FORMATO 10 - CRONOGRAMA DE AVANCE DE OBRA VALORIZADO

: MEJORAMIENTO DE LA TRANSITIBILIDAD VEHICULAR Y PEATONAL A TRAVES DE PISTAS Y VEREDAS DE LAS VIAS PRINCIPALES Y SEC
PROYECTO MAYUNMARCA, DISTRITO DE ANDABAMBA, PROVINCIA DE ACOBAMBA, DEPARTAMENTO DE
ENTIDAD : SUB GERENCIA DE ESTUDIOS - GRH
RESPONSABLE :
DEPARTAMENTO : HUANCAVELICA
PROVINCIA : ACOBAMBA
DISTRITO : ANDABAMBA
PRESUPUESTO S/.
COSTO DIRECTO S/.

Item PART I DAS Unidad Metrado Precio Precio


MES 1 MES 2
Columna1 Columna2 Columna3 Columna4 Columna5 Columna6 Columna7 Columna8
01 OBRAS PRELIMINARES 225,432.99
01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS GLB 1.00 80,378.93 80,378.93 50%
01.02 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL GLB 1.00 15,000.00 15,000.00 13% 13%
01.03 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 30,965.25 1.82 56,356.76 50% 50%
01.04 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 30,965.25 2.38 73,697.30 14% 14%
02 MOVIMIENTO DE TIERRAS 206,189.60
02.01 CORTE A NIVEL DE SUBRASANTE m3 23,892.27 5.84 139,530.86 10% 80%
02.02 RELLENO Y COMPACTADO HASTA NIVEL DE SUBRASANTE CON MATERIAL PRO m3 3,402.75 8.78 29,876.15 90%
02.03 EXCAVACION MANUAL PARA CUNETAS m3 1,086.84 30.27 32,898.65 80%
02.04 EXCAVACION MANUAL PARA BADEN m3 128.31 30.27 3,883.94
03 ESTRUCTURA DE PAVIMENTO 4,171,996.74
03.01 SUBRASANTE 90,941.57
03.01.01 PERFILADO, NIVELADO Y COMPACTADO DE SUBRASANTE EN ZONA DE CORTm2 31,797.75 2.86 90,941.57 50%
03.02 SUB BASE GRANULAR 159,879.09
Item PART I DAS Unidad Metrado Precio Precio
MES 1 MES 2
03.02.01 SUB BASE GRANULAR (e = 0.20 M) m3 6,359.55 25.14 159,879.09
03.03 PAVIMENTO DE CONCRETO RIGIDO 3,378,455.87
03.03.01 ENCOFRADO Y DESENCOFRADO DE LOSAS m2 5,329.54 41.53 221,335.80
03.03.02 ACERO LISO DE Ø 1 1/4" EN JUNTA DE LOSA kg 61,068.80 8.68 530,077.18
03.03.03 ACERO LISO DE Ø 5/8" EN JUNTA DE LOSA kg 7,480.96 7.61 56,930.11
03.03.04 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 5,519.55 415.24 2,291,937.94
03.03.05 CURADO DE LOSAS DE CONCRETO m2 27,937.37 5.87 163,992.36
03.03.06 JUNTAS ASFALTICAS 1" m 11,260.60 10.14 114,182.48
03.04 CUNETAS DE CONCRETO 315,703.40
03.04.01 ENCOFRADO Y DESENCOFRADO m2 181.44 43.33 7,861.80
03.04.02 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 716.04 415.24 297,328.45
03.04.03 JUNTAS ASFALTICAS 1" m 1,036.80 10.14 10,513.15
03.05 BADEN DE CONCRETO 80,408.04
03.05.01 ENCOFRADO Y DESENCOFRADO m2 288.51 43.33 12,501.14
03.05.02 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 128.31 415.24 53,279.44
03.05.03 JUNTAS ASFALTICAS 1" m 1,442.55 10.14 14,627.46
03.06 BOCA CALLES DE CONCRETO 37,607.31
03.06.01 ENCOFRADO Y DESENCOFRADO m2 69.87 43.33 3,027.47
03.06.02 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 67.92 415.24 28,203.10
03.06.03 JUNTAS ASFALTICAS 1" m 628.87 10.14 6,376.74
03.07 SEÑALIZACION 109,001.46
03.07.01 PINTURA DE PARAPETOS DE MUROS, ALCANTARILLAS Y SARDINELES m2 3,372.13 19.00 64,070.47
03.07.02 MARCAS EN EL PAVIMENTO m2 527.36 8.89 4,688.23
03.07.03 PINTURA DE SIMBOLOS Y FLECHAS m2 151.66 22.10 3,351.69
03.07.04 PINTURA ZONAL (CRUCE PEATONAL) m2 1,192.80 26.06 31,084.37
03.07.05 SEÑALIZACION VIAL (POSTES EN CRUCE DE CALLES) und 10.00 580.67 5,806.70
04 ESCALINATAS DE CONCRETO 604,633.88
04.01 OBRAS PRELIMINARES 4,997.29
04.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 2,099.70 2.38 4,997.29 100%
04.02 MOVIMIENTO DE TIERRAS 47,779.64
04.02.01 EXCAVACION MANUAL EN TERRENO NATURAL m3 609.17 38.92 23,708.90
04.02.02 REFINE, NIVELACION Y COMPACTACION CON EQUIPOS m2 2,029.15 6.14 12,458.98
Item PART I DAS Unidad Metrado Precio Precio
MES 1 MES 2
04.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 178.56 65.03 11,611.76
04.03 CONCRETO SIMPLE EN ESCALINATA 202,150.34
04.03.01 ENCOFRADO Y DESENCOFRADO m2 1,173.54 43.33 50,849.49
04.03.02 CONCRETO f'c = 175 kg/cm2 m3 311.90 379.77 118,450.26
04.03.03 CURADO DE CONCRETO EN ESCALINATA m2 2,352.91 11.91 28,023.16
04.03.04 JUNTAS DE DILATACION m 300.40 16.07 4,827.43
04.04 CONCRETO ARMADO EN SARDINELES 105,452.72
04.04.01 ENCOFRADO Y DESENCOFRADO m2 1,185.38 43.33 51,362.52
04.04.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 1,550.73 6.09 9,443.95
04.04.03 CONCRETO f'c = 175 kg/cm2 m3 105.84 379.77 40,194.86
04.04.04 JUNTAS DE DILATACION m 277.00 16.07 4,451.39
04.05 REVOQUES ENLUCIDOS Y MOLDURAS 231,807.81
04.05.01 BRUÑADO EN GRADERIAS m 3,608.48 8.39 30,275.15
04.05.02 ACABADO SUPERFICIAL Y LATERAL DE ESCALINATAS m2 6,963.81 28.94 201,532.66
04.06 JARDINERIA Y AREAS VERDES 12,446.08
04.06.01 SIEMBRA DE GRASS m2 542.07 2.67 1,447.33
04.06.02 PREPARACION Y SELECCIONADO DE TIERRA AGRICOLA m2 542.07 18.39 9,968.67
04.06.03 HABILITACION E INSTALACION DE PLANTAS ORNAMENTALES und 30.00 10.99 329.70
04.06.04 HABILITACION E INSTALACION DE ARBOLES ORNAMENTALES und 27.00 25.94 700.38
05 ACERA PEATONAL 1,436,111.76
05.01 OBRAS PRELIMINARES 17,574.06
05.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 7,384.06 2.38 17,574.06 100%
05.02 MOVIMIENTO DE TIERRAS 115,422.21
05.02.01 EXCAVACION MANUAL EN TERRENO NATURAL m3 1,714.85 38.92 66,741.96 80%
05.02.02 ACARREO DE MATERIAL D=50m m3 2,143.56 22.71 48,680.25
05.03 SARDINEL DE CONFINAMIENTO DE VEREDA 774,889.83
05.03.01 ENCOFRADO Y DESENCOFRADO m2 11,338.58 43.33 491,300.67
05.03.02 CONCRETO f'c=175 m3 773.77 353.16 273,264.61
05.03.03 JUNTAS ASFALTICAS 1" m 1,018.20 10.14 10,324.55
