Escolar Documentos
Profissional Documentos
Cultura Documentos
December 2017
Jointly Prepared by
PUBLIC WORKS DEPARTMENT
(Roads and Bridges)
and
Manipur Remote Sensing Application Centre(MARSAC)
Government of Manipur
Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre
Page 0|5
Effective use of Space Technology Based Tools in Public Works Department(R&B)
DOCUMENT PREPARED BY
Team MARSAC
1. L. Surjit Singh (Scientist )
2. L. Ramananda Singh (Scientist )
The Public Works Department is headed by the Chief Engineer with Headquarters at
Imphal. Works and matters regarding Planning, Construction & Monitoring, and Inter-
State Connectivity for the entire State and also the entire establishments of PWD are
controlled by the Chief Engineer. The Chief Engineer who is the head of the Department is
assisted by 1(one) Chief Engineer (Building), 3(three) Addl. Chief Engineers and 8 (eight)
Superintending Engineers at senior level.
The Chief Engineer is also assisted by one Senior Architect in the matter of design &
drawing. All the matter relating to accounts and Court cases, the Financial Adviser and the
Legal Adviser assist the Chief Engineer. There are 33 working Divisions in the
Department. Every District has a minimum of one Divisional Office for executing the works
pertaining to the P.W.D. Jiribam Sub-Division has one full-fledged Division. 6 (six)
Divisions have been assigned for taking up works related with PMGSY exclusively.
The State of Manipur having a total area of 22.327 sq km. is mountainous except about
9% of the area which forms the valley portion of the State comprising of four districts,
namely Imphal East, Imphal West, Bishnupur and Thoubal. The Road Transport is the only
means of communication for development of the State as there are no inland Waterways,
Railways and Ropeways. All the development activities depend entirely on the road
transport facilities. The total length of roads in Manipur by the end of March 2010 including
National Highways, NEC, BRTF & other Roads is 12628 Km.
5.0 Brief details of the meeting with the Department and its outcome
(MARSAC to fill this column)
A preparatory workshop on “Promoting Space Technology Base Tools and
Applications in e-governance & Development” was held on 15th September,
2016 with Special Secretary (Sc. & Tech.) Govt. of Manipur in the Chair. The
workshop was attended by 25 nos. of Nodal Officers from different line
departments of the State. As per the advancement of technology the needs
for application of modern Space based tools in various development projects
and Identifying the key areas was discovered. The Departments were asked
to identify the key areas for effective application of the technology.
Preparation of DPR for all the new roads will be much easier with less
human power and less cost. The road alignment will be better and estimate
will be more accurate. Managing of road maintenance will be regulated as
per the utility and interval. The huge amount of information related to
transport infrastructure in the state could be put together for its most efficient
utilization in planning, design, construction, maintenance.
To investigate sub-
Investigation and survey of
surface conditions and
Geotechnical for the
materials III-B
construction of new roads.
The objective to
Managing Road Maintenance
explore the potential of
Using Geographic Information
GIS in capturing,
System Application. storing, updating, III-D
retrieving, displaying
and printing data to
Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre
Page 6|5
Effective use of Space Technology Based Tools in Public Works Department(R&B)
Annexure III-A
Total Total
Category Total un-surface
surfaced length
NH 830 0.00 830
SH 1207 0.00 1207
MDR 1447 288.9 1735.9
ODR 1791 1957 3748
UR 398.5 60.8 459.3
TR 466 469.8 935.8
VR 1385 3107 4492
DDR 67.5 901.8 969.3
Total length 7592 6785.3 14377.3
1.6 Deliverables :
GIS based road information system integrating spatial and non spatial data
developed with customized tools for updating/modification of the data and for
querying and report generation.
Generation of detailed road map for use in planning and developmental purpose.
To establish a database of roads and bridges for planning, prioritizing works for up-
gradation/ maintenance
Replacing existing map by a more detailed road map.
To carry out analysis of road network system in the State.
Road Information to be made available at Central location/data centre
/web server for easy access of information when needed for road users,
administrations, engineering and technical staffs.
Quick exchange of map data and facility to view query results on the map to help
taking decisions quickly
To leverage the advances in IT for developing better management solutions for road
network.
4. Capacity building
5. GPS handheld
6. Miscellaneous
Total
Annexure III-B
2. Title of the Project / Activity:
Carrying out a comprehensive geological survey to produce a detailed statewide
geological map database.
Satellite imagery
Total Total
Category Total un-surface
surfaced length
NH 830 0.00 830
SH 1207 0.00 1207
MDR 1447 288.9 1735.9
ODR 1791 1957 3748
UR 398.5 60.8 459.3
TR 466 469.8 935.8
VR 1385 3107 4492
DDR 67.5 901.8 969.3
Total length 7592 6785.3 14377.3
2.6 Deliverables:
Helps in optimizing site conditions for construction projects, and conserving natural
resources.
To check stability of natural slopes.
Design of earthworks and structural foundation
Areas prone to geologic hazards such as as landslides, earthquake fault zones,
areas susceptible to liquifaction, historic flood zones etc. could be identified and
thus making wise land use planning and safe engineering decisions.
2.7 Timeline and manpower:
Timeline: 1 -1. 1/2 years.
