 M2
PBS15 1 M2
PBS16 1 M2
PBS17 1 M2
PBS18 1 M2
PBS19 1 M2
PBS20 1 M2
PBS21 1 M2
PBS22 1 M2
PBS23 1 M2
PBS24 1 M2
PBS25 1 M'
PBS26 1 M'
PA
PA1 1 M2
PA2 1 M2
PA3 1 M2
PA4 1 M2
PA5 1 M2
PA6 1 M2
PA7 1 M2
PA8 1 M2
PA9 1 M'
KODE SATUAN
PA10 1 M2
PA11 1 M'
PA12 1 M2
PA13 1 M2
PA14 1 M2
PA15 1 M2
PA16 1 M2
PA17 1 M2
PA18 1 M2
PA19 1 M2
PA20 1 M2
PA21 1 M1
PA22 1 M1
PA23 1 M2
PA24 1 M2
PA25 1 M2
PA26 1 M2
PA27 1 M2
PA28 1 M2
PA29 1 M2
PA30 1 M2
PA31 1 M2
PA32 1 M1
PA33 1 M1
PA34 1 M1
PA35 1 M1
PA36 1 M1
PA37 1 M1
PA38 1 M1
PA39 1 M1
PA40 1 M1
PA41 1 M2
PA42 1 M2
PC
PC1 1 M2
KODE SATUAN
PC2 1 M2
PC3 1 M2
PC4 1 M2
PC5 1 M2
PC6 1 M2
PC7 1 M2
PC8 1 M2
PC9 1 M2
PC10 1 M2
PC11 1 M2
PC12 1 M2
PC13 1 M2
PC14 1 M2
PC15 1 M2
PC16 1 M2
PC17 1 M2
PC18 1 M2
PC19 1 M2
PC20 1 M2
PC21 1 M2
PC22 1 M2
PBK
PBK1 1 M3
PBK2 1 M3
PBK3 1 M3
PBK4 1 M2
PBK5 1 M2
PBK6 1 M2
PBK7 1 M2
PBK8 1 M2
PBK9 1 M2
PBK10 1 M3
PBK11 1 M3
PBK12 1 M3
PS
PS1 1 bh
PS2 1 bh
PS3 1 bh
PS4 1 bh
PS5 1 bh
PS6 1 bh
PS7 1 bh
PS8 1 bh
PS9 1 M1
PS10 1 M1
KODE SATUAN
PS11 1 M1
PS12 1 M1
PS13 1 bh
PS14 1 bh
PS15 1 bh
PS16 1 M1
PS17 1 M1
PS18 1 M1
PS19 1 M1
PS20 1 M1
PS21 1 M1
PS22 1 M1
PS23 1 M1
PS24 1 M1
PS25 1 M1
KODE SATUAN
PS26 1 M1
PS27 1 M1
PS28 1 M1
PS29 1 M1
PS30 1 bh
PS31 1 bh
PS32 1 bh
PS33 1 bh
PPG
PPG1 1 bh
PPG2 1 bh
PPG3 1 bh
PPG4 1 bh
PPG5 1 bh
PPG6 1 bh
PPG7 1 bh
PPG8 1 bh
PPG9 1 bh
PPG10 1 bh
PPG11 1 bh
PPG12 1 bh
PPG13 1 bh
PPG14 1 bh
PPG15 1 bh
PPG16 1 M2
PPG17 1 M'
PPG18 1 M2
PPG19 1 ttk
PPG20 1 M3
PPG21 1 M3
PPG22 1 M2/Hari
PPG23 1 M2/Hari
PPG24 1 M2/Hari
PPG25 1 M2/Hari
PPG26 1 M2/Hari
PPG27 1 M2/Hari
PPG28 1 M1
PPG29 1 M1
PPG30 1 M1
PPG31 1 M1
SPL
SPL1 1 M2
SPL2 1 M2
SPL3 1 M3
SPL4 1 M3
KODE SATUAN
SPL5 1 M3
SPL6 1 M3
SPL7 1 KG
SPL8 1 KG
SPL9 1 M2
SPL10 1 KG
SPL11 1 M2
SPL12 1 M2
SPL13 1 M'
SPL14 1 M2
SPL15 1 M'
SPL16 1 M2
SPL17 1 M2
SPL18 1 M2
SPL19 1 M'
SPL20 1 M'
SPL21 1 M'
SPL22 1 M'
SPL23 1 M'
SPL24 1 M'
SPL25 1 M'
KODE SATUAN
SPL26 1 M'
SPL27 1 BH
SPL28 1 BH
SPL29 1 BH
SPL30 1 BH
SPL31 1 M'
SPL32 1 M'
SPL33 1 M'
SPL34 1 M'
SPL35 1 bh
SPL36 1 M2
SPL37 1 bh
SPL38 1 bh
SPL39 1 bh
SPL40 1 M2
SPL41 1 bh
SPL42 1 M2
SPL43 TTK
SPL44 TTK
SPL45 m2
SPL46 m2
SPL47 m2
SPL48 m'
PLS
PLS1 1 M1
PLS2 1 M1
PLS3 1 M1
PLS4 1 M1
PLS5 1 M1
PLS6 1 M1
PLS7 1 M1
PLS8 1 M1
PLS9 1 Unit
PLS10 1 Unit
PLS11 1 Unit
PLS12 1 Unit
PLS13 1 Set
PLS14 1 Unit
PLS15 1 Set
PLS16 1 Unit
PLS17 1 Set
PLS18 1 Set
PLS19 1 M1
PLS20 1 M1
PLS21 1 M1
PLS22 1 bh
KODE SATUAN
PLS23 1 bh
PLS24 1 bh
PLS25 1 Set
PLS26 1 Set
PLS27 1 Set
PLS28 1 Set
PLS29 1 Set
PLS30 1 Set
PLS31 1 Set
PLS32 1 Set
PLS33 1 Set
PLS34 1 Set
PLS35 1 Set
PLS36 1 Set
KPUT
KPUT1 1 M2
KPUT2 1 M3
KPUT3 1 M2
KPUT4 1 M2
KPUT5 1 M2
KPUT6 1 M2
KPUT7 1 M2
KPUT8 1 M2
KPUT9 1 M2
KPUT10 1 M2
KPUT11 1 M2
KPUT12 1 M2
KPUT13 1 M2
KPUT14 1 M2
KPUT15 1 M1
KPUT16 1 M2
ASP
ASP1 1 M2
ASP2 1 M2
ASP3 1 M3
ASP4 1 liter
ASP5 1 M3
ASP6 1 M3
ASP7 1 liter
ASP8 1 M2
ALT
ALT1 1 Jam
ALT2 1 Jam
ALT3 1 Jam
KODE SATUAN
ALT4 1 Jam
ALT5 1 Jam
ALT6 1 Jam
ALT7 1 Jam
ALT8 1 Jam
ALT9 1 Jam
ALT10 1 Jam
ALT11 1 Jam
ALT12 1 Jam
ALT13 1 Jam
ALT14 1 Jam
ALT15 1 Jam
ALT16 1 Jam
ALT17 1 Jam
ALT18 1 Jam
ALT19 1 Jam
ALT20 1 Jam
ALT21 1 Jam
ALT22 1 Jam
ALT23 1 Jam
ALT24 1 Jam
ALT25 1 Jam
ALT26 1 Jam
ALT27 1 Jam
ALT28 1 Jam
ALT29 1 Jam
ALT30 1 Jam
ALT31 1 Jam
ALT32 1 Jam
ALT33 1 Jam
ALT34 1 Jam
ALT35 1 Jam
ALT36 1 Jam
ALT37 1 Jam
ALT38 1 Jam
ALT39 1 Jam
ALT40 1 Jam
ALT41 1 Jam
MACAM PEKERJAAN
PEKERJAAN PERSIAPAN
Pekerjaan Pengukuran Gedung
Pengukuran dan pemasangan bouwplank untuk gedung dan saluran
Membersihkan lapangan dan perataan
Membuat Papan Nama Proyek 80x120 cm
Pembuatan jalan sementara, tebal 25 cm
Pembuatan kantor sementara, dengan lantai plesteran
Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
Pembuatan pagar sementara dari kawat duri tinggi 1,80 meter
Pembuatan gudang semen dan alat-alat
Pembuatan rumah jaga/konstruksi kayu
Pembuatan bedeng buruh
Pasang pagar kawat jaring galvanis, tinggi 1,00 m
Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm
PEKERJAAN TANAH
Galian tanah biasa sedalam sampai 1 meter
Galian tanah biasa sedalam 1 - 2 meter
Galian tanah biasa sedalam 2 - 3 meter
Galian tanah keras sedalam sampai 1 meter
Galian tanah cadas sedalam sampai 1 meter
Galian tanah lumpur sedalam 1 meter
Stripping tebing setinggi 1 meter
Pengangkutan tanah sejauh 15 meter
Pemadatkan tanah per 20 cm
Urug kembali bekas galian (dihitung 1/3 kali galian tanah)
Urugan pasir
Urugan sirtu padat untuk peninggian lantai bangunan
Urug tanah mendatangkan
Memasang Lapisan pudel campuran 1 KP : 5 TL untuk stabilisasi
Gebalan rumput
Pemasangan lapisan ijuk tebal 10cm untuk peresapan
Pembuangan Tanah sampai dengan sejauh 150 meter
MACAM PEKERJAAN
Pasangan pondasi 1 Pc : 1 Ps
Pasangan pondasi 1 Pc : 2 Ps
Pasangan pondasi 1 Pc : 5 Ps
Pasangan pondasi 1 Pc : 6 Ps
Pasangan pondasi 1 Pc : 8 Ps
Beton cyclope 60% beton camp. 1pc:2ps:3kr, 40% batu belah
Pasangan pondasi sumuran dia. 100 cm
PASANGAN DINDING
Pasangan dinding HB/CB 10, camp. 1pc : 4ps
Pasangan dinding HB/CB 10, camp. 1pc : 3ps
Pasangan dinding HB/CB 15, camp. 1pc : 4ps
Pasangan dinding HB/CB 15, camp. 1pc : 3ps
Pasangan dinding HB/CB 20, camp. 1pc : 4ps
MACAM PEKERJAAN
PEKERJAAN BETON
Membuat beton , 1 Pc : 2 Ps : 3 Kr
Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr
Beton mutu f’'c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
Beton mutu f’'c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
Lantai kerja Beton mutu f’'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,87
Beton mutu f’'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Beton mutu f’'c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
Beton mutu f’'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Beton mutu f’'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
Beton mutu f’'c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
Beton mutu f’'c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
Beton mutu f’'c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
Beton mutu f’'c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
Membongkar cetakan
Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai dolken )
Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai scafolding )
PVC Waterstop lebar 150 mm
PVC Waterstop lebar 200 mm
PVC Waterstop lebar 230 mm - 320 mm
Pembesian dengan besi polos
Pembesian dengan besi ulir
Memasang kabel presstressed polos/strands
Memasang jaring kawat baja/wire mesh
MACAM PEKERJAAN
MACAM PEKERJAAN
PEKERJAAN PLESTERAN
Plesteran 1 Sm : 1 Kp : 1 Ps, tebal 15 mm
Plesteran 1 Sm : 1 Kp : 2 Ps, tebal 15 mm
Plesteran 1 Pc : 1/2 Kp : 3 Ps, tebal 15 mm
Plesteran 1 Pc : 2 Kp : 8 Ps, tebal 15 mm
Plesteran 1 Pc : 1 Ps, tebal 15 mm
Plesteran 1 Pc : 2 Ps, tebal 15 mm
Plesteran 1 Pc : 3 Ps, tebal 15 mm
Plesteran 1 Pc : 4 Ps, tebal 15 mm
Plesteran 1 Pc : 5 Ps, tebal 15 mm
Plesteran 1 Pc : 6 Ps, tebal 15 mm
Plesteran granit 1 Pc : 2 Batu granit, tebal 10 mm
Plesteran traso 1 Pc : 2 Batu traso, tebal 10 mm
1 m2 Finishing siar pas. Bata merah (=20m')
Finishing siar pas. Batu kali 1 pc : 2 ps
Plesteran Ciprat, 1 Pc : 2 Ps
Acian
Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mm
Plesteran batu kali 1pc:3ps
Plesteran batu kali 1pc:4ps
MACAM PEKERJAAN
PEKERJAAN KERAMIK
Pasang lantai keramik artistik uk. 10 x 20 cm
Pasang lantai keramik artistik uk. 10 x 10 cm atau 5 x 20 cm
Pasang ubin porselin uk. 11 x 11 cm
Pasang ubin porselin uk. 10 x 20 cm
Pasang ubin porselin uk. 20 x 20 cm
Pasang tegel keramik uk. 33/33
Pasang tegel keramik uk. 30/30
Pasang tegel keramik uk. 20/20
Pasang tegel keramik uk. 10 x 33 cm (variasi/border)
Pasang lantai mozaik uk. 30 x 30 cm, camp. 1pc : 3ps
Pasang plint keramik ukuran 10 x 30 cm
Pasang plint keramik ukuran 10 x 40 cm
Pasang plint keramik 5 x 20 cm
Pasang plint internal cove artistik 5 x 5 x 20 cm
Pasang lantai marmer uk. 100 x 100 cm
Pasang lantai karpet
Pasang keramik dinding artistik 10 x 20 cm
Pasang keramik dinding artistik 5 x 20 cm
MACAM PEKERJAAN
PEKERJAAN KAYU
Pasang konstruksi kuda-kuda konvensional
Pasang gording Kayu meranti
Pasang usuk 5/7 Kayu meranti, reng 2/3 Kayu damar (laut)
Pasang usuk 5/7 Kayu meranti, reng 3/4 Kayu damar (laut)
Pasang rangka atap sirap
Pasang rangka langit-langit (50 x 100) c
Pasang lisplank ukuran (3 x 20) cm
Pasang lisplank ukuran (3 x 30) cm,
Pasang lisplank ukuran (2 x 20) cm
Pasang lisplank ukuran (2 x 25) cm
Pasang lisplank ukuran 2 x (3 x 20) cm
Pasang lisplank ukuran 2 x (2 x 20) cm
Mengerjakan papan ruiter 2/20
Pasang rangka dinding pemisah ukuran (60 x 120) cm
Pasang dinding pemisah teakwood rangkap
Pasang dinding pemisah plywood rangkap
Pasang dinding lambiziring, dari Kayu jati papan
Pasang dinding bilik bambu, rangka kayu klas III, IV
Membuat dan memasang kusen pintu / jendela Kayu Meranti
Membuat dan memasang kusen pintu / jendela kayu Damar Laut
MACAM PEKERJAAN
PEKERJAAN ATAP
Langit-langit asbes semen tebal 4, 5 dan 6 mm
Langit-langit asbes (1,00 x 1,00) m memakai plepet
Langit-langit akustik ukuran (30 x 30) cm
Langit-langit akustik ukuran (30 x 60) cm
Langit-langit akustik ukuran (60 x 120) cm
Langit-langit triplek ukuran (120 x 240) cm tebal 3mm, 4mm, dan 6 mm
Langit-langit lambriziring Kayu jati tebal 9 mm
Langit-langit gypsum board ukuran (1200 x 2400 x 9) mm
Pasang list plafond gypsum profil
MACAM PEKERJAAN
PEKERJAAN PENGECATAN
Mengecat kerb 3 kali TIAP 1 M2 ( 3 kali )
Mengecat kerb 3 kali TIAP 1 M2 ( 2 kali )
Mengecat kerb 3 kali TIAP 1 M2 ( 1 kali )
MACAM PEKERJAAN
PEKERJAAN BONGKARAN
Membongkar pasangan batu kali
Membongkar pasangan batu merah dan membersihkan
Membongkar beton bertulang dan membersihkan
Pekerjaan bongkar lantai tegel untuk dipergunakan lagi
Mengupas plesteran lama
Membongkar genteng / sirap untuk dipergunakan lagi
Membongkar atap seng
Membongkar usuk / reng dipakai lagi
Membongkar usuk / reng tidak dipakai lagi
Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi
Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi
Mengerjakan kembali bangunan kayu yang telah dibongkar
PEKERJAAN SANITASI
Memasang kloset duduk/monoblock
Memasang kloset jongkok porselen
Memasang kloset jongkok teraso
Memasang urinoir
Memasang wastafel
Memasang bak mandi fiberglass volume 0,30 m3
Memasang badkip porselen
Memasang bak fiberglass volume 1 m3 air
Memasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm
Memasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm
MACAM PEKERJAAN
MACAM PEKERJAAN
MACAM PEKERJAAN
MACAM PEKERJAAN
Mengebor beton dermaga untuk lobang baut fender '(dihitung 120 menit).