05.04 VEREDAS 435,548.78
05.04.01 REFINE Y NIVELACION EN TERRENO NORMAL m2 7,476.25 6.14 45,904.18
05.04.02 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m2 7,476.25 11.53 86,201.16
Item PART I DAS Unidad Metrado Precio Precio
MES 1 MES 2
05.04.03 ENCOFRADO Y DESENCOFRADO m2 697.23 43.33 30,210.98
05.04.04 CONCRETO f'c = 175 kg/cm2 m3 677.02 379.77 257,111.89
05.04.05 JUNTAS ASFALTICAS 1" m 1,589.80 10.14 16,120.57
05.05 MARTILLO DE CONCRETO 62,074.13
05.05.01 REFINE Y NIVELACION EN TERRENO NORMAL m2 539.28 6.14 3,311.18
05.05.02 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m2 539.28 11.53 6,217.90
05.05.03 ENCOFRADO Y DESENCOFRADO m2 165.01 43.33 7,149.88
05.05.04 CONCRETO f'c = 175 kg/cm2 m3 109.62 379.77 41,630.39
05.05.05 JUNTAS ASFALTICAS 1" m 371.28 10.14 3,764.78
05.06 JARDINERIA Y AREAS VERDES 22,701.56
05.06.01 SIEMBRA DE GRASS m2 818.42 2.67 2,185.18
05.06.02 PREPARACION Y SELECCIONADO DE TIERRA AGRICOLA m2 818.42 18.39 15,050.74
05.06.03 HABILITACION E INSTALACION DE PLANTAS ORNAMENTALES und 148.00 10.99 1,626.52
05.06.04 HABILITACION E INSTALACION DE ARBOLES ORNAMENTALES und 148.00 25.94 3,839.12
05.07 ACCESORIOS DE LIMPIEZA PUBLICA 7,901.19
05.07.01 TACHOS DE BASURA und 9.00 877.91 7,901.19
06 MURO DE CONTENCION 484,863.21
06.01 TRABAJOS PRELIMINARES 1,294.72
06.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 544.00 2.38 1,294.72
06.02 MOVIMIENTO DE TIERRAS 52,014.21
06.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 1,342.60 8.92 11,975.99
06.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 544.00 6.14 3,340.16
06.02.03 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO m3 717.60 51.14 36,698.06
06.03 OBRAS DE CONCRETO SIMPLE 17,444.45
06.03.01 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 54.40 320.67 17,444.45
06.04 OBRAS DE CONCRETO ARMADO 369,831.40
06.04.01 ENCOFRADO Y DESENCOFRADO m2 1,697.15 43.33 73,537.51
06.04.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 23,342.66 6.09 142,156.80
06.04.03 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 371.20 415.24 154,137.09
06.05 DRENAJE 42,230.24
06.05.01 DRENAJE PVC D=4" m 300.00 13.77 4,131.00
06.05.02 LLORADORES PVC Ø 3" m 240.00 8.50 2,040.00
Item PART I DAS Unidad Metrado Precio Precio
MES 1 MES 2
06.05.03 FILTRO CON MATERIAL CHANCADO PARA DRENAJE m3 239.60 122.30 29,303.08
06.05.04 GEOTEXTIL NO TEJIDO CLASE 1 m2 982.00 6.88 6,756.16
06.06 JUNTAS 2,048.19
06.06.01 JUNTAS PARA MUROS m2 71.54 28.63 2,048.19
07 SARDINELES ARMADOS 657,439.68
07.01 MOVIMIENTO DE TIERRAS 60,325.79
07.01.01 EXCAVACION MANUAL EN TERRENO NATURAL m3 844.94 38.92 32,885.06
07.01.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 712.80 6.14 4,376.59
07.01.03 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO m3 451.00 51.14 23,064.14
07.02 CONCRETO ARMADO EN SARDINELES 597,113.89
07.02.01 ENCOFRADO Y DESENCOFRADO m2 3,125.32 43.33 135,420.12
07.02.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 48,096.15 6.09 292,905.55
07.02.03 CONCRETO f'c = 175 kg/cm2 m3 437.04 379.77 165,974.68
07.02.04 JUNTAS PARA SARDINEL ARMADO m2 108.38 25.96 2,813.54
08 CONSTRUCCION DE ALCANTARILLAS 77,294.88
08.01 ALCANTARILLA TIPO MARCO 51,784.65
08.01.01 TRABAJOS PRELIMINARES 158.27
08.01.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 66.50 2.38 158.27 100%
08.01.02 MOVIMIENTO DE TIERRAS 12,388.79
08.01.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 220.89 8.92 1,970.34 30% 70%
08.01.02.02 REFINE, NIVELACION Y COMPACTACION CON EQUIPOS m2 66.50 6.14 408.31 30% 70%
08.01.02.03 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO m3 195.74 51.14 10,010.14 100%
08.01.03 OBRAS DE CONCRETO SIMPLE 875.43
08.01.03.01 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 2.73 320.67 875.43 100%
08.01.04 OBRAS DE CONCRETO ARMADO 38,362.16
08.01.04.01 ENCOFRADO Y DESENCOFRADO m2 183.21 43.33 7,938.49 100%
08.01.04.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 2,461.28 6.09 14,989.20 100%
08.01.04.03 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 37.17 415.24 15,434.47 100%
08.02 ALCANTARILLA TIPO TMC D=36" 25,510.23
08.02.01 OBRAS PRELIMINARES 170.19
08.02.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 71.51 2.38 170.19 100%
08.02.02 MOVIMIENTO DE TIERRAS 5,206.49
Item PART I DAS Unidad Metrado Precio Precio
MES 1 MES 2
08.02.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 173.56 8.92 1,548.16 100%
08.02.02.02 REFINE, NIVELACION Y COMPACTACION CON EQUIPOS m2 71.51 6.14 439.07 100%
08.02.02.03 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO m3 62.95 51.14 3,219.26 100%
08.02.03 OBRAS DE CONCRETO SIMPLE 14,016.27
08.02.03.01 ENCOFRADO Y DESENCOFRADO m2 107.86 43.33 4,673.57 100%
08.02.03.02 CONCRETO CLASE E (f'c = 175 kg/cm2) m3 26.14 357.41 9,342.70 100%
08.02.04 COLOCACION DE ALCANTARILLA TMC 6,117.28
08.02.04.01 ALCANTARILLA TMC D=36" m 13.60 449.80 6,117.28 100%
09 CONSTRUCCION DE BADENES TIPO II 45,722.22
09.01 OBRAS PRELIMINARES 487.31
09.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 204.75 2.38 487.31
09.02 MOVIMIENTO DE TIERRAS 2,445.11
09.02.01 EXCAVACION MANUAL EN TERRENO NATURAL m3 45.57 38.92 1,773.58
09.02.02 BASE e = 0.20 m m3 28.18 23.83 671.53
09.03 OBRAS DE CONCRETO SIMPLE 3,389.48
09.03.01 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 10.57 320.67 3,389.48
09.04 OBRAS DE CONCRETO ARMADO 39,262.42
09.04.01 ENCOFRADO Y DESENCOFRADO m2 55.24 43.33 2,393.55
