Experience:
Overall 23 Years of excellent experience in both Project Execution and design.

Multi-function role Played from a Consultant, a Client Engineer and as Contractor


Engineer)

Presently working with M/s SPB-Projects and Consultancy Limited. Chennai as


Assistant Manager (Civil) from 2005 to 2017

Name of the Client Project Type Concerned Assignment


(Construction) Activity

M/s Emami Agrotech Industry 7.5MV TG Building and Boiler


Ltd Power Plant & house, RCC chimney up to
Haldia, West Bengal Boiler OSBL Pipe 80m height, coal handling
(Project start from 10/16 rack conveyor, Ash silo, cooling
To update) tower, compressor house
and Auxiliary equipment

Overall Plant layout,


Tender documents
including project cost,
Preparing Project
schedule preparing.
Details Drawing to be
scrutinized to meet the
design requirement.

M/s UNION PAPER Industry Power plant and External


MILL in DUBAI 2.5MV Power pipe rack and auxiliary
(project start from 06/17 Plant & OSBL equipment
to up today) Pipe rack
Name of the Client Project Type Concerned Assignment
(Construction) Activity

M/s VNT-19 Vietnam Industry Power plant and pipe rack Overall Plant layout,
(Project start from 03/16 Power Plant & Tender documents
To up today) OSBL Pipe including project cost,
rack Preparing Project
schedule preparing.
Details Drawing to be
M/s ADPMCL Abudhabi Industry for Paper machine, Power scrutinized to meet the
(PROJECT START FORM paper machine plant CFBC Boiler, Waste design requirement.
3/15 TO 12/16) & Power Plant Paper Plant and pipe rack.

M/s Industry for Paper Machine#4, Fiber Deputed and stationed


EMAMI PAPER MILLS paper machine treatment plant, Power at Emami Balasore
LTS – BALASORE ORISSA & Power Plant Boiler, TG, Waste Paper Construction site for co-
(PROJECT START FROM Plant, Weigh Parking, coordinating the project
26/12 TO 7/15) Effluent Treatment Plant, between client and
OSBL pipe rack, Road contractors for speedy
works for RCC and completion of project.
Bituminous. The scope includes
scheduled planning of
day-to-day, monthly
activities, monitoring
the quality of work as
per design, quality
inspection of all
materials, scrutinizing
of the contractors bills
including final
settlement.

M/s Industry for Refinery plant, Admin Deputed and stationed


EMAMI BIOTECH ltd – Oil refinery building, weigh Bridge, at Emami Biotech
NEW OIL REFINING Plant Boiler house, Warehouse, Construction site for co-
PLANT AT Crusher House, Cooling coordinating the project
KRISHNAPATNAM, tower, water treatment between client and
NELLORE, plant, Effluent treatment contractors for speedy
Andahrapradesh Dist. plant, Coal and husk completion of project.
(Project start from storage shed, Road and The scope includes
01/13 to 23/12) drainage works scheduled planning of
day-to-day, monthly
activities, monitoring
the quality of work as
per design, quality
inspection of all
materials, scrutinizing
of the contractors bills
including final
settlement.

M/s Industry for Fibre line Building, Chipper Overall Plant layout,
BILT GRAPHIC PAPER Paper machine Plant, Recovery Boiler, Tender documents
PRODUCTSLTD- & Power Boiler Evaporator plant, including project cost,
BALLARPUR UNIT- Recausticising plant, Preparing Project
Gujarat. Effluent treatment plant schedule preparing.
(Project start from Details Drawing to be
08/2011 to 11/2012 scrutinized to meet the
End) design requirement.
Name of the Client Project Type Concerned Assignment
(Construction) Activity

M/s Industry for Recausticising Plant, Overall Plant layout,


Sabah Forest Industries, Power Plant Recovery plant, Evaporator Tender documents
Malaysia (Project start & Paper plant, Power Boiler, Yard including project cost,
from 03/2010 to Industry Pipe rack Preparing Project
07/2011 End) schedule preparing.
Details Drawing to be
scrutinized to meet the
design requirement.

M/s. Industry Fibreline Cooking plant,


Tamilnadu Newsprint Power Plant Backwater integration, Coal Deputed and stationed
and papers Ltd, Fire Boiler-5, Thermal at Tamilnadu Newsprint
Kagithapuram Karur, Generation Plant, Auxiliary Construction site for co-
Tamilnadu. Equipment. coordinating the project
(Project start from between client and
10/2008 to 08/2010 End) contractors for speedy
completion of project.
The scope includes
scheduled planning of
day-to-day, monthly
activities, monitoring
the quality of work as
per design, quality
inspection of all
materials, scrutinizing
of the contractors bills
including final
settlement

M/s Industry Coal Fire Boiler, Thermal Overall Plant layout,


West Coast Paper Mill Power Plant Generation Plant & Tender documents
Karnataka. Auxiliaries, (ETP- Effluent including project cost,
(Project start from Treatment Plant) Preparing Project
03/2007 to 03/2008 schedule preparing.
End) Details Drawing to be
scrutinized to meet the
design requirement.