Memasang fender karet
Memasang shower dinding
Memasang kran air angsa
Memasang tempat sabun
Prime coat
Tack coat
Pasang pipa beton oval dia. 25/37,5 dalam 0 - 1 m
Pasang pipa beton oval dia. 25/37,5 dalam 1 - 2 m
Handling dan Transport tiang pancang dan penimbunan ke titik pancang
Pelapisan epoxy/tar tiang pancang
Sambungan tiang pancang beton/spun pile dia 50 cm
Sambungan tiang pancang baja dia 50 cm
Memotong tiang pancang beton/ spun pile dia 50 cm
Membongkar Paving Block
Membongkar dan melepas fender
Membongkar perkerasan lama (serifying) tebal 10 cm
Sambungan tiang pancang diameter 35 cm
Rangka plafon furing
Pasangan batu alam
Pasang dinding pemisah kalsiboart
Plesteran minimalis
Kisi-kisi holow
MACAM PEKERJAAN
ANALISA KPUT
Menghampar dan mengisi bahan perkerasan
Menyawur pasir
Menggilas dengan motor walls
Perkerasan lapis pondasi bawah (sub base) tebal 20 cm padat
Pembuatan lapis pondasi bawah (sub base) tebal 15 cm padat
Pembuatan lapis pondasi atas (base) tebal 10 cm padat
Pembuatan lapis pondasi atas (base) tebal 8 cm padat
Pembuatan lapis pondasi atas (base) tebal 7 cm padat
Lapisan Penetrasi 4 cm padat
Pengaspalan sand sheet (latasir), tebal 1 cm jereng
Pengaspalan sand sheet (latasir) tanpa aspal, tebal 1 cm jereng
Mengecat marka jalan dengan Rettar
Mengecat marka jalan dengan Thermoplastic
Pemotongan aspal dengan mesin potong (cutter), 2 sisi
Pembongkaran aspal dengan Jack Hammer
Expantion joint
ANALISA ASPAL
LATASTON ( HRS )
LASTON ( AC )
ASPHALT TREATED BASE ( ATB )
LAPIS RESAP PENGIKAT (PRIME COAT)
LAPIS PONDASI AGREGAT KLAS A
LAPIS PONDASI AGREGAT KLAS B
LAPIS PEREKAT (TACK COAT)
PENYIAPAN BADAN JALAN (PEMADATAN DAN PERATAAN)
SEWA ALAT :
ASPHALT MIXING PLANT
ASPHALT FINISHER
ASPHALT SPRAYER
MACAM PEKERJAAN
HARGA SATUAN
HARGA SATUAN
UPAH BAHAN TOTAL
8,500 - 8,500
14,800 175,126 189,926
9,500 - 9,500
357,300 454,830 812,130
63,000 11,859 74,859
381,000 2,458,066 2,839,066
41,400 352,293 393,693
35,900 554,086 589,986
237,000 1,361,168 1,598,168
192,500 1,794,160 1,986,660
237,000 1,451,415 1,688,415
6,190 - 6,190
33,225 102,028 135,253
43,250 - 43,250
53,100 - 53,100
63,110 - 63,110
57,560 - 57,560
87,300 - 87,300
69,600 - 69,600
3,150 - 3,150
18,950 - 18,950
31,500 - 31,500
14,414 - 14,414
17,300 113,400 130,700
15,750 166,320 182,070
17,300 - 17,300
86,000 12,400 98,400
29,500 - 29,500
9,450 - 9,450
32,380 - 32,380
HARGA SATUAN
UPAH BAHAN TOTAL
155,250 576,680 731,930
155,250 418,365 573,615
155,250 252,280 407,530
155,250 228,195 383,445
155,250 195,205 350,455
276,250 1,893,190 2,169,440
212,720 ### 38,010,870
HARGA SATUAN
UPAH BAHAN TOTAL
34,000 129,050 163,050
26,600 46,086 72,686
26,600 45,094 71,694
26,600 54,938 81,538
26,600 56,938 83,538
26,600 59,320 85,920
26,600 60,710 87,310
26,600 62,973 89,573
26,600 66,559 93,159
26,600 72,616 99,216
53,200 110,335 163,535
53,200 124,078 177,278
53,200 126,765 179,965
53,200 131,666 184,866
53,200 140,226 193,426
53,200 153,413 206,613
26,600 19,325 45,925
26,600 23,090 49,690
31,050 23,090 54,140
38,400 66,988 105,388
- 21,988 21,988
HARGA SATUAN
UPAH BAHAN TOTAL
56,300 383,720 440,020
56,300 261,295 317,595
53,820 242,990 296,810
53,820 272,678 326,498
68,310 578,445 646,755
68,310 606,045 674,355
68,310 770,445 838,755
68,310 613,070 681,380
68,310 518,770 587,080
17,350 190,530 207,880
HARGA SATUAN
UPAH BAHAN TOTAL
15,960 63,986 79,946
26,355 72,754 99,109
118,630 965,289 1,083,919
91,700 770,358 862,058
HARGA SATUAN
UPAH BAHAN TOTAL
37,260 - 37,260
HARGA SATUAN
UPAH BAHAN TOTAL
93,150 20,104 113,254
93,150 94,905 188,055
76,730 95,760 172,490
11,850 782 12,632
134,550 70,273 204,823
22,200 - 22,200
34,920 - 34,920
17,760 - 17,760
11,840 - 11,840
17,760 815 18,575
76,730 212,160 288,890
76,730 89,760 166,490
HARGA SATUAN
UPAH BAHAN TOTAL
114,100 625,815 739,915
326,000 370,500 696,500
326,000 591,300 917,300
228,200 289,089 517,289
260,800 294,609 555,409
241,650 554,445 796,095
260,800 231,989 492,789
277,100 234,489 511,589
HARGA SATUAN
UPAH BAHAN TOTAL
74,000 5,100 79,100
7,440 163 7,603
31,100 112,030 143,130
34,060 121,556 155,616
36,740 36,090 72,830
20,700 - 20,700
26,600 - 26,600
20,700 - 20,700
26,600 - 26,600
20,700 - 20,700
26,600 - 26,600
41,400 4,680 46,080
41,400 4,680 46,080
15,060 1,956 17,016
14,490 1,956 16,446
14,490 23,781 38,271
14,250 1,956 16,206
14,250 19,296 33,546
14,250 1,956 16,206
14,250 19,942 34,192
14,250 18,616 32,866
14,250 1,956 16,206
16,110 97,800 113,910
18,990 97,800 116,790
16,110 97,800 113,910
15,050 1,038 16,088
19,980 187,680 207,660
19,980 - 19,980
28,140 - 28,140
69,450 326 69,776
87,200 652 87,852
13,340 - 13,340
72,200 352,150 424,350
HARGA SATUAN
UPAH BAHAN TOTAL
8,450 1,970 10,420
8,450 - 8,450
5,960 2,056 8,016
10,725 8,806 19,531
4,590 26,366 30,956
12,810 20,424 33,234
13,110 - 13,110
6,440 5,000 11,440
5,980 - 5,980
23,240 1,385 24,625
6,907 5,180 12,087
5,478 6,216 11,694
6,907 31,752 38,659
5,478 - 5,478
12,810 7,695 20,505
19,490 4,800 24,290
17,480 5,040 22,520
19,700 3,530 23,230
33,000 3,530 36,530
5,900 - 5,900
6,907 31,752 38,659
342,000 - 342,000
165,500 - 165,500
464,000 - 464,000
11,800 - 11,800
7,875 - 7,875
11,800 - 11,800
9,500 - 9,500
17,140 - 17,140
11,800 - 11,800
770,000 - 770,000
71,000 - 71,000
1,304,000 - 1,304,000
HARGA SATUAN
UPAH BAHAN TOTAL
14,490 23,978 38,468
39,330 226,003 265,333
258,615 160,531 419,146
125,850 256,341 382,191
190,880 389,135 580,015
13,140 - 13,140
13,140 - 13,140
13,140 - 13,140
22,392 - 22,392
22,392 - 22,392
27,994 - 27,994
7,464 - 7,464
7,464 - 7,464
7,464 - 7,464
7,464 - 7,464
HARGA SATUAN
UPAH BAHAN TOTAL
11,218 - 11,218
7,464 - 7,464
19,750 - 19,750
19,750 - 19,750
28,470 - 28,470
47,450 33,500 80,950
9,850 31,625 41,475
9,850 78,100 87,950
56,940 - 56,940
41,850 - 41,850
40,925 69,300 110,225
40,745 - 40,745
14,235 - 14,235
9,850 - 9,850
19,700 - 19,700
14,235 - 14,235
14,235 - 14,235
47,450 - 47,450
18,980 - 18,980
47,450 - 47,450
9,490 - 9,490
56,940 - 56,940
23,725 - 23,725
14,235 288,750 302,985
14,235 - 14,235
464,293 32,576 496,869
268,000 - 268,000
29,100 - 29,100
23,200 - 23,200
47 - 47
66 - 66
11 - 11
35 - 35
8 - 8
20 - 20
109,054 5,000 114,054
109,054 5,000 114,054
12,495 47,635 60,130
20,507 78,795 99,301
504,000 - 504,000
13,700 - 13,700
47,500 131,889 179,389
37,500 320,547 358,047
HARGA SATUAN
UPAH BAHAN TOTAL
37,500 334,947 372,447
37,500 4,005 41,505
384 - 384
845 - 845
56,300 1,223 57,523
1,150,620 1,000 1,151,620
25,738 81,630 107,368
54,120 158,840 212,960
3,600 7,600 11,200
34,967 201,400 236,367
24,840 9,486 34,326
37,500 - 37,500
37,500 210,408 247,908
103,500 720,060 823,560
106,000 - 106,000
214,438 - 214,438
8,875 - 8,875
106,000 - 106,000
2,683 - 2,683
53,958 - 53,958
18,583 - 18,583
HARGA SATUAN
UPAH BAHAN TOTAL
388,000 - 388,000
1,271,000 - 1,271,000
8,550 - 8,550
8,550 - 8,550
8,550 - 8,550
3,150 9,400 12,550
3,150 4,700 7,850
54,450 - 54,450
95,700 - 95,700
531,000 - 531,000
54,500 7,520 62,020
1,067,613 - 1,067,613
1,067,613 - 1,067,613
435,290 - 435,290
6,300 - 6,300
337,000 - 337,000
1,362 - 1,362
747,329 - 747,329
36,740 88,152 124,892
25,875 194,563 220,438
65,200 92,745 157,945
74,100 65,554 139,654
17,160 9,708 26,868
1,075 - 1,075
1,075 - 1,075
1,075 - 1,075
1,075 - 1,075
538 - 538
87,500 - 87,500
87,500 - 87,500
1,075 - 1,075
61,250 40,000 101,250
61,250 40,000 101,250
452,030 3,330 455,360
340,000 2,500 342,500
101,250 5,000 106,250
134,920 5,000 139,920
81,000 5,000 86,000
67,228 - 67,228
340,000 2,500 342,500
452,195 3,330 455,525
20,950 - 20,950
20,950 - 20,950
950 - 950
11,500 - 11,500
HARGA SATUAN
UPAH BAHAN TOTAL
11,500 - 11,500
11,500 - 11,500
232,500 - 232,500
357,761 - 357,761
232,500 - 232,500
665,500 206,304 871,804
765,300 206,304 971,604
802,784 206,304 1,009,088
881,810 206,304 1,088,114
970,132 206,304 1,176,436
399,284 - 399,284
342,459 - 342,459
399,284 - 399,284
372,866 - 372,866
772,658 - 772,658
491,200 - 491,200
1,964,800 9,210,000 11,174,800
169,464 230,250 399,714
135,080 203,234 338,314
92,919 141,220 234,139
13,099 125,256 138,355
9,824 109,906 119,730
98,928 2,410,171 2,509,099
1,250,595 104,380 1,354,975
89,890 37,086 126,975
220,058 236,758 456,816
446,992 1,624,644 2,071,636
2,807 13,333 16,139
173,394 972,576 1,145,970
2,750,720 ### 19,016,808
89,691
122,623
2,797,187
10,865
537,144
537,936
14,652
8,868
6,937,602
406,520
237,951
HARGA SATUAN
UPAH BAHAN TOTAL
581,080
361,045
548,211
368,177
408,950
435,401
588,272
592,669
433,290
370,199
187,046
190,399
760,067
305,471
203,646
217,605
513,441
380,897
377,093
412,993
192,560
336,022
405,741
50,000
50,000
181,000
184,000
118,000
11,000
15,000
15,000
150,000
75,000
25,000
60,000
20,000
75,000
48,000
PEKERJAAN PERSIAPAN
PP2 1 M' Pengukuran dan pemasangan bouwplank untuk gedung dan saluran
Kayu meranti balok 0.0120 m3 X Rp. 9,200,000.00
Paku reng 55 x 3,1 mm 0.0200 kg X Rp. 16,300.00
Kayu meranti papan 0.0070 m3 X Rp. 9,200,000.00
Tukang kayu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.1000 org X Rp. 55,000.00 5,500.00
Mandor 0.0050 org X Rp. 80,000.00 400.00
JUMLAH 14,800.00
PP7 1 M' Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
Kayu dolken Ø 8 - 10/400 cm 1.2500 btg X Rp. 48,000.00
Portland Cement (PC) 2.5000 kg X Rp. 1,375.00
Seng gelombang 2" - 5" BJLS 24 1.2000 lbr X Rp. -
Pasir beton 0.0050 m3 X Rp. 120,000.00
Krikil beton 0.0090 m 3
X Rp. 195,300.00
Kayu meranti balok 0.0250 m3 X Rp. 9,200,000.00
Paku biasa 0.0600 kg X Rp. 16,300.00
Cat dasar meni 0.4000 kg X Rp. 35,300.00
Tukang kayu 0.2000 org X Rp. 80,000.00 16,000.00
Kepala tukang 0.0200 org X Rp. 90,000.00 1,800.00
Pekerja 0.4000 org X Rp. 55,000.00 22,000.00
Mandor 0.0200 org X Rp. 80,000.00 1,600.00
JUMLAH 41,400.00
PP8 1 M' Pembuatan pagar sementara dari kawat duri tinggi 1,80 meter
Kayu dolken Ø 8 - 10/400 cm 1.0000 btg X Rp. 48,000.00
Portland Cement (PC) 2.0000 kg X Rp. 1,375.00
Kawat duri 25.0000 kg X Rp. 20,000.00
Pasir beton 0.0050 m 3
X Rp. 120,000.00
Krikil beton 0.0090 m3 X Rp. 195,300.00
Paku biasa 0.0600 kg X Rp. 16,300.00
Tukang kayu 0.2000 org X Rp. 80,000.00 16,000.00
Kepala tukang 0.0200 org X Rp. 90,000.00 1,800.00
Pekerja 0.3000 org X Rp. 55,000.00 16,500.00
Mandor 0.0200 org X Rp. 80,000.00 1,600.00
JUMLAH 35,900.00
PEKERJAAN TANAH
JUMLAH 57,560.00
PT10 1 m3 Urug kembali bekas galian (dihitung 1/3 kali galian tanah)
Pekerja 0.2500 org X Rp. 55,000.00 13,750.00
Mandor 0.0083 org X Rp. 80,000.00 664.00
JUMLAH 14,414.00
PEKERJAAN PASANGAN
Pasangan pondasi
PPS14 1 M3 Beton cyclope 60% beton camp. 1pc:2ps:3kr, 40% batu belah
Batu belah putih 0.4800 m3 X Rp. -
Portland Cement (PC) 194.0000 kg X Rp. 1,375.00
Pasir beton 0.3120 m3 X Rp. 120,000.00
Krikil beton 0.4680 m 3
X Rp. 195,300.00
Besi beton polos 126.0000 kg X Rp. 11,600.00
Kawat beton / bindrat 1.8000 kg X Rp. 20,000.00
Tukang batu 0.8500 org X Rp. 80,000.00 68,000.00
Kepala Tukang 0.0850 org X Rp. 90,000.00 7,650.00
Pekerja 3.4000 org X Rp. 55,000.00 187,000.00
Mandor 0.1700 org X Rp. 80,000.00 13,600.00
JUMLAH 276,250.00
PASANGAN DINDING
HB 15 12.5000 bh X Rp. -
Portland Cement (PC) 22.7400 kg X Rp. 1,375.00
Pasir pasang ( progo ) 0.5500 m 3
X Rp. 120,000.00
Besi angkur dia. 8mm 0.2800 kg X Rp. -
Tukang Batu 0.1200 org X Rp. 80,000.00 9,600.00
Kepala Tukang 0.0120 org X Rp. 90,000.00 1,080.00
Pekerja 0.3200 org X Rp. 55,000.00 17,600.00
Mandor 0.0160 org X Rp. 80,000.00 1,280.00
JUMLAH 29,560.00
PEKERJAAN BETON
PB3 1 M3 Beton mutu f’'c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Portland Cement (PC) 247.000 kg X Rp. 1,375.00
Pasir beton 0.621 m3 X Rp. 120,000.00
Split D 1 - 2 cm 0.740 m3 X Rp. 214,200.00
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00
PB4 1 M3 Beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
Portland Cement (PC) 276.000 kg X Rp. 1,375.00
Pasir beton 0.591 m3 X Rp. 120,000.00
Split D 1 - 2 cm 0.750 m3 X Rp. 214,200.00
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00
PB5 1 M3 Beton mutu f’'c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
Portland Cement (PC) 299.000 kg X Rp. 1,375.00
Pasir beton 0.571 m3 X Rp. 120,000.00
Split D 1 - 2 cm 0.753 m3 X Rp. 214,200.00
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00
PB6 1 M3 Lantai kerja Beton mutu f’'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,87
Portland Cement (PC) 230.000 kg X Rp. 1,375.00
Pasir beton 0.638 m3 X Rp. 120,000.00
Split D 1 - 2 cm 0.761 m3 X Rp. 214,200.00
Pekerja 1.200 OH X Rp. 55,000.00 66,000.00
Tukang Batu 0.200 OH X Rp. 80,000.00 16,000.00
Kepala Tukang 0.020 OH X Rp. 90,000.00 1,800.00
Mandor 0.060 OH X Rp. 80,000.00 4,800.00
JUMLAH 88,600.00
PB7 1 M3 Beton mutu f’'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Portland Cement (PC) 326.000 kg X Rp. 1,375.00
Pasir beton 0.543 m3 X Rp. 120,000.00
Split D 1 - 2 cm 0.762 m3 X Rp. 214,200.00
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00
PB8 1 M3 Beton mutu f’'c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
Portland Cement (PC) 352.000 kg X Rp. 1,375.00