09.04.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 2,946.86 6.09 17,946.38
09.04.03 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 45.57 415.24 18,922.49
09.05 JUNTA ASFALTICA 137.90
09.05.01 JUNTAS ASFALTICAS 1" m 13.60 10.14 137.90
10 SISTEMA DE DRENAJE PLUVIAL 214,953.30
10.01 SUMIDERO DE FONDO TIPO CHICO 45,261.37
10.01.01 TRABAJOS PRELIMINARES 70.69
10.01.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 29.70 2.38 70.69 100%
10.01.02 MOVIMIENTO DE TIERRAS 1,858.64
10.01.02.01 EXCAVACION MANUAL EN TERRENO NATURAL m3 43.07 38.92 1,676.28 80% 20%
10.01.02.02 REFINE, NIVELACION Y COMPACTACION CON EQUIPOS m2 29.70 6.14 182.36 70% 30%
10.01.03 OBRAS DE CONCRETO SIMPLE 715.09
10.01.03.01 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 2.23 320.67 715.09 100%
10.01.04 OBRAS DE CONCRETO ARMADO 35,427.95
Item PART I DAS Unidad Metrado Precio Precio
MES 1 MES 2
10.01.04.01 ENCOFRADO Y DESENCOFRADO m2 329.55 43.33 14,279.40 100%
10.01.04.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 1,712.16 6.09 10,427.05 100%
10.01.04.03 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 25.82 415.24 10,721.50 100%
10.01.05 REVOQUES, ENLUCIDOS Y MOLDURAS 3,456.40
10.01.05.01 TARRAJEO CON IMPERMEABILIZANTES PARA INTERIORES m2 153.96 22.45 3,456.40 100%
10.01.06 SUMINISTRO E INSTALACION DE ACCESORIOS 3,732.60
10.01.06.01 REJILLA METALICA DE SUMIDERO DE FONDO und 30.00 124.42 3,732.60 100%
10.02 CONSTRUCCION DE BUZONES O CAJAS DE INSPECCION 30,246.66
10.02.01 MOVIMIENTO DE TIERRAS 1,634.84
10.02.01.01 EXCAVACION MANUAL PARA BUZONES H=1.20 m - 1.50 m und 5.00 90.83 454.15 100%
10.02.01.02 EXCAVACION MANUAL PARA BUZONES H=1.51 m - 2.00 m und 6.00 113.53 681.18 100%
10.02.01.03 EXCAVACION MANUAL PARA BUZONES H=2.01 m - 2.50 m und 2.00 136.23 272.46 100%
10.02.01.04 EXCAVACION MANUAL PARA BUZONES H=3.01 m - 3.50 m und 1.00 227.05 227.05 100%
10.02.02 BUZONES DE CONCRETO 28,611.82
10.02.02.01 BUZON DE CONCRETO H=1.20 -1.50 m. D=1.20 m TAPA F°F° und 5.00 1,656.18 8,280.90 100%
10.02.02.02 BUZON DE CONCRETO H=1.51 -2.00 m. D=1.20 m TAPA F°F° und 6.00 1,833.12 10,998.72 100%
10.02.02.03 BUZON DE CONCRETO H=2.01 -2.50 m. D=1.20 m TAPA F°F° und 2.00 2,081.65 4,163.30 100%
10.02.02.04 BUZON DE CONCRETO H=3.01 -3.50 m. D=1.20 m TAPA F°F° und 1.00 3,311.90 3,311.90 100%
10.02.02.05 DADO DE CONCRETO f'c=170 kg/cm2 ING./SAL. BUZON und 30.00 61.90 1,857.00 100%
10.03 RED DE DESAGUE PLUVIAL 139,445.27
10.03.01 TRABAJOS PRELIMINARES 2,139.74
10.03.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 899.05 2.38 2,139.74 100%
10.03.02 MOVIMIENTO DE TIERRAS 94,950.80
10.03.02.01 EXCAVACION DE ZANJA CON MAQUINARIA H=1.20 - 1.50 m. m 310.31 11.17 3,466.16 100%
10.03.02.02 EXCAVACION DE ZANJA CON MAQUINARIA H=1.51 - 2.00 m. m 240.75 13.39 3,223.64 100%
10.03.02.03 EXCAVACION DE ZANJA CON MAQUINARIA H=2.01 - 2.50 m. m 46.98 14.88 699.06 100%
10.03.02.04 EXCAVACION DE ZANJA CON MAQUINARIA H=3.01 - 3.50 m. m 55.41 19.14 1,060.55 100%
10.03.02.05 EXCAVACION MANUAL DE ZANJAS m 245.60 80.14 19,682.38 100%
10.03.02.06 REFINE, NIVELACION Y CONFORMACION DE FONDOS m 899.05 1.70 1,528.39 100%
10.03.02.07 PREPARACION DE CAMA DE APOYO m 899.05 18.10 16,272.81 80% 20%
10.03.02.08 PRIMER RELLENO Y COMP. DE ZANJAS CON MAT. DE PRESTAMO H=0.30 m. m 899.05 26.64 23,950.69 60% 40%
10.03.02.09 SEGUNDO RELLENO Y COMP. DE ZANJAS CON MAT. PROPIO ZARANDEADO m 899.05 20.96 18,844.09 30% 70%
Item PART I DAS Unidad Metrado Precio Precio
MES 1 MES 2
10.03.02.10 ELIMINACION DE MATERIAL EXCEDENTE m3 370.86 16.78 6,223.03 100%
10.03.03 TUBERIA PARA EVACUACION DE AGUAS PLUVIALES 42,354.73
10.03.03.01 SUMINISTRO E INSTALACION DE TUBERIA UF-PVC DN=250 mm. m 653.45 45.43 29,686.23 60% 40%
10.03.03.02 SUMINISTRO E INSTALACION DE TUBERIA UF-PVC DN=200 mm. m 245.60 38.55 9,467.88 60% 40%
10.03.03.03 PRUEBA HIDRAULICA PARA TUBERIA PVC P/DESAGUE m 899.05 3.56 3,200.62 100%
11 TRANSPORTE 617,399.42
11.01 TRANSPORTE DE MATERIAL GRANULAR PARA D<=1KM M3K 7,949.44 10.22 81,243.28 20%
11.02 TRANSPORTE DE MATERIAL GRANULAR PARA D>1KM M3K 18,124.70 2.02 36,611.89 20%
11.03 TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA D<=1KM M3K 31,932.61 10.22 326,351.27
11.04 TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA D>1KM M3K 85,739.10 2.02 173,192.98
12 MITIGACION AMBIENTAL 70,572.14
12.01 PLAN DE MANEJO AMBIENTAL 61,930.94
12.01.01 RECUPERACION AMBIENTAL DE AREAS AFECTADAS m2 2,100.00 28.77 60,417.00
12.01.02 ACOMODAMIENTO DE DEPOSITO DE MATERIAL EXCEDENTE m3 850.53 1.78 1,513.94
12.02 PLAN DE MONITOREO AMBIENTAL 3,000.00
12.02.01 MONITOREO DE CALIDAD DEL AGUA pto 2.00 500.00 1,000.00 13% 13%
12.02.02 MONITOREO DE CALIDAD DEL AIRE pto 2.00 700.00 1,400.00 13% 13%
12.02.03 MONITOREO DE RUIDOS pto 2.00 300.00 600.00 13% 13%
12.03 PLAN DE CONTINGENCIA Y SEGURIDAD 5,641.20
12.03.01 SEÑALIZACION AMBIENTAL und 20.00 282.06 5,641.20 100%
13 VARIOS 576,417.99
13.01 RECONEXION DE INSTALACION DE AGUA und 530.00 40.32 21,369.60
13.02 RECONEXION DE INSTALACION DE DESAGUE und 530.00 130.57 69,202.10
13.03 ENCIMADO Y NIVELADO DE BUZONES und 180.00 675.55 121,599.00
13.04 REUBICACION DE POSTE ELECTRICO GLB 1.00 7,000.00 7,000.00
13.05 LIMPIEZA GENERAL DE LA OBRA GLB 1.00 1,684.54 1,684.54
13.06 CAPACITACION DE BENEFICIARIOS GLB 1.00 6,000.00 6,000.00
13.07 FLETE TERRESTRE GLB 1.00 349,562.75 349,562.75 100%
COSTO DIRECTO S/. 9,389,027.81
A DE AVANCE DE OBRA VALORIZADO

