Escolar Documentos
Profissional Documentos
Cultura Documentos
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Revision: 0A Status: IFR
Document Type: CAL System / Subsystem: Discipline: ELE Rev. Date:
ELECTRICAL SYSTEM
GROUNDING CALCULATION
REVISION TABLE
REVISIONS ATTACHMENTS
PAGES
REVISIONS
PAGES
REMARKS REMARKS
ATT
A B C D E
A B C D E
REVISIONS
EXHIBIT
PAGES
REMARKS
A B C D E
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Revision: 0A Status: IFR
Document Type: CAL System / Subsystem: Discipline: ELE Rev. Date:
1. GENERAL......................................................................................................................... 4
2. REFERENCES..................................................................................................................4
3. ABBREVIATION................................................................................................................4
4. SCOPE.............................................................................................................................. 5
4.1 Electrical system neutral grounding..........................................................................5
4.2 Electrical safety grounding........................................................................................5
4.3 Electrostatic grounding.............................................................................................5
5. GROUNDING CALCULATION PARAMETER...................................................................5
5.1 Soil resistivity............................................................................................................ 5
5.2 Grounding conductor................................................................................................5
5.3 Grounding electrode.................................................................................................6
5.4 Tolerable step and touch voltage..............................................................................7
6. GROUNDING CALCULATION ANALYSIS RESULT..........................................................7
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Revision: 0A Status: IFR
Document Type: CAL System / Subsystem: Discipline: ELE Rev. Date:
1. GENERAL
The purpose of this document is to give guidance on the design of the grounding and
lightning protection system. The grounding system is provided for the safety of
personnel, equipment and the proper operation of the plant. The project specifications
and the applicable international standards are listed
This calculation will be revised whenever necessary to cope up with the changes on the
system components that may be caused by further engineering.
2. REFERENCES
The grounding and lightning protection system shall be design in accordance with the
applicable sections of the following standards and codes:
3. ABBREVIATION
kVA Kilo Volt Ampere
MVA Mega Volt Ampere
PF Power Factor
LF Load Factor
ACSR Aluminum conductors steel reinforced
GCB Generator Circuit Breaker
HV High Voltage
LV Low Voltage
LVSB Low Voltage Switch Board
MDB Main Distribution Board
SDB Sub Distribution Board
DB Distribution Board
Es Essential
E Emergency
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Revision: 0A Status: IFR
Document Type: CAL System / Subsystem: Discipline: ELE Rev. Date:
4. SCOPE
This document includes the following systems:
Resistivity Depth
Location Soil material
(ohm.m) (Feet)
Crush rock surface 2500 0.328
Soil 17.28 3.28
Switchyard
Soil 48.55 9.84
Area
Soil 32.9 16.4
Soil 26.67 22.96
2 LC k1 LC
R1 ln k2
LC a' A
c) IEEE 80-2000 Equation No. 55
R2
2 nR L R
ln
4 LR
1
2 k1 LR
2
nR 1
b A
d) IEEE 80-2000 Equation No. 56
2 LC k1 LC
Rm ln k 2 1
LC LR A
Where:
Rg = total system resistance (Ω)
R1 = ground resistance of grid conductors (Ω)
R2 = ground resistance of all ground rods (Ω)
Rm = mutual ground resistance between the group of grid conductors, R1,
and group of ground rods, R2 (Ω)
ρ = soil resistivity (Ω.m)
LC = total length of all connected grid conductors (m)
a’ = a 2h for conductors buried at depth h (m)
0.157
E touch 70 (1000 1.5C s s )
ts
Where,
Cs Surface layer derating factor
Ρs Surface layer resistivity crushed rock, 2500 Ohm.m
Ts Duration of shock for determining allowable body current. Table
10 IEEE 80 2000, 0.5 s
Cs calculated based on formula
0.09 1
s
Cs 1
2hs 0.09
Where
Ρ Soil resistivity Ohm.m
Hs Surface layer thickness in meter
Below is summary for the grounding calculation report, while complete ETAP calculation
shown on attachment-3
Grounding calculation
Area Grounding Total Touch Tolerable Step Tolerable
rod quantity resistance Potential touch Potential step
Value potential potential
Switchyard 720 0.64 ohm 584.5 595.9 1090.2 1891.5
Note: Above calculation used L-G short circuit data maximum 13 kA, X/R=8.5%
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Revision: 0A Status: IFR
Document Type: CAL System / Subsystem: Discipline: ELE Rev. Date:
ATTACHMENT 1
GROUNDING LAYOUT PLAN
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Revision: 0A Status: IFR
Document Type: CAL System / Subsystem: Discipline: ELE Rev. Date:
ATTACHMENT 2
ETAP 2D AND 3D MODEL
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Revision: 0A Status: IFR
Document Type: CAL System / Subsystem: Discipline: ELE Rev. Date:
ATTACHMENT 3
GROUNDING CALCULATION REPORT
Document Number
ELECTRICAL SYSTEM
GROUNDING CALCULATION
Revision: 0A Status: IFR
Document Type: CAL System / Subsystem: Discipline: ELE Rev. Date:
Sice data for bore hole 04 are not complete,data from bore hole 03 will be used in
this calculation.