Pasir beton 0.522 m3 X Rp. 120,000.00
Split D 1 - 2 cm 0.764 m3 X Rp. 214,200.00
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00
PB9 1 M3 Beton mutu f’'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Portland Cement (PC) 371.000 kg X Rp. 1,375.00
Pasir beton 0.499 m3 X Rp. 120,000.00
Split D 1 - 2 cm 0.776 m3 X Rp. 214,200.00
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00
PB10 1 M3 Beton mutu f’'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
Portland Cement (PC) 384.000 kg X Rp. 1,375.00
Pasir beton 0.494 m3 X Rp. 120,000.00
Split D 1 - 2 cm 0.770 m3 X Rp. 214,200.00
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00
PB11 1 M3 Beton mutu f’'c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
Portland Cement (PC) 406.000 kg X Rp. 1,375.00
Pasir beton 0.489 m3 X Rp. 120,000.00
Split D 1 - 2 cm 0.760 m3 X Rp. 214,200.00
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00
PB12 1 M3 Beton mutu f’'c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
Portland Cement (PC) 413.000 kg X Rp. 1,375.00
Pasir beton 0.486 m3 X Rp. 120,000.00
Split D 1 - 2 cm 0.756 m3 X Rp. 214,200.00
Pekerja 1.650 OH X Rp. 55,000.00 90,750.00
Tukang Batu 0.275 OH X Rp. 80,000.00 22,000.00
Kepala Tukang 0.028 OH X Rp. 90,000.00 2,475.00
Mandor 0.083 OH X Rp. 80,000.00 6,600.00
JUMLAH 121,825.00
PB13 1 M3 Beton mutu f’'c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
Portland Cement (PC) 439.000 kg X Rp. 1,375.00
Pasir beton 0.479 m3 X Rp. 120,000.00
Split D 1 - 2 cm 0.745 m3 X Rp. 214,200.00
Pekerja 2.100 OH X Rp. 55,000.00 115,500.00
Tukang Batu 0.350 OH X Rp. 80,000.00 28,000.00
Kepala Tukang 0.035 OH X Rp. 90,000.00 3,150.00
Mandor 0.105 OH X Rp. 80,000.00 8,400.00
JUMLAH 155,050.00
PB14 1 M3 Beton mutu f’'c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
Portland Cement (PC) 448.000 kg X Rp. 1,375.00
Pasir beton 0.476 m3 X Rp. 120,000.00
Split D 1 - 2 cm 0.741 m3 X Rp. 214,200.00
Pekerja 2.100 OH X Rp. 55,000.00 115,500.00
Tukang Batu 0.350 OH X Rp. 80,000.00 28,000.00
Kepala Tukang 0.035 OH X Rp. 90,000.00 3,150.00
Mandor 0.105 OH X Rp. 80,000.00 8,400.00
JUMLAH 155,050.00
JUMLAH 56,300.00
PB37 1 m' Pembuatan tiang pancang (40 x 40) cm, beton bertulang
Pasir urug darat 0.0190 m3 X Rp. 94,500.00
Pasir beton 0.0940 m3 X Rp. 120,000.00
Batu pecah 2/3 ( split ) 0.1500 m 3
X Rp. 214,200.00
Portland Cement (PC) 60.5000 kg X Rp. 1,375.00
Besi beton polos 45.0000 kg X Rp. 11,600.00
Kawat beton / bindrat 0.9000 kg X Rp. 20,000.00
Kayu meranti balok 0.0320 m 3
X Rp. 9,200,000.00
Paku reng 55 x 3,1 mm 0.1200 kg X Rp. 16,300.00
Minyak bekisting 0.0900 ltr X Rp. 6,000.00
Plamur Fuji 0.2400 kg X Rp. -
Tukang batu 0.6700 org X Rp. 80,000.00 53,600.00
Kepala tukang 0.0670 org X Rp. 90,000.00 6,030.00
PB38 1 m' Pembuatan tiang pancang (35 x 35) cm, beton bertulang
Pasir urug darat 0.0160 m3 X Rp. 94,500.00
Pasir beton 0.0800 m 3
X Rp. 120,000.00
Batu pecah 2/3 ( split ) 0.1250 m3 X Rp. 214,200.00
Portland Cement (PC) 49.0000 kg X Rp. 1,375.00
Besi beton polos 34.5000 kg X Rp. 11,600.00
Kawat beton / bindrat 0.7000 kg X Rp. 20,000.00
Kayu meranti balok 0.0270 m3 X Rp. 9,200,000.00
Paku reng 55 x 3,1 mm 0.1200 kg X Rp. 16,300.00
Minyak bekisting 0.0900 ltr X Rp. 6,000.00
Plamur Fuji 0.2000 kg X Rp. -
Tukang batu 0.5000 org X Rp. 80,000.00 40,000.00
Kepala tukang 0.0500 org X Rp. 90,000.00 4,500.00
Pekerja 0.8000 org X Rp. 55,000.00 44,000.00
Mandor 0.0400 org X Rp. 80,000.00 3,200.00
JUMLAH 91,700.00
PEKERJAAN PELESTERAN
PPT16 1 m2 Acian
Portland Cement (PC) 3.2500 kg X Rp. 1,375.00
Tukang Batu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala Tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.2000 org X Rp. 55,000.00 11,000.00
Mandor 0.0100 org X Rp. 80,000.00 800.00
JUMLAH 20,700.00
PEKERJAAN KERAMIK
PPL44 1 m' Pasang plint kayu klas II tebal 2cm, lebar 10cm
Papan kayu damar laut 0.0030 m3 X Rp. -
Paku skrup 0.0500 kg X Rp. 16,300.00
Tukang Kayu 0.1200 org X Rp. 80,000.00 9,600.00
Kepala Tukang 0.0120 org X Rp. 90,000.00 1,080.00
Pekerja 0.1200 org X Rp. 55,000.00 6,600.00
Mandor 0.0060 org X Rp. 80,000.00 480.00
JUMLAH 17,760.00
PPL45 1 m2 Pasang keramik dinding 60/60
Tegel keramik 60/60 berglasir 2.7778 bh X Rp. 69,984.00
Portland Cement (PC) 9.3000 kg X Rp. 1,375.00
Pasir pasang ( progo ) 0.0180 m 3
X Rp. 120,000.00
Semen putih 1.5000 kg X Rp. 1,875.00
Tukang batu 0.6500 org X Rp. 80,000.00 52,000.00
Kepala Tukang 0.0650 org X Rp. 90,000.00 5,850.00
PCB1 1 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400
Tipe segi empat, uni, segi 6 tebal = 8 cm K 400 1.0000 m2 X Rp. -
Pasir urug darat 0.0500 m 3
X Rp. 94,500.00
Tukang batu 0.2500 org X Rp. 80,000.00 20,000.00
Kepala Tukang 0.0250 org X Rp. 90,000.00 2,250.00
Pekerja 0.5000 org X Rp. 55,000.00 27,500.00
Mandor 0.0250 org X Rp. 80,000.00 2,000.00
JUMLAH 51,750.00
PCB3 1 m2 Pasang conblock tipe segi-empat, uni, segi-enam warna 8 cm, K-400
Tipe segi empat, uni, segi 6 tebal = 8 cm K 400 1.0000 m2 X Rp. -
Pasir urug darat 0.0500 m 3
X Rp. 94,500.00
Tukang batu 0.2500 org X Rp. 80,000.00 20,000.00
Kepala Tukang 0.0250 org X Rp. 90,000.00 2,250.00
Pekerja 0.5000 org X Rp. 55,000.00 27,500.00
PEKERJAAN KAYU
Pasang gording
PK3 1 m2 Pasang usuk 5/7 Kayu meranti, reng 2/3 Kayu damar laut
Kayu meranti balok 0.0140 m3 X Rp. 9,200,000.00
Damar Laut (Kelas I) 0.0036 m3 X Rp. 15,625,000.00
Paku biasa 1/2" - 1" 0.1500 kg X Rp. 16,300.00
Paku reng 55 x 3,1 mm 0.1000 kg X Rp. 16,300.00
Tukang Kayu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala Tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.1000 org X Rp. 55,000.00 5,500.00
Mandor 0.0050 org X Rp. 80,000.00 400.00
JUMLAH 14,800.00
PK4 1 m2 Pasang usuk 5/7 Kayu meranti, reng 2/3 Kayu damar laut
Kayu meranti balok 0.0140 m3 X Rp. 9,200,000.00
Damar Laut (Kelas I) 0.0072 m3 X Rp. 15,625,000.00
Paku usuk 80 x 3,8 mm 0.1500 kg X Rp. 16,300.00
Paku reng 55 x 3,1 mm 0.1000 kg X Rp. 16,300.00
Tukang Kayu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala Tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.1000 org X Rp. 55,000.00 5,500.00
Mandor 0.0050 org X Rp. 80,000.00 400.00
JUMLAH 14,800.00
Rangka langit-langit
Pasang Listplank
JUMLAH 326,000.00
PK24 1 m2 Membuat daun pintu kayu lapis plywood rangkap, rangka tertutup kayu
Kayu meranti papan 0.0250 m3 X Rp. 9,200,000.00
Paku biasa 1/2" - 1" 0.0300 kg X Rp. 16,300.00
Lem kayu (putih) Fox 0.5000 kg X Rp. 5,000.00
Plywood 4 mm 1.0000 lbr X Rp. 56,100.00
Tukang kayu 2.1000 org X Rp. 80,000.00 168,000.00
Kepala tukang 0.2100 org X Rp. 90,000.00 18,900.00
Pekerja 0.7000 org X Rp. 55,000.00 38,500.00
Mandor 0.0350 org X Rp. 80,000.00 2,800.00
JUMLAH 228,200.00
JUMLAH 888,000.00
Peralatan 5%
PBS9 1 unit Grill dari besi beton Ǿ 16mm rangka baja 50.50.5 uk 1 x 1 m
Besi siku rata-rata 24.1280 kg X Rp. 12,100.00
Besi beton polos 31.6000 kg X Rp. 11,600.00
Besi angkur dia. 8mm 2.0000 bh X Rp. -
Cat dasar meni 1.8850 m2 X Rp. 35,300.00
Tukang Las 0.1000 oh X Rp. 80,000.00 8,000.00
Pekerja 1.0000 oh X Rp. 55,000.00 55,000.00
JUMLAH 63,000.00
PBS11 1 m2 Membuat pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Besi siku rata-rata 15.0000 kg X Rp. 12,100.00
Plat baja t = 3 mm 32.8000 kg X Rp. 12,500.00
Kawat las 0.0500 kg X Rp. 31,800.00
Tukang las 1.0500 org X Rp. 80,000.00 84,000.00
Kepala tukang 0.1050 org X Rp. 90,000.00 9,450.00
Pekerja 1.0500 org X Rp. 55,000.00 57,750.00
Mandor 0.0520 org X Rp. 80,000.00 4,160.00
JUMLAH 155,360.00
PBS25 1 m' Pasang talang datar/jurai, seng plat BJLS 28 lebar 90 cm, papan Kayu jati
PBS26 1 m' Pasang talang ½ lingkaran D - 15 cm, seng plat BJLS 30 lebar 45 cm
Seng plat 3" x 6" BJLS 28 1.0500 lbr X Rp. 1,288.13
Paku biasa 1/2" - 1" 0.0100 kg X Rp. 16,300.00
Besi strip 0.5000 kg X Rp. 13,300.00
Tukang kayu 0.3000 org X Rp. 80,000.00 24,000.00
Kepala tukang 0.0300 org X Rp. 90,000.00 2,700.00
Pekerja 0.1500 org X Rp. 55,000.00 8,250.00
Mandor 0.0075 org X Rp. 80,000.00 600.00
JUMLAH 35,550.00
PEKERJAAN ATAP
PA6 1 m2 Langit-langit triplek ukuran (120 x 240) cm tebal 3mm, 4mm, dan 6 mm
Triplek 0.3750 lbr X Rp. -
Paku triplek 0.0300 kg X Rp. 16,300.00
Tukang kayu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.1000 org X Rp. 55,000.00 5,500.00
Mandor 0.0050 org X Rp. 80,000.00 400.00
JUMLAH 14,800.00
PA16 1 m2 Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk rumah tingkat
PA18 1 m2 Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk rumah tingkat
Genteng beton besar warna 1m 9 biji 9.0000 bh X Rp. -
Tukang batu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala Tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.3000 org X Rp. 55,000.00 16,500.00
Mandor 0.0150 org X Rp. 80,000.00 1,200.00
JUMLAH 26,600.00
PA20 1 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah tingkat
Genteng beton besar natural 1m 9 biji 14.5000 bh X Rp. -
Tukang batu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala Tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.3000 org X Rp. 55,000.00 16,500.00
Mandor 0.0150 org X Rp. 80,000.00 1,200.00
JUMLAH 26,600.00
PA36 1 m2 Pasang atap genteng metal zinc alume type prima roof
Genteng metal 1.0200 m2 X Rp. 184,000.00
Paku anti karat 0.2000 kg X Rp. -
Tukang kayu 0.1000 org X Rp. 80,000.00 8,000.00
Kepala tukang 0.0100 org X Rp. 90,000.00 900.00
Pekerja 0.2000 org X Rp. 55,000.00 11,000.00
Mandor 0.0010 org X Rp. 80,000.00 80.00
JUMLAH 19,980.00
PEKERJAAN PENGECATAN
PC3 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual
Sabun deterjen 0.0500 kg X Rp. -
Pekerja 0.1500 org X Rp. 55,000.00 8,250.00
Mandor 0.0025 org X Rp. 80,000.00 200.00
JUMLAH 8,450.00
PC6 1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
Cat dasar meni kayu 0.2000 kg X Rp. 51,800.00
Plamur Fuji 0.1500 kg X Rp. -
Cat dasar meni kayu 0.1700 kg X Rp. 51,800.00
Cat penutup 0.2600 kg X Rp. -
Tukang cat 0.0900 org X Rp. 80,000.00
Kepala tukang 0.0060 org X Rp. 90,000.00 540.00
Pekerja 0.0700 org X Rp. 55,000.00 3,850.00
Mandor 0.0025 org X Rp. 80,000.00 200.00
JUMLAH 4,590.00
PC7 1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
Cat dasar meni kayu 0.2000 kg X Rp. 51,800.00
Plamur Fuji 0.1500 kg X Rp. -
Cat kayu 0.1700 kg X Rp. 59,200.00
Cat penutup 0.3500 kg X Rp. -
Tukang cat 0.1050 org X Rp. 80,000.00 8,400.00
Kepala tukang 0.0040 org X Rp. 90,000.00 360.00
Pekerja 0.0700 org X Rp. 55,000.00 3,850.00
Mandor 0.0025 org X Rp. 80,000.00 200.00
JUMLAH 12,810.00
PC12 1 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Plamur Fuji 0.1000 kg X Rp. -
Cat dasar meni kayu 0.1000 kg X Rp. 51,800.00
Cat penutup 0.2600 kg X Rp. -
Tukang cat 0.0630 org X Rp. 80,000.00 5,040.00
Kepala tukang 0.0063 org X Rp. 90,000.00 567.00
Pekerja 0.0200 org X Rp. 55,000.00 1,100.00
Mandor 0.0025 org X Rp. 80,000.00 200.00
JUMLAH 6,907.00
PC13 1 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Cat dasar meni kayu 0.1200 kg X Rp. 51,800.00
Cat penutup 0.1800 kg X Rp. -
Tukang cat 0.0420 org X Rp. 80,000.00 3,360.00
Kepala tukang 0.0042 org X Rp. 90,000.00 378.00
Pekerja 0.0280 org X Rp. 55,000.00 1,540.00
Mandor 0.0025 org X Rp. 80,000.00 200.00
JUMLAH 5,478.00
PC17 1 m2 Melamin
Cat tembok melamin 0.2000 kg X Rp. 24,000.00
Kuas ukuran 3,5" 0.0150 bh X Rp. -
Pekerja 0.2000 org X Rp. 55,000.00 11,000.00
Tukang cat 0.1000 org X Rp. 80,000.00 8,000.00
Kepala Tukang 0.0050 org X Rp. 90,000.00 450.00
Mandor 0.0005 org X Rp. 80,000.00 40.00
JUMLAH 19,490.00
PEKERJAAN BONGKARAN
PBK10 1 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi
Tukang kayu 6.0000 org X Rp. 80,000.00 480,000.00
Kepala Tukang 0.6000 org X Rp. 90,000.00 54,000.00
Pekerja 4.0000 org X Rp. 55,000.00 220,000.00
Mandor 0.2000 org X Rp. 80,000.00 16,000.00
JUMLAH 770,000.00
PBK11 1 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi
Pekerja 1.0000 org X Rp. 55,000.00 55,000.00
Mandor 0.2000 org X Rp. 80,000.00 16,000.00
JUMLAH 71,000.00
PEKERJAAN SANITASI
PS9 Memasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm
Pipa tanah dia. 15 cm 1.6000 bh X Rp. -
Portland Cement (PC) 0.6800 kg X Rp. 1,375.00
Pasir pasang ( progo ) 0.0130 m3 X Rp. 120,000.00
PS10 1 m' Memasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm
Pipa tanah dia. 20 cm 1.6000 bh X Rp. -
Portland Cement (PC) 0.8700 kg X Rp. 1,375.00
Pasir pasang ( progo ) 0.0140 m 3
X Rp. 120,000.00
Pasir urug darat 0.1400 m3 X Rp. 94,500.00
Tukang batu 0.0400 org X Rp. 80,000.00 3,200.00
Kepala tukang 0.0040 org X Rp. 90,000.00 360.00
Pekerja 0.0800 org X Rp. 55,000.00 4,400.00
Mandor 0.0070 org X Rp. 80,000.00 560.00
JUMLAH 8,520.00
JUMLAH 39,330.00
PS13 1 bh Memasang bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm
Batu merah ( 5x11x23 ) 87.0000 bh X Rp. 600.00
Portland Cement (PC) 44.0000 kg X Rp. 1,375.00
Pasir pasang ( progo ) 0.0700 m3 X Rp. 120,000.00
Krikil beton 0.0700 m 3
X Rp. 195,300.00
Besi beton polos 1.6000 kg X Rp. 11,600.00
Pasir beton 0.0600 m 3
X Rp. 120,000.00
Tukang batu 1.0150 org X Rp. 80,000.00 81,200.00
Kepala tukang 0.0015 org X Rp. 90,000.00 135.00