TAS Y VEREDAS DE LAS VIAS PRINCIPALES Y SECUNDARIA DEL CENTRO POBLADO RURAL DE SAN MARTIN DE
A, PROVINCIA DE ACOBAMBA, DEPARTAMENTO DE HUANCAVELICA

PRESUPUESTO TOTAL DEL PROYECTO :


COSTO DIRECTO :

P E R I O D O DE E J E C U C I O N

MES 3 MES 4 MES 5 MES 6 MES 7 MES 8


Columna9 Columna10 Columna11 Columna12 Columna13 Columna14

50%
13% 13% 13% 13% 13% 13%

14% 14% 14% 14% 14%

10%
10%
20%
20% 80%

50%
P E R I O D O DE E J E C U C I O N

MES 3 MES 4 MES 5 MES 6 MES 7 MES 8


50% 50%

30% 30% 30% 10%


30% 30% 30% 10%
30% 30% 30% 10%
20% 30% 30% 20%
20% 30% 30% 20%
30% 30% 30% 10%

100%
30% 70%
100%

100%
100%
100%

100%
100%
100%

100%
100%
100%
100%
100%

20% 80%
100%
P E R I O D O DE E J E C U C I O N

MES 3 MES 4 MES 5 MES 6 MES 7 MES 8


100%

50% 50%
100%
100%
100%

100%
100%
10% 90%
100%

80% 20%
100%

100%
100%
100%
100%

20%
10% 90%

20% 40% 40%


50% 50%
100%

10% 90%
100%
P E R I O D O DE E J E C U C I O N

MES 3 MES 4 MES 5 MES 6 MES 7 MES 8


50% 50%
80% 20%
50% 50%

100%
100%
50% 50%
100%
100%

100%
100%
100%
100%

100%

100%

100%
100%
20% 80%

100%

100%
20% 80%
100%

100%
100%
P E R I O D O DE E J E C U C I O N

MES 3 MES 4 MES 5 MES 6 MES 7 MES 8


100%
100%

100%

60% 40%
100%
100%

50% 50%
100%
100%
100%
P E R I O D O DE E J E C U C I O N

MES 3 MES 4 MES 5 MES 6 MES 7 MES 8

100%

90% 10%
50% 50%

100%

80% 20%
80% 20%
100%

100%
P E R I O D O DE E J E C U C I O N

MES 3 MES 4 MES 5 MES 6 MES 7 MES 8


P E R I O D O DE E J E C U C I O N

MES 3 MES 4 MES 5 MES 6 MES 7 MES 8

40% 40%
40% 40%
20% 40% 40%
20% 40% 40%

100%
100%

13% 13% 13% 13% 13% 13%


13% 13% 13% 13% 13% 13%
13% 13% 13% 13% 13% 13%

100%
100%
100%
100%
100%
100%
FORMATO 10 - CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
: MEJORAMIENTO DE LA TRANSITIBILIDAD VEHICULAR Y PEATONAL A TRAVES DE PISTAS Y VEREDAS DE LAS VIAS PRINCIPALES Y SECUNDARIA DEL CENTRO POBLADO RURAL DE SAN MARTIN DE
PROYECTO MAYUNMARCA, DISTRITO DE ANDABAMBA, PROVINCIA DE ACOBAMBA, DEPARTAMENTO DE HUANCAVELICA
ENTIDAD : SUB GERENCIA DE ESTUDIOS - GRH
RESPONSABLE :
DEPARTAMENTO : HUANCAVELICA
PROVINCIA : ACOBAMBA PRESUPUESTO TOTAL DEL PROYECTO : S/. 13,354,283.51
DISTRITO : ANDABAMBA COSTO DIRECTO : S/. 9,389,027.81
P E R I O D O DE E J E C U C I O N
Item PART I DAS Und Metrado Precio Precio
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8
01 OBRAS PRELIMINARES 225,432.99
01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS GLB 1.00 80,378.93 80,378.93 40,189.47 40,189.47
01.02 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL GLB 1.00 15,000.00 15,000.00 1,875.00 1,875.00 1,875.00 1,875.00 1,875.00 1,875.00 1,875.00 1,875.00
01.03 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 30,965.25 1.82 56,356.76 28,178.38 28,178.38
01.04 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 30,965.25 2.38 73,697.30 10,528.19 10,528.19 10,528.19 10,528.19 10,528.19 10,528.19 10,528.19
02 MOVIMIENTO DE TIERRAS 206,189.60
02.01 CORTE A NIVEL DE SUBRASANTE m3 23,892.27 5.84 139,530.86 13,953.09 111,624.69 13,953.09
02.02 RELLENO Y COMPACTADO HASTA NIVEL DE SUBRASANTE CON MATERIAL PRO m3 3,402.75 8.78 29,876.15 26,888.54 2,987.62
02.03 EXCAVACION MANUAL PARA CUNETAS m3 1,086.84 30.27 32,898.65 26,318.92 6,579.73
02.04 EXCAVACION MANUAL PARA BADEN m3 128.31 30.27 3,883.94 776.79 3,107.15
03 ESTRUCTURA DE PAVIMENTO 4,171,996.74
03.01 SUBRASANTE 90,941.57
03.01.01 PERFILADO, NIVELADO Y COMPACTADO DE SUBRASANTE EN ZONA DE CORTEm2 31,797.75 2.86 90,941.57 45,470.79 45,470.79
03.02 SUB BASE GRANULAR 159,879.09
03.02.01 SUB BASE GRANULAR (e = 0.20 M) m3 6,359.55 25.14 159,879.09 79,939.55 79,939.55
03.03 PAVIMENTO DE CONCRETO RIGIDO 3,378,455.87
03.03.01 ENCOFRADO Y DESENCOFRADO DE LOSAS m2 5,329.54 41.53 221,335.80 66,400.74 66,400.74 66,400.74 22,133.58
03.03.02 ACERO LISO DE Ø 1 1/4" EN JUNTA DE LOSA kg 61,068.80 8.68 530,077.18 159,023.15 159,023.15 159,023.15 53,007.72
03.03.03 ACERO LISO DE Ø 5/8" EN JUNTA DE LOSA kg 7,480.96 7.61 56,930.11 17,079.03 17,079.03 17,079.03 5,693.01
03.03.04 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 5,519.55 415.24 2,291,937.94 458,387.59 687,581.38 687,581.38 458,387.59
03.03.05 CURADO DE LOSAS DE CONCRETO m2 27,937.37 5.87 163,992.36 32,798.47 49,197.71 49,197.71 32,798.47
03.03.06 JUNTAS ASFALTICAS 1" m 11,260.60 10.14 114,182.48 34,254.74 34,254.74 34,254.74 11,418.25
03.04 CUNETAS DE CONCRETO 315,703.40
03.04.01 ENCOFRADO Y DESENCOFRADO m2 181.44 43.33 7,861.80 7,861.80
03.04.02 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 716.04 415.24 297,328.45 89,198.54 208,129.92
03.04.03 JUNTAS ASFALTICAS 1" m 1,036.80 10.14 10,513.15 10,513.15
03.05 BADEN DE CONCRETO 80,408.04
03.05.01 ENCOFRADO Y DESENCOFRADO m2 288.51 43.33 12,501.14 12,501.14
03.05.02 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 128.31 415.24 53,279.44 53,279.44
03.05.03 JUNTAS ASFALTICAS 1" m 1,442.55 10.14 14,627.46 14,627.46
03.06 BOCA CALLES DE CONCRETO 37,607.31
03.06.01 ENCOFRADO Y DESENCOFRADO m2 69.87 43.33 3,027.47 3,027.47
03.06.02 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 67.92 415.24 28,203.10 28,203.10
03.06.03 JUNTAS ASFALTICAS 1" m 628.87 10.14 6,376.74 6,376.74
03.07 SENÑALIZACION 109,001.46
03.07.01 PINTURA DE PARAPETOS DE MUROS, ALCANTARILLAS Y SARDINELES m2 3,372.13 19.00 64,070.47 64,070.47
03.07.02 MARCAS EN EL PAVIMENTO m2 527.36 8.89 4,688.23 4,688.23
03.07.03 PINTURA DE SIMBOLOS Y FLECHAS m2 151.66 22.10 3,351.69 3,351.69
03.07.04 PINTURA ZONAL (CRUCE PEATONAL) m2 1,192.80 26.06 31,084.37 31,084.37
