RECORD OF PRESSURE TEST

PT. DELUGE ENGINEERING


CONSTRUCTION

CLIENT : PT. Cikarang Listrindo REPORT NO. :____.HT/FF-AG/BPS-DEL/___/___


Project No. : CIK-14000-801-10030 DATE :
SYSTEM : Fire Protection & Detection PACKAGE NO. :
LOCATION : Babelan -Bekasi DRAWING NO. : BPS-0SGA-121205
Pressurized Media : Air Line No : Fuel System Pipe Line

PRESSURE PRESSURE
NO. TIME GAUGE TEMP ◦C GAUGE TEMP ◦C REMARKS
1 2

1 10:00:00 40 Psi 29.3


2 11:00:00 40 Psi 29.5
3 12:00:00 40 Psi 29.8
4 13:00:00 40 Psi 30.1
5 14:00:00 40 Psi 30.3
6 15:00:00 40 Psi 29.2
7 16:00:00 40 Psi 29.0
8 17:00:00 40 Psi 29.7
9 09:00:00 40 Psi 29.0
10 10:00:00 40 Psi 29.2

RESULT: ACCEPTABLE UNACCEPTABLE

DESCRIPTION/COMPANY SIGNATURE DATE

PREPARED/RECORDED BY DELUGE

WITNESSED BY
REVIEWED/WITNESSED BY
PS-DEL/___/___