Pekerja 3.2000 org X Rp. 55,000.00 176,000.00
Mandor 0.0160 org X Rp. 80,000.00 1,280.00
JUMLAH 258,615.00
PS14 1 bh Memasang bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm
Batu merah ( 5x11x23 ) 150.0000 bh X Rp. 600.00
Portland Cement (PC) 77.0000 kg X Rp. 1,375.00
Pasir pasang ( progo ) 0.1300 m 3
X Rp. 120,000.00
Krikil beton 0.0200 m3 X Rp. 195,300.00
Besi beton polos 2.6000 kg X Rp. 11,600.00
Pasir beton 0.0900 m3 X Rp. 120,000.00
Tukang batu 0.4730 org X Rp. 80,000.00 37,840.00
Kepala tukang 0.0470 org X Rp. 90,000.00 4,230.00
Pekerja 1.4200 org X Rp. 55,000.00 78,100.00
Mandor 0.0710 org X Rp. 80,000.00 5,680.00
JUMLAH 125,850.00
PS15 1 bh Memasang bak kontrol pasangan batu bata ukuran (60 x 60) cm, tingg 65 cm
Batu merah ( 5x11x23 ) 222.0000 bh X Rp. 600.00
Portland Cement (PC) 114.0000 kg X Rp. 1,375.00
Pasir pasang ( progo ) 0.1840 m3 X Rp. 120,000.00
Krikil beton 0.0330 m 3
X Rp. 195,300.00
Besi beton polos 4.8500 kg X Rp. 11,600.00
Pasir beton 0.1200 m 3
X Rp. 120,000.00
Tukang batu 0.7200 org X Rp. 80,000.00 57,600.00
Kepala tukang 0.0720 org X Rp. 90,000.00 6,480.00
Pekerja 2.1600 org X Rp. 55,000.00 118,800.00
Mandor 0.1000 org X Rp. 80,000.00 8,000.00
JUMLAH 190,880.00
JUMLAH 7,464.00
JUMLAH A + B 464,292.50
/ 3,650,000.00 46.50
PPG28 1 m' Pekerjaan Grouting / Injeksi retakan beton dengan epoxy resin
Nitobond EC 0.050 kg X Rp. -
Conbextra EP 0.016 kg X Rp. -
Sewa Compressor untuk pekerjaan grouting 0.225 hr X Rp. -
Sewa Mesin Grouting 0.150 hr X Rp. -
Sewa mesin gerinda untuk pekerjaan grouting 0.075 hr X Rp. -
Sewa mixer ubtuk pekerjaan grouting 1.000 hr X Rp. -
Alat bantu 1.000 ls X Rp. 5,000.00
Tukang grouting 0.3125 org X Rp. 80,000.00 25,000.00
Kepala Tukang 0.0312 org X Rp. 90,000.00 2,808.00
Pekerja 1.2500 org X Rp. 55,000.00 68,750.00
Mandor 0.1562 org X Rp. 80,000.00 12,496.00
JUMLAH 109,054.00
PPG29 1 m' Pekerjaan Grouting / Injeksi retakan dinding bata dengan Semen Slurry (Cebex 100)
Pipa PVC abu-abu dia. 1/2" Wavin 3.000 bh X Rp. -
Nitobond EC 0.050 kg X Rp. -
Sewa Mesin Grouting 0.150 hr X Rp. -
Sewa mesin gerinda untuk pekerjaan grouting 0.075 hr X Rp. -
Alat bantu 1.000 ls X Rp. 5,000.00
Tukang grouting 0.3125 org X Rp. 80,000.00 25,000.00
Kepala Tukang 0.0312 org X Rp. 90,000.00 2,808.00
Pekerja 1.2500 org X Rp. 55,000.00 68,750.00
Mandor 0.1562 org X Rp. 80,000.00 12,496.00
JUMLAH 109,054.00
SPL9 1 M2 Mengerjakan lantai jembatan (papan yang dipakukan diatas gelagar kayu) :
Paku biasa 1/2" - 1" 0.075 kg X Rp. 16,300.00
Papan kayu damar laut 0.025 X Rp. -
Tukang kayu 0.500 org/hr X Rp. 80,000.00 40,000.00
Kepala tukang 0.050 org/hr X Rp. 90,000.00 4,500.00
Pekerja 0.200 org/hr X Rp. 55,000.00 11,000.00
Mandor 0.010 org/hr X Rp. 80,000.00 800.00
JUMLAH 56,300.00
SPL14 1 M2 memasang lantai cone block t.10 cm dipadatkan denganVibratory Roller kapasitas 10-15 ton
Conblock t=10 cm 44.000 Bh X Rp. 4,400.00
Pasir pasang ( progo ) 0.050 M3 X Rp. 120,000.00
Pasir pasang ( krasak ) 0.015 M3 X Rp. 120,000.00
Tukang batu 0.100 org/hr X Rp. 80,000.00 8,000.00
Pekerja 0.400 org/hr X Rp. 55,000.00 22,000.00
Kepala tukang 0.010 org/hr X Rp. 90,000.00 900.00
Mandor 0.040 org/hr X Rp. 80,000.00 3,200.00
Mesin Gilas getar otomatis 5 - 8 T 0.002 hr X Rp. 433,290.05 866.58
JUMLAH 34,966.58
SPL18 1 m2 Pasang Aluminium Composite Panel (Alucopan) : (Jumlah volume besi disesuaikan terhadap rencana design)
Al. Composite Panel (Alucopan) 1.05 m2 X Rp. 277,200.00
Besi Profil 30 Kg X Rp. 12,100.00
Ramset / dina bolt 8 Bh X Rp. 2,000.00
Sewa alat las 1 ls X Rp. 50,000.00
Tukang alumunium 0.5 org/hr X Rp. 80,000.00 40,000.00
Kepala Tukang 0.05 org/hr X Rp. 90,000.00 4,500.00
Pekerja 1 org/hr X Rp. 55,000.00 55,000.00
Mandor 0.05 org/hr X Rp. 80,000.00 4,000.00
JUMLAH 103,500.00
SPL26 1 Bh Mengebor beton dermaga untuk lobang baut fender '(dihitung 120 menit).
Tukang besi 0.250 org/hr X Rp. 80,000.00 20,000.00
Kepala tukang 0.025 org/hr X Rp. 90,000.00 2,250.00
Pekerja 0.250 org/hr X Rp. 55,000.00 13,750.00
Mandor 0.025 org/hr X Rp. 80,000.00 2,000.00
Mekanik terlatih 1.000 org/hr X Rp. 100,000.00 100,000.00
Genset 0.250 hr X Rp. 275,000.00 68,750.00
Bor beton 0.250 hr X Rp. 375,000.00 93,750.00
Perancah 0.250 hr X Rp. 350,000.00 87,500.00
JUMLAH 388,000.00
SPL35 1 bh Handling dan Transport tiang pancang dan penimbunan ke titik pancang
Pekerja 8.400 oh X Rp. 55,000.00 462000
Tukang Pancang 0.800 oh X Rp. 80,000.00 64000
Alat Bantu 1.000 ls X Rp. 5,000.00 5000
JUMLAH 531,000.00
Bahan Jumlah
(4) (5)
- 850,000.00
- 8,500.00
110,400.00
326.00
64,400.00
175,126.00 189,926.00
- 9,500.00
322,000.00
-
9,780.00
88,800.00
23,100.00
3,240.00
7,909.65
454,829.65 812,129.65
-
5,859.00
6,000.00
11,859.00 74,859.00
60,000.00
1,656,000.00
13,855.00
14,630.00
1,203.13
18,000.00
12,000.00
29,295.00
18,000.00
322.03
600,000.00
21,000.00
10,395.00
3,366.00
2,458,066.16 2,839,066.16
60,000.00
3,437.50
-
600.00
1,757.70
230,000.00
978.00
14,120.00
16,000.00
1,800.00
22,000.00
1,600.00
352,293.20 393,693.20
48,000.00
2,750.00
500,000.00
600.00
1,757.70
978.00
554,085.70 589,985.70
81,600.00
1,246,875.00
4,890.00
14,437.50
3,600.00
9,765.00
-
1,361,167.50 1,598,167.50
144,000.00
1,638,750.00
11,410.00
-
1,794,160.00 1,986,660.00
60,000.00
1,104,375.00
4,890.00
24,750.00
3,600.00
9,765.00
-
244,035.00
1,451,415.00 1,688,415.00
- 6,190.00
-
-
8,880.00
31,273.20
61,875.00
102,028.20 135,253.20
- 43,250.00
- 53,100.00
- 63,110.00
- 57,560.00
- 87,300.00
- 69,600.00
- 3,150.00
18,950.00
31,500.00
14,414.00
113,400.00
113,400.00 130,700.00
166,320.00
166,320.00 182,070.00
- 17,300.00
12,400.00
-
12,400.00 98,400.00
-
-
- 29,500.00
- 9,450.00
- 32,380.00
-
40,824.00
40,824.00 121,554.00
-
11,450.00
429.38
65,280.00
77,159.38 232,409.38
-
8,500.00
318.75
40,800.00
49,618.75 204,868.75
-
131,202.50
11,450.00
45,840.00
188,492.50 343,742.50
-
83,875.00
7,350.00
59,040.00
150,265.00 305,515.00
-
56,375.00
6,550.00
62,760.00
125,685.00 280,935.00
-
224,125.00
62,400.00
286,525.00 441,775.00
-
277,750.00
58,200.00
335,950.00 491,200.00
-
539,000.00
37,680.00
576,680.00 731,930.00
-
367,125.00
51,240.00
418,365.00 573,615.00
-
187,000.00
65,280.00
252,280.00 407,530.00
-
160,875.00
67,320.00
228,195.00 383,445.00
-
125,125.00
70,080.00
195,205.00 350,455.00
-
266,750.00
37,440.00
91,400.40
1,461,600.00
36,000.00
1,893,190.40 2,169,440.40
-
266,750.00
37,440,000.00
91,400.40
37,798,150.40 38,010,870.40
-
16,678.75
46,560.00
-
63,238.75 89,838.75
-
20,845.00
43,680.00
-
64,525.00 91,125.00
-
25,025.00
69,840.00
-
94,865.00 124,425.00
-
31,267.50
66,000.00
-
97,267.50 126,827.50
-
33,357.50
92,640.00
-
125,997.50 159,997.50
-
41,690.00
87,360.00
-
129,050.00 163,050.00
42,000.00
700.00
26.25
3,360.00
46,086.25 72,686.25
42,000.00
900.00
33.75
2,160.00
45,093.75 71,693.75
42,000.00
6,187.50
750.00
6,000.00
54,937.50 81,537.50
42,000.00
8,937.50
6,000.00
56,937.50 83,537.50
42,000.00
11,440.00
5,880.00
59,320.00 85,920.00
42,000.00
13,310.00
5,400.00
60,710.00 87,310.00
42,000.00
15,812.50
5,160.00
62,972.50 89,572.50
42,000.00
19,758.75
4,800.00
66,558.75 93,158.75
42,000.00
26,056.25
4,560.00
72,616.25 99,216.25
84,000.00
13,860.00
1,375.00
11,100.00
110,335.00 163,535.00
84,000.00
25,437.50
14,640.00
124,077.50 177,277.50
84,000.00
30,525.00
12,240.00
126,765.00 179,965.00
84,000.00
36,506.25
11,160.00
131,666.25 184,866.25
84,000.00
45,306.25
10,920.00
140,226.25 193,426.25
84,000.00
59,812.50
9,600.00
153,412.50 206,612.50
-
15,125.00
4,200.00
19,325.00 45,925.00
-
19,250.00
3,840.00
23,090.00 49,690.00
-
19,250.00
3,840.00
23,090.00 54,140.00
45,000.00
17,187.50
4,800.00
66,987.50 105,387.50
-
17,187.50
4,800.00
21,987.50 21,987.50
462,000.00
64,800.00
158,193.00
684,993.00 804,393.00
299,750.00
62,400.00
169,911.00
532,061.00 651,461.00
339,625.00
74,485.71
158,508.00
572,618.71 694,443.71
379,500.00
70,971.43
160,570.67
611,042.10 732,867.10
411,125.00
68,485.71
161,364.00
640,974.71 762,799.71
316,250.00
76,542.86
162,950.67
555,743.52 644,343.52
448,250.00
65,142.86
163,268.00
676,660.86 798,485.86
484,000.00
62,657.14
163,585.33
710,242.48 832,067.48
510,125.00
59,828.57
166,124.00
736,077.57 857,902.57
528,000.00
59,314.29
164,854.67
752,168.95 873,993.95
558,250.00
58,628.57
162,792.00
779,670.57 901,495.57
567,875.00
58,371.43
161,998.67
788,245.10 910,070.10
603,625.00
57,428.57
159,618.67
820,672.24 975,722.24
616,000.00
57,171.43
158,666.67
831,838.10 986,888.10
- 220,000.00
33,600.00
33,600.00 1,174,600.00
- 442,100.00
- 6,210.00
- 7,525.00
- 8,280.00
12,180.00
300.00
12,480.00 13,516.00
12,915.00
300.00
13,215.00 14,251.00
12,180.00
200.00
12,380.00 13,120.00
11,832.00
100.00
11,932.00 12,504.50
156,400.00
220,800.00
6,520.00
383,720.00 440,020.00
156,400.00
98,374.50
6,520.00
261,294.50 317,594.50
237,500.00
4,890.00
600.00
242,990.00 296,810.00
267,187.50
4,890.00
600.00
272,677.50 326,497.50
237,500.00
6,520.00
1,200.00
138,000.00
99,225.00
96,000.00
578,445.00 646,755.00
237,500.00
6,520.00
1,200.00
165,600.00
99,225.00
96,000.00
606,045.00 674,355.00
237,500.00
6,520.00
1,200.00
138,000.00
99,225.00
288,000.00
770,445.00 838,755.00
178,125.00
6,520.00
1,200.00
184,000.00
99,225.00
144,000.00
-
613,070.00 681,380.00
178,125.00
6,520.00
900.00
138,000.00
99,225.00
96,000.00
518,770.00 587,080.00
156,750.00
9,780.00
24,000.00
190,530.00 207,880.00
20,788.00
11,875.00
163.00
34,800.00
9,000.00
5,500.00
720.00
1,927.80
63,985.80 79,945.80
17,812.50
326.00
41,760.00
1,000.00
7,562.50
1,080.00
3,213.00
72,754.00 99,109.00
1,795.50
11,280.00
32,130.00
83,187.50
522,000.00
18,000.00
294,400.00
1,956.00
540.00
-
965,289.00 1,083,919.00
1,512.00
9,600.00
26,775.00
67,375.00
400,200.00
14,000.00
248,400.00
1,956.00
540.00
-
770,358.00 862,058.00
16.88
450.00
1,080.00
1,546.88 33,466.88
13.13
350.00
1,800.00
2,163.13 34,083.13
7,920.00
150.00
1,560.00
9,630.00 41,550.00
4,125.00
250.00
2,400.00
6,775.00 38,695.00
21,318.00
800.00
22,118.00 59,168.00
14,058.00
1,000.00
15,058.00 52,108.00
10,692.00
2,760.00
13,452.00 44,502.00
8,580.00
2,880.00
11,460.00 42,510.00
7,128.00
3,120.00
10,248.00 41,298.00
6,072.00
3,240.00
9,312.00 40,362.00
13,750.00
-
13,750.00 60,325.00
13,750.00
-
13,750.00 60,325.00
4,273.50
4,273.50 19,798.50
8,717.50
1,440.00
10,157.50 41,207.50
5,940.00
720.00
6,660.00 33,260.00
4,468.75
4,468.75 25,168.75
7,012.50
70.00
1,632.00
8,714.50 50,114.50
11,220.00
2,328.00
13,548.00 54,948.00
8,952.63
2,508.00
11,460.63 52,860.63
-
13,475.00
5,400.00
2,437.50
21,312.50 47,187.50
-
13,750.00
5,400.00
2,812.50
21,962.50 48,872.50
-
2,268.75
480.00
2,748.75 16,068.75
-
1,705.00
360.00
2,065.00 15,385.00
-
1,705.00
360.00
2,065.00 15,385.00
-
1,567.50
360.00
187.50
2,115.00 15,435.00
-
1,567.50
360.00
187.50
2,115.00 15,435.00
-
1,567.50
360.00
187.50
2,115.00 15,435.00
-
1,567.50
360.00
187.50
2,115.00 15,435.00
-
1,567.50
360.00
187.50
2,115.00 15,435.00
-
1,567.50
360.00
187.50
2,115.00 15,435.00
-
1,567.50
360.00
187.50
2,115.00 15,435.00
-
1,567.50
360.00
187.50
2,115.00 15,435.00
-
1,567.50
360.00
187.50
2,115.00 15,435.00
-
1,567.50
360.00
187.50
2,115.00 15,435.00
- 37,260.00
-
11,261.25
5,400.00
5,156.25
21,817.50 94,267.50
-
11,261.25
5,400.00
6,000.00
22,661.25 95,111.25
-
12,787.50
2,160.00
2,812.50
17,760.00 71,760.00
-
12,787.50
2,160.00
5,156.25
20,103.75 113,253.75
-
12,787.50
2,160.00
232,800.00
247,747.50 340,897.50
-
11,261.25
5,400.00
3,037.50
19,698.75 92,148.75
-
13,750.00
5,400.00
2,812.50
21,962.50 94,412.50
76,320.00
14,300.00
5,400.00
3,037.50
99,057.50 171,507.50
-
13,475.00
5,400.00
8,193.75
27,068.75 135,743.75
-
19,456.25
4,680.00
3,750.00
27,886.25 100,336.25
-
1,567.50
360.00
46.88
1,974.38 15,294.38
-
1,567.50
360.00
93.75
2,021.25 15,341.25
-
783.75
180.00
24.38
988.13 14,308.13
-
1,567.50
360.00
187.50
2,115.00 113,115.00
-
11,261.25
5,400.00
1,218.75
17,880.00 90,330.00
-
-
- 25,160.00
152,640.00
12,787.50
2,160.00
5,156.25
172,743.75 265,893.75
-
12,787.50
2,160.00
5,156.25
20,103.75 113,253.75
-
12,787.50
2,160.00
5,156.25
20,103.75 113,253.75
76,320.00
12,787.50
2,160.00
3,637.50
94,905.00 188,055.00
78,000.00
12,787.50
2,160.00
2,812.50
95,760.00 172,490.00
-
561.00
108.00
112.50
781.50 12,631.50
-
48,948.90
17,105.00
3,000.00
1,218.75
70,272.65 204,822.65
-
-
- 22,200.00
-
-
- 34,920.00
- 17,760.00
-
-
- 11,840.00
-
815.00
815.00 18,575.00
194,400.00
12,787.50
2,160.00
2,812.50
212,160.00 288,890.00
72,000.00
12,787.50
2,160.00
2,812.50
89,760.00 166,490.00
-
4,725.00
4,725.00 56,475.00
-
4,725.00
4,725.00 56,475.00
-
4,725.00
4,725.00 56,475.00
-
4,725.00
4,725.00 56,475.00
-
4,725.00
4,725.00 56,475.00
-
4,725.00
4,725.00 56,475.00
- 369,900.00
- 24,875.00
- 12,600.00
- 7,560.00
- 3,150.00
10,120,000.00
199,500.00
91,280.00
10,410,780.00 11,714,780.00
10,120,000.00
199,500.00
48,900.00
10,368,400.00 11,150,800.00
128,800.00
56,250.00
2,445.00
1,630.00
189,125.00 203,925.00
128,800.00
112,500.00
2,445.00
1,630.00
245,375.00 260,175.00
1,518,000.00
3,260.00
1,521,260.00 1,539,020.00