03.07.05 SENÑALIZACION VIAL (POSTES EN CRUCE DE CALLES) und 10.00 580.67 5,806.70 5,806.70
04 ESCALINATAS DE CONCRETO 604,633.88
04.01 OBRAS PRELIMINARES 4,997.29
04.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 2,099.70 2.38 4,997.29 4,997.29
04.02 MOVIMIENTO DE TIERRAS 47,779.64
04.02.01 EXCAVACION MANUAL EN TERRENO NATURAL m3 609.17 38.92 23,708.90 4,741.78 18,967.12
04.02.02 REFINE, NIVELACION Y COMPACTACION CON EQUIPOS m2 2,029.15 6.14 12,458.98 12,458.98
04.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 178.56 65.03 11,611.76 11,611.76
04.03 CONCRETO SIMPLE EN ESCALINATA 202,150.34
04.03.01 ENCOFRADO Y DESENCOFRADO m2 1,173.54 43.33 50,849.49 25,424.75 25,424.75
04.03.02 CONCRETO f'c = 175 kg/cm2 m3 311.90 379.77 118,450.26 118,450.26
FORMATO 10 - CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
: MEJORAMIENTO DE LA TRANSITIBILIDAD VEHICULAR Y PEATONAL A TRAVES DE PISTAS Y VEREDAS DE LAS VIAS PRINCIPALES Y SECUNDARIA DEL CENTRO POBLADO RURAL DE SAN MARTIN DE
PROYECTO MAYUNMARCA, DISTRITO DE ANDABAMBA, PROVINCIA DE ACOBAMBA, DEPARTAMENTO DE HUANCAVELICA
ENTIDAD : SUB GERENCIA DE ESTUDIOS - GRH
RESPONSABLE :
DEPARTAMENTO : HUANCAVELICA
PROVINCIA : ACOBAMBA PRESUPUESTO TOTAL DEL PROYECTO : S/. 13,354,283.51
DISTRITO : ANDABAMBA COSTO DIRECTO : S/. 9,389,027.81
P E R I O D O DE E J E C U C I O N
Item PART I DAS Und Metrado Precio Precio
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8
04.03.03 CURADO DE CONCRETO EN ESCALINATA m2 2,352.91 11.91 28,023.16 28,023.16
04.03.04 JUNTAS DE DILATACION m 300.40 16.07 4,827.43 4,827.43
04.04 CONCRETO ARMADO EN SARDINELES 105,452.72
04.04.01 ENCOFRADO Y DESENCOFRADO m2 1,185.38 43.33 51,362.52 51,362.52
04.04.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 1,550.73 6.09 9,443.95 9,443.95
04.04.03 CONCRETO f'c = 175 kg/cm2 m3 105.84 379.77 40,194.86 4,019.49 36,175.37
04.04.04 JUNTAS DE DILATACION m 277.00 16.07 4,451.39 4,451.39
04.05 REVOQUES ENLUCIDOS Y MOLDURAS 231,807.81
04.05.01 BRUNÑADO EN GRADERIAS m 3,608.48 8.39 30,275.15 24,220.12 6,055.03
04.05.02 ACABADO SUPERFICIAL Y LATERAL DE ESCALINATAS m2 6,963.81 28.94 201,532.66 201,532.66
04.06 JARDINERIA Y AREAS VERDES 12,446.08
04.06.01 SIEMBRA DE GRASS m2 542.07 2.67 1,447.33 1,447.33
04.06.02 PREPARACION Y SELECCIONADO DE TIERRA AGRICOLA m2 542.07 18.39 9,968.67 9,968.67
04.06.03 HABILITACION E INSTALACION DE PLANTAS ORNAMENTALES und 30.00 10.99 329.70 329.70
04.06.04 HABILITACION E INSTALACION DE ARBOLES ORNAMENTALES und 27.00 25.94 700.38 700.38
05 ACERA PEATONAL 1,436,111.76
05.01 OBRAS PRELIMINARES 17,574.06
05.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 7,384.06 2.38 17,574.06 17,574.06
05.02 MOVIMIENTO DE TIERRAS 115,422.21
05.02.01 EXCAVACION MANUAL EN TERRENO NATURAL m3 1,714.85 38.92 66,741.96 53,393.57 13,348.39
05.02.02 ACARREO DE MATERIAL D=50m m3 2,143.56 22.71 48,680.25 4,868.03 43,812.23
05.03 SARDINEL DE CONFINAMIENTO DE VEREDA 774,889.83
05.03.01 ENCOFRADO Y DESENCOFRADO m2 11,338.58 43.33 491,300.67 98,260.13 196,520.27 196,520.27
05.03.02 CONCRETO f'c=175 m3 773.77 353.16 273,264.61 136,632.31 136,632.31
05.03.03 JUNTAS ASFALTICAS 1" m 1,018.20 10.14 10,324.55 10,324.55
05.04 VEREDAS 435,548.78
05.04.01 REFINE Y NIVELACION EN TERRENO NORMAL m2 7,476.25 6.14 45,904.18 4,590.42 41,313.76
05.04.02 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m2 7,476.25 11.53 86,201.16 86,201.16
05.04.03 ENCOFRADO Y DESENCOFRADO m2 697.23 43.33 30,210.98 15,105.49 15,105.49
05.04.04 CONCRETO f'c = 175 kg/cm2 m3 677.02 379.77 257,111.89 205,689.51 51,422.38
05.04.05 JUNTAS ASFALTICAS 1" m 1,589.80 10.14 16,120.57 8,060.29 8,060.29
05.05 MARTILLO DE CONCRETO 62,074.13
05.05.01 REFINE Y NIVELACION EN TERRENO NORMAL m2 539.28 6.14 3,311.18 3,311.18
05.05.02 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m2 539.28 11.53 6,217.90 6,217.90
05.05.03 ENCOFRADO Y DESENCOFRADO m2 165.01 43.33 7,149.88 3,574.94 3,574.94
05.05.04 CONCRETO f'c = 175 kg/cm2 m3 109.62 379.77 41,630.39 41,630.39
05.05.05 JUNTAS ASFALTICAS 1" m 371.28 10.14 3,764.78 3,764.78
05.06 JARDINERIA Y AREAS VERDES 22,701.56
05.06.01 SIEMBRA DE GRASS m2 818.42 2.67 2,185.18 2,185.18
05.06.02 PREPARACION Y SELECCIONADO DE TIERRA AGRICOLA m2 818.42 18.39 15,050.74 15,050.74
05.06.03 HABILITACION E INSTALACION DE PLANTAS ORNAMENTALES und 148.00 10.99 1,626.52 1,626.52
05.06.04 HABILITACION E INSTALACION DE ARBOLES ORNAMENTALES und 148.00 25.94 3,839.12 3,839.12
05.07 ACCESORIOS DE LIMPIEZA PUBLICA 7,901.19
05.07.01 TACHOS DE BASURA und 9.00 877.91 7,901.19 7,901.19
06 MURO DE CONTENCION 484,863.21
06.01 TRABAJOS PRELIMINARES 1,294.72
06.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 544.00 2.38 1,294.72 1,294.72
06.02 MOVIMIENTO DE TIERRAS 52,014.21
06.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 1,342.60 8.92 11,975.99 11,975.99
06.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 544.00 6.14 3,340.16 3,340.16
FORMATO 10 - CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
: MEJORAMIENTO DE LA TRANSITIBILIDAD VEHICULAR Y PEATONAL A TRAVES DE PISTAS Y VEREDAS DE LAS VIAS PRINCIPALES Y SECUNDARIA DEL CENTRO POBLADO RURAL DE SAN MARTIN DE
PROYECTO MAYUNMARCA, DISTRITO DE ANDABAMBA, PROVINCIA DE ACOBAMBA, DEPARTAMENTO DE HUANCAVELICA
ENTIDAD : SUB GERENCIA DE ESTUDIOS - GRH
RESPONSABLE :
DEPARTAMENTO : HUANCAVELICA
PROVINCIA : ACOBAMBA PRESUPUESTO TOTAL DEL PROYECTO : S/. 13,354,283.51
DISTRITO : ANDABAMBA COSTO DIRECTO : S/. 9,389,027.81
P E R I O D O DE E J E C U C I O N
Item PART I DAS Und Metrado Precio Precio
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8
