Power supply consumption calculation for Medium Voltage switchgear type Unigear ZS1

ABB
ABB s.r.o. Czech Republic

PRELIMINARY AC-DC CALCULATION

Project/contract name: BANDARANAIKE INTERNATIONAL AIRPORT


Switchgear name: 11kV SWITCHGEAR Prepared by: Roman Hurda
Revision: 17Q3344887 Rev.0
Required supply: 110 VDC Date: 23.11.2017
220 VAC

LOAD PROFILES AND POWER CONSUMPTION [W]


Typical panels Qty Continuous Inrush (150ms) Peak (5s) Note
A Measuring panel Measuring panel 40,0 100,0 0,0
B Incoming feeder 2 Incoming feeder 1 76,0 880,0 200,0
C Transformer feeder 1 Incoming feeder 2 76,0 880,0 200,0
Transformer feeder 48,0 880,0 200,0

Total No. of panels: 3 Total swg. consumption [W]: 240,0 2740,0 600,0
Continuous Inrush (150ms) Peak (5s)

SUMMARY FOR THE REQUIRED SUPPLY 110V VDC Net values:


1. For proper function of the switchgear is necessary cover Continuous current demand: 2,18 A
2. For proper function of the switchgear is necessary cover Inrush (150ms) current demand: 24,91 A
3. For proper function of the switchgear is necessary cover Peak (5s) current demand: 5,45 A

SUMMARY FOR THE REQUIRED SUPPLY 220V VAC


1. Estimated AC load for all panels (LV compartment light, cable comp. heater, CB comp. heater, LV comp. heater). 3,36 A
1

PRELIMINARY AC-DC CALCULATION 1 of 4