141,680.00
3,260.00
144,940.00 185,890.00
99,360.00
1,630.00
100,990.00 124,690.00
101,200.00
815.00
102,015.00 125,715.00
44,160.00
978.00
45,138.00 59,938.00
55,200.00
978.00
56,178.00 70,978.00
133,400.00
978.00
134,378.00 165,478.00
79,120.00
978.00
80,098.00 94,898.00
36,800.00
326.00
37,126.00 45,898.00
257,600.00
2,445.00
260,045.00 308,945.00
257,600.00
-
2,800.00
2,445.00
262,845.00 311,745.00
-
48,246.00
2,800.00
2,445.00
53,491.00 118,691.00
64,400.00
1,630.00
-
66,030.00 261,630.00
-
218,750.00
-
48.90
218,798.90 229,148.90
10,120,000.00
20,375.00
10,140,375.00 12,422,375.00
17,187,500.00
20,375.00
17,207,875.00 19,163,875.00
625,000.00
815.00
625,815.00 739,915.00
368,000.00
2,500.00
370,500.00 696,500.00
588,800.00
2,500.00
591,300.00 917,300.00
230,000.00
489.00
2,500.00
56,100.00
289,089.00 517,289.00
235,520.00
489.00
2,500.00
56,100.00
294,609.00 555,409.00
552,000.00
2,445.00
554,445.00 796,095.00
230,000.00
489.00
1,500.00
-
231,989.00 492,789.00
230,000.00
489.00
4,000.00
-
234,489.00 511,589.00
13,915.00
13,915.00 22,795.00
13,915.00
13,915.00 22,795.00
1,391,500.00
1,391,500.00 2,279,500.00
113,975.00
0.01 23,934.75
1,437,500.00
1,437,500.00 2,325,500.00
71,875.00 116,275.00
15,093.75 24,417.75
1,391,500.00
1,391,500.00 2,279,500.00
69,575.00 113,975.00
14,610.75 23,934.75
1,334,000.00
-
1,334,000.00 2,222,000.00
111,100.00
0.01 23,331.00
1,334,000.00
1,334,000.00 2,222,000.00
111,100.00
0.01 23,331.00
77,440.00
144,250.00
-
-
-
39,712.50
261,402.50 316,402.50
291,948.80
366,560.00
-
66,540.50
725,049.30 788,049.30
11,000.00
4,200.00
-
15,200.00 29,190.00
152.00 291.90
181,500.00
410,000.00
1,590.00
593,090.00 748,450.00
12,720.00
3,300.00
1,680.00
194,820.00
17,700.00 21,840.00
1,770.00 2,184.00
-
-
- 96,160.00
- 173,280.00
- 65,120.00
- 75,920.00
105,800.00
105,800.00 253,800.00
-
-
450.00
450.00 6,810.00
-
-
- 12,576.00
465,520.00
334,950.00
2,025.00
802,495.00 815,180.00
- 51,800.00
82,154.10
82,154.10 329,274.10
22,000.00
22,822.80
44,822.80 59,622.80
330,000.00
163,000.00
93,100.00
586,100.00 614,980.00
1,352.53
244.50
174,800.00
176,397.03 222,447.03
1,352.53
163.00
6,650.00
8,165.53 43,715.53
16,610.00
163.00
16,773.00 24,973.00
16,610.00
-
163.00
16,773.00 24,773.00
-
815.00
815.00 18,575.00
-
815.00
815.00 15,615.00
-
815.00
815.00 15,615.00
-
489.00
489.00 15,289.00
138,000.00
489.00
138,489.00 256,889.00
24,752.00
1,793.00
26,545.00 36,895.00
7,297.50
750.00
8,047.50 16,927.50
-
3,000.00
2,100.00
-
5,100.00 79,100.00
-
163.00
163.00 7,603.00
110,400.00
1,630.00
112,030.00 143,130.00
119,600.00
1,956.00
121,556.00 155,616.00
35,437.50
652.00
-
36,089.50 72,829.50
- 20,700.00
- 26,600.00
- 20,700.00
- 26,600.00
- 20,700.00
- 26,600.00
-
760.00
1,824.00
2,095.50
4,679.50 46,079.50
-
760.00
1,824.00
2,095.50
4,679.50 46,079.50
-
1,956.00
1,956.00 17,016.00
-
1,956.00
1,956.00 16,446.00
21,825.00
1,956.00
23,781.00 38,271.00
-
1,956.00
1,956.00 16,206.00
17,340.00
1,956.00
19,296.00 33,546.00
-
1,956.00
1,956.00 16,206.00
17,986.00
1,956.00
19,942.00 34,192.00
16,660.00
1,956.00
18,616.00 32,866.00
-
1,956.00
1,956.00 16,206.00
-
97,800.00
97,800.00 113,910.00
-
97,800.00
97,800.00 116,790.00
-
97,800.00
97,800.00 113,910.00
386.44
652.00
1,038.44 16,088.44
187,680.00
-
187,680.00 207,660.00
-
-
- 19,980.00
-
-
- 28,140.00
-
326.00
326.00 69,776.00
-
652.00
652.00 87,852.00
- 13,340.00
120,750.00
84,700.00
146,700.00
352,150.00 424,350.00
150,025.00
6,840.00
156,865.00 541,865.00
15,686.50 54,186.50
10,457.67 36,124.33
5,228.83 18,062.17
1,970.00
1,970.00 10,420.00
- 8,450.00
1,816.00
240.00
-
2,056.00 8,016.00
-
8,806.00
8,806.00 19,531.00
10,360.00
-
8,806.00
-
7,200.00
26,366.00 30,956.00
10,360.00
-
10,064.00
-
20,424.00 33,234.00
- 13,110.00
-
-
5,000.00
5,000.00 11,440.00
- 5,980.00
-
1,135.00
250.00
-
1,385.00 24,625.00
-
5,180.00
-
5,180.00 12,087.00
6,216.00
-
6,216.00 11,694.00
-
31,752.00
31,752.00 38,659.00
- 5,478.00
5,895.10
1,800.00
7,695.10 20,505.10
4,800.00
-
4,800.00 24,290.00
-
5,040.00
5,040.00 22,520.00
3,530.00
-
3,530.00 23,230.00
3,530.00
-
-
3,530.00 36,530.00
- 5,900.00
31,752.00
31,752.00 38,659.00
- 342,000.00
- 165,500.00
- 464,000.00
- 118,000.00
- 11,800.00
- 78,750.00
- 7,875.00
- 118,000.00
- 11,800.00
- 95,000.00
- 9,500.00
- 171,400.00
- 17,140.00
- 118,000.00
- 11,800.00
- 770,000.00
- 71,000.00
- 1,304,000.00
1,890,000.00
6,804.00
1,896,804.00 2,179,194.00
-
8,250.00
1,200.00
9,450.00 332,250.00
-
4,200.00
8,250.00
1,200.00
13,650.00 224,450.00
882,000.00
79,380.00
8,250.00
1,200.00
970,830.00 1,122,830.00
535,500.00
7,711.20
8,250.00
1,200.00
552,661.20 756,161.20
-
-
- 372,400.00
-
-
- 93,500.00
-
-
- 678,000.00
-
935.00
1,560.00
1,039.50
3,534.50 9,704.50
-
1,196.25
1,680.00
13,230.00
16,106.25 24,626.25
-
9,600.00
5,390.00
6,720.00
2,268.00
23,978.00 38,468.00
-
198,000.00
14,162.50
7,320.00
6,520.50
226,003.00 265,333.00
52,200.00
60,500.00
8,400.00
13,671.00
18,560.00
7,200.00
160,531.00 419,146.00
90,000.00
105,875.00
15,600.00
3,906.00
30,160.00
10,800.00
256,341.00 382,191.00
133,200.00
156,750.00
22,080.00
6,444.90
56,260.00
14,400.00
389,134.90 580,014.90
-
-
- 13,140.00
-
-
- 13,140.00
-
-
- 13,140.00
-
-
- 22,392.00
-
-
- 22,392.00
-
-
- 27,994.00
-
-
- 7,464.00
-
-
- 7,464.00
-
-
- 7,464.00
-
-
- 7,464.00
-
-
- 11,218.00
-
-
- 7,464.00
-
-
- 19,750.00
- 19,750.00
-
-
- 28,470.00
-
-
27,500.00
6,000.00
33,500.00 80,950.00
31,500.00
125.00
31,625.00 41,475.00
78,100.00
78,100.00 87,950.00
- 56,940.00
- 41,850.00
69,300.00
69,300.00 110,225.00
- 40,745.00
- 14,235.00
- 9,850.00
- 19,700.00
- 14,235.00
- 14,235.00
- 47,450.00
- 18,980.00
- 47,450.00
- 9,490.00
- 56,940.00
- 23,725.00
288,750.00
288,750.00 302,985.00
-
-
- 14,235.00
6,216.00
6,216.00 13,708.50
25,160.00
1,200.00
26,360.00 483,160.00
32,576.00 496,868.50
- 268,000.00
- 29,100.00
- 23,200.00
-
-
-
-
-
-
-
- 169,725,000.00
- 46.50
-
-
-
-
- 66,424.00
- 66.42
-
-
- 315,000.00
315,000.00
- 10.50
-
-
- 520,000.00
- 1,040,000.00
- 34.67
-
-
-
- 127,400.00
- 254,800.00
- 8.49
-
-
- 300,000.00
- 600,000.00
- 20.00
-
-
-
-
-
-
5,000.00
5,000.00 114,054.00
-
-
-
-
5,000.00
5,000.00 114,054.00
21,037.50
2,916.00
7,206.57
16,031.25
443.36
47,634.68 60,129.68
42,075.00
5,832.00
14,413.14
16,031.25
443.36
78,794.75 99,301.25
-
-
-
-
-
-
-
-
-
-
- 126,000.00
- 504,000.00
- 13,700.00
120,960.00
3,228.22
2,121.33
3,008.96
2,570.82
131889.3308266 179389.33082656
316,800.00
1,157.04
1,288.98
1,300.90
320546.9175981 358046.91759811
331,200.00
1,157.04
1,288.98
1,300.90
334946.9175981 372446.91759811
1,157.04
1,546.77
1,300.90
4004.713256097 41504.713256097
- 38400
- 384.00
- 84500
- 845.00
1,222.50
-
1,222.50 57522.5
-
1,000.00
1,000.00 1151620
1,630.00
80,000.00
81,630.00 107367.5
143,640.00
15,200.00
158,840.00 212960
-
76,000.00
76,000.00 112000
7,600.00 11200
193,600.00
6,000.00
1,800.00
201,400.00 236366.58010432
3,657.50
91,200.00
94,857.50 343257.5
9,485.75 34325.75
-
-
- 37500
210,000.00
407.50
210,407.50 247907.5
720,060.00 823,560.00
- 8,480,000.00
- 106,000.00
- 17,155,000.00
- 214,437.50
- 1,775,000.00
- 8,875.00
- 8,480,000.00
- 106,000.00
- 805,000.00
- 2,683.33
- 6,475,000.00
- 53,958.33
- 2,230,000.00
- 18,583.33
- 388,000.00
- 1,271,000.00
- 8,550.00
- 8,550.00
- 8,550.00
9,400.00
9,400.00 12,550.00
4,700.00
4,700.00 7,850.00
- 54,450.00
- 95,700.00
- 531,000.00
-
1,680.00
840.00
5,000.00
7,520.00 62,020.00
- 1,067,612.56
- 1,067,612.56
- 435,290.00
- 6,300.00
- 337,000.00
- 1,362.00
- 1,067,612.56
- 747,328.79
22,500.00
652.00
65,000.00
88,152.00 124,892.00
173,250.00
13,475.00
5,400.00
2,437.50
194,562.50 220,437.50
90,300.00
2,445.00
92,745.00 157,945.00
63,954.00
1,600.00
65,554.00 139,654.00
9,056.25
652.00
9,708.25 26,868.25
PLS6 50 M' Pasang Kabel DX 2x10 sqmm + Accessories (antar tiang / gawang)
Kabel DX 2 x 10 sqmm "Supreme" 50.0000 m1 X Rp. 0
Tukang Listrik 0.5000 org X Rp. 80000
Pekerja 0.5000 org X Rp. 55000
Mandor 0.2500 org X Rp. 80000
Penyambungan beban 1.0000 ls X Rp. 0
JUMLAH
PLS7 50 M' Pasang Kabel DX 2x16 sqmm + Accessories (antar tiang / gawang)
Kabel DX 2 x 16 sqmm "Supreme" 50.0000 m1 X Rp. 0
Tukang Listrik 0.5000 org X Rp. 80000
Pekerja 0.5000 org X Rp. 55000
Mandor 0.2500 org X Rp. 80000
Penyambungan beban 1.0000 ls X Rp. 0
JUMLAH
PLS25 1 Set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son + pengetesan dan penyalaan
Pekerja 0.5000 org X Rp. 55000
Tukang Listrik 0.5000 org X Rp. 80000
Pengawas 1.2500 org X Rp. 100000
Mandor 0.5000 org X Rp. 80000
JUMLAH (A)
PLS26 1 Set Pasang Stang Ornamen 6 meter + Lampu SRP 822/250 Watt Son
Pekerja 0.8750 org X Rp. 55000
Tukang Listrik 0.8750 org X Rp. 80000
Pengawas 1.8033 org X Rp. 100000
Mandor 0.7413 org X Rp. 80000
JUMLAH (C)
PLS27 1 Set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son
Pekerja 0.5000 org X Rp. 55000
Tukang Listrik 0.5000 org X Rp. 80000
Pengawas 1.2500 org X Rp. 100000
Mandor 0.5000 org X Rp. 80000
JUMLAH (D)
PLS28 1 Set Pasang Tiang Octogonal Cabang 1, h= 7 meter+ lampu SRP 822/250 Watt Son
Pondasi Tiang Beton bertulang 1:2:3 0.4200 m3 X Rp. 491,200.00
Pekerja 2.8500 org X Rp. 55000
Tukang Listrik 2.8500 org X Rp. 80000
Pengawas 2.0075 org X Rp. 100000
Mandor 1.0000 org X Rp. 80000
JUMLAH (E)
PLS29 1 Set Pasang Tiang Octogonal Cabang 1, h= 9 meter + lampu SRP 822/250 Watt Son
Pondasi Tiang Beton bertulang 1:2:3 0.4200 m3 X Rp. 491,200.00
Pekerja 3.1000 org X Rp. 55000
Tukang Listrik 3.1000 org X Rp. 80000
Pengawas 2.5000 org X Rp. 100000
Mandor 1.2100 org X Rp. 80000
JUMLAH (F)
PLS30 1 Set Pasang Tiang Octogonal Cabang 2, h= 9 meter+ lampu SRP 822/250 Watt Son
Pondasi Tiang Beton bertulang 1:2:3 0.4200 m3 X Rp. 491,200.00
Pekerja 3.3000 org X Rp. 55000
Tukang Listrik 3.3000 org X Rp. 80000
Pengawas 2.5782 org X Rp. 100000
Mandor 1.2433 org X Rp. 80000
JUMLAH (G)
PLS31 1 Set Pasang Tiang Octogonal Cabang 3, h= 9 m+ lampu SRP 822/250 Watt Son
Pondasi Tiang Beton bertulang 1:2:3 0.4200 m3 X Rp. 491,200.00
Pekerja 3.8100 org X Rp. 55000
Tukang Listrik 3.8100 org X Rp. 80000
Pengawas 2.6626 org X Rp. 100000
Mandor 1.2650 org X Rp. 80000
JUMLAH (H)
PLS32 1 Set Pasang Tiang Octogonal Cabang 3, h= 11 m+ lampu SRP 822/250 Watt Son
Pondasi Tiang Beton bertulang 1:2:3 0.4200 m3 X Rp. 491,200.00
Pekerja 4.2500 org X Rp. 55000
Tukang Listrik 4.2500 org X Rp. 80000
Pengawas 2.9287 org X Rp. 100000
Mandor 1.2939 org X Rp. 80000
JUMLAH (I)
PLS33 1 Set Bongkar armatur pada stang ornamen existing + pasang lampu SRP 822/150 Watt Son + return
Pekerja 0.9000 org X Rp. 55000
Tukang Listrik 0.9000 org X Rp. 80000
Pengawas 2.1044 org X Rp. 100000
Mandor 0.8418 org X Rp. 80000
Retur material existing 0.0500 unit X Rp. 0
JUMLAH (J)
PLS34 1 Set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/250 Watt Son + retur
Pekerja 0.8750 org X Rp. 55000
Tukang Listrik 0.8750 org X Rp. 80000
Pengawas 1.6995 org X Rp. 100000
Mandor 0.6798 org X Rp. 80000
Retur material existing 0.0500 unit X Rp. 0
JUMLAH (K)
PLS35 1 Set Bongkar armatur pada tang existing + pasang Lampu SRP 822/250 Watt Son + retur
Pekerja 0.9000 org X Rp. 55000
Tukang Listrik 0.9000 org X Rp. 80000
Pengawas 2.1044 org X Rp. 100000
Mandor 0.8418 org X Rp. 80000
Retur material existing 0.0500 unit X Rp. 0
JUMLAH (L)
PLS36 1 Set Bongkar komponen lama existing + pasang komponen Lampu SRP 822/250 Watt Son + retur
Pekerja 0.8500 org X Rp. 55000
Tukang Listrik 0.8500 org X Rp. 80000
Pengawas 1.9554 org X Rp. 100000
Mandor 0.7822 org X Rp. 80000
Retur material existing 0.0500 unit X Rp. 0
JUMLAH (M)
RJAAN LISTRIK
400.00
275.00
400.00
1,075.00 - 1,075.00
400.00
275.00
400.00
1,075.00 - 1,075.00
400.00
275.00
400.00
1,075.00 - 1,075.00
400.00
275.00
400.00
1,075.00 - 1,075.00
200.00
137.50
200.00
537.50 - 537.50
-
40,000.00
27,500.00
20,000.00
-
87,500.00 - 87,500.00
-
40,000.00
27,500.00
20,000.00
-
87,500.00 - 87,500.00
-
400.00
275.00
400.00
1,075.00 - 1,075.00
40,000.00
41,250.00
20,000.00
-
61,250.00 40,000.00 101,250.00
40,000.00
41,250.00
20,000.00
-
61,250.00 40,000.00 101,250.00
52,800.00
52,800.00
293,150.00
53,280.00
3,330.00
-
452,030.00 3,330.00 455,360.00
40,000.00
40,000.00
220,000.00
40,000.00
2,500.00
-
340,000.00 2,500.00 342,500.00
40,000.00
41,250.00
20,000.00
5,000.00
101,250.00 5,000.00 106,250.00
53,280.00
55,000.00
26,640.00
5,000.00
134,920.00 5,000.00 139,920.00
32,000.00
33,000.00
16,000.00
5,000.00
81,000.00 5,000.00 86,000.00
26,400.00
27,500.00
13,328.00
-
67,228.00 - 67,228.00
40,000.00
40,000.00
220,000.00
40,000.00
2,500.00
-
340,000.00 2,500.00 342,500.00
52,800.00
52,800.00
293,315.00
53,280.00
3,330.00
-
452,195.00 3,330.00 455,525.00
-
20,000.00
550.00
400.00
20,950.00 - 20,950.00
-
20,000.00
550.00
400.00
20,950.00 - 20,950.00
-
550.00
400.00
950.00 - 950.00
-
4,000.00
5,500.00
2,000.00
11,500.00 - 11,500.00
-
4,000.00
5,500.00
2,000.00
11,500.00 - 11,500.00
-
4,000.00
5,500.00
2,000.00
11,500.00 - 11,500.00
-
- - -
48,125.00
70,000.00
180,330.00
59,306.40
357,761.40 - 357,761.40
27,500.00
40,000.00
125,000.00