Manpower: 2 Project Scientist and 6 project Assistant.
Annexure III-C
3.4 Scope of Space Based Inputs: Inputs of road components were able
identified as per their locations.
Total Total
Category Total un-surface
surfaced length
NH 830 0.00 830
SH 1207 0.00 1207
MDR 1447 288.9 1735.9
ODR 1791 1957 3748
UR 398.5 60.8 459.3
TR 466 469.8 935.8
VR 1385 3107 4492
DDR 67.5 901.8 969.3
Total length 7592 6785.3 14377.3
3.6 Deliverables :
Identify major gaps in the road network.
Help in determining repair and maintenance priorities across that road network.
For instance most heavily trafficked roads should receive priority for full routine and
periodic maintenance.
.Estimate alternative route accessibility.
To select the optimal route between two locations.
Determine the distance of each village from various types of roads/access to road.
Annexure III-D
4. Title of the Project / Activity:
Implementation of Geographic Information System (GIS) Application in the
Maintenance Management of Roads.
Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre
P a g e 15 | 5
Effective use of Space Technology Based Tools in Public Works Department(R&B)
Total Total
Category Total un-surface
surfaced length
NH 830 0.00 830
SH 1207 0.00 1207
Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre
P a g e 16 | 5
Effective use of Space Technology Based Tools in Public Works Department(R&B)
4.6 Deliverables :
Generation of Road maintenance indicator map on the basis of priority and needs
Maintain roads and other assets in optimum condition and maximise the benefits to
its users.
Enable fast data access of road database with higher data accuracy and
consistency of data maintained.
Promoting data sharing to other end-users and generation of map ensuring secure
and better organized roads.
Create a Spatial Decision Support System (SDSS) for the maintenance
management of roads.
Identify and display sections of roads in deplorable state using the condition score.
Prioritise maintenance work by considering strategic importance, condition and
traffic volume and recommend maintenance activities for the affected sections in
the network.
Annexure III-E
5. Title of the Project / Activity:
Study of Road Alignment and Gradients.
Total Total
Category Total un-surface
surfaced length
NH 830 0.00 830
SH 1207 0.00 1207
MDR 1447 288.9 1735.9
ODR 1791 1957 3748
UR 398.5 60.8 459.3
TR 466 469.8 935.8
VR 1385 3107 4492
DDR 67.5 901.8 969.3
Total length 7592 6785.3 14377.3
5.6 Deliverables:
Generation of comprehensive road map,re-alignment of all existing roads and
future road plans.
To find the most economical alignment connecting two given end points based on
topography, socioeconomic factors and environmental impacts, while satisfying a
set of design and operational constraints using GIS and remotesensing technology
To ensure roads are properly planned, constructed and maintained in order for easy
access, smooth transport, safety, comfort and economy on vehicle operations
To construct proper drainage system.
Access to roads with minimum number of sharp curves and as far as possible and
steeper gradients.
5.7 Timeline and manpower:
Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre
P a g e 19 | 5
Effective use of Space Technology Based Tools in Public Works Department(R&B)
Timeline: 2 year.
Manpower: 2 Project Scientist and 6 project Assistant.
Annexure III-F
6. Title of the Project / Activity:
Development of Real time Road monitoring on progress of work.
Real time access to the status/progress of work; also detecting the quality of work.
Total Total
Category Total un-surface
surfaced length
NH 830 0.00 830
SH 1207 0.00 1207
MDR 1447 288.9 1735.9
ODR 1791 1957 3748
UR 398.5 60.8 459.3
TR 466 469.8 935.8
VR 1385 3107 4492
DDR 67.5 901.8 969.3
Total length 7592 6785.3 14377.3
6.6 Deliverables :
Generation of High-quality spatial and non-spatial data of the road (either stretches,
junctions or roundabouts, or a combination of them all).
Allows frequent revisits of each point on earth surface.
Annexure III-G
The bridge maintenance and management practices in India vary from Department to Department
or State to State. No Indian State has a comprehensive management system consisting of various
components viz. Inventory of bridges, Inspection and assessment of condition of bridges, Scientific
analysis and bridge maintenance/repair needs, Assessment of requirement of funds at National/
State/ Project level, Maintenance scheduling, Identifying and prioritization of rehabilitation, Regular
performance monitoring, Maintaining and constantly updating the Data Base, etc
Creating a road database on the different attributes such as Road Type, Road
Name, Road Quality, Road Status, Road Scheme, date of completion etc.
Collection and authentication of non-spatial data.
Total Total
Category Total un-surface
surfaced length
NH 830 0.00 830
SH 1207 0.00 1207
MDR 1447 288.9 1735.9
ODR 1791 1957 3748
UR 398.5 60.8 459.3
TR 466 469.8 935.8
VR 1385 3107 4492
DDR 67.5 901.8 969.3
Total length 7592 6785.3 14377.3
1.6 Deliverables :
Replacing existing map by a more detailed road map.
To establish a database of roads and bridges for planning, prioritizing works for up-
gradation/ maintenance.
Generation of detailed road map for use in planning and developmental purpose.
To carry out analysis of road network system in the State.
Road Information to be made available at Central location for easy access of
information when needed.
To leverage the advances in IT for developing better management solutions for road
network.