06.02.03 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO m3 717.60 51.14 36,698.06 7,339.61 29,358.45
06.03 OBRAS DE CONCRETO SIMPLE 17,444.45
06.03.01 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 54.40 320.67 17,444.45 17,444.45
06.04 OBRAS DE CONCRETO ARMADO 369,831.40
06.04.01 ENCOFRADO Y DESENCOFRADO m2 1,697.15 43.33 73,537.51 73,537.51
06.04.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 23,342.66 6.09 142,156.80 28,431.36 113,725.44
06.04.03 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 371.20 415.24 154,137.09 154,137.09
06.05 DRENAJE 42,230.24
06.05.01 DRENAJE PVC D=4" m 300.00 13.77 4,131.00 4,131.00
06.05.02 LLORADORES PVC Ø 3" m 240.00 8.50 2,040.00 2,040.00
06.05.03 FILTRO CON MATERIAL CHANCADO PARA DRENAJE m3 239.60 122.30 29,303.08 29,303.08
06.05.04 GEOTEXTIL NO TEJIDO CLASE 1 m2 982.00 6.88 6,756.16 6,756.16
06.06 JUNTAS 2,048.19
06.06.01 JUNTAS PARA MUROS m2 71.54 28.63 2,048.19 2,048.19
07 SARDINELES ARMADOS 657,439.68
07.01 MOVIMIENTO DE TIERRAS 60,325.79
07.01.01 EXCAVACION MANUAL EN TERRENO NATURAL m3 844.94 38.92 32,885.06 19,731.04 13,154.02
07.01.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 712.80 6.14 4,376.59 4,376.59
07.01.03 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO m3 451.00 51.14 23,064.14 23,064.14
07.02 CONCRETO ARMADO EN SARDINELES 597,113.89
07.02.01 ENCOFRADO Y DESENCOFRADO m2 3,125.32 43.33 135,420.12 67,710.06 67,710.06
07.02.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 48,096.15 6.09 292,905.55 292,905.55
07.02.03 CONCRETO f'c = 175 kg/cm2 m3 437.04 379.77 165,974.68 165,974.68
07.02.04 JUNTAS PARA SARDINEL ARMADO m2 108.38 25.96 2,813.54 2,813.54
08 CONSTRUCCION DE ALCANTARILLAS 77,294.88
08.01 ALCANTARILLA TIPO MARCO 51,784.65
08.01.01 TRABAJOS PRELIMINARES 158.27
08.01.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 66.50 2.38 158.27 158.27
08.01.02 MOVIMIENTO DE TIERRAS 12,388.79
08.01.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 220.89 8.92 1,970.34 591.10 1,379.24
08.01.02.02 REFINE, NIVELACION Y COMPACTACION CON EQUIPOS m2 66.50 6.14 408.31 122.49 285.82
08.01.02.03 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO m3 195.74 51.14 10,010.14 10,010.14
08.01.03 OBRAS DE CONCRETO SIMPLE 875.43
08.01.03.01 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 2.73 320.67 875.43 875.43
08.01.04 OBRAS DE CONCRETO ARMADO 38,362.16
08.01.04.01 ENCOFRADO Y DESENCOFRADO m2 183.21 43.33 7,938.49 7,938.49
08.01.04.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 2,461.28 6.09 14,989.20 14,989.20
08.01.04.03 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 37.17 415.24 15,434.47 15,434.47
08.02 ALCANTARILLA TIPO TMC D=36" 25,510.23
08.02.01 OBRAS PRELIMINARES 170.19
08.02.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 71.51 2.38 170.19 170.19
08.02.02 MOVIMIENTO DE TIERRAS 5,206.49
08.02.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 173.56 8.92 1,548.16 1,548.16
08.02.02.02 REFINE, NIVELACION Y COMPACTACION CON EQUIPOS m2 71.51 6.14 439.07 439.07
08.02.02.03 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO m3 62.95 51.14 3,219.26 3,219.26
08.02.03 OBRAS DE CONCRETO SIMPLE 14,016.27
08.02.03.01 ENCOFRADO Y DESENCOFRADO m2 107.86 43.33 4,673.57 4,673.57
08.02.03.02 CONCRETO CLASE E (f'c = 175 kg/cm2) m3 26.14 357.41 9,342.70 9,342.70
08.02.04 COLOCACION DE ALCANTARILLA TMC 6,117.28
08.02.04.01 ALCANTARILLA TMC D=36" m 13.60 449.80 6,117.28 6,117.28
FORMATO 10 - CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
: MEJORAMIENTO DE LA TRANSITIBILIDAD VEHICULAR Y PEATONAL A TRAVES DE PISTAS Y VEREDAS DE LAS VIAS PRINCIPALES Y SECUNDARIA DEL CENTRO POBLADO RURAL DE SAN MARTIN DE
PROYECTO MAYUNMARCA, DISTRITO DE ANDABAMBA, PROVINCIA DE ACOBAMBA, DEPARTAMENTO DE HUANCAVELICA
ENTIDAD : SUB GERENCIA DE ESTUDIOS - GRH
RESPONSABLE :
DEPARTAMENTO : HUANCAVELICA
PROVINCIA : ACOBAMBA PRESUPUESTO TOTAL DEL PROYECTO : S/. 13,354,283.51
DISTRITO : ANDABAMBA COSTO DIRECTO : S/. 9,389,027.81
P E R I O D O DE E J E C U C I O N
Item PART I DAS Und Metrado Precio Precio
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8
09 CONSTRUCCION DE BADENES TIPO II 45,722.22
09.01 OBRAS PRELIMINARES 487.31
09.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 204.75 2.38 487.31 487.31
09.02 MOVIMIENTO DE TIERRAS 2,445.11
09.02.01 EXCAVACION MANUAL EN TERRENO NATURAL m3 45.57 38.92 1,773.58 1,596.22 177.36
09.02.02 BASE e = 0.20 m m3 28.18 23.83 671.53 335.77 335.77
09.03 OBRAS DE CONCRETO SIMPLE 3,389.48
09.03.01 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 10.57 320.67 3,389.48 3,389.48
09.04 OBRAS DE CONCRETO ARMADO 39,262.42
09.04.01 ENCOFRADO Y DESENCOFRADO m2 55.24 43.33 2,393.55 1,914.84 478.71
09.04.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 2,946.86 6.09 17,946.38 14,357.10 3,589.28
09.04.03 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 45.57 415.24 18,922.49 18,922.49
09.05 JUNTA ASFALTICA 137.90
09.05.01 JUNTAS ASFALTICAS 1" m 13.60 10.14 137.90 137.90
10 SISTEMA DE DRENAJE PLUVIAL 214,953.30
10.01 SUMIDERO DE FONDO TIPO CHICO 45,261.37
10.01.01 TRABAJOS PRELIMINARES 70.69
10.01.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 29.70 2.38 70.69 70.69
10.01.02 MOVIMIENTO DE TIERRAS 1,858.64
10.01.02.01 EXCAVACION MANUAL EN TERRENO NATURAL m3 43.07 38.92 1,676.28 1,341.02 335.26
10.01.02.02 REFINE, NIVELACION Y COMPACTACION CON EQUIPOS m2 29.70 6.14 182.36 127.65 54.71
10.01.03 OBRAS DE CONCRETO SIMPLE 715.09
10.01.03.01 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 2.23 320.67 715.09 715.09
10.01.04 OBRAS DE CONCRETO ARMADO 35,427.95