40,000.00
232,500.00 - 232,500.00
0 Watt Son
206,304.00
156,750.00
228,000.00
200,750.00
80,000.00
665,500.00 206,304.00 871,804.00
0 Watt Son
206,304.00
170,500.00
248,000.00
250,000.00
96,800.00
765,300.00 206,304.00 971,604.00
0 Watt Son
206,304.00
181,500.00
264,000.00
257,820.00
99,464.00
802,784.00 206,304.00 1,009,088.00
206,304.00
209,550.00
304,800.00
266,260.00
101,200.00
881,810.00 206,304.00 1,088,114.00
206,304.00
233,750.00
340,000.00
292,870.00
103,512.00
970,132.00 206,304.00 1,176,436.00
KPUT4 100 m2 Perkerasan lapis pondasi bawah (sub base) tebal 20 cm padat
Pasair pasang 5.0000 m3 X Rp. 491,200.00
Batu belah 15/20 23.0000 m 3
X Rp. 491,200.00
Batu pecah 5/7 cm 3.0000 m3 X Rp. 491,200.00
Pasir urug 6.5000 m 3
X Rp. 491,200.00
Isi batu berkerasan 26.0000 m 3
X Rp. 491,200.00
Menyawur pasir 6.5000 Tng X Rp. 491,200.00
JUMLAH
Tiap m2
1/100 x 15,964,000.00 + 18,420,000.00
Biaya menggilas
1/200 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/200 x -
JUMLAH
KPUT5 100 m2 Pembuatan lapis pondasi bawah (sub base) tebal 15 cm padat
Pasair urug 5.0000 m3 X Rp. 491,200.00
Batu belah 15/20 17.5000 m3 X Rp. 491,200.00
Batu pecah 5/7 cm 3.0000 m 3
X Rp. 491,200.00
Pasir urug (pengisi) 6.5000 m 3
X Rp. 491,200.00
Isi batu berkerasan 20.5000 m 3
X Rp. 491,200.00
Menyawur pasir 5.0000 Tng X Rp. 491,200.00
JUMLAH ( BELUM TERMASUK PPN )
Tiap m2
1/100 x 12,525,600.00 + 15,718,400.00
Biaya menggilas
1/200 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/200 x -
Tiap m2
1/100 x 7,982,000.00 + 7,982,000.00
Biaya menggilas
1/150 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/150 x -
JUMLAH
Tiap m2
1/100 x 9,578,400.00 + 239,543,504.00
Biaya menggilas
4/12,5/200 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/200 x -
JUMLAH
Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat)
2/100 x 62,333,280.00 + 4,298,000.00
Biaya menggilas
1/500 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/500 x -
Aspal untuk lem 0,5 kg
0.5000 x -
JUMLAH
Tiap m1
Aspal sand sheet 3 cm jereng (2 cm padat)
3/100 x 62,333,280.00 + 4,298,000.00
Biaya menggilas
1/500 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/500 x -
Aspal untuk lem 0,5 kg
0.5000 x -
JUMLAH
KPUT11 100 m2 Pengaspalan sand sheet (latasir) tanpa aspal, tebal 1 cm jereng
Aspal - kg X Rp. 491,200.00
Pasair pasang 1.0000 m 3
X Rp. 491,200.00
Kayu bakar 0.9000 m 3
X Rp. 491,200.00
Juru godog aspal 0.2500 org X Rp. 491,200.00
Pekerja 8.1000 org X Rp. 491,200.00
Mandor 0.4000 org X Rp. 491,200.00
JUMLAH
Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat) tanpa aspal
2/100 x 4,298,000.00 + 933,280.00
Biaya menggilas
1/500 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/500 x -
Aspal untuk lem 0,5 kg
0.5000 x -
JUMLAH
Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat) tanpa aspal
2/100 x 4,298,000.00 + 933,280.00
Biaya menggilas
1/500 x 1,964,800.00 + 9,210,000.00
Sewa motor walls
1/500 x -
Aspal untuk lem 0,5 kg
0.5000 x -
JUMLAH
KPUT14 350 m' Pemotongan aspal dengan mesin potong (cutter), 2 sisi
Cutter 2.0000 bh X Rp. 491,200.00
Sewa mesin cutter 2.0000 hr X Rp. 491,200.00
Solar 15.0000 ltr X Rp. 491,200.00
Tk. Cutter / masinis 2.0000 org X Rp. 491,200.00
Pekerja 2.0000 org X Rp. 491,200.00
JUMLAH
Tiap m1
1/350 x 1,964,800.00 + 9,332,800.00
736,800.00 -
35,857.60 -
772,657.60 - 772,657.60
491,200.00
491,200.00 - 491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
368,400.00
7,859,200.00
1,964,800.00 9,210,000.00 11,174,800.00
2,456,000.00
11,297,600.00
1,473,600.00
3,192,800.00
12,771,200.00
3,192,800.00
15,964,000.00 18,420,000.00 34,384,000.00
159,640.00 184,200.00
9,824.00 46,050.00
-
169,464.00 230,250.00 399,714.00
2,456,000.00
8,596,000.00
1,473,600.00
3,192,800.00
10,069,600.00
2,456,000.00
12,525,600.00 15,718,400.00 28,244,000.00
125,256.00 157,184.00
9,824.00 46,050.00
4,912,000.00
982,400.00
491,200.00
1,596,400.00
6,385,600.00
1,596,400.00
7,982,000.00 7,982,000.00 15,964,000.00
79,820.00 79,820.00
13,098.67 61,400.00
-
92,918.67 141,220.00 234,138.67
- 63,856.00
13,098.67 61,400.00
-
13,098.67 125,256.00 138,354.67
- 63,856.00
9,824.00 46,050.00
-
9,824.00 109,906.00 119,730.00
117,888.00
235,776.00
1,719,200.00
589,440.00
614,000.00
6,876,800.00
491,200.00
736,800.00
491,200.00
491,200.00
491,200.00
196,480,000.00
39,296,000.00
491,200.00
9,578,400.00 239,543,504.00 249,121,904.00
95,784.00 2,395,435.04
3,143.68 14,736.00
-
98,927.68 2,410,171.04 2,509,098.72
61,400,000.00
491,200.00
442,080.00
122,800.00
3,978,720.00
196,480.00
62,333,280.00 4,298,000.00 66,631,280.00
1,246,665.60 85,960.00
3,929.60 18,420.00
-
1,250,595.20 104,380.00 1,354,975.20
1,869,998.40 128,940.00
3,929.60 18,420.00
-
1,873,928.00 147,360.00 2,021,288.00
-
491,200.00
442,080.00
122,800.00
3,978,720.00
196,480.00
4,298,000.00 933,280.00 5,231,280.00
85,960.00 18,665.60
3,929.60 18,420.00
-
89,889.60 37,085.60 126,975.20
85,960.00 18,665.60
3,929.60 18,420.00
-
89,889.60 37,085.60 126,975.20
2,087,600.00
279,984.00
1,105,200.00
112,976.00
982,400.00
2,200,576.00 2,367,584.00 4,568,160.00
220,057.60 236,758.40
220,057.60 236,758.40 456,816.00
814,164.00
221,040.00
515,760.00
36,840.00
36,840.00
4,912.00
110,520.00
294,720.00
36,840.00
446,992.00 1,624,644.00 2,071,636.00
982,400.00
982,400.00
7,368,000.00
982,400.00
982,400.00
1,964,800.00 9,332,800.00 11,297,600.00
324,192.00
648,384.00
19,648.00
122,800.00
30,945.60
173,393.60 972,576.00 1,145,969.60
9,087,200.00
2,701,600.00
491,200.00
7,368.00
3,192,800.00
49,120.00
49,120.00
49,120.00
49,120.00
49,120.00
49,120.00
491,200.00
491,200.00
2,210,400.00
49,120.00
2,750,720.00 16,266,088.00 19,016,808.00
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT MIXING PL
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT FINISHE
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT SPRAYE
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan BULLDOZER 100 -15
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan COMPRESSOR 4000 - 6
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan WHEEL LOADER 1,0 -
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan TANDEM ROLLER 6
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru a Umur Ekonomis A
b Jam Kerja dalam 1 Tahun W
c Harga Alat B
5 Alat yang dipakai a Umur Ekonomis A'
b Jam Kerja dalam 1 Tahun W'
c Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan PNEUMATIC TYRE ROLLE
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru a Umur Ekonomis A
b Jam Kerja dalam 1 Tahun W
c Harga Alat B
5 Alat yang dipakai a Umur Ekonomis A'
b Jam Kerja dalam 1 Tahun W'
c Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan GENERATOR SE
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan MOTOR GRADER > 1
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru a Umur Ekonomis A
b Jam Kerja dalam 1 Tahun W
c Harga Alat B
5 Alat yang dipakai a Umur Ekonomis A'
b Jam Kerja dalam 1 Tahun W'
c Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan VIBRATORY ROLLER
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru Umur Ekonomis A
Jam Kerja dalam 1 Tahun W
Harga Alat B
5 Alat yang dipakai a Umur Ekonomis A'
b Jam Kerja dalam 1 Tahun W'
c Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan WATER TANK TRUCK 300
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan JACK HAMMER
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan TAMPER
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan STONE CRUSHER
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan THREE WHEEL ROLLER
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan CONCRETE VIBRAT
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan CONCRETE MIXER 0.3 -
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan CRANE 10 - 15 TO
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK 3 - 4
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan EXCAVATOR 80 - 140
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan FLAT BED TRUCK 3 -
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan WATER PUMP 70 - 10
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan FULVI MIXER
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan TRACK LOADER 75 - 1
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
AT
150.00 HP
50.00 Ton/jam
10.00 Tahun
1,500.00 Jam
7,500,000,000.00 Rupiah
10.00 Tahun Alat Baru
1,500.00 Jam Alat Baru
7,500,000,000.00 Rupiah Alat Baru
750,000,000.00 Rupiah
0.23852 -
1,073,352.41 Rupiah
10,000.00 Rupiah
1,083,352.41 Rupiah
206,250.00 Rupiah
4,620,000.00 Rupiah Khusus AMP
63,000.00 Rupiah
625,000.00 Rupiah
100,000.00 Rupiah
240,000.00 Rupiah
5,854,250.00 Rp
6,937,602.41 Rp
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
47.00 HP
6.00 Ton
6.00 Tahun
2,000 Jam
715,000,000.00 Rupiah
6.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
715,000,000.00 Rupiah Alat Baru
71,500,000.00 Rupiah
0.30071 -
96,752.07 Rupiah
715.00 Rupiah
97,467.07 Rupiah
64,625.00 Rupiah
19,740.00 Rupiah
44,687.50 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
309,052.50 Rupiah
406,519.57 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
15.00 HP
800.00 Liter
5.00 Tahun
2,000 Jam
145,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
145,000,000.00 Rupiah Alat Baru
14,500,000.00 Rupiah
0.33438 -
21,818.28 Rupiah
145.00 Rupiah
21,963.28 Rupiah
20,625.00 Rupiah
6,300.00 Rupiah
9,062.50 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
215,987.50 Rupiah
237,950.78 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
140.00 HP
Ton
5.00 Tahun
2,000 Jam
700,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
700,000,000.00 Rupiah Alat Baru
70,000,000.00 Rupiah
0.33438 -
105,329.61 Rupiah
700.00 Rupiah
106,029.61 Rupiah
192,500.00 Rupiah
58,800.00 Rupiah
43,750.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
475,050.00 Rupiah
581,079.61 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
80.00 HP
Ton
5.00 Tahun
2,000 Jam
175,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
175,000,000.00 Rupiah Alat Baru
17,500,000.00 Rupiah
0.33438 -
26,332.40 Rupiah
175.00 Rupiah
26,507.40 Rupiah
110,000.00 Rupiah
33,600.00 Rupiah
10,937.50 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
334,537.50 Rupiah
361,044.90 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
105.00 HP
1.50 Ton
5.00 Tahun
2,000.00 Jam
840,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
840,000,000.00 Rupiah Alat Baru
84,000,000.00 Rupiah
0.33438 -
126,395.53 Rupiah
840.00 Rupiah
127,235.53 Rupiah
144,375.00 Rupiah
44,100.00 Rupiah
52,500.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
420,975.00 Rupiah
548,210.53 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
50.00 HP
8.00 Ton
5.00 Tahun
2,000.00 Jam
460,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
460,000,000.00 Rupiah Alat Baru
46,000,000.00 Rupiah
0.33 -
69,216.60 Rupiah
460.00 Rupiah
69,676.60 Rupiah
68,750.00 Rupiah
21,000.00 Rupiah
28,750.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
298,500.00 Rupiah
368,176.60 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
60.00 HP
10.00 Ton
5.00 Tahun
1,800.00 Jam
510,000,000.00 Rupiah
5.00 Tahun Alat Baru
1,800.00 Jam Alat Baru
510,000,000.00 Rupiah Alat Baru
51,000,000.00 Rupiah
0.33438 -
85,266.82 Rupiah
566.67 Rupiah
85,833.49 Rupiah
82,500.00 Rupiah
25,200.00 Rupiah
35,416.67 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
323,116.67 Rupiah
408,950.16 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
125.00 HP
8.00 Ton
5.00 Tahun
2,000.00 Jam
145,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
145,000,000.00 Rupiah Alat Baru
14,500,000.00 Rupiah
0.33438 -
21,818.28 Rupiah
145.00 Rupiah
21,963.28 Rupiah
171,875.00 Rupiah
52,500.00 Rupiah
9,062.50 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
413,437.50 Rupiah
435,400.78 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
175.00 HP
125.00 KVA
5.00 Tahun
2,000.00 Jam
440,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
440,000,000.00 Rupiah Alat Baru
44,000,000.00 Rupiah
0.33438 -
66,207.18 Rupiah
440.00 Rupiah
66,647.18 Rupiah
240,625.00 Rupiah
73,500.00 Rupiah
27,500.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
521,625.00 Rupiah
588,272.18 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
125.00 HP
- -
5.00 Tahun
2,000.00 Jam
880,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
880,000,000.00 Rupiah Alat Baru
88,000,000.00 Rupiah
0.33438 -
132,414.36 Rupiah
880.00 Rupiah
133,294.36 Rupiah
171,875.00 Rupiah
52,500.00 Rupiah
55,000.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
459,375.00 Rupiah
592,669.36 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
75.00 HP
7.00 Ton
4.00 Tahun
2,000.00 Jam
500,000,000.00 Rupiah
4.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
500,000,000.00 Rupiah Alat Baru
50,000,000.00 Rupiah
0.38629 -
86,915.05 Rupiah
500.00 Rupiah
87,415.05 Rp
103,125.00 Rupiah
31,500.00 Rupiah
31,250.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
345,875.00 Rp
433,290.05 Rp
