Table 4

ACTIVITY TASK TIME COVERAGE IN-CHARGE


BRAINSTORMING Get ideas from 1 hour a day Febuary 6, 7, 13, Whole group
each members & 14, 2018
about the project
CONSULTATION Meeting with the 30 minutes a day Febuary 15, 19, Whole group
mentor on how 22, 23, & 28;
to improve the March 5&6, 2018
project
FUNDING Collect funds 10 minutes a day Febuary 27&28; Whole group
from the March 1, 2, 5, &
members for the 6, 2018
prototype
materials
CANVASSING Sorting out and 1 hour a day Febuary 13-14, Whole group
estimating prices 2018
of certain
materials
COMPLETION OF Buying the 2 ½ hour a day Febuary 28; Whole group
MATERIALS needed materials March 1, 2, 5, &
for the prototype 6, 2018.
BUILDING Construction of 2 hours a day Febuary 28; Whole group
the prototype March 1, 2, 5, &
6, 2018.
PROTOTYPE Gathering food 1 hour a day March 6 & 7, Whole group
TESTING scraps and 2018
testing the
product
PRESENTATION Present the 1 hour Whole group
prototype

Maintenance
After lots of trial and error, sharper and bigger blades must be needed to cut off the food wastes

into smaller pieces, it also advised that blades are stick together. Make sure that the barrel is not

absolutely full and that there would be enough space for the oxygen to freely enter and help in

the decomposing and oxidation process of the biodegradable materials. The oxygen will do the

work by helping the bacterias in the compost perform aerobic respiration to carry out rich

compost. It is also advised that it must apply and put all the rich compost that was retrieved

from the compost tumbler and it can now be used as rich soil for crops.