Mu = 470795155 Nmm

ø = 0.85
B1 = 0.85
fy = 400 Mpa
f'c = 30 Mpa
b = 450 mm
h = 600 mm
d = 535.5 mm
d' = 64.5 mm
D tul = 25 mm
øs = 12 mm
ts = 40 mm

1. Menentukan Mn
Mn = Mu
ø
= 470795155
0.85
= 553876652.9 Nmm
2. Menentukan nilai Xb, Xmax
Xb = ((600)/ 600+fy) x d
= ((600)/ 600+ 400) x 535.5
= 321.3 mm
Xmax = 0.75 x Xb
= 0.75 x 321.3
= 240.975 mm
Xmin = ts + ø s + D tul
= 40 + 12 + 25
= 77 mm
X rencana = Tidak boleh melebihi X max, Tidak kurang dari X min
= 90 mm
3. Menentukan nilai Cc, Mnc, Mns
Cc = 0.85 x f'c x b x B1 x X rencana
= 0.85 x 30 x 450 x 0.85 x 90
= 877837.5 N
Mnc = Cc x (d - B1 x X rencana)
2
= 877837.5 x ( 535.5 - 0.85 x 90 )
2
= 436504696.88 Nmm
Mns = Mn - Mnc
= 553876652.9 - 436504696.88
= 117371956.07 Nmm
Cs = Mns
d-d'
= 117371956.07
535.5 - 64.5
= 249197.359 N
4. nilai Fs
f's = X rencana - d' x 600
X rencana
= 90 - 64.5 x 600
90
= 170.000
f's yang digunakan = 170
5. nilai As dan As’
A's = Cs
f's - 0.85 x f'c
= 249197.359
170.- 0.85 x 30
= 1724.549 mm2
As = Cc + Cs
fy
= 877837.5 + 249197.359
400
= 2817.587 mm2
6. As tulangan
As Tulangan = 490.874 mm2
Tulangan tarik
n = As
As Tulangan

= 2817.587 = 5.740
490.874
Jadi untuk Tulangan Tarik digunakan = 6 D 25
As Aktual = n x As tulangan
= 6 x 490.874
= 2945.243 mm2
Tulangan tekan
n = As
As Tulangan

= 1724.549 = 3.513
490.874
jadi untuk Tulangan Tekan digunakan = 4 D 25
A's Aktual = n x As tulangan
= 4 x 490.874
= 1963.495 mm2
KONTROL KEMAMPUAN PENAMPANG
- Kontrol spasi tulangan
S bersih = b - 2ts – 2 ø s - n pasang D tul
n -1
= 450 - 2.40 - 2 .12 – 4.25
4 -1
= 82
Jadi dalam penyusunan tulangan, tulangan pada daerah tarik akan dipasang 2 lapis dan
Tulangan pada daerah tekan akan dipasang 1 lapis
Dikarenakan susunan tulangan tarik terdiri dari 2 lapis, maka terjadi perubahan tinggi efektif,
oleh sebab itu harus dilakukan perhitungan terhadap tinggi efektif yang baru.
y = 4 x 490.874 x 64.5 + 2 x 490.874 x 117
6 x 490.874
= 82 mm
d =h-y
= 600 - 82
= 518 mm
7. nilai Cc
Cc = 0.85 x f'c x b x B1 x X
= 0.85 x 30 x 450 x 0.85x X
= 9753.75 X
Cs =( X - d' x 600 ) - (0.85x f'c x A's actual)
x
= X - 64.5 x 600 - 0.85 x 30 x 1963.495
X
= 1128028.112 - 75987272.31
X
T = As actual x fy
= 2945.243 x400
= 1178097.245 N
8. nilai T
T = Cc + Cs
1178097.245 = 9754 X + 1128028.112 - 75987272.31
X

1178097.245 = 9754 X2 + 1128028.112 X - 75987272.31


X

0 = 9754 X2 +( -50069.13292 )X (-75987272.31)


0 = 1 X2 + -5.133X - 7790.570018

X = - b ± √ b2 – 4 a c
2a
= 5.133 ± √ 26.351 - (-31162.28007)
2
= 5.133 ± √ 31188.631
2
= 5.133 ± 176.6030324
2
X1 = 90.868 mm
X2 = -85.735 mm
Jadi X yang digunakan = 90.868 mm
9. Fs sebenarnya
f's = X - d' x 600
X
= 90.868 - 64.5 x 600
90.868
= 174.108 Mpa
10. nilai Mn
Mn1 =As x fy - A's x f's x d - a/2
= 2945.243 x 400 - 1963.495 x 174.108 (518 - 77.2/2)
= 836236.3472 x 479.38
= 400875837.14 Nmm
Mn2 = A's x f's x d - d'
= (1963.495 x 174.108) x (518 - 64.5)
= 155033917.17 Nmm
Mn = Mn1 + Mn2
= 400875837.14 + 155033917.17
= 555909754.32
11. cek !!!!!!
øMn > Mu
0.85 x 555909754.32 > 470795155
472523291.2 > 470795155 OK