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
100.00 HP
4,000.00 Liter
5.00 Tahun
2,000.00 Jam
50,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
50,000,000.00 Rupiah Alat Baru
5,000,000.00 Rupiah
0.33438 -
7,523.54 Rupiah
50.00 Rupiah
7,573.54 Rp
137,500.00 Rupiah
42,000.00 Rupiah
3,125.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
362,625.00 Rp
370,198.54 Rp
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
3.00 HP
- Liter
4.00 Tahun
1,000.00 Jam
3,500,000.00 Rupiah
4.00 Tahun Alat Baru
1,000.00 Jam Alat Baru
3,500,000.00 Rupiah Alat Baru
350,000.00 Rupiah
0.38629 -
1,216.81 Rupiah
7.00 Rupiah
1,223.81 Rp
4,125.00 Rupiah
1,260.00 Rupiah
437.50 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
185,822.50 Rp
187,046.31 Rp
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
TAMPER E25
5.00 HP
0.170 Ton
4.00 Tahun
1,000.00 Jam
3,000,000.00 Rupiah
4.00 Tahun Alat Baru
1,000.00 Jam Alat Baru
3,000,000.00 Rupiah Alat Baru
300,000.00 Rupiah
0.38629 -
1,042.98 Rupiah
6.00 Rupiah
1,048.98 Rp
6,875.00 Rupiah
2,100.00 Rupiah
375.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
189,350.00 Rp
190,398.98 Rp
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
220.00 HP
50.00 Ton/Jam
5.00 Tahun
2,000.00 Jam
491,500,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
491,500,000.00 Rupiah Alat Baru
49,150,000.00 Rupiah
0.33438 -
73,956.43 Rupiah
491.50 Rupiah
74,447.93 Rp
302,500.00 Rupiah
92,400.00 Rupiah
30,718.75 Rupiah
100,000.00 Rupiah
160,000.00 Rupiah
685,618.75 Rp
760,066.68 Rp
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
55.00 HP
8.00 Ton
5.00 Tahun
2,000.00 Jam
125,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
125,000,000.00 Rupiah Alat Baru
12,500,000.00 Rupiah
0.33438 -
18,808.86 Rupiah
125.00 Rupiah
18,933.86 Rp
75,625.00 Rupiah
23,100.00 Rupiah
7,812.50 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
286,537.50 Rp
305,471.36 Rp
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
10.00 HP
- -
4.00 Tahun
1,000.00 Jam
12,000,000.00 Rupiah
4.00 Tahun Alat Baru
1,000.00 Jam Alat Baru
12,000,000.00 Rupiah Alat Baru
1,200,000.00 Rupiah
0.38629 -
4,171.92 Rupiah
24.00 Rupiah
4,195.92 Rp
13,750.00 Rupiah
4,200.00 Rupiah
1,500.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
199,450.00 Rp
203,645.92 Rp
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
15.00 HP
500.00 Liter
4.00 Tahun
2,000.00 Jam
45,000,000.00 Rupiah
4.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
45,000,000.00 Rupiah Alat Baru
4,500,000.00 Rupiah
0.38629 -
7,822.35 Rupiah
45.00 Rupiah
7,867.35 Rp
20,625.00 Rupiah
6,300.00 Rupiah
2,812.50 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
209,737.50 Rp
217,604.85 Rp
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
150.00 HP
15.00 Ton
5.00 Tahun
2,000.00 Jam
300,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
300,000,000.00 Rupiah Alat Baru
30,000,000.00 Rupiah
0.33438 -
45,141.26 Rupiah
300.00 Rupiah
45,441.26 Rp
206,250.00 Rupiah
63,000.00 Rupiah
18,750.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
468,000.00 Rp
513,441.26 Rp
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
100.00 HP
6.00 Ton
5.00 Tahun
2,000.00 Jam
100,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
100,000,000.00 Rupiah Alat Baru
10,000,000.00 Rupiah
0.33438 -
15,047.09 Rupiah
100.00 Rupiah
15,147.09 Rupiah
137,500.00 Rupiah
42,000.00 Rupiah
6,250.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
365,750.00 Rupiah
380,897.09 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
80.00 HP
0.50 M3
5.00 Tahun
2,000.00 Jam
250,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
250,000,000.00 Rupiah Alat Baru
25,000,000.00 Rupiah
0.33438 -
37,617.72 Rupiah
250.00 Rupiah
37,867.72 Rupiah
110,000.00 Rupiah
33,600.00 Rupiah
15,625.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
339,225.00 Rupiah
377,092.72 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
100.00 HP
4.00 M3
5.00 Tahun
2,000.00 Jam
250,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
250,000,000.00 Rupiah Alat Baru
25,000,000.00 Rupiah
0.33438 -
37,617.72 Rupiah
250.00 Rupiah
37,867.72 Rupiah
137,500.00 Rupiah
42,000.00 Rupiah
15,625.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
375,125.00 Rupiah
412,992.72 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
6.00 HP
- -
2.00 Tahun
2,000.00 Jam
5,000,000.00 Rupiah
2.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
5,000,000.00 Rupiah Alat Baru
500,000.00 Rupiah
0.65455 -
1,472.73 Rupiah
5.00 Rupiah
1,477.73 Rupiah
8,250.00 Rupiah
2,520.00 Rupiah
312.50 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
191,082.50 Rupiah
192,560.23 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
75.00 HP
- -
5.00 Tahun
2,000.00 Jam
100,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
100,000,000.00 Rupiah Alat Baru
10,000,000.00 Rupiah
0.33438 -
15,047.09 Rupiah
100.00 Rupiah
15,147.09 Rupiah
103,125.00 Rupiah
31,500.00 Rupiah
6,250.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
320,875.00 Rupiah
336,022.09 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
90.00 HP
1.60 M3
5.00 Tahun
2,000.00 Jam
300,000,000.00 Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
300,000,000.00 Rupiah Alat Baru
30,000,000.00 Rupiah
0.33438 -
45,141.26 Rupiah
300.00 Rupiah
45,441.26 Rupiah
123,750.00 Rupiah
37,800.00 Rupiah
18,750.00 Rupiah
100,000.00 Rupiah
80,000.00 Rupiah
360,300.00 Rupiah
405,741.26 Rupiah
20.00 % / Tahun
100,000.00 Rp / Jam
80,000.00 Rp / Jam
5,400.00 Liter
11,000.00 Liter
42,000.00 Liter
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0113
2 Mandor ( L 03 ) Jam 0.0016
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.0121
2 Agregat Halus ( M 04 ) M3 0.0232
3 Filler ( M 05 ) Kg 4.8004
4 Aspal ( M 10 ) Kg 5.2962
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0011
2 AMP ( E 01 ) Jam 0.0016
3 Genset ( E 12 ) Jam 0.0016
4 Dump Truck ( E 09 ) Jam 0.0143
5 Aspal Finisher ( E 02 ) Jam 0.0020
6 Tandem Roller ( E 17 ) Jam 0.0017
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0013
8 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
I ASUMSI
1 Menggunakan alat berat ( cara mekanik )
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal lapisan padat t 0.03
6 Jam kerja efektif 1 hari Tk 7.00
7 Faktor kehilangan material
- Agregat Fh 1 1.10
- Aspal Fh 2 1.05
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung ke
dalam Dump Truck dan diangkut ke lokasi pekerjaan.
3 Campuran panas HRS dihampar dengan Finisher dan dipadatakan dengan Tandem
dan Peneumatic Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Muat T1 1.50
- Lain lain T2 0.50
Ts 1 2.00
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 8.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 40.00
Kecepatan rata rata kosong v2 50.00
Kapasitas AMP batch Q2 b 0.50
Waktu menyiapkan 1 batch HRS Tb 1.00
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 16.00
- Angkut = ( L : v1 ) x 60 menit T2 30.00
- Tunggu + Dumping + Putar T3 15.00
- Kembali = ( L : v2 ) x 60 menit T4 24.00
Ts2 85.00
e Finisher ( E 02 )
Kapasitas produksi V 40.00
Faktor efisiensi alat Fa 0.83
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 3.50
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 6.00
Faktor efisiensi alat Fa 0.83
h Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 617.56
Produksi HRS / hari = Tk x Q2 Qt 4,322.92
Kebutuhan tenaga
- Pekerja P 7.00
- Mandor M 1.00
Rp 89,691.00 / M2
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0217
2 Mandor ( L 03 ) Jam 0.0022
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.0336
2 Agregat Halus ( M 04 ) M3 0.0149
3 Filler ( M 05 ) Kg 4.8015
4 Aspal ( M 10 ) Kg 6.6150
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0015
2 AMP ( E 01 ) Jam 0.0022
3 Genset ( E 12 ) Jam 0.0022
4 Dump Truck ( E 09 ) Jam 0.0348
5 Aspal Finisher ( E 02 ) Jam 0.0027
6 Tandem Roller ( E 17 ) Jam 0.0016
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0023
8 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal lapisan ( AC ) padat t 0.04
6 Jam kerja efektif 1 hari Tk 7.00
7 Faktor kehilangan material
- Agregat Fh 1 1.10
- Aspal Fh 2 1.05
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung ke
dalam Dump Truck dan diangkut ke lapangan
3 Campuran panas AC dihampar dengan Finisher dan dipadatakan dengan Tandem dan
Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Muat T1 1.50
- Lain lain T2 0.50
Ts 1 2.00
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 4.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 40.00
Kecepatan rata rata kosong v2 50.00
Kapasitas AMP batch Q2 b 0.50
Waktu menyiapkan 1 batch AC Tb 1.00
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 8.00
- Angkut = ( L : v1 ) x 60 menit T2 29.99
- Tunggu + Dumping + Putar T3 15.00
- Kembali = ( L : v2 ) x 60 menit T4 23.99
Ts2 76.98
e Finisher ( E 02 )
Kapasitas produksi V 40.00
Faktor efisiensi alat Fa 0.83
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 2.50
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 4.00
Faktor efisiensi alat Fa 0.83
h Alat Bantu
Diperlukan :
- Rambu = 2 bh
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 461.11
Produksi AC / hari = Tk x Q2 Qt 3,227.78
Kebutuhan tenaga
- Pekerja P 10.00
- Mandor M 1.00
Rp 122,623.00 / M2
A TENAGA
1 Pekerja ( L 01 ) Jam 0.3880
2 Mandor ( L 03 ) Jam 0.0554
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7028
2 Agregat Halus ( M 04 ) M3 0.5341
3 Filler ( M 05 ) Kg 139.2
4 Aspal ( M 10 ) Kg 157.0
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0380
2 AMP ( E 01 ) Jam 0.0554
3 Genset ( E 12 ) Jam 0.0554
4 Dump Truck ( E 09 ) Jam 0.4906
5 Aspal Finisher ( E 02 ) Jam 0.0767
6 Tandem Roller ( E 17 ) Jam 0.0430
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0321
8 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
SATUAN : M3
I ASUMSI
1 Menggunakan alat berat ( Cara mekanik )
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal lapisan ( ATB ) padat t 0.04
6 Jam kerja efektif 1 hari Tk 7.00
7 Faktor kehilangan material
- Agregat Fh 1 1.10
- Aspal Fh 2 1.05
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung ke
dalam Dump truck dan diangkut ke lokasi pekerjaan
3 Campuran panas ATB dihampar dengan Finisher dan dipadatakan dengan Tandem dan
Pneumatic Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Muat T1 1.50
- Lain lain T2 0.50
Ts 1 2.00
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 8.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 40.00
Kecepatan rata rata kosong v2 50.00
Kapasitas AMP batch Q2 b 0.50
Waktu menyiapkan 1 batch ATB Tb 1.00
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 16.00
- Angkut = ( L : v1 ) x 60 menit T2 29.99
- Tunggu + Dumping + Putar T3 15.00
- Kembali = ( L : v2 ) x 60 menit T4 23.99
Ts2 84.99
e Finisher
Kapasitas produksi V 40.00
Faktor efisiensi alat Fa 0.75
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 3.50
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 6.00
Faktor efisiensi alat Fa 0.83
h Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 18.04
Produksi ATB / hari = Tk x Q2 Qt 126.30
Kebutuhan tenaga
- Pekerja P 7.00
- Mandor M 1.00
Rp 2,797,187.00 / M3
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0301
2 Mandor ( L 03 ) Jam 0.0060
B BAHAN
1 Aspal ( M 10 ) ( M 10 ) Kg 0.6417
2 Karosene ( M 11 ) ( M 11 ) Liter 0.4889
C PERALATAN
1 Asphalt Sprayer ( E 03 ) Jam 0.0030
2 Compresor ( E 05 ) Jam 0.0031
3 Dump Truck ( E 08 ) Jam 0.0030
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
SATUAN : L
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00
4 Jam kerja efektif 1 hari Tk 7.00
5 Faktor kehilangan material Fh 1.10
6 Komposisi campuran AC ( Spesifikasi )
- Aspal AC - 10 atau AC - 20 AS 56
- Minyak Flux / pencair K 44
8 Bahan dasar ( aspal dan minyak pencair ) semuanya diterima di Lokasi Pekerjaan
II METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg akan dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck
2 ALAT
a Asphalt Sprayer ( E 03 )
Kapasitas alat V 800.00
Faktor efisiensi alat Fa 0.83
Waktu siklus ( termasuk proses pemanasan ) Ts 2.00
b Air Compresor ( E 05 )
Kapasitas alat -----------> Diambil V 400.00
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.80
c Dump Truk ( DT ) ( E 08 )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer
3 TENAGA
Produksi menentukan : ASPALT FINISHER Q4 332.00
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 2,324.00
Kebutuhan tenaga
- Pekerja P 10.00
- Mandor M 2.00
Rp 10,865.00 / LITER
A TENAGA
1 Pekerja ( L 01 ) Jam 0.4373
2 Mandor ( L 03 ) Jam 0.0625
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7680
2 Agregat Halus ( M 04 ) M3 0.4320
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0625
2 Dump Truck ( E 09 ) Jam 0.1994
3 Motor Grader ( E 13 ) Jam 0.0117
4 Vibratory Roller ( E 19 ) Jam 0.0178
5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043
6 Water Tank Truck ( E 23 ) Jam 0.0211
7 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
UNTUK 1 M2 TEBAL 20 CM