10.01.04.01 ENCOFRADO Y DESENCOFRADO m2 329.55 43.33 14,279.40 14,279.40
10.01.04.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 1,712.16 6.09 10,427.05 10,427.05
10.01.04.03 CONCRETO CLASE D (f'c = 210 kg/cm2) m3 25.82 415.24 10,721.50 10,721.50
10.01.05 REVOQUES, ENLUCIDOS Y MOLDURAS 3,456.40
10.01.05.01 TARRAJEO CON IMPERMEABILIZANTES PARA INTERIORES m2 153.96 22.45 3,456.40 3,456.40
10.01.06 SUMINISTRO E INSTALACION DE ACCESORIOS 3,732.60
10.01.06.01 REJILLA METALICA DE SUMIDERO DE FONDO und 30.00 124.42 3,732.60 3,732.60
10.02 CONSTRUCCION DE BUZONES O CAJAS DE INSPECCION 30,246.66
10.02.01 MOVIMIENTO DE TIERRAS 1,634.84
10.02.01.01 EXCAVACION MANUAL PARA BUZONES H=1.20 m - 1.50 m und 5.00 90.83 454.15 454.15
10.02.01.02 EXCAVACION MANUAL PARA BUZONES H=1.51 m - 2.00 m und 6.00 113.53 681.18 681.18
10.02.01.03 EXCAVACION MANUAL PARA BUZONES H=2.01 m - 2.50 m und 2.00 136.23 272.46 272.46
10.02.01.04 EXCAVACION MANUAL PARA BUZONES H=3.01 m - 3.50 m und 1.00 227.05 227.05 227.05
10.02.02 BUZONES DE CONCRETO 28,611.82
10.02.02.01 BUZON DE CONCRETO H=1.20 -1.50 m. D=1.20 m TAPA F°F° und 5.00 1,656.18 8,280.90 8,280.90
10.02.02.02 BUZON DE CONCRETO H=1.51 -2.00 m. D=1.20 m TAPA F°F° und 6.00 1,833.12 10,998.72 10,998.72
10.02.02.03 BUZON DE CONCRETO H=2.01 -2.50 m. D=1.20 m TAPA F°F° und 2.00 2,081.65 4,163.30 4,163.30
10.02.02.04 BUZON DE CONCRETO H=3.01 -3.50 m. D=1.20 m TAPA F°F° und 1.00 3,311.90 3,311.90 3,311.90
10.02.02.05 DADO DE CONCRETO f'c=170 kg/cm2 ING./SAL. BUZON und 30.00 61.90 1,857.00 1,857.00
10.03 RED DE DESAGUE PLUVIAL 139,445.27
10.03.01 TRABAJOS PRELIMINARES 2,139.74
10.03.01.01 TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO DE EJECUCION m2 899.05 2.38 2,139.74 2,139.74
10.03.02 MOVIMIENTO DE TIERRAS 94,950.80
10.03.02.01 EXCAVACION DE ZANJA CON MAQUINARIA H=1.20 - 1.50 m. m 310.31 11.17 3,466.16 3,466.16
10.03.02.02 EXCAVACION DE ZANJA CON MAQUINARIA H=1.51 - 2.00 m. m 240.75 13.39 3,223.64 3,223.64
10.03.02.03 EXCAVACION DE ZANJA CON MAQUINARIA H=2.01 - 2.50 m. m 46.98 14.88 699.06 699.06
FORMATO 10 - CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
: MEJORAMIENTO DE LA TRANSITIBILIDAD VEHICULAR Y PEATONAL A TRAVES DE PISTAS Y VEREDAS DE LAS VIAS PRINCIPALES Y SECUNDARIA DEL CENTRO POBLADO RURAL DE SAN MARTIN DE
PROYECTO MAYUNMARCA, DISTRITO DE ANDABAMBA, PROVINCIA DE ACOBAMBA, DEPARTAMENTO DE HUANCAVELICA
ENTIDAD : SUB GERENCIA DE ESTUDIOS - GRH
RESPONSABLE :
DEPARTAMENTO : HUANCAVELICA
PROVINCIA : ACOBAMBA PRESUPUESTO TOTAL DEL PROYECTO : S/. 13,354,283.51
DISTRITO : ANDABAMBA COSTO DIRECTO : S/. 9,389,027.81
P E R I O D O DE E J E C U C I O N
Item PART I DAS Und Metrado Precio Precio
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8
10.03.02.04 EXCAVACION DE ZANJA CON MAQUINARIA H=3.01 - 3.50 m. m 55.41 19.14 1,060.55 1,060.55
10.03.02.05 EXCAVACION MANUAL DE ZANJAS m 245.60 80.14 19,682.38 19,682.38
10.03.02.06 REFINE, NIVELACION Y CONFORMACION DE FONDOS m 899.05 1.70 1,528.39 1,528.39
10.03.02.07 PREPARACION DE CAMA DE APOYO m 899.05 18.10 16,272.81 13,018.25 3,254.56
10.03.02.08 PRIMER RELLENO Y COMP. DE ZANJAS CON MAT. DE PRESTAMO H=0.30 m. m 899.05 26.64 23,950.69 14,370.41 9,580.28
10.03.02.09 SEGUNDO RELLENO Y COMP. DE ZANJAS CON MAT. PROPIO ZARANDEADO m 899.05 20.96 18,844.09 5,653.23 13,190.86
10.03.02.10 ELIMINACION DE MATERIAL EXCEDENTE m3 370.86 16.78 6,223.03 6,223.03
10.03.03 TUBERIA PARA EVACUACION DE AGUAS PLUVIALES 42,354.73
10.03.03.01 SUMINISTRO E INSTALACION DE TUBERIA UF-PVC DN=250 mm. m 653.45 45.43 29,686.23 17,811.74 11,874.49
10.03.03.02 SUMINISTRO E INSTALACION DE TUBERIA UF-PVC DN=200 mm. m 245.60 38.55 9,467.88 5,680.73 3,787.15
10.03.03.03 PRUEBA HIDRAULICA PARA TUBERIA PVC P/DESAGUE m 899.05 3.56 3,200.62 3,200.62
11 TRANSPORTE 617,399.42
11.01 TRANSPORTE DE MATERIAL GRANULAR PARA D<=1KM M3K 7,949.44 10.22 81,243.28 16,248.66 32,497.31 32,497.31
11.02 TRANSPORTE DE MATERIAL GRANULAR PARA D>1KM M3K 18,124.70 2.02 36,611.89 7,322.38 14,644.76 14,644.76
11.03 TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA D<=1KM M3K 31,932.61 10.22 326,351.27 65,270.25 130,540.51 130,540.51
11.04 TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA D>1KM M3K 85,739.10 2.02 173,192.98 34,638.60 69,277.19 69,277.19
12 MITIGACION AMBIENTAL 70,572.14
12.01 PLAN DE MANEJO AMBIENTAL 61,930.94
12.01.01 RECUPERACION AMBIENTAL DE AREAS AFECTADAS m2 2,100.00 28.77 60,417.00 60,417.00
12.01.02 ACOMODAMIENTO DE DEPOSITO DE MATERIAL EXCEDENTE m3 850.53 1.78 1,513.94 1,513.94
12.02 PLAN DE MONITOREO AMBIENTAL 3,000.00
12.02.01 MONITOREO DE CALIDAD DEL AGUA pto 2.00 500.00 1,000.00 125.00 125.00 125.00 125.00 125.00 125.00 125.00 125.00
12.02.02 MONITOREO DE CALIDAD DEL AIRE pto 2.00 700.00 1,400.00 175.00 175.00 175.00 175.00 175.00 175.00 175.00 175.00
12.02.03 MONITOREO DE RUIDOS pto 2.00 300.00 600.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00 75.00
12.03 PLAN DE CONTINGENCIA Y SEGURIDAD 5,641.20
12.03.01 SENÑALIZACION AMBIENTAL und 20.00 282.06 5,641.20 5,641.20
13 VARIOS 576,417.99
13.01 RECONEXION DE INSTALACION DE AGUA und 530.00 40.32 21,369.60 21,369.60
13.02 RECONEXION DE INSTALACION DE DESAGUE und 530.00 130.57 69,202.10 69,202.10
13.03 ENCIMADO Y NIVELADO DE BUZONES und 180.00 675.55 121,599.00 121,599.00
13.04 REUBICACION DE POSTE ELECTRICO GLB 1.00 7,000.00 7,000.00 7,000.00
13.05 LIMPIEZA GENERAL DE LA OBRA GLB 1.00 1,684.54 1,684.54 1,684.54
13.06 CAPACITACION DE BENEFICIARIOS GLB 1.00 6,000.00 6,000.00 6,000.00
13.07 FLETE TERRESTRE GLB 1.00 349,562.75 349,562.75 349,562.75