M/s. Industry Paper Paper Mill, DM Plant, Clo2, Overall Plant layout,
Abhishek Industries Ltd machine & Lime interplanetary, Tender documents
Punjab. Power Plant Coal Fire Boiler, Thermal including project cost,
(Project start from Generation Plant, Fibreline, Preparing Project
09/2006 to 06/2008 Cooking plant, Chipper schedule preparing.
End) House, Silo’s, Chemical Details Drawing to be
Plant, (WTP-Water scrutinized to meet the
Treatment Plant), Recover design requirement.
Boiler

M/s Industry Emami Housing Colony and 1. Drawing clarification


VICI Engineering Guest House Building and Identify potential
Consultancy Pvt Ltd. problems in as per site
Chennai, as Drawing and Problem Solving-
Checker (Civil) Period Directly correlate with
from 2003 to 2005 – 2 creative abilities.
Years
Name of the Client Project Type Concerned Assignment
(Construction) Activity

M/s PWD Works District Collect Building and Supervising of


PSK Engineering Administration Building structural design of
Construction ltd, steel and concrete and
Villupuram as Site Earth work Marking,
Engineer (Civil) assessing of drawing
period from 1999 to works and preparing
2003 – 3 Years. estimate of civil works

M/s PWD Works NH-45 Road, Maintenance Supervising of NH 45


PWD Highways works Road in the work of
Department WBM laying and center
Villupuram, as Site line marking, leveling
Engineer (Civil) survey, quality control
period from 1998 to and labor maintain.
1999 – 1 Year

M/s Residential Multistory Building and Building and preparing


Monarch Property & Building Commercial complex Estimate, Structural
Developers Pvt. Ltd, works. design mix of Concrete
as Technical Assistant Maintaining the quality,
(Civil) Period: 1996 to assessing of drawing
1998 – 2 Years works and labor
maintain.

M/s Sugar Industry Factory Maintenance Supervising of Factory


National Co-operative works. maintenance Work,
Sugar Mill Ltd as preparing of drawings,
Technical Assistant and Preparing of
(Civil) Period: 1995 to estimate and bills.
1996 – 1 Year

M/s Office Building Administrative Building and Supervising, Center


Agricultural Stock Godown, Line Marking the
marketing Board as Maintenance Repair work Building, Assessing of
Technical Assistant Drawing Estimate
(Civil) Period: Oct Preparing, Maintaining
1993 to 1995 – 2 the quality of work.
Years

Excellent Technical Skills:

 Good Exposure and understanding of the Engineering Drawings, Identify Potential


Problems
 Ability and understand the testing &Quality development life cycle and capable of
manually testing the applications and analyze the test results with respect to the
business process
 Good Exposure in priorities of Organization and influences factors. (like Custer, focus,
innovation, cost cutting measures and employer empowerment.
Potential Skills:
 Hands-on experience in Project review, code review, monitoring and control, Project
implementation and delivery
 Technical proficiency preferably Packages & Procedures, Reports, along with Query
Tuning.
 Having knowledge of investigation and problem-solving abilities.
 Having excellent team management skill to managing Resource related issues.

Soft Skills:

 Positive attitude-Generate lots of positive energy and spread goodwill within the Team.
 Problem solving-Directly correlate with creative abilities.
 Time management -Good planning for priority tasks to produce more production in less
time.
 Team spirit-Person success is defined by team's success. Willing to cooperate, sharing of
knowledge and willing to put team goals.

Technical Skills:
Understanding Engineering Drawings, Identify Potential Problems,Technical Issues
make Engineering Decisions with Excellent analytical
Soft skills:
Knowledge in MS OFFICE, AUTOCADD, MS PROJECT & STADD PRO

Education:
Degree in B. Tech Civil ENGINEERNING

Diploma in CIVIL ENGINEERING

Diploma in CONSTRUCTION MANAGEMENT

Personal Profile:

Date of Birth 31-05-1973 - Passport No: R 7287048

Marital Status : Married

Language Skill: English, Tamil & Telugu

Salary As per my experience and skill currently drawing Rs.45,000/Month


Rs 5,40,000/Annum

Signature

(BIRLA. D)

Você também pode gostar