Analisa Tulangan Geser SRPMK


f’c = 30 Mpa fys = 240 Mpa
fy = 400 Mpa qu = 1,2 DL + LL = 4000 Kg/m
b = 450 mm d = h – (Ts + Øs + ½ D)
h = 600 mm = 535,5 mm
D = 25 mm d’ = h-d
Ø = 12 mm = 64,5 mm

 Gempa dari arah kanan

Pada tumpuan A (M(+))

M(+) 6 D 25 → As pasang = 2945,243 mm

𝐴𝑠 𝑝𝑎𝑠𝑎𝑛𝑔 𝑥 1,25 𝑓𝑦 2945,243 𝑥 1,25 (400)


a= =
0,85 𝑓′ 𝑐 𝑥 𝑏 0,85 (30) 𝑥 450
= 86,98 mm
Cc’ = 0,85 x f’c x b x a
= 0,85 x 30 x 450 x 86,98
= 998,097.2 N
ØMn = Ø x Cc’ (d – a/2)
= 0,9 x 998,097.2 (535,5 – 86,98/2)
= 441,966,423 Nmm
Pada tumpuan B (M(-))

M(-) 4 D 25 → As pasang = 1963,425 mm

Dikarenakan susunan tulangan tarik terdiri dari 2 lapis, maka terjadi perubahan tinggi
efektif, oleh sebab itu harus dilakukan perhitungan terhadap tinggi efektif yang baru.
4 𝑥 490,875 𝑥 65.5 +2 𝑥 490,875 𝑥 117
Y = = 82 mm
6 𝑥 490,875
Dbaru = h – y
= 600 - 82
= 518 mm
𝐴𝑠 𝑝𝑎𝑠𝑎𝑛𝑔 𝑥 1,25 𝑓𝑦 1963,425 𝑥 1,25 (400)
a= =
0,85 𝑓′ 𝑐 𝑥 𝑏 0,85 (30)𝑥 450

= 85.55 mm
Cc’ = 0,85 x f’c x b x a
= 0,85 x 30 x 450 x 85,55
= 981,712.5 N
ØMn = Ø x Cc’ (d – a/2)
= 0,9 x 981,712.5 (518 – 85,55/2)
= 419880890.5 Nmm
TABEL momen
M Tumpuan Ø.Mn
M (+) A 441,966,423.0
M (-) B 419,880,890.5

Cek Persyaratan SRPMK Tulangan Geser


Qu = 4000 kg/m (di tentukan sejak awal )
 VA & VB Dari Kombinasi
qu = 1,2 DL + LL

𝑞𝑢 𝑥 𝐿 4000 𝑥 6
VA = =
2 2
= 12000 kg

VB = -12000 kg
 VA & VB Dari Akibat Gempa
𝑀(+) + 𝑀(−) 441,966,423.0 + 419,880,890.5
VA = =
𝐿 6
= 143641218.9 N karena di rubah ke kg maka di bagi 10000
= 14364.122 kg

VB = -14364.122 kg

 Jumlahkan (Vu)
Vu = 12000 + 14364.122
= 26364,122 kg

Jadi Vu Pakai = 26364,122 kg


 kontrol apakah Vc = 0 ( pasal 23.3 (4(2))
a. Gaya geser akibat gempa saja > 0,5 total geser
14364.122 > 0,5 x 26364,122
14364.122 > 13182.061 (ok)
𝐴𝑔 𝑥 𝐹′𝑐
b. Gaya Akibat Tekan <
20
Sehingga Vc = 0 → Diasumsikan Karna Pu Tidak ada
Ø SRPMK = 1
Vu = Vs + Vc
Vu/Ø = Vs + Vc → Vs = Vu/Ø
26364,122
Vs = = 26364,122 kg
1
1 Av = 113,04 mm2
Untuk tulangan geser 2 kaki → 2 x Av
2 x 113,04
Av perlu = 226.08 mm2
 Analisa Jarak(s) Sengkang
𝑓𝑦 𝑥 𝑑 𝑥 𝐴𝑣
S =
𝑉𝑠
240 𝑥 535,5 𝑥 226.08
=
26364,122
S = 110 > 8 db sengkang ( 96 )
1/3.bw.d.√(f’c) = 1/3.400.535.5.√(30) = 39107,39 kg
Karena vs < 1/3.bw.d.√(f’c) , maka jarak maximum d/2 atau 600 mm.
Smax = d/2 = 267.75 mm atau 600 mm
 Sengkang Digunakan Jarak S = 90 mm dan akan dapat
𝑉𝑠 𝑥 𝑠
Av =
𝑓𝑦 𝑥 𝑑
26364,122 𝑥 90
=
240 𝑥 535,5
= 184.62 atau 185 mm2
Maka di gunakan tulangan geser serta di pasang sengkang 12 mm dengan jarak 90
mm dengan AV = 185 mm2 ( 12 – 90 mm)