% DE EJECUCION MENSUAL 6.09% 5.56% 6.61% 15.46% 21.43% 26.25% 10.30% 8.31%
COSTO DIRECTO S/. 9,389,027.81 571,465.42 521,881.27 621,007.99 1,451,654.31 2,012,067.10 2,464,257.91 966,698.19 779,995.61
COSTO INDIRECTO (GG ) S/. 704,579.47 42,884.40 39,163.46 46,602.21 108,936.29 150,991.26 184,924.95 72,543.79 58,533.10
UTILIDADES (UTI (8 % CD) ) S/. 751,122.22 45,717.23 41,750.50 49,680.64 116,132.34 160,965.37 197,140.63 77,335.85 62,399.65

SUB TOTAL S/. 10,844,729.50 660,067.05 602,795.23 717,290.84 1,676,722.94 2,324,023.73 2,846,323.49 1,116,577.84 900,928.35

IGV S/. 1,952,051.31 118,812.07 108,503.14 129,112.35 301,810.13 418,324.27 512,338.23 200,984.01 162,167.10

PRESUPUESTO DE OBRA S/. 12,796,780.81 778,879.12 711,298.37 846,403.20 1,978,533.07 2,742,348.00 3,358,661.72 1,317,561.85 1,063,095.46

SUPERVISIÓN - SUPV (2.35 % CD) S/. 216,652.00


GASTOS ADMINISTRATIVOS - GA (1.01 % CD) S/. 86,785.00
E.T. - EXPEDIENTE TÉCNICO S/. 254,065.70
PRESUPUESTO TOTAL DEL PROYECTO S/. 13,354,283.51