UNTUK 1 M2 TEBAL 15 CM
UNTUK 1 M2 TEBAL 10 CM
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
SATUAN : M3
I ASUMSI
1 Menggunakan alat berat Cara mekanik
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal Agregat padat t 0.15
6 Faktor kembang material ( padat - lepas ) Fk 1.20
7 Jam kerja efektif per hari Tk 7.00
8 Proporsi campuran
- Agregat Kasar Ak 64.00
- Agregat halus Ah 36.00
II METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di Base
camp
2
Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dg motor Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan dengan
Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level
permukaan dengan menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Mencampur T1 2.50
- Memuat dan Lain lain T2 1.00
Ts 1 3.50
Fk x Ts1
Koefisien Alat / m3 = 1 / Q1 ( E 15 ) 0.0625
b Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 6.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 45.00
Kecepatan rata rata kosong v2 60.00
Waktu Siklus Ts2
- Waktu tempuh isi = ( L : v1 ) x 60 menit T1 26.65
- Waktu tempuh kosong = ( L : v2 ) x 60 menit T2 19.99
- lain lain termasuk menurunkan Agregat T3 3.00
Ts2 49.65
c Motor Grader ( E 13 )
Panjang hamparan Lh 50.00
Lebar efektif kerja blade b 2.40
Faktor Efisiensi alat Fa 0.83
Kecepatan rata rata alat v 4.00
Jumlah lintasan n 6.00
Waktu siklus Ts 3
- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 0.75
- Lain lain T2 1.00
Ts 3 1.75
d Vibratory Roller ( E 19 )
Kecepatan rata rata alat v 3.00
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 8.00
Faktor efisiensi alat Fa 0.83
g Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
3 TENAGA
Produksi menentukan : WHEEL LOADER Q1 16.01
Produksi Agregat / hari = Tk x Q1 Qt 112.05
Kebutuhan tenaga
- Pekerja P 7.00
- Mandor M 1.00
Rp 537,144.00 / M2
A TENAGA
1 Pekerja ( L 01 ) Jam 0.4373
2 Mandor ( L 03 ) Jam 0.0625
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7080
2 Agregat Halus ( M 04 ) M3 0.4920
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0625
2 Dump Truck ( E 09 ) Jam 0.1994
3 Motor Grader ( E 13 ) Jam 0.0117
4 Vibratory Roller ( E 19 ) Jam 0.0178
5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043
6 Water Tank Truck ( E 23 ) Jam 0.0211
7 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
UNTUK 1 M2 TEBAL 20 CM
UNTUK 1 M2 TEBAL 15 CM
UNTUK 1 M2 TEBAL 10 CM
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
SATUAN : M3
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal Agregat padat t 0.15
6 Faktor kembang material ( padat - lepas ) Fk 1.20
7 Jam kerja efektif per hari Tk 7.00
8 Proporsi campuran
- Agregat Kasar Ak 59.00
- Agregat halus Ah 41.00
II METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di Base
camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan motor
Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan dengan
Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level
permukaan dengan menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Mencampur T1 2.50
- Memuat dan Lain lain T2 1.00
Ts 1 3.50
Fk x Ts1
Koefisien Alat / m2 = 1 / Q1 ( E 15 ) 0.0625
b Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 6.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 45.00
Kecepatan rata rata kosong v2 60.00
Waktu Siklus Ts2
- Waktu tempuh isi = ( L : v1 ) x 60 menit T1 26.65
- Waktu tempuh kosong = ( L : v2 ) x 60 menit T2 19.99
- lain lain termasuk menurunkan Agregat T3 3.00
Ts2 49.65
c Motor Grader ( E 13 )
Panjang hamparan Lh 50.00
Lebar efektif kerja blade b 2.40
Faktor Efisiensi alat Fa 0.83
Kecepatan rata rata alat v 4.00
Jumlah lintasan n 6.00
Waktu siklus Ts 3
- Perataan 1 Lintasan = ( Lh x 60 ) : ( v x 1000 ) T1 0.75
- Lain lain T2 1.00
Ts 3 1.75
d Vibratory Roller ( E 17 )
Kecepatan rata rata alat v 3.00
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 8.00
Faktor efisiensi alat Fa 0.83
g Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
3 TENAGA
Produksi menentukan : WHEEL LOADER Q1 16.01
Produksi Agregat / hari = Tk x Q1 Qt 112.05
Kebutuhan tenaga
- Pekerja P 7.00
- Mandor M 1.00
Rp 537,936.00 / M2
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0301
2 Mandor ( L 03 ) Jam 0.0060
B BAHAN
1 Aspal ( M 10 ) Kg 0.8880
2 Kerosene ( M 11 ) Liter 0.2530
C PERALATAN
1 Asphalt Sprayer ( E 03 ) Jam 0.0030
2 Compresor ( E 05 ) Jam 0.0063
3 Dump Truck ( E 08 ) Jam 0.0030
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
SATUAN : M3
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00
4 Jam kerja efektif 1 hari Tk 7.00
5 Faktor kehilangan material Fh 1.10
6 Komposisi campuran ( Spesifikasi )
- Aspal AC - 10 atau AC - 20 AS 77
- Minyak Flux / pencair K 23
8
Bahan dasar ( aspal dan minyak pencair ) semuanya diterima di Lokasi Pekerjaan
II METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal
cair
2
Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg akan
dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck
2 ALAT
a Asphalt Sprayer ( E 03 )
Kapasitas alat V 800.00
Faktor efisiensi alat Fa 0.83
Waktu siklus ( termasuk proses pemanasan ) Ts 2.00
b Air Compresor ( E 05 )
Kapasitas alat . . . . . Diambil V 400.00
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.40
c Dump Truk ( DT ) ( E 08 )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer
3 TENAGA
Produksi menentukan : ASPALT FINISHER Q4 332.00
Produksi Lapis Perekat / hari = Tk x Q4 Qt 2,324.00
Kebutuhan tenaga
- Pekerja P 10.00
- Mandor M 2.00
Rp 14,652.00 / Liter
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0161
2 Mandor ( L 02 ) Jam 0.0040
B BAHAN
C PERALATAN
1 Motor Grader ( E 13 ) Jam 0.0025
2 Vibratory Roller ( E 19 ) Jam 0.0040
3 Water Tank Truck ( E 23 ) Jam 0.0105
4 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembaya
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar da
lainnya
SATUAN : M2
I ASUMSI
1 Pekerjaan dilakukan pada hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi jalan : jelek / belum padat
5 Jam kerja efektif per hari Tk 7.00
II URUTAN KERJA
1 Motor Grader meratakan permukaan hasil galian
2 Vibro Roller memadatkan permukaan jalan yang telah diratakan oleh Motor grader
3 Sekelompok pekerja akan membanru meratakan badan jalan dengan alat bantu
permukaan dengan menggunakan alat bantu
2 ALAT
a Motor Grader ( E 13 )
Panjang hamparan Lh 50.00
Lebar efektif kerja blade b 2.40
Faktor Efisiensi alat Fa 0.83
Kecepatan rata rata alat v 2.00
Jumlah lintasan n 6.00
Waktu siklus Ts 1
- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 1.50
- Lain lain T2 1.00
Ts 1 2.50
b Vibratory Roller ( E 19 )
Kecepatan rata rata alat v 2.00
Lebar efektif pemadatan b 1.20
g Alat Bantu
Diperlukan :
- Skop = 3 bh
3 TENAGA
Produksi menentukan : VIBRATORY ROLLER Q2 249.00
Produksi Pekerjaan / hari = Tk x Q2 Qt 1,743.00
Kebutuhan tenaga
- Pekerja P 4.00
- Mandor M 1.00
Rp 8,868.00 / M2
ASP 1
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 77.93
80,000.00 129.54
207.47
276,000.00 3,343.65
288,000.00 6,682.37
- -
9,400.00 49,784.60
59,810.61
548,210.53 608.85
6,937,602.41 11,233.90
588,272.18 952.58
435,400.78 6,242.49
406,519.57 822.83
368,176.60 633.69
408,950.16 525.56
500.00 500.00
21,519.91
81,537.99
8,153.80
89,691.79
89,691.00
r mata pembayaran
ASP 2
SATUAN KET.
Km
m
Jam
-
-
%
%
%
%
t / m3
t / m3
t / m3
t / m3
m3
m3
Kg
Kg
m3
-
-
menit
menit
menit
m2
Jam
SATUAN KET.
ton / jam
-
m2
Jam
m2
Jam
ton
-
km / jam
km / jam
ton
menit
menit
menit
menit
menit
menit
m2
Jam
km / jam
-
m2
Jam
km/jam
m
lintasan
-
m2
Jam
SATUAN KET.
km / jam
m
lintasan
-
m2
Jam
Lump sum
m2 / jam
m2
orang
orang
jam
jam
ASP 3
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 149.10
80,000.00 173.49
322.59
276,000.00 9,282.57
288,000.00 4,276.80
- -
9,400.00 62,181.00
75,740.37
548,210.53 815.43
6,937,602.41 15,045.40
588,272.18 1,275.77
435,400.78 15,144.04
406,519.57 1,102.01
368,176.60 591.45
408,950.16 938.50
500.00 500.00
35,412.59
111,475.56
11,147.56
122,623.11
122,623.00
ASP 4
SATUAN KET.
Km
m
Jam
-
-
%
%
%
%
t / m3
t / m3
t / m3
t / m3
m3
m3
Kg
Kg
m3
-
-
menit
menit
menit
m3
Jam
SATUAN KET.
ton / jam
-
m2
Jam
271,506.00
m2
Jam
m3
-
km / jam
km / jam
ton
menit
menit
menit
menit
menit
menit
m2
Jam
ton / jam
-
m2
Jam
km / jam
m
lintasan
-
m2
Jam
SATUAN KET.
km / jam
m
lintasan
-
m2
Jam
Lump sum
m2 / jam
m2
orang
orang
jam
jam
ASP 5
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 2,667.17
80,000.00 4,433.73
7,100.90
276,000.00 193,966.67
288,000.00 153,824.00
- -
9,400.00 1,475,799.96
1,823,590.62
548,210.53 20,838.65
6,937,602.41 384,493.63
588,272.18 32,603.04
435,400.78 213,622.82
406,519.57 31,166.50
368,176.60 15,842.37
408,950.16 13,138.96
500.00 500.00
712,205.96
2,542,897.49
254,289.75
2,797,187.24
2,797,187.00
B)
ASP 6
SATUAN KET.
Km
m
Jam
-
-
%
%
%
%
t / m3
t/m3
t/m3
t/m3
m3
m3
Kg
Kg
m3
-
-
menit
menit
menit
m3
Jam
SATUAN KET.
ton / jam
-
m3
Jam
m3
Jam
ton
-
km / jam
km / jam
ton
menit
menit
menit
menit
menit
menit
m3
Jam
ton/jam
-
m3
Jam
km / jam
m
lintasan
-
m3
Jam
SATUAN KET.
km / jam
m
lintasan
-
m3
Jam
Lump sum
m3 / jam
m3
orang
orang
jam
jam
ASP 7
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 207.08
80,000.00 481.93
689.01
9,400.00 6,032.15
- -
6,032.15
237,950.78 716.72
361,044.90 1,128.27
435,400.78 1,311.45
3,156.43
9,877.59
987.76
10,865.35
10,865.00
ASP 8
SATUAN KET.
Km
Jam
-
% 100 Bagian
% 80 Bagian
Kg / Lt
Kg / Lt
liter Campuran
kg
liter
liter
-
jam
liter
jam
m2 / jam
liter / m2
liter
jam
SATUAN KET.
liter
jam
Liter
Liter
orang
orang
jam
jam
ASP 9
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 3,006.47
80,000.00 4,997.77
8,004.24
276,000.00 211,968.00
288,000.00 124,416.00
336,384.00
548,210.53 34,247.87
435,400.78 86,810.29
433,290.05 5,075.35
433,290.05 7,733.87
408,950.16 1,751.86
370,198.54 7,805.39
500.00 500.00
143,924.63
488,312.87
48,831.29
537,144.16
537,144.00
107,428.00
80,571.00
53,714.00
S A
ASP 10
SATUAN KET.
Km
m
Jam
m3
m3
m3
-
-
menit
menit
menit
m3
Jam
m3
-
km / jam
km / jam
menit
menit
menit
menit
SATUAN KET.
m3
Jam
m
m
-
km / jam
Lintas 3 x pp
menit
menit
menit
m3
Jam
km / jam
m
lintasan
-
m3
Jam
km/jam
m
lintasan
-
m3
Jam
m3
m3
kali
-
m3
Jam
SATUAN KET.
Lump sum
m3 / jam
m3
orang
orang
jam
jam
ASP 11
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 3,006.47
80,000.00 4,997.77
8,004.24
276,000.00 195,408.00
288,000.00 141,696.00
337,104.00
548,210.53 34,247.87
435,400.78 86,810.29
433,290.05 5,075.35
433,290.05 7,733.87
408,950.16 1,751.86
370,198.54 7,805.39
500.00 500.00
143,924.63
489,032.87
48,903.29
537,936.16
537,936.00
107,587.00
80,690.00
53,793.00
r mata pembayaran
S B
ASP 12
SATUAN KET.
Km
m
Jam
m3
m3
m3
-
-
menit
menit
menit
m3
Jam
m3
-
km / jam
km / jam
menit
menit
menit
menit
SATUAN KET.
m3
Jam
m
m
-
km / jam
Lintas 3 x pp
menit
menit
menit
m3
Jam
km / jam
m
lintasan
-
m3
Jam
km / jam
m
lintasan
-
m3
Jam
km / jam
m3
lintasan
-
m3
Jam
SATUAN KET.
Lump sum
m3 / jam
m3 / jam
orang
orang
jam
jam
ASP 13
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 207.08
80,000.00 481.93
689.01
9,400.00 8,346.86
- -
8,346.86
237,950.78 716.72
361,044.90 2,256.53
435,400.78 1,311.45
4,284.70
13,320.57
1,332.06
14,652.62
14,652.00
ASP 14
SATUAN KET.
Km
Jam
-
% 100 Bagian
% 30 Bagian
Kg / Lt
Kg / Lt
Liter Campuran
Kg
Liter
Liter
-
Jam
Liter
Jam
m2 / jam
Liter / m2
Liter
Jam
SATUAN KET.
Liter
Jam
Liter
Liter
orang
orang
jam
jam
ASP 15
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,875.00 110.44
80,000.00 321.29
431.73
592,669.36 1,487.62
433,290.05 1,740.12
370,198.54 3,902.70
500.00 500.00
7,630.44
8,062.17
806.22
8,868.38
8,868.00
ASP 16
SATUAN KET.
Jam
m
m
-
km / jam
Lintas 3 x pp
menit
menit
menit
m3
Jam
km / jam
m
lintasan
-
m3
Jam
m3
m3
kali
-
SATUAN KET.
m3
Jam
Lump sum
m3 / jam
m3
orang
orang
jam
jam
The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when opening this workbook in
an earlier version of Excel or if you save this workbook in an earlier file format.
Any effects on this object will be removed. Any text that overflows the 132
boundaries of this graphic will appear clipped.
Kamus'!B4:K63
Upah&Bahan'!B1:J1022
analisa 2012'!A1:M4120
analisa_listrik'!B1:K300
analisa_kput'!A1:L253
analisa_alat'!A2:M1422
analisa aspal'!A3:M1517
Some formulas in this workbook are linked to other workbooks that are 7
closed. When these formulas are recalculated in earlier versions of Excel Defined Names
without opening the linked workbooks, characters beyond the 255-character
limit cannot be returned.
Some cells or styles in this workbook contain formatting that is not supported 90
by the selected file format. These formats will be converted to the closest
format available.
One or more objects in this workbook such as shapes, WordArt, or text boxes 44
may allow text to overflow the object boundaries. Earlier versions of Excel do
not recognize this option and will hide overflowing text.
Kamus'!B4:K63
Version
Excel 97-2003
Excel 97-2003
Excel 97-2003
Excel 97-2003
Excel 97-2003
Excel 97-2003
Excel 97-2003
Excel 97-2003
Excel 97-2003
Excel 97-2003